Introduction of a substation
• Intermediate link between Generating station & Consumers.
• An Electrical Substation is a subsidiary station of an electricity Generation, Transmission And
Distribution System where voltage is transformed high to low or reverse using transformer.
• Examples of Substation:-
 400kV/220kV substation
 220kV/132kV substation
 132kV/33kV substation
 33kV/11kV substation
 11kV/.4kV substation
33/11KV TT Nagar Substation
 Established in 2002.
 This substation is used 33KV as input and converted it into 11KV through Power transformer.
 Approximate 52000 people of Tatya tope nagar and Ambedkar nagar get the electricity from
this substation.
 In this substation there are 3 substation operator, 3 line man under 1 JE.
 In 2004 Meharbaan Singh Ka Purva was added with TT Nagar Substation with the same 33KV
supply.
SINGLE LINE DIAGRAM
Outgoing feeders
132KV incoming 11KV outgoing
132KV is step down to Tatya tope Nagar
33KV in Barra 8 and Ambedkar Nagar
then get as incoming 16 Village
33KV in TT nagar, 33KV is
supplied to Meharbaan Singh Ka
Purva.
Equipment used in Substation
 Lightning Arresters
 Potential transformer
 Current Transformer
 Bus-Bars
 Isolators
 Insulators
 Circuit Breakers
 Protective Relays
 Grounding
 Power Transformer
 Switchgear
 Batteries
 Fire fighting system
Lightning Arresters
 Lightening arrestors are the instrument that are used in the incoming feeders so that to
prevent the high voltage entering the main station.
 To prevent any damage lightening arrestors are used.
Potential Transformer (P.T)
 Potential transformers used in the bus connected both side of the bus.
 The potential transformer uses a bus isolator to protect itself.
 The main use of this transformer is to measure the voltage through the bus.
 To get the detail information of the voltage passing through the bus to the instrument.
Current Transformer
 It steps down the current level of the line for following purposes:
 CT’s are basically used to take the readings of the currents entering the substation.
 This transformer steps down the current from 800 amps to 1 amp.
Bus-Bars
 Carry electrical supply
 Maximum load
Isolators
 Isolator is the devices used to protect the S/S from any fault on the incoming feeder.
 They are also helpful while maintenance is to be done in substation.
Insulators
 The main function of the insulators is to provide perfect insulation between the live conductors
and the supports.
Types of Insulators are
 Pin type insulators
 Suspension type insulators
 Strain insulators
 Shackle insulators
 Stay insulators
Circuit Breakers
 A circuit breaker can make or break a circuit either manually or automatically under no load, full load or
short circuit conditions.
Circuit Breaker are of
types
 Oil Circuit Breaker
 Vacuum Circuit Breaker
 SF6 Circuit Breaker
 Air Blast Circuit Breaker
Oil Circuit Breaker
 Oil circuit breaker which employ insulating oil for arc extinction.
 Buchholz Relay is also used to protect the P.T.
SF6 Circuit Breaker
 In this hexafluoride gas is used as arc quenching medium.
 The SF6 is an electro-negative gas and has a strong tendency to absorb free electrons.
Protective Relays
 These are the devices that detect the fault and initiates the operation of the circuit breaker
to isolate the defective element from rest of the element.
They are basically of two types
Electromagnetic type
Induction type
Grounding
 It is used to protect the system from extra voltage.
 Types of grounding are
 Resistance Grounding
 Reactance Grounding
 Resonant Grounding
 But commonly people used the
mixture of coal and salt and coal,
as a grounding material.
Power Transformer
 Transformer’s are basically used to step up and step down and vice versa.
 Now basically small substation used transformer to reduce the voltage or step down the
voltage.
 It is easier to installed single three phase transformer instead of 3 single phase transformer.
 In This Power Transformer from the incoming 33KV is Provided and we get 11KV as O/P after
step down.
 It’s rating is 10MVA, we can also used 3.15MVA or 5MVA rating of transformer.
 In 33/11KV substation delta-star connection’s are used.
Transformer Oil
 This is used for protection and cooling purpose.
 It’s mineral oil obtained by refine crude petroleum. It serves the following purpose.
 Provide additional insulation.
 Carries away the heat generated in the core & coils.
 Protects the paper from dirt & moisture for this Breather is used.
 Transformer oil is very costly.
Maintenance of Transformers
 Check Oil level in main tank.
 Check the colour of silica gel in breather.
i. It must be blue in colour.
ii. If it is turns pink then replace.
 Check On load Tap Changer Lower/Raise trail by Local & Remote.
 Trip trail by draining oil in Buchholz relay.
 Check Earth resistance ,provide watering arrangement for earthling pits.
 Clean the bushings.
Attend the oil leakages.
Note Temperature of Oil & leakage.
Batteries
 Batteries are used in substation as an auxiliary power supply to provide power for
lightning, heating ventilation and communication equipment.
 Several batteries are connected in series.
 All latest equipment’s are now also design as they can operate with DC voltage also.
Switchgear
 This is first part of protection or controlling.
 This type of equipment is directly linked to the reliability of the electricity supply.
 It act as controller to control the output supply.
 This is also used to know how much power is consumed in the area as well as in
substation.
 To repair any faulty part firstly isolate from control room then through isolator which is
placed there.
Fire Fighting System
 This is used to protect the equipment’s of the substation from any accident.
 Basically Dry Carbon-Di-Oxide is used.
 But sand is also used for instant protection.
Important Terms
 Tripping – Power goes due to over load. It is for the protection of components.
 Shut down – Power is cut due to maintenance in progress. It is done manually.
 Break down – Power goes due to any fault in the line. When fault is removed , power is
back.
 Roasting – Power is cut deliberately on order of higher authority due to shortage of
power.
Name: Shubham Sachan
Registration No: 11104846
Section: E3108

