Attempts to match the supply of and
demand for a product or service by
determining the appropriate quantities and
timing of inputs, transformation, and
outputs. Decisions made on production,
staffing, inventory and backorder levels.
 Considers a "planning horizon" from about 3
to 18 months, with periodic updating
 Looks at aggregate product demand, stated
in common terms
 Looks at aggregate resource quantities,
stated in common terms
 Possible to influence both supply and
demand by adjusting production rates,
workforce levels, inventory levels, etc., but
facilities cannot be expanded.
 Maximize customer service
 Minimize inventory investment
 Minimize changes in workforce levels
 Minimize changes in production rates
 Maximize utilization of plant and equipment
 A managerial statement of the period-by-
period staff sizes and labor-related
capacities, given customer requirements and
capacity limitations.
 Attempts to handle fluctuations in demand by
focusing on demand management
 Use pricing strategies and/or advertising and
promotion
 Develop counter-cyclical products
 Request customers to backorder or advance-
order
 Do not meet demand
 Attempts to handle fluctuations in demand by
focusing on supply and capacity management
 Vary size work force size by hiring or layoffs
 Vary utilization of labour and equipment
through overtime or idle time
 Build or draw from inventory
 Subcontract production
 Negotiate cooperative arrangements with
other firms
 Allow backlogs, back orders, and/or
stockouts
 Combines elements of both an active strategy
and a passive (reactive) strategy
 Firms will usually use some combination of
the two
Capacities (workforce levels, production
schedules, output rates, etc.) are adjusted to
match demand requirements over the
planning horizon.
Advantages:
 Anticipation inventory is not required, and
investment in inventory is low
 Labor utilization is kept high
 Disadvantages:
Expense of adjusting output rates and/or
workforce levels
Alienation of workforce
 Capacities (workforce levels, production
schedules, output rates, etc.) are kept
constant over the planning horizon.
Stable output rates and workforce
levels
Unlike the rest of Psychology it
focuses on how we are different
from each other rather than
generalizing findings to
everybody.
 Greater inventory investment is required
 Increased overtime and idle time
 Resource utilizations vary over time
Intuitive methods use management intuition,
experience, and rules-of-thumb, frequently
accompanied by graphical and/or spreadsheet
analysis.
 Easy to use and explain
 Many solutions are possible, most of which
are not optimal
 Suppose you have the following forecasts for
demand to meet:
Month 1 2 3 4 5 6
Demand 1000 1200 1500 1900 1800 1600
Regular production cost $35/unit
Lost sales $100/unit
Inventory carrying costs $10/unit/month
Subcontracting costs $60/unit
Hiring costs $1500/worker
Firing costs $3000/worker
Beginning workforce level 20 workers
Capacity per worker 50 units/month
Initial inventory level 700 units
Closing inventory level 100 units
Find the requirements for the period of the
plan and produce the average amount needed
per month to meet the plan.
Average Requirements :
total requirements - opening inv. + closing inv.
number of periods
(9000 - 700 + 100)/6 = 1400 units/period
Steps:
 Enter the production data
 Determine hire/fire to get to production level
desired
 Update inventory levels
 Does the inventory run out - If it does recalculate
average production needed and go to step 1
 Calculate totals for each category
 Calculate costs
 Trial and Error to find a good solution
 Use Excel to model the problem and test the
impact of different solutions
 Build the model using proper structure with
key variables at the top and a summary of key
results immediately below.
 Aggregate planning problems can be solved
optimally using linear programming (LP).
 Given the constraints on requirements,
production capabilities, allowed workforce
changes, overtime and subcontracting limits
plus all relevant costs LP will find an optimal
solution to the problem which minimizes
total costs.
 Excel's Solver add-in will perform LP
An aggregate plan takes into consideration
the overall level of output and the capacity
that is required to produce it. There are two
basic approaches to estimating the capacity
that will be required to produce an
aggregation or grouping of a company’s
products.
With this approach, the desirable overall plan is
developed for the periods in the planning
horizon, with the plan for the first few periods
being fairly firm. This approach rests on the
assumption that if the proper amount of total
