INDUSTRIAL VISIT REPORT- UTTAM
TRANSFORMERS
Departmentof Electrical Engineering,PoornimaCollege of Engineering organized an industrial visit
on 25th
March 2017 to Uttam (Bharat) Electricals Private Limited, addressed at B-189/A, Road No.
9(F), Vishwakarma Industrial Area, Jaipur for students of the Branch. The visit was organized with
priorpermissionandguidance of Dr.VirendraSangtani,Headof Department.Total40studentsalong
with faculty members Mr. Rohit Sharma and Mr. Amba Lal as coordinators visited the same.
We started from the college at 9:15 AM. and it took us approximately two hours to reach our
destination via College transport.
The main objective of the visitwastoknow theoretical termswithindustrial(practical) exposure and
working of Uttam Transformers.
An engineer at Uttam transformers welcomed all of us at the entrance and took us in batches to
explain the manufacturing process and working of Transformers in detail.
COMPANY PROFILE:
Uttam Bharat) Electricals Private Limited is an ISO 9001:2008 certified leading manufacturer of
PowerandDistributionTransformers from 5KVA to 12500 KVA upto 11-22-33 KV class, Single-Three
Phase having a turnover of approx. 112 crores.
The company hasmachine facilitiestoDesign,Manufacture andtestTransformersasperIS:2026/BS-
171/IEC-76 international standards.Transformersupto12500 KVA rating33 KV classhave beentype
tested for Short circuit and Impulse test at CPRI and other government approved laboratories.
The company has received SE2B rating by CRISIL which denotes high performance capability
adjudged in relation to other SSI’s.
The company has been meeting specific requirements such as dual-ratio transformer, Furnace
transformers, Transformers with OLTC or conversion of existing transformer to any voltage ratio.
Uttam transformers have developed and supplied fail safe Distribution transformers, wound core
transformers and are in the process of developing Amorphous core, and Dry type transformers.
Uttam made transformers are approved by Telecom, CPWD, MES, Railways, PWD and various
utilities ans state electricity boards.In a span of over 30 years, the company has supplied over
1,50,000 Power and Distribution transformers at various ratings and voltages to users in India and
Abroad. The company has exported transformers to Jordan, Nigeria, Bhutan, Sri Lanka and Nepal.
The salient features of the company include Robust Design, Economical losses, Stringent Quality
control,timelydelivery,extendedguarantee period,efficientandpromptaftersalesservice. We
were explained the following details about transformers:
There are two types of circuits in a transformer-
 Magnetic circuit (core)
 Electric circuit
Basic Parts of a Transformer:
1) Laminated core
2) Windings
3) Insulating Materials
4) Transformer oil
5) Tap changer
6) Conservator
7) Breather
8) Cooling tubes
9) Buchholz Relay
10) Explosion vent
Core:
The core is used to support the windings in the transformer.
Cold-rolledgrain-oriented(CRGO) steel is used for the manufacture of transformer core.It has low
magnetichysteresislooparea,whichminimizes magneticlosses&highsiliconcontentwhichleadsto
high resistance, decreasing eddy current losses. So, overall losses are reduced.
Amorphous Core: Amorphous core material offers both reduced hysteresis loss and eddy current
lossbecause this material has a random grain and magnetic domain structure which results in high
permeability, which ensures a narrow hysteresis curve compared to conventional CRGO material.
The thickness of Amorphous sheet is about 1/10th
that of CRGO.
Core Assembly:
It consists of:
1) Core made up of CRGO steel.
2) Core bolt
3) Three limbs
4) Top Yoke and Bottom yoke
5) Tie rod
6) LT & HT Windings
WINDINGS:-
LT Windings are connected in star and HT Windings are connected in Delta.
Enamel isusedto insulate the windingsof low voltagetransformers. For power transformers, paper
insulation is used for winding wire as well as in the form of strips of paper insulation between
winding layers.
Cross winding-
It is made of circular conductor used for High voltage windings of relatively small transformers.
Helical winding:
We use helical winding where we need to draw more current.It consists of large no. of parallel
conductors piled in the radial direction and wound. It is used for windings of low voltage(20 KV or
below) & large current.
Between layers, no insulation other than conductor insulation is required as voltage between the
layers is low.
The parallel circuits bring in the problem of current sharing.Transposition is adopted to reduce
unequal current distribution. The modern trend is to use transposed and bunched conductors.
MS Tank
Mild Steel Tank consists of three phase windings along with Neutral.
It is filled with Transformer oil.
Gasket- Oil seal is used to prevent any leakage.
TRANSFORMER OIL:-
ON-AN (Oil Natural Air Natural) transformers have inbuilt properties of cooling down oil inside it.
ON (Oil Natural)- AF (Air Force) Transformers have to be provided with external air force to cool
down the temperature.
OVEN:
Core assembly is heated in the oven.
Conservator Tank:
It is placed on the Mils Steel Tank and is filled with Transformer Oil.
Breather Pipe:
It is used to carry moisture-free, dry air into the tank.
Equalizer Pipe- It is used to equalize pressure.
The expected life of a transformer is 20-25 Years.
Testing Lab is used for the Health check of the transformers.
Tap No. PT Ratio
1 600/600
2 1200/600
3 1800/600
4 2400/600
5 3000/600
MarshallingBox:Itis a weather-proof terminal box which connects the transformer’s fittings to the
protective schemes to give alarm under abnormal conditions.
It also houses Oil temperature indicator (OTI) and Winding temperature indicator (WTI).
Buchholz Relay:
It is connected between the Conservator tank and Transformer tank.
Explosion vent pipe:
It is the top-most and weakest part of the transforer to ensure transformer protection. A very thin
brass metal is used which breaks if there is any fault in the transformer.

