W.b 11. 02.13
Upcoming SlideShare
Loading in...5
×

Like this? Share it with your network

Share
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
174
On Slideshare
172
From Embeds
2
Number of Embeds
1

Actions

Shares
Downloads
0
Comments
0
Likes
0

Embeds 2

http://www.blogger.com 2

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. BTEC Extended Diploma in Creative Media ProductionIG4 Final Major ProjectProduction DiaryPROGRESS UPDATE PLAN FOR NEXT MONTH / WEEK(Including Possible ContingencyPlans If Problems Anticipated)Mon W/B 14/01/13(Detailed Weekly Summary)Today was the first lesson we had when we was given thisproject so I had to start thinking and deciding what type ofproject I wanted to do. I decided that I would make aCelebrity, Beauty and Fashion magazine for older teenagefemales. So now that I have come up with my initial idea Ihave begun filling in my time management timeline as Iknow exactly what things I will need to do for: research,pre-production, production and post-production.I plan to have this time management task completed anduploaded to my blog by next week. Then I will began the pieceof work I said I would do next on my time managementschedule which is part of my market research – I will be lookingat magazines with the same genre as me and target audience tofind the magazines that influence me then I will put them into aPowerPoint.Mon W/B 21/01/13(Detailed Weekly Summary)I have started doing this PowerPoint and I am now half waythrough it I have included pictures of the magazine – thecover contents page, double page spreads and images theyuse throughout the magazine and said what images I planto use for mine and gave information about the magazinesthat influence me.I just need to add a few more slides to this and it will be donehopefully by the end of this week if not the end of next week’sfirst lesson so I am ready to do something else for next weekwhich will be writing my project proposal.Mon W/B 28/01/13(Detailed Weekly Summary)I did plan to have my Influences PowerPoint finished bynow however I have not yet managed to do this but this isbecause my project proposal needed to be completedearlier than I thought so as the proposal had to becompleted first I did that instead and uploaded it to myblog.I have now completed my PowerPoint and uploaded it to myblog. Now for the rest of the week I will be carrying on with mypre-production where I will be finding images of pages, frontcovers and contents pages of Teen Vogue magazine as that ismy main magazine inspiration and then with these I will becreating a mood board to show what I am going for with myown magazine.Mon W/B 04/02/13(Detailed Weekly Summary)Today I began looking at all other magazines with the samegenre of my magazine and gathered images of all the onesthat I liked and put them into a mood board and then fromthese I picked my favourite and created a separate moodboard using just images from the magazine that influencedme the most.I have created the two mood boards that I planned to do thisweek and have uploaded them both to my blog. Next week isour week off so I am going to book out a camera and during thisweek off take most of the images for my magazine as up to nowI have 1 model. I will need quite a few more people however as Iam only using one person for my front cover this will do fine fornow.Mon W/B 11/02/13(Detailed Weekly Summary)
  • 2. BTEC Extended Diploma in Creative Media ProductionIG4 Final Major ProjectProduction DiaryMon W/B 18/02/13(Detailed Weekly Summary)Mon W/B 25/02/13(Detailed Weekly Summary)Mon W/B 04/03/13(Detailed Weekly Summary)Mon W/B 11/03/13(Detailed Weekly Summary)Mon W/B 18/03/13(Detailed Weekly Summary)Mon W/B 01/04/13(Detailed Weekly Summary)Mon W/B 08/04/13(Detailed Weekly Summary)Mon W/B 15/04/13(Detailed Weekly Summary)PROGRESS UPDATE PLAN FOR NEXT MONTH / WEEK (Including PossibleContingency Plans)