SlideShare a Scribd company logo
1 of 16
Turnkey Projects
Somesh Gurbani
SYMMS
Roll no:.15
Contents
• What are Turnkey Projects
• Process of turnkey projects
• The Continental Group
• Turnkey service offerings by the Continental
Group
• Advantages of Turnkey Projects
• Dis-advantages of Turnkey Projects
What are Turnkey Projects?
It is a contract under which a firm agrees to
fully design, construct and equip a
manufacturing/ business/
service facility and turn
the project over to
the purchaser when it
is ready for operation.
Turnkey projects
It Refers to something that is ready for
immediate use, generally used in the
sale or supply of goods
or services.
Process of Turnkey projects
contractor
tender for the
project
• Wanted: who
is eligible and
what is the
best contract
execution
project delivery and
execution
One of the turnkey project company
The Continental Group
• The Continental group is India’s one of the leading
interior groups specializing in turnkey assignments
and interior solutions of the most advanced and
sophisticated variety.
• The history of Continental dates back to 1940s. A
small workshop initiated by Mr. Kailash Lamba has
now become a specialist in the global industry
providing complete solutions in turnkey and building
projects, interiors and furnishings.
• Presently operates with manufacturing units
employing over 300 employees. The strength of the
group lies in its ability to cater to the industry specific
needs within given timelines.
Areas in which the continental group
provides turnkey service
• Corporate
• Telecom
• Retail solutions
• Hospitality
• Health care
Corporate
• Requirement:
1. Combination of efficiency of our interiors along
with the designer sensibilities
2. Signature style
3. Supreme quality
Customers served in this sector are:
1.ESSAR Steel 2.Coke 3.Birla group
4.Mallaya’s 5.Ruai’s
6.Singapore high commision
Telecom
• Requirements :
1. Lot of expertise
2. Under pressure with a low tolerance and
high sensitivity
3. Service back up and failures
4. International standards
Customers served in this sector are:
1.Bharti Group 2.Spice telecom
3.Idea cellular 4. Tata telecom
Retail Solutions
• Requirements :
1. Innovative
2. Trend specific to the product
3. Highly commpetitive
 Customers served in this sector are:
1.Wills Lifestyle
2.The Mobile Store
Hospitality
• Requirement
Exceptional quality as well as designer innovation
Premium signature furnishing of the rooms
 Customers served in this sector are:
1.The Oberio’s 2. Taj Group
3.ITC Group
Health-care
• Requirement
• Formulating interiors with the highest efficiency and
lowest maintenance
• Most conducive to the hygienic environment
 Customers served in this sector are:
1.Max
2.Aasholk
Advantages
• Great way to earn economic returns from the
asset
• Contractor’s responsibility forces him to give the
good result
• Contactor has a fixed price
• Eliminates extra expenses
Dis-Advantages
• High in price
• No client interference
• Difficult to find the
specialist for particular
project
Turnkey projects

More Related Content

What's hot

International project appraisal
International project appraisalInternational project appraisal
International project appraisal
17somya
 
Human aspects of_prj_mgmt-unit_iv-part_3
Human aspects of_prj_mgmt-unit_iv-part_3Human aspects of_prj_mgmt-unit_iv-part_3
Human aspects of_prj_mgmt-unit_iv-part_3
2june2
 
Turnkey project
Turnkey projectTurnkey project
Turnkey project
zairanieto
 
FIDIC 2016 Day02-1010 Variations Under FIDIC Forms, Adrias Tan
FIDIC 2016 Day02-1010 Variations Under FIDIC Forms, Adrias TanFIDIC 2016 Day02-1010 Variations Under FIDIC Forms, Adrias Tan
FIDIC 2016 Day02-1010 Variations Under FIDIC Forms, Adrias Tan
Adrias TAN
 

What's hot (20)

Engineering, procurement and construction (EPC) projects
Engineering, procurement and construction (EPC) projectsEngineering, procurement and construction (EPC) projects
Engineering, procurement and construction (EPC) projects
 