More Related Content

What's hot

Load dispatch center
Load dispatch centerLoad dispatch center
Load dispatch centerddxdharmesh
 
Protection of power transformer
Protection of power transformerProtection of power transformer
Protection of power transformerRitesh Verma
 
Transformer protection
Transformer protectionTransformer protection
Transformer protectionjawaharramaya
 
substation internship report
substation internship report substation internship report
substation internship report Arun Thapa
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentationKamal Mittal
 
SLD-LINE LENGTH-NAMEPLATE DETAILS OF 765/400/220KV EQUIPMENT DETAILS-TYPES OF...
SLD-LINE LENGTH-NAMEPLATE DETAILS OF 765/400/220KV EQUIPMENT DETAILS-TYPES OF...SLD-LINE LENGTH-NAMEPLATE DETAILS OF 765/400/220KV EQUIPMENT DETAILS-TYPES OF...
SLD-LINE LENGTH-NAMEPLATE DETAILS OF 765/400/220KV EQUIPMENT DETAILS-TYPES OF...Pavan choudhary
 
Power electronics Phase Controlled Rectifiers - SCR
Power electronics   Phase Controlled Rectifiers - SCRPower electronics   Phase Controlled Rectifiers - SCR
Power electronics Phase Controlled Rectifiers - SCRBurdwan University
 
Protective relay
Protective relay Protective relay
Protective relay Uday Wankar
 
Hvdc transmission seminar
Hvdc transmission seminar Hvdc transmission seminar
Hvdc transmission seminar Utkarsh Jambhule
 
Doubly fed-induction-generator
Doubly fed-induction-generatorDoubly fed-induction-generator
Doubly fed-induction-generatorHarshad Karmarkar
 
Industrial training report
Industrial training report Industrial training report
Industrial training report Pritam Samanta
 
Methods of Voltage Control
Methods of Voltage ControlMethods of Voltage Control
Methods of Voltage ControlYashvi Mehta
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentationNikhil Kachare
 

What's hot (20)

Load dispatch center
Load dispatch centerLoad dispatch center
Load dispatch center
 
Protection of power transformer
Protection of power transformerProtection of power transformer
Protection of power transformer
 
Transformer protection
Transformer protectionTransformer protection
Transformer protection
 
relay-distance relay basics
relay-distance relay basicsrelay-distance relay basics
relay-distance relay basics
 
substation internship report
substation internship report substation internship report
substation internship report
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
SLD-LINE LENGTH-NAMEPLATE DETAILS OF 765/400/220KV EQUIPMENT DETAILS-TYPES OF...
SLD-LINE LENGTH-NAMEPLATE DETAILS OF 765/400/220KV EQUIPMENT DETAILS-TYPES OF...SLD-LINE LENGTH-NAMEPLATE DETAILS OF 765/400/220KV EQUIPMENT DETAILS-TYPES OF...
SLD-LINE LENGTH-NAMEPLATE DETAILS OF 765/400/220KV EQUIPMENT DETAILS-TYPES OF...
 