capacity is available, the right amount of capacity
for all of the parts will be available. With this
approach, the desirable overall plan is developed
for the periods in the planning horizon, with the
plan for the first few periods being fairly firm.
This approach rests on the assumption that if the
proper amount of total capacity is available, the
right amount of capacity for all of the parts will
be available.
This is also called as resource requirement
planning (sometimes called rough-cut
capacity planning) which is usually used in
conjunction with material requirement
planning (MRP-1) both capacity and materials
must be available for products to be made
and hence material plans need to be
coordinated with a more detailed production
plan.
 This is done in conjunction with the tentative
mater production schedule to test its feasibility
in terms of capacity before the Master Production
Schedule (MPS) is finalized.
 This ensures that a proposed MPS does not
inadvertently overload any key department, work
centre or machine, making the MPS unworkable.
Although the check can be applied to all work
centers, it is typically applied only to the critical
work centers that are most likely to be
bottlenecks. It is a quick and inexpensive way to
find and correct gross discrepancies between the
capacity requirements of the MPS and the
available capacity.
 For manufacturing firms the luxury of building
up inventories during periods of slack demand
allows coverage of an anticipated time when
demand will exceed capacity. Services cannot be
stockpiled or inventoried so they do not have this
option. Also, since services are considered
"perishable," any capacity that goes unused is
essentially wasted. An empty hotel room or an
empty seat on a flight cannot be held and sold
later, as can a manufactured item held in
inventory.
 Service capacity can also be very difficult to measure.
When capacity is dictated somewhat by machine
capability, reasonably accurate measures of capacity
are not extremely difficult to develop. However,
services generally have variable processing
requirements that make it difficult to establish a
suitable measure of capacity.
 Historically, services are much more labor intensive
than manufacturing, where labor averages 10 percent
(or less) of total cost. This labor intensity can actually
be an advantage because of the variety of service
requirements an individual can handle. This can
provide quite a degree of flexibility that can make
aggregate planning easier for services than
manufacturing.
Operations management, also called "operations
planning" or "operations scheduling," is a term
assigned to the planning of production in all
aspects, from workforce activities to product
delivery. While this type of planning is almost
exclusively seen in manufacturing environments,
many of the techniques are used by service-
oriented businesses. Simple to implement,
operations management can be applied using
nothing more than a spreadsheet program.
Operations management is primarily
concerned with the efficient use of resources.
While it is sometimes referred to as
production planning and employs many of
the same techniques, the primary
distinguishing characteristic is that
production planning is narrowly focused on
the actual production whereas operations
management looks at the operation as a
whole.
Operations planning is an important part of
any business. Effective and efficient
management of operations is the hallmark of
a successful company. Operations
management is an old concept, but as many
of the techniques of operations management
have gained attention in the business media,
the definition has become somewhat unclear,
making effective management of operations
seem more complicated than it really is.
Operations management has a broad
focus: inventory levels must be managed,
materials ordered/stored, capacity
maximized, relationships with suppliers
maintained, and the interactions within
the system monitored.
Capacity planning is focused on maximizing
the capacity of a company to make it more
efficient and more profitable. Capacity
planning at its most basic attempts to match
the volume the company is able to produce to
the demand to avoid downtime by preventing
bottlenecks.
Aggregate planning is a static form of production
planning. It focuses on satisfying expected
demand. This may be in relation to production, the
workforce itself or inventory management.
Aggregate planning basically ties facility planning
in with scheduling decisions and it does so
quantitatively, meaning it produces numbers to
back up an operations plan.
Operations ppt