Project Management- Unit II
Project Management- Unit IIProject Management- Unit II
Project Management- Unit II
 
Competitive Bidding
Competitive BiddingCompetitive Bidding
Competitive Bidding
 
Analytical comparision of BOT,BOOT and PPP models
 Analytical comparision of BOT,BOOT and PPP models Analytical comparision of BOT,BOOT and PPP models
Analytical comparision of BOT,BOOT and PPP models
 
Project Management- Unit V
Project Management- Unit VProject Management- Unit V
Project Management- Unit V
 
International project appraisal
International project appraisalInternational project appraisal
International project appraisal
 
Build - Operate - Transfer
Build - Operate - TransferBuild - Operate - Transfer
Build - Operate - Transfer
 
Bolt(build own lease transfer) model
Bolt(build own lease transfer) modelBolt(build own lease transfer) model
Bolt(build own lease transfer) model
 
Types of contract
Types of contractTypes of contract
Types of contract
 
Bot(build operate transfer)
Bot(build operate transfer)Bot(build operate transfer)
Bot(build operate transfer)
 
time cost trade off
 time cost trade off time cost trade off
time cost trade off
 
Bot(build operate transfr)
Bot(build operate transfr)Bot(build operate transfr)
Bot(build operate transfr)
 
Generation & Screening of Project Idea
Generation & Screening of Project IdeaGeneration & Screening of Project Idea
Generation & Screening of Project Idea
 
Pre qualification stages and tender selection
Pre qualification stages and tender selectionPre qualification stages and tender selection
Pre qualification stages and tender selection
 
Project Financing
Project FinancingProject Financing
Project Financing
 
Human aspects of_prj_mgmt-unit_iv-part_3
Human aspects of_prj_mgmt-unit_iv-part_3Human aspects of_prj_mgmt-unit_iv-part_3
Human aspects of_prj_mgmt-unit_iv-part_3
 
Turnkey project
Turnkey projectTurnkey project
Turnkey project
 
FIDIC 2016 Day02-1010 Variations Under FIDIC Forms, Adrias Tan
FIDIC 2016 Day02-1010 Variations Under FIDIC Forms, Adrias TanFIDIC 2016 Day02-1010 Variations Under FIDIC Forms, Adrias Tan
FIDIC 2016 Day02-1010 Variations Under FIDIC Forms, Adrias Tan
 
Foreign trade financing.st
Foreign trade financing.stForeign trade financing.st
Foreign trade financing.st
 
Social Cost Benefit Analysis
Social Cost Benefit Analysis Social Cost Benefit Analysis
Social Cost Benefit Analysis
 

Viewers also liked

9 benefit to cost ratio method
9 benefit to cost ratio method9 benefit to cost ratio method
9 benefit to cost ratio method
Ali Juma Albahrani
 
BOT Presentation 2010
BOT Presentation 2010BOT Presentation 2010
BOT Presentation 2010
Megetime
 
The multinational enterprise
The multinational enterpriseThe multinational enterprise
The multinational enterprise
kamran
 

Viewers also liked (19)

Successful turnkey project design and flawless delivery
Successful turnkey project design and flawless deliverySuccessful turnkey project design and flawless delivery
Successful turnkey project design and flawless delivery
 
Kontrak ‘turnkey’
Kontrak ‘turnkey’Kontrak ‘turnkey’
Kontrak ‘turnkey’
 
Management contracts
Management contractsManagement contracts
Management contracts
 
9 benefit to cost ratio method
9 benefit to cost ratio method9 benefit to cost ratio method
9 benefit to cost ratio method
 
BOT Presentation 2010
BOT Presentation 2010BOT Presentation 2010
BOT Presentation 2010
 
Trade theories
Trade theoriesTrade theories
Trade theories
 
Entry strategies in international marketing
Entry strategies in international marketingEntry strategies in international marketing
Entry strategies in international marketing
 
Trade theory
Trade theoryTrade theory
Trade theory
 
Classical country-based trade theories and Modern Firm-based trade theories
Classical country-based trade theories and Modern Firm-based trade theoriesClassical country-based trade theories and Modern Firm-based trade theories
Classical country-based trade theories and Modern Firm-based trade theories
 
