A turnkey project refers to a project in which
clients pay contractors to design and construct
new facilities and train personnel.

Example: Industrial companies that specialize in
complex production technologies normally use
turnkey projects as an entry strategy.
In projects "turnkey" a contractor agrees to
 deliver every detail of the project to a
 foreign client, including the training of
 operating personnel. Upon completion of
 the contract, the foreign client receives the
 "key" to a plant ready for its overall
 performance.
Other services that are always present in
        contracts "turnkey", are:
       The supply of materials and machinery transport
       thereof.


       The completion of civil works.



       Installation and assembly, and the set-up and
       operation of the proposed work.

       In certain instances, it is also possible to include
       staff training and technical assistance.
In the area of international trade as a
 consequence of technological advances, which
 better reflects the transformations in this sector
 is the method "turnkey".

With it disappears the traditional relationship
between customer (contractor), engineer and
contractor, for become replaced by a single
customer-contractor relationship, in which the
latter, with their traditional roles, project design
assumes.
STANDINGS
1. When used in the same project:

    Contracts "turnkey" Mixed:
      When part of the project is traditional and the other is turnkey.

    Contracts "turnkey" partial:
      When hiring traditionally entire project but part outsources turnkey.

    Contracts semi "turnkey“:
      When the contractor holds several contracts being
    one turnkey contractor responsible latter coordinating other contracts.
2. ​Based on the difference in practice content:

 Contracts "turnkey" single or partial:


 Contracts "turnkey" complete or classic:


 Contracts "turnkey" wide:
CHARACTERISTICS
The two essential features of the contracts "turnkey“

     a) the merger of the missions of conception
        and execution of the work in one person.

      b) the overall obligation assumed by the
        contractor to the client to deliver a work
        fully equipped and in perfect working
        order.
CONTRACT CHARACTERISTICS

 It involves holding one single contract made
  between the client and the contractor.

 The contractor assumes the design and execution
  of the work

 Gives the contractor the right to make changes in
  their plans, at their own cost and risk.
PHASES:
1. Contract preparation: in determining the client's
   objectives, the contractor is selected and
   negotiated contract terms with him.



2. Execution of the contract that includes the start of
  work, the progressive development of the work and
  its full implementation, operation and acceptance.
In the preparation phase of the contract the
  engineer's role is limited to advising the client
  as:
a) the preparation of documents for invitation
    to tenders.

b) the comparison and selection of offers.

c) in some cases, develop overall project
   specifications are given where technical
   conditions required by the customer.
As contracts "turnkey" detailed description of the work takes place
during the execution of the contract, in such a situation are certain
legal consequences:

             Indeterminacy of the object of the contract at the time of
             awarding the contract, which is to meet standards through


             rights granted to the contractor to modify the project provided
             that it is informed, review or approve such changes, and
             provided that such amendments do not alter the technical
             guarantees and good work.

             The contractor shall be responsible for any possible gaps and
             omissions that may vitiate the project and the client's rights.
ADVANTAGES
        The advantages of these
       projects is that they are a
     great way to earn economic
      returns from the asset and
    provide the ability to leverage
       the skills of technological
     processes in countries where
     research and development.
DISADVANTAGES
 The      company      is a
   contractor will not have a
   long-term business in the
   foreign country.

 Can create a competitor.

 Competitive advantage is
  the technology may also
  be     the    competitive
  advantage of current or
  potential competitors.
Turnkey project

More Related Content

What's hot

Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contract
guestdb5e498
 
Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)
Mohd. Ikhwan
 

What's hot (20)

Construction Claims
Construction ClaimsConstruction Claims
Construction Claims
 
Presentation on Cost Overrun ( Project Management)
Presentation on Cost Overrun ( Project Management)Presentation on Cost Overrun ( Project Management)
Presentation on Cost Overrun ( Project Management)
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contract
 
Construction claims, disputes and project closure
Construction claims, disputes and project closureConstruction claims, disputes and project closure
Construction claims, disputes and project closure
 