More Related Content

What's hot

Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khoja
ASHOK KHOJA
 

What's hot (20)

132 kV uppcl
132 kV uppcl132 kV uppcl
132 kV uppcl
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt
 
132 33kv substation
132 33kv substation132 33kv substation
132 33kv substation
 
Industrial visit report uttam transformers
Industrial visit report  uttam transformersIndustrial visit report  uttam transformers
Industrial visit report uttam transformers
 
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, AllahabadSummer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
 
220KV Substation Training Report
220KV Substation Training Report220KV Substation Training Report
220KV Substation Training Report
 
PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...
PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...
PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khoja
 
APFC project presentation
APFC project presentationAPFC project presentation
APFC project presentation
 
Summer Internship Report -By Rahul Mehra
Summer Internship Report -By Rahul MehraSummer Internship Report -By Rahul Mehra
Summer Internship Report -By Rahul Mehra
 
33 kv substation vt report
33 kv substation vt report33 kv substation vt report
33 kv substation vt report
 
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
 
industrial Training report in PTCUL Substation dehradun
industrial Training report in PTCUL Substation dehradunindustrial Training report in PTCUL Substation dehradun
industrial Training report in PTCUL Substation dehradun
 
220 kv gss dausa
220 kv gss dausa220 kv gss dausa
220 kv gss dausa
 
PPT ON 220KV GSS
PPT ON 220KV GSSPPT ON 220KV GSS
PPT ON 220KV GSS
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
A 220kV Substation
A 220kV SubstationA 220kV Substation
A 220kV Substation
 
Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training
 
industrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCLindustrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCL
 
presentation on 400kv gss heerapura @mnit
presentation on 400kv gss heerapura @mnitpresentation on 400kv gss heerapura @mnit
presentation on 400kv gss heerapura @mnit
 

Viewers also liked

33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)
Prateek Agarwal
 
132kv Substation
132kv Substation132kv Substation
132kv Substation
guestecdd58
 
Typical layout of a Sub-Station
Typical layout of a Sub-StationTypical layout of a Sub-Station
Typical layout of a Sub-Station
Towfiqur Rahman
 

Viewers also liked (20)

33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)
 
132kv Substation
132kv Substation132kv Substation
132kv Substation
 
Substation overview
Substation overviewSubstation overview
Substation overview
 
132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL
 
Typical layout of a Sub-Station
Typical layout of a Sub-StationTypical layout of a Sub-Station
Typical layout of a Sub-Station
 
Industrial Training Presentation
Industrial Training PresentationIndustrial Training Presentation
Industrial Training Presentation
 
1.substation layouts
1.substation  layouts1.substation  layouts
1.substation layouts
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV
 
Substation presentation by ram
Substation presentation by ramSubstation presentation by ram
Substation presentation by ram
 
Sub ststion
Sub ststionSub ststion
Sub ststion
 
Training report of 33/11kv substation Mohamdabad, Tundla
Training report of 33/11kv substation Mohamdabad, TundlaTraining report of 33/11kv substation Mohamdabad, Tundla
Training report of 33/11kv substation Mohamdabad, Tundla
 
Rembrandt and Female Nude - Eric Jan Sluijter
Rembrandt and Female Nude - Eric Jan SluijterRembrandt and Female Nude - Eric Jan Sluijter
Rembrandt and Female Nude - Eric Jan Sluijter
 
My ppt
My pptMy ppt
My ppt
 
Training from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
Training from 220kv GSS Sanganer, which is located on Muhana Road, JaipurTraining from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
Training from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
 
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANTSTUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
 
HVDC presentation
HVDC presentationHVDC presentation
HVDC presentation
 
industrial training on 132 kv substation
industrial training on 132 kv substationindustrial training on 132 kv substation
industrial training on 132 kv substation
 