More Related Content

What's hot

Aggregat planning stevenson
Aggregat planning stevensonAggregat planning stevenson
Aggregat planning stevensonPiyush Vanjani
 
Aggregate planning in service
Aggregate planning in service Aggregate planning in service
Aggregate planning in service Ryan Shams
 
Aggragate planning1
Aggragate planning1Aggragate planning1
Aggragate planning1arathymalz
 
CAPACITY & AGGREGATE PLANNING
CAPACITY & AGGREGATE PLANNINGCAPACITY & AGGREGATE PLANNING
CAPACITY & AGGREGATE PLANNINGVijit Gajbhiye
 
Productionplanning aggregate capacity
Productionplanning aggregate capacityProductionplanning aggregate capacity
Productionplanning aggregate capacityzmagtoto
 
IBF conference, 20-22 Amsterdam Nov/2013
IBF conference, 20-22 Amsterdam Nov/2013IBF conference, 20-22 Amsterdam Nov/2013
IBF conference, 20-22 Amsterdam Nov/2013Humberto Galasso
 
Forward scheduling vs. backward scheduling in production planning
Forward scheduling vs. backward scheduling in production planningForward scheduling vs. backward scheduling in production planning
Forward scheduling vs. backward scheduling in production planningMRPeasy
 
Ch14 aggt.sales & op.planning
Ch14 aggt.sales & op.planningCh14 aggt.sales & op.planning
Ch14 aggt.sales & op.planningvideoaakash15
 
Master production schedule
Master production scheduleMaster production schedule
Master production scheduleyashbhhardwaj260
 

What's hot (19)

Aggregat planning stevenson
Aggregat planning stevensonAggregat planning stevenson
Aggregat planning stevenson
 
Aggregate planning in service
Aggregate planning in service Aggregate planning in service
Aggregate planning in service
 
Chapter 5_OM
Chapter 5_OMChapter 5_OM
Chapter 5_OM
 
Aggrigate planning copy
Aggrigate planning   copyAggrigate planning   copy
Aggrigate planning copy
 
Aggregate Planning
Aggregate PlanningAggregate Planning
Aggregate Planning
 
Aggragate planning1
Aggragate planning1Aggragate planning1
Aggragate planning1
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
CAPACITY & AGGREGATE PLANNING
CAPACITY & AGGREGATE PLANNINGCAPACITY & AGGREGATE PLANNING
CAPACITY & AGGREGATE PLANNING
 
Productionplanning aggregate capacity
Productionplanning aggregate capacityProductionplanning aggregate capacity
Productionplanning aggregate capacity
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Ppt6
Ppt6Ppt6
Ppt6
 
IBF conference, 20-22 Amsterdam Nov/2013
IBF conference, 20-22 Amsterdam Nov/2013IBF conference, 20-22 Amsterdam Nov/2013
IBF conference, 20-22 Amsterdam Nov/2013
 
Opm101 chapter13 000
Opm101 chapter13 000Opm101 chapter13 000
Opm101 chapter13 000
 
A Roadmap To World Class Forecasting Accuracy
A Roadmap To World Class Forecasting AccuracyA Roadmap To World Class Forecasting Accuracy
A Roadmap To World Class Forecasting Accuracy
 
Capacity management
Capacity managementCapacity management
Capacity management
 
Forward scheduling vs. backward scheduling in production planning
Forward scheduling vs. backward scheduling in production planningForward scheduling vs. backward scheduling in production planning
Forward scheduling vs. backward scheduling in production planning
 
Ch14 aggt.sales & op.planning
Ch14 aggt.sales & op.planningCh14 aggt.sales & op.planning
Ch14 aggt.sales & op.planning
 
Master production schedule
Master production scheduleMaster production schedule
Master production schedule
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 

Viewers also liked

Attracting Team Members and Investors
Attracting Team Members and InvestorsAttracting Team Members and Investors
Attracting Team Members and InvestorsPlugginto
 
09 創新創業成功個案 以發明人王舜清的專利賣斷為例
09 創新創業成功個案 以發明人王舜清的專利賣斷為例09 創新創業成功個案 以發明人王舜清的專利賣斷為例
09 創新創業成功個案 以發明人王舜清的專利賣斷為例wei245
 
Molecules to Machine Code
Molecules to Machine CodeMolecules to Machine Code
Molecules to Machine CodeJames Lawson
 
Brandon Hebert Resume TK-CA
Brandon Hebert Resume TK-CABrandon Hebert Resume TK-CA
Brandon Hebert Resume TK-CABrandon Hebert
 
Editorial ocde-perspectives-economiques-juin-2016
Editorial ocde-perspectives-economiques-juin-2016Editorial ocde-perspectives-economiques-juin-2016
Editorial ocde-perspectives-economiques-juin-2016Daniel BASTIEN
 