Pre qualification stages and tender selection
Pre qualification stages and tender selectionPre qualification stages and tender selection
Pre qualification stages and tender selection
 
Types of contract
Types of contractTypes of contract
Types of contract
 
Tender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement GuideTender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement Guide
 
Contracts and-tenders
Contracts and-tendersContracts and-tenders
Contracts and-tenders
 
Price variation in works contracts
Price variation in works contractsPrice variation in works contracts
Price variation in works contracts
 
Unit 10. CONTRACT CLAUSES
Unit 10. CONTRACT CLAUSESUnit 10. CONTRACT CLAUSES
Unit 10. CONTRACT CLAUSES
 
Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)
 
Advance Payments in Works
Advance Payments in WorksAdvance Payments in Works
Advance Payments in Works
 
Project management in construction
Project management in constructionProject management in construction
Project management in construction
 
Fidic contract
Fidic contract Fidic contract
Fidic contract
 
Tendering documentation
Tendering documentationTendering documentation
Tendering documentation
 
Epc contracts.
Epc contracts.Epc contracts.
Epc contracts.
 
Cost estimates & contract documents ce224 pdf
Cost estimates & contract documents   ce224 pdfCost estimates & contract documents   ce224 pdf
Cost estimates & contract documents ce224 pdf
 
Lecture 4 - selection of contract forms
Lecture 4 - selection of contract formsLecture 4 - selection of contract forms
Lecture 4 - selection of contract forms
 
Fidic Form of Contract.
Fidic Form of Contract.Fidic Form of Contract.
Fidic Form of Contract.
 
Construction Claims Explained
Construction Claims ExplainedConstruction Claims Explained
Construction Claims Explained
 

Viewers also liked

Turnkey project
Turnkey projectTurnkey project
Turnkey project
zairanieto
 
International Entrepreneurship - Entry Mode Strategies
International Entrepreneurship - Entry Mode StrategiesInternational Entrepreneurship - Entry Mode Strategies
International Entrepreneurship - Entry Mode Strategies
SenthilKumar Mukund
 
Licensing entry mode
Licensing entry modeLicensing entry mode
Licensing entry mode
Yina Jas
 
Licensing & franchising
Licensing & franchisingLicensing & franchising
Licensing & franchising
Silvia Aguilar
 
The multinational enterprise
The multinational enterpriseThe multinational enterprise
The multinational enterprise
kamran
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
AYM1979
 

Viewers also liked (20)

Successful turnkey project design and flawless delivery
Successful turnkey project design and flawless deliverySuccessful turnkey project design and flawless delivery
Successful turnkey project design and flawless delivery
 
Turnkey project
Turnkey projectTurnkey project
Turnkey project
 
International Entrepreneurship - Entry Mode Strategies
International Entrepreneurship - Entry Mode StrategiesInternational Entrepreneurship - Entry Mode Strategies
International Entrepreneurship - Entry Mode Strategies
 
Rkil it,security & corporate presentation
Rkil it,security & corporate presentationRkil it,security & corporate presentation
Rkil it,security & corporate presentation
 
Frenchising
FrenchisingFrenchising
Frenchising
 
Licensing entry mode
Licensing entry modeLicensing entry mode
Licensing entry mode
 
Unit 2 international business 6th semester bbm notes pdf
Unit 2   international business 6th semester bbm notes pdfUnit 2   international business 6th semester bbm notes pdf
Unit 2 international business 6th semester bbm notes pdf
 
Unit 4 international business 6th semester bbm notes pdf
Unit 4   international business 6th semester bbm notes pdfUnit 4   international business 6th semester bbm notes pdf
Unit 4 international business 6th semester bbm notes pdf
 
Project report on saarc
Project report on saarcProject report on saarc
Project report on saarc
 