High Voltage Dc (HVDC) transmission
High Voltage Dc (HVDC) transmissionHigh Voltage Dc (HVDC) transmission
High Voltage Dc (HVDC) transmission
 
Substations
Substations Substations
Substations
 

Similar to Presentation on KESCO sub-station, kanpur

Similar to Presentation on KESCO sub-station, kanpur (20)

Abhishek_Kesco_ppt.pptx
Abhishek_Kesco_ppt.pptxAbhishek_Kesco_ppt.pptx
Abhishek_Kesco_ppt.pptx
 
Ashish.pptx
Ashish.pptxAshish.pptx
Ashish.pptx
 
rough.pptx
rough.pptxrough.pptx
rough.pptx
 
the substation components study
the substation components study the substation components study
the substation components study
 
ntpc
ntpcntpc
ntpc
 
ntpc ppt
ntpc pptntpc ppt
ntpc ppt
 
132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training report132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training report
 
Power Transformer in DPL
Power Transformer in DPLPower Transformer in DPL
Power Transformer in DPL
 
Power Corporation ppt
Power Corporation pptPower Corporation ppt
Power Corporation ppt
 
power house training seminar
power house training seminarpower house training seminar
power house training seminar
 
substation internship report
substation internship report substation internship report
substation internship report
 
“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...
“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...
“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...
 
pptravi-191011011024 (1).pdf
pptravi-191011011024 (1).pdfpptravi-191011011024 (1).pdf
pptravi-191011011024 (1).pdf
 
Sharavati receiving station
Sharavati  receiving stationSharavati  receiving station
Sharavati receiving station
 
Switchgear Equipment in a Substation
Switchgear Equipment in a SubstationSwitchgear Equipment in a Substation
Switchgear Equipment in a Substation
 
Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
 
West bengal state electricity distribution limited vocational traning
West bengal state electricity distribution limited vocational traningWest bengal state electricity distribution limited vocational traning
West bengal state electricity distribution limited vocational traning
 
Srijan tripathi(220kv gss) ppt
Srijan tripathi(220kv gss) pptSrijan tripathi(220kv gss) ppt
Srijan tripathi(220kv gss) ppt
 
Heavy maintenance
Heavy maintenanceHeavy maintenance
Heavy maintenance
 
WBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training ReportWBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training Report
 

More from Shubham Sachan

More from Shubham Sachan (9)

Importance of reactive power in determining the cost of power system in futur...
Importance of reactive power in determining the cost of power system in futur...Importance of reactive power in determining the cost of power system in futur...
Importance of reactive power in determining the cost of power system in futur...
 
Importance of reactive power in determining the cost of power system in futur...
Importance of reactive power in determining the cost of power system in futur...Importance of reactive power in determining the cost of power system in futur...
Importance of reactive power in determining the cost of power system in futur...
 
520planning
520planning520planning
520planning
 
Synopsis ele 522
Synopsis ele 522Synopsis ele 522
Synopsis ele 522
 
A new game to reign the skies
A new game to reign the skiesA new game to reign the skies
A new game to reign the skies
 
Comparison performance of ipfc copy
Comparison performance of ipfc   copyComparison performance of ipfc   copy
Comparison performance of ipfc copy
 
Automatic room light controlling Capstone Report
Automatic room light controlling Capstone ReportAutomatic room light controlling Capstone Report
Automatic room light controlling Capstone Report
 
Automatic control of electrical Appliances
Automatic control of electrical AppliancesAutomatic control of electrical Appliances
Automatic control of electrical Appliances
 
Training report by shubham sachan
Training report by shubham sachanTraining report by shubham sachan
Training report by shubham sachan
 

Recently uploaded

notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 

Recently uploaded (20)

Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 

Presentation on KESCO sub-station, kanpur

  • 1. Kanpur Electricity Supply Authority Name: Shubham Sachan Registration No: 11104846 Section: E3108
  • 2. Introduction of a substation • Intermediate link between Generating station & Consumers. • An Electrical Substation is a subsidiary station of an electricity Generation, Transmission And Distribution System where voltage is transformed high to low or reverse using transformer. • Examples of Substation:-  400kV/220kV substation  220kV/132kV substation  132kV/33kV substation  33kV/11kV substation  11kV/.4kV substation
  • 3. 33/11KV TT Nagar Substation  Established in 2002.  This substation is used 33KV as input and converted it into 11KV through Power transformer.  Approximate 52000 people of Tatya tope nagar and Ambedkar nagar get the electricity from this substation.  In this substation there are 3 substation operator, 3 line man under 1 JE.  In 2004 Meharbaan Singh Ka Purva was added with TT Nagar Substation with the same 33KV supply.
  • 4.
  • 6. Outgoing feeders 132KV incoming 11KV outgoing 132KV is step down to Tatya tope Nagar 33KV in Barra 8 and Ambedkar Nagar then get as incoming 16 Village 33KV in TT nagar, 33KV is supplied to Meharbaan Singh Ka Purva.
  • 7. Equipment used in Substation  Lightning Arresters  Potential transformer  Current Transformer  Bus-Bars  Isolators  Insulators  Circuit Breakers  Protective Relays  Grounding  Power Transformer  Switchgear  Batteries  Fire fighting system
  • 8. Lightning Arresters  Lightening arrestors are the instrument that are used in the incoming feeders so that to prevent the high voltage entering the main station.  To prevent any damage lightening arrestors are used.
  • 9. Potential Transformer (P.T)  Potential transformers used in the bus connected both side of the bus.  The potential transformer uses a bus isolator to protect itself.  The main use of this transformer is to measure the voltage through the bus.  To get the detail information of the voltage passing through the bus to the instrument.
  • 10. Current Transformer  It steps down the current level of the line for following purposes:  CT’s are basically used to take the readings of the currents entering the substation.  This transformer steps down the current from 800 amps to 1 amp.
  • 11. Bus-Bars  Carry electrical supply  Maximum load
  • 12. Isolators  Isolator is the devices used to protect the S/S from any fault on the incoming feeder.  They are also helpful while maintenance is to be done in substation.
  • 13. Insulators  The main function of the insulators is to provide perfect insulation between the live conductors and the supports. Types of Insulators are  Pin type insulators  Suspension type insulators  Strain insulators  Shackle insulators  Stay insulators
  • 14. Circuit Breakers  A circuit breaker can make or break a circuit either manually or automatically under no load, full load or short circuit conditions. Circuit Breaker are of types  Oil Circuit Breaker  Vacuum Circuit Breaker  SF6 Circuit Breaker  Air Blast Circuit Breaker
  • 15. Oil Circuit Breaker  Oil circuit breaker which employ insulating oil for arc extinction.  Buchholz Relay is also used to protect the P.T.
  • 16. SF6 Circuit Breaker  In this hexafluoride gas is used as arc quenching medium.  The SF6 is an electro-negative gas and has a strong tendency to absorb free electrons.
  • 17. Protective Relays  These are the devices that detect the fault and initiates the operation of the circuit breaker to isolate the defective element from rest of the element. They are basically of two types Electromagnetic type Induction type
  • 18. Grounding  It is used to protect the system from extra voltage.  Types of grounding are  Resistance Grounding  Reactance Grounding  Resonant Grounding  But commonly people used the mixture of coal and salt and coal, as a grounding material.
  • 20.  Transformer’s are basically used to step up and step down and vice versa.  Now basically small substation used transformer to reduce the voltage or step down the voltage.  It is easier to installed single three phase transformer instead of 3 single phase transformer.  In This Power Transformer from the incoming 33KV is Provided and we get 11KV as O/P after step down.  It’s rating is 10MVA, we can also used 3.15MVA or 5MVA rating of transformer.  In 33/11KV substation delta-star connection’s are used.
  • 21. Transformer Oil  This is used for protection and cooling purpose.  It’s mineral oil obtained by refine crude petroleum. It serves the following purpose.  Provide additional insulation.  Carries away the heat generated in the core & coils.  Protects the paper from dirt & moisture for this Breather is used.  Transformer oil is very costly.
  • 22. Maintenance of Transformers  Check Oil level in main tank.  Check the colour of silica gel in breather. i. It must be blue in colour. ii. If it is turns pink then replace.  Check On load Tap Changer Lower/Raise trail by Local & Remote.  Trip trail by draining oil in Buchholz relay.  Check Earth resistance ,provide watering arrangement for earthling pits.  Clean the bushings. Attend the oil leakages. Note Temperature of Oil & leakage.
  • 23. Batteries  Batteries are used in substation as an auxiliary power supply to provide power for lightning, heating ventilation and communication equipment.  Several batteries are connected in series.  All latest equipment’s are now also design as they can operate with DC voltage also.
  • 24. Switchgear  This is first part of protection or controlling.  This type of equipment is directly linked to the reliability of the electricity supply.  It act as controller to control the output supply.  This is also used to know how much power is consumed in the area as well as in substation.  To repair any faulty part firstly isolate from control room then through isolator which is placed there.
  • 25. Fire Fighting System  This is used to protect the equipment’s of the substation from any accident.  Basically Dry Carbon-Di-Oxide is used.  But sand is also used for instant protection.
  • 26. Important Terms  Tripping – Power goes due to over load. It is for the protection of components.  Shut down – Power is cut due to maintenance in progress. It is done manually.  Break down – Power goes due to any fault in the line. When fault is removed , power is back.  Roasting – Power is cut deliberately on order of higher authority due to shortage of power.