Presentation Objective
• This presentation has been created to
explain the common stages of a project
regardless of which underlying
methodology is being used.
• It will show how a business will benefit by
using STOMP to give all resources
effected by the project a general
understanding of the processes that the
project follow.
Providing Project Visibility & Understanding to the Wider Audience...
Streamlined Task Orientated Management of Projects
What is a Project?
• A project is a piece of work that is not part of an
organisation’s core business, with a definite start
and end. e.g. Building or relocating an office for
an Insurance Company.
• A methodology is a group of processes, set out in
a defined order to deliver a project. e.g.
PRINCE2, Six-Sigma.
• Project Tools are usually PC or networked
applications that help project resources deliver
projects and report more efficiently. e.g. MS
Project, Primavera.
Providing Project Visibility & Understanding to the Wider Audience...
What are Project Phases?
• All projects will have various phases of work,
breaking up the project into phases allows better
tracking of progress & makes the project more
manageable.
• No matter what type of project it is, the same
phases will exist in all projects, the difference
will be what each of these phases include.
• When a Project Plan is created at the start of a
project each of these phases will be covered.
Providing Project Visibility & Understanding to the Wider Audience...
Streamlined Task Orientated Management of Projects

Design

Build

Test

Deliver

All projects will have these phases, however the content &
duration of the phase will differ dependant on the type of project.
Providing Project Visibility & Understanding to the Wider Audience...

Post-Project Process
(Post Project Review, Ongoing Support,, etc…)

Pre-Project Process
(Request for Tender, Statement of Work, Order, etc…)

Planning (Continuously monitored and amended throughout the project lifecycle)
Streamlined Task Orientated Management of Projects
What is STOMP?
• STOMP is high level project methodology designed to
sit on top of an organisations detailed methodology, that
enables all resources in the organisation to understand
the process without the need for them fully
understanding a detailed project management structure
such as PRINCE2, Six Sigma etc…
• The objective of STOMP is to enable project teams to
provide information on the overall progress of a project
to any level of an organisation using terminology that is
easy to understand and for management to make
decisions without fully understanding the underlying
processes being utilised.

Providing Project Visibility & Understanding to the Wider Audience...
Streamlined Task Orientated Management of Projects
Streamlined Task Orientated Management of Projects
Project
Completion

Timeline

This slide shows the principle of the STOMP process.
The key element of all detailed methodologies are very
similar, they all include pre-project activities, project
initiation, a timeline, project completion and many will
include a post-project element.

Underlying Project Methodology (PRINCE, Six Sigma, Etc…)

Providing Project Visibility & Understanding to the Wider Audience...

Post-Project Process
(Post Project Review, Ongoing Support,, etc…)

Pre-Project Process
(Request for Tender, Statement of Work, Order, etc…)

Project
Initiation
Streamlined Task Orientated Management of Projects
Project
Completion

Timeline

STOMP is designed to sit on top of complex project
methodologies like PRINCE2, Six-Sigma or Bespoke
Solutions. We will not look at the detail of this aspect,
however, it is important to remember that constraints
may be placed on the project by the underlying process
being used.
Underlying Project Methodology (PRINCE, Six Sigma, Etc…)

Providing Project Visibility & Understanding to the Wider Audience...

Post-Project Process
(Post Project Review, Ongoing Support,, etc…)

Pre-Project Process
(Request for Tender, Statement of Work, Order, etc…)

Project
Initiation
Streamlined Task Orientated Management of Projects
Project
Completion

Timeline

Pre-Project Activities are in many occasions taken as a
separate activity, with the project starting from the next
step. However some methodologies will include the
Request for Tender, Statement of Work or Bidding
Process in the overall methodology.

Underlying Project Methodology (PRINCE, Six Sigma, Etc…)

Providing Project Visibility & Understanding to the Wider Audience...

Post-Project Process
(Post Project Review, Ongoing Support,, etc…)

Pre-Project Process
(Request for Tender, Statement of Work, Order, etc…)

Project
Initiation
Streamlined Task Orientated Management of Projects
Project
Completion

Timeline

The Project Initiation or Project Start is one of the most
critical aspects of all projects. Here the project scope,
timescale, budget, sponsors, deliverables, reporting
method, change control process & project management
methodology will be defined and agreed by all parties
involved in the project.
Underlying Project Methodology (PRINCE, Six Sigma, Etc…)

Providing Project Visibility & Understanding to the Wider Audience...

