SlideShare a Scribd company logo
1 of 3
Download to read offline
Inputs
DevelopProjectCharter
DevelopProjectManagementPlan
DirectandManageProjectWork
MonitorandControlProjectWork
PerformIntegratedChangeControl
CloseProjectorPhase
PlanScopeManagement
CollectRequirements
DefineScope
CreateWBS
ValidateScope
ControlScope
PlanScheduleManagement
DefineActivities
SequenceActivities
EstimateActivityResources
EstimateActivityDurations
DevelopSchedule
ControlSchedule
PlanCostManagement
EstimateCosts
DetermineBudget
ControlCosts
PlanQualityManagemet
PerformQualityAssurance
ControlQuality
PlanHRManagement
AcquireProjectTeam
DevelopProjectTeam
ManageProjectTeam
PlanCommunicationsmanagement
ManageCommunications
ControlCommunications
PlanRiskManagement
IdentifyRisks
PerformQualitativeriskanalysis
PerformQuantitativeriskanalysis
PlanRiskresponses
ControlRisks
PlanProcurementManagement
Conductprocurements
Controlprocurements
Closeprocurements
Identifystakeholders
PlanStakeholdermanagement
ManageStakeholderengagements
ControlStakeholderengagements
Accepted deliverables x
Activity Attributes x x x x
Activity cost estimates x x x x
Activity duration estimates x x
Activity List x x x x
Activity resource requirements x x x x
Agreements x x x
Approved Change Requests x x x
Basis of estimates x
Business Case x
Change log x
Change Requests x
Communications management plan x x
Cost Forecasts x
Cost Management Plan x x x x
Deliverables x
Enterprise Environmental Factors x x x x x x x x x x x x x x x x x x x x x x x x x x x
Human Resource management plan x x x x x
Issue log x x x
Make-or-buy decisions x
Milestone List x
Organizational Process Assets x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
Outputs from other processes x
Process improvement plan x
Procurement documents x x x x x
Procurement management plan x
Procurement statement of work x
Project Calendars x
Project Charter x x x x x x x x
Project communications x
Project documents x x x x x
project funding requirements x
Project Management Plan x x x x x x x x x x x x x x x x x x x x x x x
Project schedule x x x x
Project schedule network diagrams x
Project Scope Statement x x x x
Project staff assignments x x x
Project Statement of Work x
Quality checklists x
Quality control measurements x
Quality management plan x x
Quality metrics x x
Requirements Documentation x x x x x x
Requirements Management Plan x
Requirements traceability matrix x x
Resource Breakdown Structure x x
Resource Calendars x x x x x
Risk management plan x x x x
Risk Register x x x x x x x x x x x
Schedule data x
Schedule Forecasts x
Schedule management plan x x x x x x x
Scope baseline x x x x x
Scope Management Plan x x x
Seller proposals x
Source selection criteria x
Stakeholder Management Plan x x
Stakeholder Register x x x x x x x
Team performance assessments x
Validated Changes x
Verified deliverables x
work performance data x x x x x x x x x
Work Performance Information x
Work Performance reports x x x x x
Outputs
DevelopProjectCharter
DevelopProjectManagementPlan
DirectandManageProjectWork
MonitorandControlProjectWork
PerformIntegratedChangeControl
CloseProjectorPhase
PlanScopeManagement
CollectRequirements
DefineScope
CreateWBS
ValidateScope
ControlScope
PlanScheduleManagement
DefineActivities
SequenceActivities
EstimateActivityResources
EstimateActivityDurations
DevelopSchedule
ControlSchedule
PlanCostManagement
EstimateCosts
DetermineBudget
ControlCosts
PlanQualityManagemet
PerformQualityAssurance
ControlQuality
PlanHRManagement
AcquireProjectTeam
DevelopProjectTeam
ManageProjectTeam
PlanCommunicationsmanagement
ManageCommunications
ControlCommunications
PlanRiskManagement
IdentifyRisks
PerformQualitativeriskanalysis
PerformQuantitativeriskanalysis
PlanRiskresponses
ControlRisks
PlanProcurementManagement
Conductprocurements
Controlprocurements
Closeprocurements
Identifystakeholders
PlanStakeholdermanagement
ManageStakeholderengagements
ControlStakeholderengagements
Accepted Deliverables x
Activity Attributes x
Activity cost estimates x
Activity duration estimates x
Activity List x
Activity resource requirements x
Agreements x
Approved Change requests x
Basis of estimates x
Change Log x
Change Requests x x x x x x x x x x x x x x x x
Closed procurements x
Communications management plan x
Cost baseline x
Cost forecasts x
Cost Management Plan x
Deliverables x
Enterprise environmental factors updates x x
Final Product, service, or result transition x
Human resource management plan x
Issue log x
Make-or-buy decisions x
Milestone List x
Organizational process assets updates x x x x x x x x x x x x x x
Process improvement plan x
Procurement documents x
Procurement management plan x
Procurement statement of work x
Project documents updates x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
Project Calendars x
Project Charter x
Project communications x
Project funding requirements x
Project Management Plan x
Project Management Plan updates x x x x x x x x x x x x x x x x x x x