AMAL RESUME 2015
AMAL RESUME 2015AMAL RESUME 2015
AMAL RESUME 2015Amal Makki
 
Lighting Tech Summit 2016 - Khaled M. Abdelgawad - Lighting Design in Landsca...
Lighting Tech Summit 2016 - Khaled M. Abdelgawad - Lighting Design in Landsca...Lighting Tech Summit 2016 - Khaled M. Abdelgawad - Lighting Design in Landsca...
Lighting Tech Summit 2016 - Khaled M. Abdelgawad - Lighting Design in Landsca...Khaled M. Abdel-Gawad
 
Intern Report on System Analysis & Design (NGO in Bangladesh)
Intern Report on System Analysis & Design (NGO in Bangladesh)Intern Report on System Analysis & Design (NGO in Bangladesh)
Intern Report on System Analysis & Design (NGO in Bangladesh)Sadia Tasnim
 

Viewers also liked (14)

Attracting Team Members and Investors
Attracting Team Members and InvestorsAttracting Team Members and Investors
Attracting Team Members and Investors
 
08
0808
08
 
09 創新創業成功個案 以發明人王舜清的專利賣斷為例
09 創新創業成功個案 以發明人王舜清的專利賣斷為例09 創新創業成功個案 以發明人王舜清的專利賣斷為例
09 創新創業成功個案 以發明人王舜清的專利賣斷為例
 
Mobile Development
Mobile DevelopmentMobile Development
Mobile Development
 
Molecules to Machine Code
Molecules to Machine CodeMolecules to Machine Code
Molecules to Machine Code
 
Brandon Hebert Resume TK-CA
Brandon Hebert Resume TK-CABrandon Hebert Resume TK-CA
Brandon Hebert Resume TK-CA
 
Editorial ocde-perspectives-economiques-juin-2016
Editorial ocde-perspectives-economiques-juin-2016Editorial ocde-perspectives-economiques-juin-2016
Editorial ocde-perspectives-economiques-juin-2016
 
Intro computer
Intro computerIntro computer
Intro computer
 
LOlsenPortfolio
LOlsenPortfolioLOlsenPortfolio
LOlsenPortfolio
 
BATD164
BATD164BATD164
BATD164
 
AMAL RESUME 2015
AMAL RESUME 2015AMAL RESUME 2015
AMAL RESUME 2015
 
Lighting Tech Summit 2016 - Khaled M. Abdelgawad - Lighting Design in Landsca...
Lighting Tech Summit 2016 - Khaled M. Abdelgawad - Lighting Design in Landsca...Lighting Tech Summit 2016 - Khaled M. Abdelgawad - Lighting Design in Landsca...
Lighting Tech Summit 2016 - Khaled M. Abdelgawad - Lighting Design in Landsca...
 
LANDSCAPE LIGHTING
LANDSCAPE LIGHTING LANDSCAPE LIGHTING
LANDSCAPE LIGHTING
 
Intern Report on System Analysis & Design (NGO in Bangladesh)
Intern Report on System Analysis & Design (NGO in Bangladesh)Intern Report on System Analysis & Design (NGO in Bangladesh)
Intern Report on System Analysis & Design (NGO in Bangladesh)
 

Similar to Operations ppt

Capacity planning chapter 8
Capacity planning chapter 8Capacity planning chapter 8
Capacity planning chapter 8Yonela Gaba
 
Sales & Operations Planning
Sales & Operations PlanningSales & Operations Planning
Sales & Operations Planningmubarak2009
 
Mps vs aggregate planning
Mps vs aggregate planningMps vs aggregate planning
Mps vs aggregate planningUmar Yazdani
 
OPERATIONS MANAGEMENT_jims.pptx
OPERATIONS MANAGEMENT_jims.pptxOPERATIONS MANAGEMENT_jims.pptx
OPERATIONS MANAGEMENT_jims.pptxShrajal Gupta
 
AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING Aqib ali
 
A presentation on aggregate planning
A presentation on aggregate planningA presentation on aggregate planning
A presentation on aggregate planningAhelVitsu
 