Post-Project Process
(Post Project Review, Ongoing Support,, etc…)

Pre-Project Process
(Request for Tender, Statement of Work, Order, etc…)

Project
Initiation
Streamlined Task Orientated Management of Projects
Project
Completion

Timeline

The Timeline or Project Duration will vary in all projects.
Sometimes it will be set in stone due to business
constraints or regulatory changes that must be adhered
to by a fixed date. Other times the timescale will be
flexible and effected by outside influences like financial
circumstances, resource availability or other projects.
Underlying Project Methodology (PRINCE, Six Sigma, Etc…)

Providing Project Visibility & Understanding to the Wider Audience...

Post-Project Process
(Post Project Review, Ongoing Support,, etc…)

Pre-Project Process
(Request for Tender, Statement of Work, Order, etc…)

Project
Initiation
Streamlined Task Orientated Management of Projects
Project
Completion

Timeline

Project Completion or Close is often a very difficult
aspect of the project, the success of this stage is totally
reliant on the quality of the Project Initiation stage. At
this point the project will be formally closed and all
responsibility passed on to the business.

Underlying Project Methodology (PRINCE, Six Sigma, Etc…)

Providing Project Visibility & Understanding to the Wider Audience...

Post-Project Process
(Post Project Review, Ongoing Support,, etc…)

Pre-Project Process
(Request for Tender, Statement of Work, Order, etc…)

Project
Initiation
Streamlined Task Orientated Management of Projects
Project
Completion

Timeline

The Post-Project Process is often an aspect of a project that is
missed out. However, it is a very important part of the project
that should be completed. One important aspect is the Post
Project Review, this will include a ‘Lessons Learnt’ report
which will help the organisation deliver better projects in the
future and the final knowledge transfer from the project team to
the business team.
Underlying Project Methodology (PRINCE, Six Sigma, Etc…)

Providing Project Visibility & Understanding to the Wider Audience...

Post-Project Process
(Post Project Review, Ongoing Support,, etc…)

Pre-Project Process
(Request for Tender, Statement of Work, Order, etc…)

Project
Initiation
Streamlined Task Orientated Management of Projects
What is a Project Plan?
• All projects must have a plan.
• Tasks from the project definition are placed into a
plan at the start of the project, this is checked and
modified throughout the lifecycle of the project.
• Dependant on the complexity of the project these
can be simple high level plans, but can be complex
multi-tier plans, these are usually broken up into
phases.
• Plans are usually documented in the form of a
Gantt Chart, this shows the tasks in an easy to
follow way (usually produced using a project tool.)
Providing Project Visibility & Understanding to the Wider Audience...
Elements of a Project Plan?
• All projects will have the following elements:•
•
•
•

Project Start
Tasks
Milestones (Key Points)
Project End
Example of a Plan (Gantt Chart)

Project
start/initiation

Task

Milestone
Project
end/completion

Providing Project Visibility & Understanding to the Wider Audience...
What is Change Control?
• All projects are likely to have changes to the
deliverables during their lifecycle, these could be
financial, regulatory or business related changes.
• Not all changes mean additional work,
sometimes an element of a project may be
removed from the main list of deliverables to be
included in a future project.
• All changes should be documented and agreed
by all parties involved.
• Changes can be requested for work not yet
started or work that has already been performed.
Providing Project Visibility & Understanding to the Wider Audience...
The Change Control Process
• At the start of a project the Change Control
Process must be defined, this will include:•
•
•
•

Change Request Process & Form
Change Control Database Definition
Change Control Meeting Cycle
Change Control Panel Members

• Without a clearly defined and agreed
Change Control Process closure of a
project is almost impossible to achieve!
Providing Project Visibility & Understanding to the Wider Audience...
Streamlined Task Orientated Management of Projects

Planning & Change Control Process

Project
Completion

At the Project Initiation stage the Project Scope &
Change Control Process are agreed and signed off by
the Project Sponsors.