Public private partnerships
Public private partnershipsPublic private partnerships
Public private partnerships
 
BIOAVAILABILITY BIOEQUIVALENCE THERAPEUTIC INDEX
BIOAVAILABILITY BIOEQUIVALENCE THERAPEUTIC INDEXBIOAVAILABILITY BIOEQUIVALENCE THERAPEUTIC INDEX
BIOAVAILABILITY BIOEQUIVALENCE THERAPEUTIC INDEX
 
Understanding "BOT" projects
Understanding "BOT" projectsUnderstanding "BOT" projects
Understanding "BOT" projects
 
The multinational enterprise
The multinational enterpriseThe multinational enterprise
The multinational enterprise
 
Therapeutic Index of drugs and Factors modifying drug action
Therapeutic Index of drugs and Factors modifying drug action Therapeutic Index of drugs and Factors modifying drug action
Therapeutic Index of drugs and Factors modifying drug action
 
Presentation Public Private Partnership (PPP)
Presentation Public Private Partnership (PPP) Presentation Public Private Partnership (PPP)
Presentation Public Private Partnership (PPP)
 
Strategic Alliance
Strategic AllianceStrategic Alliance
Strategic Alliance
 
portfolio investment
portfolio investmentportfolio investment
portfolio investment
 
PPP Presentation
PPP PresentationPPP Presentation
PPP Presentation
 
Transnational corporations
Transnational corporationsTransnational corporations
Transnational corporations
 

Similar to Turnkey projects

Utrana corporate presentation
Utrana corporate presentationUtrana corporate presentation
Utrana corporate presentation
cols.sam
 

Similar to Turnkey projects (20)

Olive laptop
Olive laptopOlive laptop
Olive laptop
 
Anil sharma cmd amrapali group
Anil sharma cmd amrapali groupAnil sharma cmd amrapali group
Anil sharma cmd amrapali group
 
Channel-Management
Channel-ManagementChannel-Management
Channel-Management
 
Tega Partnerships in Practice
Tega Partnerships in PracticeTega Partnerships in Practice
Tega Partnerships in Practice
 
Excellent business opportunity with ultrafresh modular kitchen
Excellent business opportunity with ultrafresh modular kitchenExcellent business opportunity with ultrafresh modular kitchen
Excellent business opportunity with ultrafresh modular kitchen
 
VTL Group Overview
VTL Group OverviewVTL Group Overview
VTL Group Overview
 
Engineer plus Channel Management
Engineer plus Channel ManagementEngineer plus Channel Management
Engineer plus Channel Management
 
Tega Corporate Presentation
Tega Corporate PresentationTega Corporate Presentation
Tega Corporate Presentation
 
TITAN CASE STUDY.pptx
TITAN CASE STUDY.pptxTITAN CASE STUDY.pptx
TITAN CASE STUDY.pptx
 
Wooden Flooring Company in India - Square Foot
Wooden Flooring Company in India - Square FootWooden Flooring Company in India - Square Foot
Wooden Flooring Company in India - Square Foot
 
Case study on_samsung
Case study on_samsungCase study on_samsung
Case study on_samsung
 
distribution and channel management
distribution and channel managementdistribution and channel management
distribution and channel management
 
Utrana corporate presentation
Utrana corporate presentationUtrana corporate presentation
Utrana corporate presentation
 
Automotive Insulations Limited - the digital journey, Paul Walker
Automotive Insulations Limited - the digital journey, Paul WalkerAutomotive Insulations Limited - the digital journey, Paul Walker
Automotive Insulations Limited - the digital journey, Paul Walker
 
Sleek company presentation
Sleek company presentationSleek company presentation
Sleek company presentation
 
The Dynamic Workspace: An Emaar story
The Dynamic Workspace: An Emaar storyThe Dynamic Workspace: An Emaar story
The Dynamic Workspace: An Emaar story
 