Capacity resource planning and production scheduling
Capacity resource planning and production schedulingCapacity resource planning and production scheduling
Capacity resource planning and production schedulingdutconsult
 
aggregateplanningreport-121002061533-phpapp02.pdf
aggregateplanningreport-121002061533-phpapp02.pdfaggregateplanningreport-121002061533-phpapp02.pdf
aggregateplanningreport-121002061533-phpapp02.pdfChunWan
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planningAtif Ghayas
 
CHAPTER 3 System and design Capacity.pptx
CHAPTER 3 System and design Capacity.pptxCHAPTER 3 System and design Capacity.pptx
CHAPTER 3 System and design Capacity.pptxPeriMinstrel
 
Forecasting And Aggregate Planning
Forecasting And Aggregate PlanningForecasting And Aggregate Planning
Forecasting And Aggregate PlanningJoanmaines
 
Session 4_OM
Session 4_OMSession 4_OM
Session 4_OMthangv
 
Aggregate Planning, Guide numericals
Aggregate Planning, Guide numericalsAggregate Planning, Guide numericals
Aggregate Planning, Guide numericalsOsama Yousaf
 
CAPACITY PLANNING AND ‎FACILITIES PLANNING
CAPACITY PLANNING AND ‎FACILITIES PLANNINGCAPACITY PLANNING AND ‎FACILITIES PLANNING
CAPACITY PLANNING AND ‎FACILITIES PLANNINGLibcorpio
 
Aggregate planning using transportation method a case study in cable industry
Aggregate planning using transportation method a case study in cable industryAggregate planning using transportation method a case study in cable industry
Aggregate planning using transportation method a case study in cable industryijmvsc
 
Resourcing strategy mpp 5
Resourcing strategy mpp 5Resourcing strategy mpp 5
Resourcing strategy mpp 5Tufail Ahmed
 
Manufacturers use project erp for tough times
Manufacturers use project erp for tough timesManufacturers use project erp for tough times
Manufacturers use project erp for tough timesKaizenlogcom
 

Similar to Operations ppt (20)

Capacity planning chapter 8
Capacity planning chapter 8Capacity planning chapter 8
Capacity planning chapter 8
 
Sales & Operations Planning
Sales & Operations PlanningSales & Operations Planning
Sales & Operations Planning
 
Mps vs aggregate planning
Mps vs aggregate planningMps vs aggregate planning
Mps vs aggregate planning
 
435ch14
435ch14435ch14
435ch14
 
OPERATIONS MANAGEMENT_jims.pptx
OPERATIONS MANAGEMENT_jims.pptxOPERATIONS MANAGEMENT_jims.pptx
OPERATIONS MANAGEMENT_jims.pptx
 
AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING
 
A presentation on aggregate planning
A presentation on aggregate planningA presentation on aggregate planning
A presentation on aggregate planning
 
Capacity resource planning and production scheduling
Capacity resource planning and production schedulingCapacity resource planning and production scheduling
Capacity resource planning and production scheduling
 
aggregateplanningreport-121002061533-phpapp02.pdf
aggregateplanningreport-121002061533-phpapp02.pdfaggregateplanningreport-121002061533-phpapp02.pdf
aggregateplanningreport-121002061533-phpapp02.pdf
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Mrpc final
Mrpc finalMrpc final
Mrpc final
 
CHAPTER 3 System and design Capacity.pptx
CHAPTER 3 System and design Capacity.pptxCHAPTER 3 System and design Capacity.pptx
CHAPTER 3 System and design Capacity.pptx
 
Forecasting And Aggregate Planning
Forecasting And Aggregate PlanningForecasting And Aggregate Planning
Forecasting And Aggregate Planning
 
Session 4
Session 4Session 4
Session 4
 
Session 4_OM
Session 4_OMSession 4_OM
Session 4_OM
 
Aggregate Planning, Guide numericals
Aggregate Planning, Guide numericalsAggregate Planning, Guide numericals
Aggregate Planning, Guide numericals
 
CAPACITY PLANNING AND ‎FACILITIES PLANNING
CAPACITY PLANNING AND ‎FACILITIES PLANNINGCAPACITY PLANNING AND ‎FACILITIES PLANNING
CAPACITY PLANNING AND ‎FACILITIES PLANNING
 