Underlying Project Methodology (PRINCE, Six Sigma, Etc…)

Providing Project Visibility & Understanding to the Wider Audience...

Post-Project Process
(Post Project Review, Ongoing Support,, etc…)

Pre-Project Process
(Request for Tender, Statement of Work, Order, etc…)

Project
Initiation
Streamlined Task Orientated Management of Projects

Planning & Change Control Process

Project
Completion

Project tasks &
milestones planned /
scheduled

At the start of the project the tasks are put into the order
that the need to be performed and put into the project
plan. (This is called a Gantt Chart)

Underlying Project Methodology (PRINCE, Six Sigma, Etc…)

Providing Project Visibility & Understanding to the Wider Audience...

Post-Project Process
(Post Project Review, Ongoing Support,, etc…)

Pre-Project Process
(Request for Tender, Statement of Work, Order, etc…)

Project
Initiation
Streamlined Task Orientated Management of Projects

Planning & Change Control Process

Project
Completion

Project tasks &
milestones planned /
scheduled

At the start of the project the tasks are put into the order
that the need to be performed and put into the project
plan. (This is called a Gantt Chart)

Underlying Project Methodology (PRINCE, Six Sigma, Etc…)

Providing Project Visibility & Understanding to the Wider Audience...

Post-Project Process
(Post Project Review, Ongoing Support,, etc…)

Pre-Project Process
(Request for Tender, Statement of Work, Order, etc…)

Project
Initiation
Streamlined Task Orientated Management of Projects

Planning & Change Control Process
Completed
tasks

Incomplete
task

Project
Completion

Scheduled
tasks/milestones

Tasks are tracked against the plan and the progress is
reported to the project sponsors as per meeting
schedule agreed at the project initiation.

Underlying Project Methodology (PRINCE, Six Sigma, Etc…)

Providing Project Visibility & Understanding to the Wider Audience...

Post-Project Process
(Post Project Review, Ongoing Support,, etc…)

Pre-Project Process
(Request for Tender, Statement of Work, Order, etc…)

Project
Initiation
Streamlined Task Orientated Management of Projects

Planning & Change Control Process
Completed
tasks

Incomplete
task

Project
Completion

Scheduled
tasks/milestones

Tasks are tracked against the plan and the progress is
reported to the project sponsors as per meeting
schedule agreed at the project initiation.

Underlying Project Methodology (PRINCE, Six Sigma, Etc…)

Providing Project Visibility & Understanding to the Wider Audience...

Post-Project Process
(Post Project Review, Ongoing Support,, etc…)

Pre-Project Process
(Request for Tender, Statement of Work, Order, etc…)

Project
Initiation
Streamlined Task Orientated Management of Projects

Planning & Change Control Process
Completed
tasks

Incomplete
task

Project
Completion

Scheduled
tasks/milestones

Tasks are tracked against the plan and the progress is
reported to the project sponsors as per meeting
schedule agreed at the project initiation.

Underlying Project Methodology (PRINCE, Six Sigma, Etc…)

Providing Project Visibility & Understanding to the Wider Audience...

Post-Project Process
(Post Project Review, Ongoing Support,, etc…)

Pre-Project Process
(Request for Tender, Statement of Work, Order, etc…)

Project
Initiation
Streamlined Task Orientated Management of Projects

Planning & Change Control Process

Project
Completion

Changes are usually related to an existing task but can
be a completely new task. In this example we will look
at the 5th task in our project.

Underlying Project Methodology (PRINCE, Six Sigma, Etc…)

Providing Project Visibility & Understanding to the Wider Audience...

Post-Project Process
(Post Project Review, Ongoing Support,, etc…)

Pre-Project Process
(Request for Tender, Statement of Work, Order, etc…)

Project
Initiation
Streamlined Task Orientated Management of Projects

Planning & Change Control Process

Project
Completion

Change
Request
Form

The Change Request Form is received by the Project
Manager or PMO (Project Management Office)

Underlying Project Methodology (PRINCE, Six Sigma, Etc…)

Providing Project Visibility & Understanding to the Wider Audience...