Amera Engineering Services Presentations
Amera Engineering Services PresentationsAmera Engineering Services Presentations
Amera Engineering Services Presentations
 
Fdocuments.in venkys ppt
Fdocuments.in venkys pptFdocuments.in venkys ppt
Fdocuments.in venkys ppt
 
Titan watches: A brand innovation case study
Titan watches: A brand innovation case studyTitan watches: A brand innovation case study
Titan watches: A brand innovation case study
 
Saudi Jawraa profile v8
Saudi Jawraa profile v8Saudi Jawraa profile v8
Saudi Jawraa profile v8
 

Recently uploaded

Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Riyadh +966572737505 get cytotec
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
alinstan901
 

Recently uploaded (20)

Continuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningContinuous Improvement Infographics for Learning
Continuous Improvement Infographics for Learning
 
Discover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdfDiscover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdf
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
situational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Ssituational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima S
 
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg PartnershipUnlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
 
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdfImagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
 
Peak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian DugmorePeak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian Dugmore
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote SpeakerLeadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
 
Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
Continuous Improvement Posters for Learning
Continuous Improvement Posters for LearningContinuous Improvement Posters for Learning
Continuous Improvement Posters for Learning
 
Disrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdfDisrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdf
 
Becoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette ThompsonBecoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette Thompson
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 

Turnkey projects

  • 2. Contents • What are Turnkey Projects • Process of turnkey projects • The Continental Group • Turnkey service offerings by the Continental Group • Advantages of Turnkey Projects • Dis-advantages of Turnkey Projects
  • 3. What are Turnkey Projects? It is a contract under which a firm agrees to fully design, construct and equip a manufacturing/ business/ service facility and turn the project over to the purchaser when it is ready for operation.
  • 4. Turnkey projects It Refers to something that is ready for immediate use, generally used in the sale or supply of goods or services.
  • 5. Process of Turnkey projects contractor tender for the project • Wanted: who is eligible and what is the best contract execution project delivery and execution
  • 6. One of the turnkey project company The Continental Group
  • 7. • The Continental group is India’s one of the leading interior groups specializing in turnkey assignments and interior solutions of the most advanced and sophisticated variety. • The history of Continental dates back to 1940s. A small workshop initiated by Mr. Kailash Lamba has now become a specialist in the global industry providing complete solutions in turnkey and building projects, interiors and furnishings. • Presently operates with manufacturing units employing over 300 employees. The strength of the group lies in its ability to cater to the industry specific needs within given timelines.
  • 8. Areas in which the continental group provides turnkey service • Corporate • Telecom • Retail solutions • Hospitality • Health care
  • 9. Corporate • Requirement: 1. Combination of efficiency of our interiors along with the designer sensibilities 2. Signature style 3. Supreme quality Customers served in this sector are: 1.ESSAR Steel 2.Coke 3.Birla group 4.Mallaya’s 5.Ruai’s 6.Singapore high commision
  • 10. Telecom • Requirements : 1. Lot of expertise 2. Under pressure with a low tolerance and high sensitivity 3. Service back up and failures 4. International standards Customers served in this sector are: 1.Bharti Group 2.Spice telecom 3.Idea cellular 4. Tata telecom
  • 11. Retail Solutions • Requirements : 1. Innovative 2. Trend specific to the product 3. Highly commpetitive  Customers served in this sector are: 1.Wills Lifestyle 2.The Mobile Store
  • 12. Hospitality • Requirement Exceptional quality as well as designer innovation Premium signature furnishing of the rooms  Customers served in this sector are: 1.The Oberio’s 2. Taj Group 3.ITC Group
  • 13. Health-care • Requirement • Formulating interiors with the highest efficiency and lowest maintenance • Most conducive to the hygienic environment  Customers served in this sector are: 1.Max 2.Aasholk
  • 14. Advantages • Great way to earn economic returns from the asset • Contractor’s responsibility forces him to give the good result • Contactor has a fixed price • Eliminates extra expenses
  • 15. Dis-Advantages • High in price • No client interference • Difficult to find the specialist for particular project