Aggregate planning using transportation method a case study in cable industry
Aggregate planning using transportation method a case study in cable industryAggregate planning using transportation method a case study in cable industry
Aggregate planning using transportation method a case study in cable industry
 
Resourcing strategy mpp 5
Resourcing strategy mpp 5Resourcing strategy mpp 5
Resourcing strategy mpp 5
 
Manufacturers use project erp for tough times
Manufacturers use project erp for tough timesManufacturers use project erp for tough times
Manufacturers use project erp for tough times
 

Recently uploaded

08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?Antenna Manufacturer Coco
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdfChristopherTHyatt
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfhans926745
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 

Recently uploaded (20)

08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 

Operations ppt

  • 1. DEEPIKA MANOHAR PRITAM KUDNAVER JAGU MAJEE HIMANSHU PANDEY MASUD KARIM GAURAV KR PAL
  • 2. Attempts to match the supply of and demand for a product or service by determining the appropriate quantities and timing of inputs, transformation, and outputs. Decisions made on production, staffing, inventory and backorder levels.
  • 3.  Considers a "planning horizon" from about 3 to 18 months, with periodic updating  Looks at aggregate product demand, stated in common terms  Looks at aggregate resource quantities, stated in common terms  Possible to influence both supply and demand by adjusting production rates, workforce levels, inventory levels, etc., but facilities cannot be expanded.
  • 4.  Maximize customer service  Minimize inventory investment  Minimize changes in workforce levels  Minimize changes in production rates  Maximize utilization of plant and equipment
  • 5.  A managerial statement of the period-by- period staff sizes and labor-related capacities, given customer requirements and capacity limitations.
  • 6.  Attempts to handle fluctuations in demand by focusing on demand management  Use pricing strategies and/or advertising and promotion  Develop counter-cyclical products  Request customers to backorder or advance- order  Do not meet demand
  • 7.  Attempts to handle fluctuations in demand by focusing on supply and capacity management  Vary size work force size by hiring or layoffs  Vary utilization of labour and equipment through overtime or idle time  Build or draw from inventory  Subcontract production  Negotiate cooperative arrangements with other firms  Allow backlogs, back orders, and/or stockouts
  • 8.  Combines elements of both an active strategy and a passive (reactive) strategy  Firms will usually use some combination of the two
  • 9. Capacities (workforce levels, production schedules, output rates, etc.) are adjusted to match demand requirements over the planning horizon.
  • 10. Advantages:  Anticipation inventory is not required, and investment in inventory is low  Labor utilization is kept high  Disadvantages: Expense of adjusting output rates and/or workforce levels Alienation of workforce
  • 11.  Capacities (workforce levels, production schedules, output rates, etc.) are kept constant over the planning horizon.
  • 12. Stable output rates and workforce levels Unlike the rest of Psychology it focuses on how we are different from each other rather than generalizing findings to everybody.
  • 13.  Greater inventory investment is required  Increased overtime and idle time  Resource utilizations vary over time
  • 14. Intuitive methods use management intuition, experience, and rules-of-thumb, frequently accompanied by graphical and/or spreadsheet analysis.
  • 15.  Easy to use and explain  Many solutions are possible, most of which are not optimal
  • 16.  Suppose you have the following forecasts for demand to meet: Month 1 2 3 4 5 6 Demand 1000 1200 1500 1900 1800 1600
  • 17. Regular production cost $35/unit Lost sales $100/unit Inventory carrying costs $10/unit/month Subcontracting costs $60/unit Hiring costs $1500/worker Firing costs $3000/worker Beginning workforce level 20 workers Capacity per worker 50 units/month Initial inventory level 700 units Closing inventory level 100 units
  • 18. Find the requirements for the period of the plan and produce the average amount needed per month to meet the plan.
  • 19. Average Requirements : total requirements - opening inv. + closing inv. number of periods
  • 20. (9000 - 700 + 100)/6 = 1400 units/period Steps:  Enter the production data  Determine hire/fire to get to production level desired  Update inventory levels  Does the inventory run out - If it does recalculate average production needed and go to step 1  Calculate totals for each category  Calculate costs
  • 21.  Trial and Error to find a good solution  Use Excel to model the problem and test the impact of different solutions  Build the model using proper structure with key variables at the top and a summary of key results immediately below.
  • 22.  Aggregate planning problems can be solved optimally using linear programming (LP).  Given the constraints on requirements, production capabilities, allowed workforce changes, overtime and subcontracting limits plus all relevant costs LP will find an optimal solution to the problem which minimizes total costs.  Excel's Solver add-in will perform LP