Post-Project Process
(Post Project Review, Ongoing Support,, etc…)

Pre-Project Process
(Request for Tender, Statement of Work, Order, etc…)

Project
Initiation
Streamlined Task Orientated Management of Projects

Planning & Change Control Process

Project
Completion

Change
Request
Form

The Change Request Form is received by the Project
Manager or PMO (Project Management Office)

Underlying Project Methodology (PRINCE, Six Sigma, Etc…)

Providing Project Visibility & Understanding to the Wider Audience...

Post-Project Process
(Post Project Review, Ongoing Support,, etc…)

Pre-Project Process
(Request for Tender, Statement of Work, Order, etc…)

Project
Initiation
Streamlined Task Orientated Management of Projects

Planning & Change Control Process
Change
Request
Form

Change
Request
Database

The Change Request details are entered into the
Change Request database.
Providing Project Visibility & Understanding to the Wider Audience...
Streamlined Task Orientated Management of Projects

Planning & Change Control Process
Change
Request
Form

Change
Request
Database

SME

The Change Request details are then passed onto the
SME (Subject .Matter Expert) so they can review the
change request and make recommendations.
Providing Project Visibility & Understanding to the Wider Audience...
Streamlined Task Orientated Management of Projects

Planning & Change Control Process
Change
Request
Form

Change
Request
Database

SME

Change Control
Panel

The Change Request details and recommendations are
reviewed by the Change Control Panel.
Providing Project Visibility & Understanding to the Wider Audience...
Streamlined Task Orientated Management of Projects

Planning & Change Control Process
Change
Request
Form

Change
Request
Database

SME

Change Control
Panel

If the Change Control Panel reject the Change Request
it is closed & the Change Request Database is updated
to reflect this.
Providing Project Visibility & Understanding to the Wider Audience...
Streamlined Task Orientated Management of Projects

Planning & Change Control Process
Change
Request
Form

Change
Request
Database

SME

Change Control
Panel

If the Change Control Panel reject the Change Request
it is closed & the Change Request Database is updated
to reflect this.
Providing Project Visibility & Understanding to the Wider Audience...
Streamlined Task Orientated Management of Projects

Planning & Change Control Process
Change
Request
Form

Change
Request
Database

SME

If the Change Control Panel accept the Change
Request it is passed on to the Project Planner & the
Change Request Database is updated to reflect this.

Change Control
Panel

Planner

Providing Project Visibility & Understanding to the Wider Audience...
Streamlined Task Orientated Management of Projects

Planning & Change Control Process
Change
Request
Form

Change
Request
Database

SME

If the Change Control Panel accept the Change
Request it is passed on to the Project Planner & the
Change Request Database is updated to reflect this.

Change Control
Panel

Planner

Providing Project Visibility & Understanding to the Wider Audience...
Streamlined Task Orientated Management of Projects

Planning & Change Control Process

If the Change Control Panel accept the Change
Request it is passed on to the Project Planner & the
Change Request Database is updated to reflect this.

Planner

Providing Project Visibility & Understanding to the Wider Audience...
Streamlined Task Orientated Management of Projects

Planning & Change Control Process

If the Change Control Panel accept the Change
Request it is passed on to the Project Planner & the
Change Request Database is updated to reflect this.

Planner

Providing Project Visibility & Understanding to the Wider Audience...
Streamlined Task Orientated Management of Projects

Planning & Change Control Process

The Project Planner looks at the existing
Project Plan & looks at the impact of the
Change Request.

Project
Completion

Planner

Underlying Project Methodology (PRINCE, Six Sigma, Etc…)

Providing Project Visibility & Understanding to the Wider Audience...

Post-Project Process
(Post Project Review, Ongoing Support,, etc…)

Pre-Project Process
(Request for Tender, Statement of Work, Order, etc…)

Project
Initiation
Streamlined Task Orientated Management of Projects

Planning & Change Control Process

The Project Planner looks at the existing
Project Plan & looks at the impact of the
Change Request.

Project
Completion

Planner

Underlying Project Methodology (PRINCE, Six Sigma, Etc…)

Providing Project Visibility & Understanding to the Wider Audience...

Post-Project Process
(Post Project Review, Ongoing Support,, etc…)

Pre-Project Process
(Request for Tender, Statement of Work, Order, etc…)

Project
Initiation
Streamlined Task Orientated Management of Projects

Planning & Change Control Process

The new tasks are plotted on the Gantt
Chart.