Project Schedule x
Project Schedule Network Diagram x
Project Scope Statement x
Project staff assignments x
Quality checklists x
Quality control measurements x
Quality management plan x
Quality metrics x
Requirements Documentation x
Requirements Management Plan x
Requirements Traceability Matrix x
Resource Breakdown Structure x
Resource calendars x x
Risk management plan x
Risk register x
Schedule baseline x
Schedule data x
Schedule forecasts x
Schedule Management Plan x
Scope Baseline x
Scope management Plan x
Selected sellers x
Source selection criteria x
Stakeholder management plan x
Stakeholder register x
Team performance assessments x
Validated changes x
Validated deliverables x
Work Performance Data x
Work Performance information x x x x x x x x x
Work Performance Reports x
Tools and Techniques
DevelopProjectCharter
DevelopProjectManagementPlan
DirectandManageProjectWork
MonitorandControlProjectWork
PerformIntegratedChangeControl
CloseProjectorPhase
PlanScopeManagement
CollectRequirements
DefineScope
CreateWBS
ValidateScope
ControlScope
PlanScheduleManagement
DefineActivities
SequenceActivities
EstimateActivityResources
EstimateActivityDurations
DevelopSchedule
ControlSchedule
PlanCostManagement
EstimateCosts
DetermineBudget
ControlCosts
PlanQualityManagemet
PerformQualityAssurance
ControlQuality
PlanHRManagement
AcquireProjectTeam
DevelopProjectTeam
ManageProjectTeam
PlanCommunicationsmanagement
ManageCommunications
ControlCommunications
PlanRiskManagement
IdentifyRisks
PerformQualitativeriskanalysis
PerformQuantitativeriskanalysis
PlanRiskresponses
ControlRisks
PlanProcurementManagement
Conductprocurements
Controlprocurements
Closeprocurements
Identifystakeholders
PlanStakeholdermanagement
ManageStakeholderengagements
ControlStakeholderengagements
Acquisition x
Additional quality planning tools x
Advertising x
Alternative analysis x
Alternatives Generation x
Analogous estimating x x
Analytical Techniques x x x x x x x
Approved change requests review x
Assumptions analysis x
Benchmarking x x
Bidder conference x
Bottom-up estimating x x
Change Control Tools x
Checklist analysis x
Claims administration x
Colocation x
Communication methods x x x
Communication models x x
Communication requirements analysis x
Communication technology x x
Conflict management x
Context Diagrams x
Contingent Response Strategy x
Contract change control system x
Cost Aggregation x
Cost of quality x x
Cost-benefit analysis x
Critical Chain method x
Critical path method x
Data gathering and representation techniques x
Decomposition x x
Dependency determination x
Design of experiments x
Diagramming techniques x
Documentation reviews x
Documents Analysis x
Earned value management x
Expert Judgement x x x x x x x x x x x x x x x x x x x x x x x x x x x x
Facilitated Workshops x x
Facilitation Techniques x x
Focus Groups x
Forecasting x
Funding limit reconciliation x
Ground rules x
Group Creativity techniques x
Group decision-making techniques x x x x
Historical relationships x
Independent estimates
Information gathering techniques x x
Information management systems x x x
Inspection x x
Inspections and audits x
Interpersonal skills x x x
Interviews x
Leads and Lags x x x
Make-or-buy analysis x
Management skills x
Market research x
Meetings x x x x x x x x x x x x x x x
Modelling techniques x x
Multi-criteria decision analysis x
Negotiation x
Networking x
Observation and conversation x
Observations x
Organization charts and position descriptions x
Organizational theory x
Parametric estimating x x
Payment systems x
Performance reporting x x
Performance reviews x x
Personnel assessment tools x
Pre-assignment x
Precedence diagramming method (PDM) x
Probability and impact matrix x
Process analysis x
Procurement audits x
Procurement negotiations x x
Procurement performance reviews x
Product Analysis x
Project Management Information System x x
Project management software x x x x
Project performance appraisals x
Proposal evaluation techniques x
Prototypes x
Published estimating data x
Quality audits x
Quality management and control tools x
Quantitative risk analysis and modeling techniques x
Questionnaires and Surveys x
Recognition and rewards x
Records management system x x
Reserve analysis x x x x x
Resource optimization method x
Resource optimization techniques x
Risk audits x
Risk categorization x
Risk data quality assessment x
Risk probability and impact assessment x
Risk reassessment x
Risk urgency assessment x
Rolling wave planning x
Schedule compression x x
Schedule network analysis x
Scheduling tool x x
Seven basic quality tools x x
Stakeholder analysis x
Statistical sampling x x
Strategies for negative risks or threats x
Strategies for positive risks or opportunities x
SWOT analysis x
Team-building activities x
Technical performance measurement x
Three point estimating x x
To-Complete performance index (TCPI) x
Training x
Variance analysis x
Variance and trend analysis x
Vendor bid analysis x
Virtual teams x