Power electronics Phase Controlled Rectifiers - SCR
Power electronics   Phase Controlled Rectifiers - SCRPower electronics   Phase Controlled Rectifiers - SCR
Power electronics Phase Controlled Rectifiers - SCR
 
Protective relay
Protective relay Protective relay
Protective relay
 
Reactive power compensation
Reactive power compensationReactive power compensation
Reactive power compensation
 
Buchholz relay
Buchholz relayBuchholz relay
Buchholz relay
 
66 kv substation
66 kv substation66 kv substation
66 kv substation
 
Hvdc transmission seminar
Hvdc transmission seminar Hvdc transmission seminar
Hvdc transmission seminar
 
Doubly fed-induction-generator
Doubly fed-induction-generatorDoubly fed-induction-generator
Doubly fed-induction-generator
 
Industrial training report
Industrial training report Industrial training report
Industrial training report
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformer
 
Facts devices
Facts devicesFacts devices
Facts devices
 
Protection of alternator
Protection of alternatorProtection of alternator
Protection of alternator
 
Methods of Voltage Control
Methods of Voltage ControlMethods of Voltage Control
Methods of Voltage Control
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 

Similar to Industrial visit report uttam transformers

Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE] Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE] Nik Sharma
 
Transformer protection & maintenance
Transformer protection & maintenanceTransformer protection & maintenance
Transformer protection & maintenancePradeep Avanigadda
 
Seminar report theory
Seminar report theorySeminar report theory
Seminar report theoryRanjan kumar
 
Transformer report-Siemens
Transformer report-SiemensTransformer report-Siemens
Transformer report-SiemensMahmood Ali
 
Tbea vocatinal training
Tbea vocatinal trainingTbea vocatinal training
Tbea vocatinal trainingDeep Shah
 
transformer Sales, after sales & service presentation
transformer Sales, after sales & service presentationtransformer Sales, after sales & service presentation
transformer Sales, after sales & service presentationFawaz Baik
 
summer internship report on erection, commissioning and pre-comissioning of50...
summer internship report on erection, commissioning and pre-comissioning of50...summer internship report on erection, commissioning and pre-comissioning of50...
summer internship report on erection, commissioning and pre-comissioning of50...Rahul Akinapelli
 
Inovative Solution by Transformers Manufacturers in India
Inovative Solution by Transformers Manufacturers in IndiaInovative Solution by Transformers Manufacturers in India
Inovative Solution by Transformers Manufacturers in IndiaSynergy Transformers
 
University college of engineering, rajasthan technical university
University college of engineering, rajasthan technical universityUniversity college of engineering, rajasthan technical university
University college of engineering, rajasthan technical universityDivyansh Gupta
 
A vocational summer training at Jindal Steel and Power Limited
A vocational summer training at Jindal Steel and Power LimitedA vocational summer training at Jindal Steel and Power Limited
A vocational summer training at Jindal Steel and Power LimitedKishan Gabel
 
Power Transformer in DPL
Power Transformer in DPLPower Transformer in DPL
Power Transformer in DPLAbhishek Roy
 
transformer Manufactures and exporters in India
transformer Manufactures and exporters in Indiatransformer Manufactures and exporters in India
transformer Manufactures and exporters in Indiaseo27poogle
 
Industrial training 220 KV moradabad
Industrial training 220 KV moradabadIndustrial training 220 KV moradabad
Industrial training 220 KV moradabadMONU KUMAR
 
132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training report132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training reportMuntazir Mehdi
 

Similar to Industrial visit report uttam transformers (20)

TELK Industrial Visit Report
TELK Industrial Visit ReportTELK Industrial Visit Report
TELK Industrial Visit Report
 