Association of Southeast Asian Nations (ASEAN)
Association of Southeast Asian Nations (ASEAN)Association of Southeast Asian Nations (ASEAN)
Association of Southeast Asian Nations (ASEAN)
 
Trade theories
Trade theoriesTrade theories
Trade theories
 
ASEAN
ASEANASEAN
ASEAN
 
Trade theory
Trade theoryTrade theory
Trade theory
 
Classical country-based trade theories and Modern Firm-based trade theories
Classical country-based trade theories and Modern Firm-based trade theoriesClassical country-based trade theories and Modern Firm-based trade theories
Classical country-based trade theories and Modern Firm-based trade theories
 
WTO - BRICS Overview
WTO - BRICS OverviewWTO - BRICS Overview
WTO - BRICS Overview
 
SAARC
SAARCSAARC
SAARC
 
Understanding "BOT" projects
Understanding "BOT" projectsUnderstanding "BOT" projects
Understanding "BOT" projects
 
Licensing & franchising
Licensing & franchisingLicensing & franchising
Licensing & franchising
 
The multinational enterprise
The multinational enterpriseThe multinational enterprise
The multinational enterprise
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 

Similar to Turnkey project

Ethics and Integated Design-Build services 062916
Ethics and Integated Design-Build services 062916Ethics and Integated Design-Build services 062916
Ethics and Integated Design-Build services 062916
George Wilkinson
 
Pp 1-report-complete
Pp 1-report-completePp 1-report-complete
Pp 1-report-complete
Yong Sy
 
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
Praveen Premkumar
 

Similar to Turnkey project (20)

Ethics and Integated Design-Build services 062916
Ethics and Integated Design-Build services 062916Ethics and Integated Design-Build services 062916
Ethics and Integated Design-Build services 062916
 
05 Contract Management.pptx . DEFINITION
05 Contract Management.pptx . DEFINITION05 Contract Management.pptx . DEFINITION
05 Contract Management.pptx . DEFINITION
 
Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016
 
Matrix207
Matrix207Matrix207
Matrix207
 
Professional Practice
Professional PracticeProfessional Practice
Professional Practice
 
Pp 1-report-complete
Pp 1-report-completePp 1-report-complete
Pp 1-report-complete
 
PROJECT CONTRACTS.pptx
PROJECT CONTRACTS.pptxPROJECT CONTRACTS.pptx
PROJECT CONTRACTS.pptx
 
Fi dic silver book
Fi dic silver bookFi dic silver book
Fi dic silver book
 
TURNKEY PROJECT.pptx
TURNKEY PROJECT.pptxTURNKEY PROJECT.pptx
TURNKEY PROJECT.pptx
 
Pp1 assignment
Pp1 assignmentPp1 assignment
Pp1 assignment
 
Pp1 assignment
Pp1 assignmentPp1 assignment
Pp1 assignment
 
Chapter 1 [compatibility mode]
Chapter 1 [compatibility mode]Chapter 1 [compatibility mode]
Chapter 1 [compatibility mode]
 
Chapter 1 [compatibility mode]
Chapter 1 [compatibility mode]Chapter 1 [compatibility mode]
Chapter 1 [compatibility mode]
 
Professional Practice 1 Proposal Report
Professional Practice 1 Proposal ReportProfessional Practice 1 Proposal Report
Professional Practice 1 Proposal Report
 
projectclosure-rutik.pptx project management
projectclosure-rutik.pptx project managementprojectclosure-rutik.pptx project management
projectclosure-rutik.pptx project management
 
TOPIC2.pdf
TOPIC2.pdfTOPIC2.pdf
TOPIC2.pdf
 
Contract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment StructureContract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment Structure
 
Ch1 introduction
Ch1 introductionCh1 introduction
Ch1 introduction
 
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
 
Newsletter TE&A
Newsletter TE&ANewsletter TE&A
Newsletter TE&A
 

Recently uploaded

Recently uploaded (20)

Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Only Cash On Delivery Call Girls In Sikandarpur Gurgaon ❤️8448577510 ⊹Escorts...
Only Cash On Delivery Call Girls In Sikandarpur Gurgaon ❤️8448577510 ⊹Escorts...Only Cash On Delivery Call Girls In Sikandarpur Gurgaon ❤️8448577510 ⊹Escorts...
Only Cash On Delivery Call Girls In Sikandarpur Gurgaon ❤️8448577510 ⊹Escorts...
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
KALYANI 💋 Call Girl 9827461493 Call Girls in Escort service book now
KALYANI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowKALYANI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
KALYANI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 

Turnkey project

  • 1. TURNKEY PROJECT KELLY BUITRAGO ZAIRA NIETO PADILLA UNIVERSIDAD DE IBAGUE INTERNATIONAL BUSINESS I
  • 2. A turnkey project refers to a project in which clients pay contractors to design and construct new facilities and train personnel. Example: Industrial companies that specialize in complex production technologies normally use turnkey projects as an entry strategy.
  • 3. In projects "turnkey" a contractor agrees to deliver every detail of the project to a foreign client, including the training of operating personnel. Upon completion of the contract, the foreign client receives the "key" to a plant ready for its overall performance.
  • 4. Other services that are always present in contracts "turnkey", are: The supply of materials and machinery transport thereof. The completion of civil works. Installation and assembly, and the set-up and operation of the proposed work. In certain instances, it is also possible to include staff training and technical assistance.
  • 5. In the area of international trade as a consequence of technological advances, which better reflects the transformations in this sector is the method "turnkey". With it disappears the traditional relationship between customer (contractor), engineer and contractor, for become replaced by a single customer-contractor relationship, in which the latter, with their traditional roles, project design assumes.
  • 6. STANDINGS 1. When used in the same project:  Contracts "turnkey" Mixed: When part of the project is traditional and the other is turnkey.  Contracts "turnkey" partial: When hiring traditionally entire project but part outsources turnkey.  Contracts semi "turnkey“: When the contractor holds several contracts being one turnkey contractor responsible latter coordinating other contracts.
  • 7. 2. ​Based on the difference in practice content:  Contracts "turnkey" single or partial:  Contracts "turnkey" complete or classic:  Contracts "turnkey" wide:
  • 8. CHARACTERISTICS The two essential features of the contracts "turnkey“ a) the merger of the missions of conception and execution of the work in one person. b) the overall obligation assumed by the contractor to the client to deliver a work fully equipped and in perfect working order.
  • 9. CONTRACT CHARACTERISTICS  It involves holding one single contract made between the client and the contractor.  The contractor assumes the design and execution of the work  Gives the contractor the right to make changes in their plans, at their own cost and risk.
  • 10. PHASES: 1. Contract preparation: in determining the client's objectives, the contractor is selected and negotiated contract terms with him. 2. Execution of the contract that includes the start of work, the progressive development of the work and its full implementation, operation and acceptance.
  • 11. In the preparation phase of the contract the engineer's role is limited to advising the client as: a) the preparation of documents for invitation to tenders. b) the comparison and selection of offers. c) in some cases, develop overall project specifications are given where technical conditions required by the customer.
  • 12. As contracts "turnkey" detailed description of the work takes place during the execution of the contract, in such a situation are certain legal consequences: Indeterminacy of the object of the contract at the time of awarding the contract, which is to meet standards through rights granted to the contractor to modify the project provided that it is informed, review or approve such changes, and provided that such amendments do not alter the technical guarantees and good work. The contractor shall be responsible for any possible gaps and omissions that may vitiate the project and the client's rights.
  • 13. ADVANTAGES The advantages of these projects is that they are a great way to earn economic returns from the asset and provide the ability to leverage the skills of technological processes in countries where research and development.
  • 14. DISADVANTAGES  The company is a contractor will not have a long-term business in the foreign country.  Can create a competitor.  Competitive advantage is the technology may also be the competitive advantage of current or potential competitors.