Project
Completion

Planner

Underlying Project Methodology (PRINCE, Six Sigma, Etc…)

Providing Project Visibility & Understanding to the Wider Audience...

Post-Project Process
(Post Project Review, Ongoing Support,, etc…)

Pre-Project Process
(Request for Tender, Statement of Work, Order, etc…)

Project
Initiation
Streamlined Task Orientated Management of Projects

Planning & Change Control Process

The Project Plan is updated & released to
the business & all project resources.

Project
Completion

Planner

Underlying Project Methodology (PRINCE, Six Sigma, Etc…)

Providing Project Visibility & Understanding to the Wider Audience...

Post-Project Process
(Post Project Review, Ongoing Support,, etc…)

Pre-Project Process
(Request for Tender, Statement of Work, Order, etc…)

Project
Initiation
Changes & Planning?
• On larger projects many changes are likely
to take place.
• The role of the Project Planner is to keep
the Project Plan up to date & ensure that
all relevant parties are informed of
changes.

Providing Project Visibility & Understanding to the Wider Audience...
Streamlined Task Orientated Management of Projects
Understanding STOMP?
• More slides to follow soon, including
Reporting, Milestones, Finance &
Performance……
Streamlined Task Orientated Management of Projects
Streamlined Task Orientated Management of Projects
• Thank you for watching this presentation.
• For more information contact Patrick Cannon
• Email: patrick@pcannon.net
Streamlined Task Orientated Management of Projects

More Related Content

What's hot

Pmp Exam Prep PDF-1
Pmp Exam Prep PDF-1Pmp Exam Prep PDF-1
Pmp Exam Prep PDF-1Amr Miqdadi
 
Project Management Life Cycle
Project Management Life CycleProject Management Life Cycle
Project Management Life CycleReema
 
Lec 03 project life cycle
Lec 03 project life cycleLec 03 project life cycle
Lec 03 project life cycleSAJID ALI RUK
 
Understand PMBoK 5th edition
Understand PMBoK 5th editionUnderstand PMBoK 5th edition
Understand PMBoK 5th editionAmr Miqdadi
 
A Beginner's Guide to IT Project Management
A Beginner's Guide to IT Project ManagementA Beginner's Guide to IT Project Management
A Beginner's Guide to IT Project ManagementWorkfront
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycleAmjad Idries
 
The six phase comprehensive project life cycle model-2013
The six phase comprehensive project life cycle model-2013The six phase comprehensive project life cycle model-2013
The six phase comprehensive project life cycle model-2013Russell Archibald
 
Project Management:Life Cycle & Phases.
Project Management:Life Cycle & Phases.Project Management:Life Cycle & Phases.
Project Management:Life Cycle & Phases.Ashutosh Mishra
 
5 Basic Phases of Project Management
5 Basic Phases of Project Management 5 Basic Phases of Project Management
5 Basic Phases of Project Management Project Insight
 
Software Project Management (lecture 2)
Software Project Management (lecture 2)Software Project Management (lecture 2)
Software Project Management (lecture 2)Syed Muhammad Hammad
 
Telco Implementation Project Management
Telco Implementation Project ManagementTelco Implementation Project Management
Telco Implementation Project Managementanwarizal
 
2005.04.04.cpp.project.management.adb
2005.04.04.cpp.project.management.adb2005.04.04.cpp.project.management.adb
2005.04.04.cpp.project.management.adbTa Ngoc
 
Pmp slide share
Pmp slide sharePmp slide share
Pmp slide sharesaleem54
 
Project Management Life Cycle
Project Management Life CycleProject Management Life Cycle
Project Management Life CycleReema
 

What's hot (20)

Pmp Exam Prep PDF-1
Pmp Exam Prep PDF-1Pmp Exam Prep PDF-1
Pmp Exam Prep PDF-1
 
Project Management Life Cycle
Project Management Life CycleProject Management Life Cycle
Project Management Life Cycle
 
Project Management Tools and Techniques
Project Management Tools and TechniquesProject Management Tools and Techniques
Project Management Tools and Techniques
 