More Related Content

What's hot

Project managemenet knowledge areas
Project managemenet knowledge areasProject managemenet knowledge areas
Project managemenet knowledge areaslinajarruti
 
PM Knowledge Areas
PM Knowledge AreasPM Knowledge Areas
PM Knowledge AreasDerya Milner
 
OVERVIEW OF PROJECT MANAGEMENT KNOWLEDGE AREAS 2
OVERVIEW OF PROJECT MANAGEMENT KNOWLEDGE AREAS 2OVERVIEW OF PROJECT MANAGEMENT KNOWLEDGE AREAS 2
OVERVIEW OF PROJECT MANAGEMENT KNOWLEDGE AREAS 2Idris Animasaun, PMP
 
Pmp doc data_as per pmp - copy
Pmp doc data_as per pmp - copyPmp doc data_as per pmp - copy
Pmp doc data_as per pmp - copysandeep sonkusale
 
PMBOK(R) sixth edition data flow diagrams r2
PMBOK(R)  sixth edition data flow diagrams r2PMBOK(R)  sixth edition data flow diagrams r2
PMBOK(R) sixth edition data flow diagrams r2Kose Jumnichi
 
Project Quality Management - PMBOK6
Project Quality Management - PMBOK6Project Quality Management - PMBOK6
Project Quality Management - PMBOK6Agus Suhanto
 
PMBOK(R) sixth edition Data Flow diagram by english, A3 Printable.
PMBOK(R)  sixth edition Data Flow diagram by english, A3 Printable.PMBOK(R)  sixth edition Data Flow diagram by english, A3 Printable.
PMBOK(R) sixth edition Data Flow diagram by english, A3 Printable.Kose Jumnichi
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycleImran Jamil
 
PMP CAPM Study Guide Time Management
PMP CAPM Study Guide Time ManagementPMP CAPM Study Guide Time Management
PMP CAPM Study Guide Time ManagementAhmed Higazi, PMP CSM
 
PMP CAPM Study Guide Procurement Management
PMP CAPM Study Guide Procurement ManagementPMP CAPM Study Guide Procurement Management
PMP CAPM Study Guide Procurement ManagementAhmed Higazi, PMP CSM
 
PMP CAPM Study Guide Risk Management
PMP CAPM Study Guide Risk ManagementPMP CAPM Study Guide Risk Management
PMP CAPM Study Guide Risk ManagementAhmed Higazi, PMP CSM
 
PMP-Integration Management area
PMP-Integration Management  areaPMP-Integration Management  area
PMP-Integration Management areaZaur Ahmadov, PMP
 
PMP CAPM Study Guide Communication Management
PMP CAPM Study Guide Communication ManagementPMP CAPM Study Guide Communication Management
PMP CAPM Study Guide Communication ManagementAhmed Higazi, PMP CSM
 
Project Resource Management - PMBOK6
Project Resource Management - PMBOK6Project Resource Management - PMBOK6
Project Resource Management - PMBOK6Agus Suhanto
 
PMP CAPM Study Guide-Cost Management
PMP CAPM Study Guide-Cost ManagementPMP CAPM Study Guide-Cost Management
PMP CAPM Study Guide-Cost ManagementAhmed Higazi, PMP CSM
 
PMP GLOSSARY
PMP GLOSSARYPMP GLOSSARY
PMP GLOSSARYSoumya De
 

What's hot (20)

Project managemenet knowledge areas
Project managemenet knowledge areasProject managemenet knowledge areas
Project managemenet knowledge areas
 