  • 23. An aggregate plan takes into consideration the overall level of output and the capacity that is required to produce it. There are two basic approaches to estimating the capacity that will be required to produce an aggregation or grouping of a company’s products.
  • 24. With this approach, the desirable overall plan is developed for the periods in the planning horizon, with the plan for the first few periods being fairly firm. This approach rests on the assumption that if the proper amount of total capacity is available, the right amount of capacity for all of the parts will be available. With this approach, the desirable overall plan is developed for the periods in the planning horizon, with the plan for the first few periods being fairly firm. This approach rests on the assumption that if the proper amount of total capacity is available, the right amount of capacity for all of the parts will be available.
  • 25. This is also called as resource requirement planning (sometimes called rough-cut capacity planning) which is usually used in conjunction with material requirement planning (MRP-1) both capacity and materials must be available for products to be made and hence material plans need to be coordinated with a more detailed production plan.
  • 26.  This is done in conjunction with the tentative mater production schedule to test its feasibility in terms of capacity before the Master Production Schedule (MPS) is finalized.  This ensures that a proposed MPS does not inadvertently overload any key department, work centre or machine, making the MPS unworkable. Although the check can be applied to all work centers, it is typically applied only to the critical work centers that are most likely to be bottlenecks. It is a quick and inexpensive way to find and correct gross discrepancies between the capacity requirements of the MPS and the available capacity.
  • 27.  For manufacturing firms the luxury of building up inventories during periods of slack demand allows coverage of an anticipated time when demand will exceed capacity. Services cannot be stockpiled or inventoried so they do not have this option. Also, since services are considered "perishable," any capacity that goes unused is essentially wasted. An empty hotel room or an empty seat on a flight cannot be held and sold later, as can a manufactured item held in inventory.
  • 28.  Service capacity can also be very difficult to measure. When capacity is dictated somewhat by machine capability, reasonably accurate measures of capacity are not extremely difficult to develop. However, services generally have variable processing requirements that make it difficult to establish a suitable measure of capacity.  Historically, services are much more labor intensive than manufacturing, where labor averages 10 percent (or less) of total cost. This labor intensity can actually be an advantage because of the variety of service requirements an individual can handle. This can provide quite a degree of flexibility that can make aggregate planning easier for services than manufacturing.
  • 29. Operations management, also called "operations planning" or "operations scheduling," is a term assigned to the planning of production in all aspects, from workforce activities to product delivery. While this type of planning is almost exclusively seen in manufacturing environments, many of the techniques are used by service- oriented businesses. Simple to implement, operations management can be applied using nothing more than a spreadsheet program.
  • 30. Operations management is primarily concerned with the efficient use of resources. While it is sometimes referred to as production planning and employs many of the same techniques, the primary distinguishing characteristic is that production planning is narrowly focused on the actual production whereas operations management looks at the operation as a whole.
  • 31. Operations planning is an important part of any business. Effective and efficient management of operations is the hallmark of a successful company. Operations management is an old concept, but as many of the techniques of operations management have gained attention in the business media, the definition has become somewhat unclear, making effective management of operations seem more complicated than it really is.
  • 32. Operations management has a broad focus: inventory levels must be managed, materials ordered/stored, capacity maximized, relationships with suppliers maintained, and the interactions within the system monitored.
  • 33. Capacity planning is focused on maximizing the capacity of a company to make it more efficient and more profitable. Capacity planning at its most basic attempts to match the volume the company is able to produce to the demand to avoid downtime by preventing bottlenecks.
  • 34. Aggregate planning is a static form of production planning. It focuses on satisfying expected demand. This may be in relation to production, the workforce itself or inventory management. Aggregate planning basically ties facility planning in with scheduling decisions and it does so quantitatively, meaning it produces numbers to back up an operations plan.