Lec 03 project life cycle
Lec 03 project life cycleLec 03 project life cycle
Lec 03 project life cycle
 
Understand PMBoK 5th edition
Understand PMBoK 5th editionUnderstand PMBoK 5th edition
Understand PMBoK 5th edition
 
Project management-CH 4
Project management-CH 4Project management-CH 4
Project management-CH 4
 
Integrating project life cycle with process groups
Integrating project life cycle with process groupsIntegrating project life cycle with process groups
Integrating project life cycle with process groups
 
Chapter 4
Chapter 4Chapter 4
Chapter 4
 
A Beginner's Guide to IT Project Management
A Beginner's Guide to IT Project ManagementA Beginner's Guide to IT Project Management
A Beginner's Guide to IT Project Management
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycle
 
Project life cycle
Project life cycleProject life cycle
Project life cycle
 
The six phase comprehensive project life cycle model-2013
The six phase comprehensive project life cycle model-2013The six phase comprehensive project life cycle model-2013
The six phase comprehensive project life cycle model-2013
 
Project life cycle
Project life cycleProject life cycle
Project life cycle
 
Project Management:Life Cycle & Phases.
Project Management:Life Cycle & Phases.Project Management:Life Cycle & Phases.
Project Management:Life Cycle & Phases.
 
5 Basic Phases of Project Management
5 Basic Phases of Project Management 5 Basic Phases of Project Management
5 Basic Phases of Project Management
 
Software Project Management (lecture 2)
Software Project Management (lecture 2)Software Project Management (lecture 2)
Software Project Management (lecture 2)
 
Telco Implementation Project Management
Telco Implementation Project ManagementTelco Implementation Project Management
Telco Implementation Project Management
 
2005.04.04.cpp.project.management.adb
2005.04.04.cpp.project.management.adb2005.04.04.cpp.project.management.adb
2005.04.04.cpp.project.management.adb
 
Pmp slide share
Pmp slide sharePmp slide share
Pmp slide share
 
Project Management Life Cycle
Project Management Life CycleProject Management Life Cycle
Project Management Life Cycle
 

Viewers also liked

конструктор українська мова_таблиці
конструктор українська мова_таблиціконструктор українська мова_таблиці
конструктор українська мова_таблиціТатьяна Глинская
 
Day 5 race & slavery
Day 5 race & slaveryDay 5 race & slavery
Day 5 race & slaveryTravis Klein
 
Freddy bolivar
Freddy bolivarFreddy bolivar
Freddy bolivarescolante
 
Virtualization 2.0: The Next Generation of Virtualization
Virtualization 2.0: The Next Generation of VirtualizationVirtualization 2.0: The Next Generation of Virtualization
Virtualization 2.0: The Next Generation of VirtualizationEMC
 
Women CEO’s in Family Business: Challenges & Differentiating Styles
Women CEO’s in Family Business: Challenges & Differentiating StylesWomen CEO’s in Family Business: Challenges & Differentiating Styles
Women CEO’s in Family Business: Challenges & Differentiating StylesDaleCarnegieIndia1
 
The Disruptive Truth: New Shopping Behaviors and Attitudes
The Disruptive Truth: New Shopping Behaviors and AttitudesThe Disruptive Truth: New Shopping Behaviors and Attitudes
The Disruptive Truth: New Shopping Behaviors and AttitudesResearch Now
 
Intelligence Driven Threat Detection and Response
Intelligence Driven Threat Detection and ResponseIntelligence Driven Threat Detection and Response
Intelligence Driven Threat Detection and ResponseEMC
 
الجريدة الرسمية ليوم 19 يناير
الجريدة الرسمية ليوم 19 ينايرالجريدة الرسمية ليوم 19 يناير
الجريدة الرسمية ليوم 19 ينايرHatem Naguib
 
Painting development
Painting developmentPainting development
Painting developmentmariaricha
 
Csw2012
Csw2012Csw2012
Csw2012htisnj
 
EMC Hybrid Cloud Solution with VMware: Hadoop Applications Solution Guide 2.5
EMC Hybrid Cloud Solution with VMware: Hadoop Applications Solution Guide 2.5EMC Hybrid Cloud Solution with VMware: Hadoop Applications Solution Guide 2.5
EMC Hybrid Cloud Solution with VMware: Hadoop Applications Solution Guide 2.5EMC
 