PM Knowledge Areas
PM Knowledge AreasPM Knowledge Areas
PM Knowledge Areas
 
OVERVIEW OF PROJECT MANAGEMENT KNOWLEDGE AREAS 2
OVERVIEW OF PROJECT MANAGEMENT KNOWLEDGE AREAS 2OVERVIEW OF PROJECT MANAGEMENT KNOWLEDGE AREAS 2
OVERVIEW OF PROJECT MANAGEMENT KNOWLEDGE AREAS 2
 
Pmp doc data_as per pmp - copy
Pmp doc data_as per pmp - copyPmp doc data_as per pmp - copy
Pmp doc data_as per pmp - copy
 
PMBOK(R) sixth edition data flow diagrams r2
PMBOK(R)  sixth edition data flow diagrams r2PMBOK(R)  sixth edition data flow diagrams r2
PMBOK(R) sixth edition data flow diagrams r2
 
11 project risk management
11 project risk management11 project risk management
11 project risk management
 
PMP CAPM study guide Scope
PMP CAPM study guide ScopePMP CAPM study guide Scope
PMP CAPM study guide Scope
 
Project Quality Management - PMBOK6
Project Quality Management - PMBOK6Project Quality Management - PMBOK6
Project Quality Management - PMBOK6
 
PMBOK(R) sixth edition Data Flow diagram by english, A3 Printable.
PMBOK(R)  sixth edition Data Flow diagram by english, A3 Printable.PMBOK(R)  sixth edition Data Flow diagram by english, A3 Printable.
PMBOK(R) sixth edition Data Flow diagram by english, A3 Printable.
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycle
 
PMP CAPM Study Guide Time Management
PMP CAPM Study Guide Time ManagementPMP CAPM Study Guide Time Management
PMP CAPM Study Guide Time Management
 
PMP CAPM Study Guide Procurement Management
PMP CAPM Study Guide Procurement ManagementPMP CAPM Study Guide Procurement Management
PMP CAPM Study Guide Procurement Management
 
PMP CAPM Study Guide Risk Management
PMP CAPM Study Guide Risk ManagementPMP CAPM Study Guide Risk Management
PMP CAPM Study Guide Risk Management
 
PMP CAPM Study Guide-HR Management
PMP CAPM Study Guide-HR ManagementPMP CAPM Study Guide-HR Management
PMP CAPM Study Guide-HR Management
 
PMP-Integration Management area
PMP-Integration Management  areaPMP-Integration Management  area
PMP-Integration Management area
 
PMP CAPM Study Guide Communication Management
PMP CAPM Study Guide Communication ManagementPMP CAPM Study Guide Communication Management
PMP CAPM Study Guide Communication Management
 
Project Resource Management - PMBOK6
Project Resource Management - PMBOK6Project Resource Management - PMBOK6
Project Resource Management - PMBOK6
 
Project Management
Project ManagementProject Management
Project Management
 
PMP CAPM Study Guide-Cost Management
PMP CAPM Study Guide-Cost ManagementPMP CAPM Study Guide-Cost Management
PMP CAPM Study Guide-Cost Management
 
PMP GLOSSARY
PMP GLOSSARYPMP GLOSSARY
PMP GLOSSARY
 

Similar to Pmp itto factors_dfd

PMBOK's Tools techniques combination matrix
PMBOK's Tools techniques combination matrixPMBOK's Tools techniques combination matrix
PMBOK's Tools techniques combination matrixLorraine Lord
 
Data Science for Fundraising: Build Data-Driven Solutions Using R - Rodger De...
Data Science for Fundraising: Build Data-Driven Solutions Using R - Rodger De...Data Science for Fundraising: Build Data-Driven Solutions Using R - Rodger De...
Data Science for Fundraising: Build Data-Driven Solutions Using R - Rodger De...Rodger Devine
 
Name of ProjectStudent NameIndependent Research Projec.docx
Name of ProjectStudent NameIndependent Research Projec.docxName of ProjectStudent NameIndependent Research Projec.docx
Name of ProjectStudent NameIndependent Research Projec.docxrosemarybdodson23141
 
Software Testing Management
Software Testing ManagementSoftware Testing Management
Software Testing ManagementSachin-QA
 
Project Management
Project ManagementProject Management
Project ManagementANKUR-BA
 
Software Testing Management
Software Testing ManagementSoftware Testing Management
Software Testing ManagementVidya-QA
 
Test Management
Test ManagementTest Management
Test ManagementFayis-QA
 
Testing Management
Testing ManagementTesting Management
Testing ManagementRajesh-QA
 
Transforming compliance and audit management with ServiceNow
Transforming compliance and audit management with ServiceNowTransforming compliance and audit management with ServiceNow
Transforming compliance and audit management with ServiceNowIceberg Networks Corporation
 