Transformer ppt
Transformer pptTransformer ppt
Transformer ppt
 
Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE] Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE]
 
Transformer protection & maintenance
Transformer protection & maintenanceTransformer protection & maintenance
Transformer protection & maintenance
 
Seminar report theory
Seminar report theorySeminar report theory
Seminar report theory
 
Transformer report-Siemens
Transformer report-SiemensTransformer report-Siemens
Transformer report-Siemens
 
Makpower - Furnace Transformer Manufacturer in India
Makpower - Furnace Transformer Manufacturer in IndiaMakpower - Furnace Transformer Manufacturer in India
Makpower - Furnace Transformer Manufacturer in India
 
Tbea vocatinal training
Tbea vocatinal trainingTbea vocatinal training
Tbea vocatinal training
 
transformer Sales, after sales & service presentation
transformer Sales, after sales & service presentationtransformer Sales, after sales & service presentation
transformer Sales, after sales & service presentation
 
summer internship report on erection, commissioning and pre-comissioning of50...
summer internship report on erection, commissioning and pre-comissioning of50...summer internship report on erection, commissioning and pre-comissioning of50...
summer internship report on erection, commissioning and pre-comissioning of50...
 
Inovative Solution by Transformers Manufacturers in India
Inovative Solution by Transformers Manufacturers in IndiaInovative Solution by Transformers Manufacturers in India
Inovative Solution by Transformers Manufacturers in India
 
University college of engineering, rajasthan technical university
University college of engineering, rajasthan technical universityUniversity college of engineering, rajasthan technical university
University college of engineering, rajasthan technical university
 
A vocational summer training at Jindal Steel and Power Limited
A vocational summer training at Jindal Steel and Power LimitedA vocational summer training at Jindal Steel and Power Limited
A vocational summer training at Jindal Steel and Power Limited
 
Emt megatherm a site visit report
Emt megatherm a site visit reportEmt megatherm a site visit report
Emt megatherm a site visit report
 
Power Transformer in DPL
Power Transformer in DPLPower Transformer in DPL
Power Transformer in DPL
 
ZUNED ATIK.pptx
ZUNED ATIK.pptxZUNED ATIK.pptx
ZUNED ATIK.pptx
 
transformer Manufactures and exporters in India
transformer Manufactures and exporters in Indiatransformer Manufactures and exporters in India
transformer Manufactures and exporters in India
 
Internship report
Internship report Internship report
Internship report
 
Industrial training 220 KV moradabad
Industrial training 220 KV moradabadIndustrial training 220 KV moradabad
Industrial training 220 KV moradabad
 
132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training report132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training report
 

Recently uploaded

Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 

Recently uploaded (20)

Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 

Industrial visit report uttam transformers

  • 1. INDUSTRIAL VISIT REPORT- UTTAM TRANSFORMERS Departmentof Electrical Engineering,PoornimaCollege of Engineering organized an industrial visit on 25th March 2017 to Uttam (Bharat) Electricals Private Limited, addressed at B-189/A, Road No. 9(F), Vishwakarma Industrial Area, Jaipur for students of the Branch. The visit was organized with priorpermissionandguidance of Dr.VirendraSangtani,Headof Department.Total40studentsalong with faculty members Mr. Rohit Sharma and Mr. Amba Lal as coordinators visited the same. We started from the college at 9:15 AM. and it took us approximately two hours to reach our destination via College transport. The main objective of the visitwastoknow theoretical termswithindustrial(practical) exposure and working of Uttam Transformers. An engineer at Uttam transformers welcomed all of us at the entrance and took us in batches to explain the manufacturing process and working of Transformers in detail. COMPANY PROFILE: Uttam Bharat) Electricals Private Limited is an ISO 9001:2008 certified leading manufacturer of PowerandDistributionTransformers from 5KVA to 12500 KVA upto 11-22-33 KV class, Single-Three Phase having a turnover of approx. 112 crores. The company hasmachine facilitiestoDesign,Manufacture andtestTransformersasperIS:2026/BS- 171/IEC-76 international standards.Transformersupto12500 KVA rating33 KV classhave beentype tested for Short circuit and Impulse test at CPRI and other government approved laboratories. The company has received SE2B rating by CRISIL which denotes high performance capability adjudged in relation to other SSI’s. The company has been meeting specific requirements such as dual-ratio transformer, Furnace transformers, Transformers with OLTC or conversion of existing transformer to any voltage ratio. Uttam transformers have developed and supplied fail safe Distribution transformers, wound core transformers and are in the process of developing Amorphous core, and Dry type transformers. Uttam made transformers are approved by Telecom, CPWD, MES, Railways, PWD and various utilities ans state electricity boards.In a span of over 30 years, the company has supplied over 1,50,000 Power and Distribution transformers at various ratings and voltages to users in India and Abroad. The company has exported transformers to Jordan, Nigeria, Bhutan, Sri Lanka and Nepal. The salient features of the company include Robust Design, Economical losses, Stringent Quality control,timelydelivery,extendedguarantee period,efficientandpromptaftersalesservice. We were explained the following details about transformers:
  • 2. There are two types of circuits in a transformer-  Magnetic circuit (core)  Electric circuit Basic Parts of a Transformer: 1) Laminated core 2) Windings 3) Insulating Materials 4) Transformer oil 5) Tap changer 6) Conservator 7) Breather 8) Cooling tubes 9) Buchholz Relay 10) Explosion vent Core: The core is used to support the windings in the transformer. Cold-rolledgrain-oriented(CRGO) steel is used for the manufacture of transformer core.It has low magnetichysteresislooparea,whichminimizes magneticlosses&highsiliconcontentwhichleadsto high resistance, decreasing eddy current losses. So, overall losses are reduced. Amorphous Core: Amorphous core material offers both reduced hysteresis loss and eddy current lossbecause this material has a random grain and magnetic domain structure which results in high permeability, which ensures a narrow hysteresis curve compared to conventional CRGO material. The thickness of Amorphous sheet is about 1/10th that of CRGO. Core Assembly: It consists of: 1) Core made up of CRGO steel. 2) Core bolt 3) Three limbs 4) Top Yoke and Bottom yoke 5) Tie rod 6) LT & HT Windings WINDINGS:- LT Windings are connected in star and HT Windings are connected in Delta.
  • 3. Enamel isusedto insulate the windingsof low voltagetransformers. For power transformers, paper insulation is used for winding wire as well as in the form of strips of paper insulation between winding layers. Cross winding- It is made of circular conductor used for High voltage windings of relatively small transformers. Helical winding: We use helical winding where we need to draw more current.It consists of large no. of parallel conductors piled in the radial direction and wound. It is used for windings of low voltage(20 KV or below) & large current. Between layers, no insulation other than conductor insulation is required as voltage between the layers is low. The parallel circuits bring in the problem of current sharing.Transposition is adopted to reduce unequal current distribution. The modern trend is to use transposed and bunched conductors. MS Tank Mild Steel Tank consists of three phase windings along with Neutral. It is filled with Transformer oil. Gasket- Oil seal is used to prevent any leakage. TRANSFORMER OIL:- ON-AN (Oil Natural Air Natural) transformers have inbuilt properties of cooling down oil inside it. ON (Oil Natural)- AF (Air Force) Transformers have to be provided with external air force to cool down the temperature. OVEN: Core assembly is heated in the oven. Conservator Tank: It is placed on the Mils Steel Tank and is filled with Transformer Oil. Breather Pipe: It is used to carry moisture-free, dry air into the tank. Equalizer Pipe- It is used to equalize pressure. The expected life of a transformer is 20-25 Years.
  • 4. Testing Lab is used for the Health check of the transformers. Tap No. PT Ratio 1 600/600 2 1200/600 3 1800/600 4 2400/600 5 3000/600 MarshallingBox:Itis a weather-proof terminal box which connects the transformer’s fittings to the protective schemes to give alarm under abnormal conditions. It also houses Oil temperature indicator (OTI) and Winding temperature indicator (WTI). Buchholz Relay: It is connected between the Conservator tank and Transformer tank. Explosion vent pipe: It is the top-most and weakest part of the transforer to ensure transformer protection. A very thin brass metal is used which breaks if there is any fault in the transformer.