Successful Project Management
Successful Project ManagementSuccessful Project Management
Successful Project ManagementAnasKhalifah
 
282.successful project management
282.successful project management282.successful project management
282.successful project managementNav Saini
 
Esouag r12 presentation
Esouag r12 presentationEsouag r12 presentation
Esouag r12 presentationIshtiaq Khan
 
Successful project management - Facade perspective
Successful project management - Facade perspectiveSuccessful project management - Facade perspective
Successful project management - Facade perspectiveArshad khan
 
Clinical QbD Best Practices When Outsourcing
Clinical QbD Best Practices When OutsourcingClinical QbD Best Practices When Outsourcing
Clinical QbD Best Practices When OutsourcingThe Avoca Group
 
Cobit itil and iso 27001 mapping
Cobit itil and iso 27001 mappingCobit itil and iso 27001 mapping
Cobit itil and iso 27001 mappingMuhammad Aslam
 
Value stream management is essential for dev ops v4
Value stream management is essential for dev ops v4Value stream management is essential for dev ops v4
Value stream management is essential for dev ops v4DevOps.com
 

Similar to Pmp itto factors_dfd (20)

PMBOK's Tools techniques combination matrix
PMBOK's Tools techniques combination matrixPMBOK's Tools techniques combination matrix
PMBOK's Tools techniques combination matrix
 
Successful project management
Successful project managementSuccessful project management
Successful project management
 
Six sigma[2]
Six sigma[2]Six sigma[2]
Six sigma[2]
 
Data Science for Fundraising: Build Data-Driven Solutions Using R - Rodger De...
Data Science for Fundraising: Build Data-Driven Solutions Using R - Rodger De...Data Science for Fundraising: Build Data-Driven Solutions Using R - Rodger De...
Data Science for Fundraising: Build Data-Driven Solutions Using R - Rodger De...
 
Name of ProjectStudent NameIndependent Research Projec.docx
Name of ProjectStudent NameIndependent Research Projec.docxName of ProjectStudent NameIndependent Research Projec.docx
Name of ProjectStudent NameIndependent Research Projec.docx
 
Software Testing Management
Software Testing ManagementSoftware Testing Management
Software Testing Management
 
Project Management
Project ManagementProject Management
Project Management
 
Software Testing Management
Software Testing ManagementSoftware Testing Management
Software Testing Management
 
Test Management
Test ManagementTest Management
Test Management
 
Testing Management
Testing ManagementTesting Management
Testing Management
 
Transforming compliance and audit management with ServiceNow
Transforming compliance and audit management with ServiceNowTransforming compliance and audit management with ServiceNow
Transforming compliance and audit management with ServiceNow
 
Successful Project Management
Successful Project ManagementSuccessful Project Management
Successful Project Management
 
282.successful project management
282.successful project management282.successful project management
282.successful project management
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Esouag r12 presentation
Esouag r12 presentationEsouag r12 presentation
Esouag r12 presentation
 
Successful project management - Facade perspective
Successful project management - Facade perspectiveSuccessful project management - Facade perspective
Successful project management - Facade perspective
 
Clinical QbD Best Practices When Outsourcing
Clinical QbD Best Practices When OutsourcingClinical QbD Best Practices When Outsourcing
Clinical QbD Best Practices When Outsourcing
 
DMAIC Components
DMAIC ComponentsDMAIC Components
DMAIC Components
 
Cobit itil and iso 27001 mapping
Cobit itil and iso 27001 mappingCobit itil and iso 27001 mapping
Cobit itil and iso 27001 mapping
 
Value stream management is essential for dev ops v4
Value stream management is essential for dev ops v4Value stream management is essential for dev ops v4
Value stream management is essential for dev ops v4
 

Recently uploaded

Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)jennyeacort
 
Management and managerial skills training manual.pdf
Management and managerial skills training manual.pdfManagement and managerial skills training manual.pdf
Management and managerial skills training manual.pdffillmonipdc
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsCIToolkit
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
Motivational theories an leadership skills
Motivational theories an leadership skillsMotivational theories an leadership skills
Motivational theories an leadership skillskristinalimarenko7
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证jdkhjh
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramCIToolkit
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionCIToolkit
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 

Recently uploaded (18)

Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
 
Management and managerial skills training manual.pdf
Management and managerial skills training manual.pdfManagement and managerial skills training manual.pdf
Management and managerial skills training manual.pdf
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
Motivational theories an leadership skills
Motivational theories an leadership skillsMotivational theories an leadership skills
Motivational theories an leadership skills
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem Resolution
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 

Pmp itto factors_dfd