Math powerpoint
Math powerpointMath powerpoint
Math powerpointwhiteman22
 
Market structures project and quiz
Market structures project and quizMarket structures project and quiz
Market structures project and quizTravis Klein
 
ActionInfo Consulting - SOQ
ActionInfo Consulting - SOQActionInfo Consulting - SOQ
ActionInfo Consulting - SOQspinnerama18
 
Location Shoot
Location ShootLocation Shoot
Location Shootloousmith
 

Viewers also liked (20)

конструктор українська мова_таблиці
конструктор українська мова_таблиціконструктор українська мова_таблиці
конструктор українська мова_таблиці
 
Day 5 race & slavery
Day 5 race & slaveryDay 5 race & slavery
Day 5 race & slavery
 
Freddy bolivar
Freddy bolivarFreddy bolivar
Freddy bolivar
 
Virtualization 2.0: The Next Generation of Virtualization
Virtualization 2.0: The Next Generation of VirtualizationVirtualization 2.0: The Next Generation of Virtualization
Virtualization 2.0: The Next Generation of Virtualization
 
Women CEO’s in Family Business: Challenges & Differentiating Styles
Women CEO’s in Family Business: Challenges & Differentiating StylesWomen CEO’s in Family Business: Challenges & Differentiating Styles
Women CEO’s in Family Business: Challenges & Differentiating Styles
 
The Disruptive Truth: New Shopping Behaviors and Attitudes
The Disruptive Truth: New Shopping Behaviors and AttitudesThe Disruptive Truth: New Shopping Behaviors and Attitudes
The Disruptive Truth: New Shopping Behaviors and Attitudes
 
Intelligence Driven Threat Detection and Response
Intelligence Driven Threat Detection and ResponseIntelligence Driven Threat Detection and Response
Intelligence Driven Threat Detection and Response
 
Windows Debugging and Troubleshooting
Windows Debugging and TroubleshootingWindows Debugging and Troubleshooting
Windows Debugging and Troubleshooting
 
الجريدة الرسمية ليوم 19 يناير
الجريدة الرسمية ليوم 19 ينايرالجريدة الرسمية ليوم 19 يناير
الجريدة الرسمية ليوم 19 يناير
 
Painting development
Painting developmentPainting development
Painting development
 
Csw2012
Csw2012Csw2012
Csw2012
 
3 law of supply
3   law of supply3   law of supply
3 law of supply
 
elasticity 2014
elasticity 2014elasticity 2014
elasticity 2014
 
Take3 Capabilities
Take3 CapabilitiesTake3 Capabilities
Take3 Capabilities
 
EMC Hybrid Cloud Solution with VMware: Hadoop Applications Solution Guide 2.5
EMC Hybrid Cloud Solution with VMware: Hadoop Applications Solution Guide 2.5EMC Hybrid Cloud Solution with VMware: Hadoop Applications Solution Guide 2.5
EMC Hybrid Cloud Solution with VMware: Hadoop Applications Solution Guide 2.5
 
Dario
DarioDario
Dario
 
Math powerpoint
Math powerpointMath powerpoint
Math powerpoint
 
Market structures project and quiz
Market structures project and quizMarket structures project and quiz
Market structures project and quiz
 
ActionInfo Consulting - SOQ
ActionInfo Consulting - SOQActionInfo Consulting - SOQ
ActionInfo Consulting - SOQ
 
Location Shoot
Location ShootLocation Shoot
Location Shoot
 

Similar to Stomp presentation v1.5.1

Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMPSubodh Kumar
 
Northern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentNorthern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentSiwawong Wuttipongprasert
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800PRIYANSHU KUMAR
 
Project Management Process and Its Phases
Project Management Process and Its PhasesProject Management Process and Its Phases
Project Management Process and Its PhasesGaurav Sukhija
 
12 Terms You Should Know Project Management Fundamentals
12 Terms You Should Know Project Management Fundamentals12 Terms You Should Know Project Management Fundamentals
12 Terms You Should Know Project Management FundamentalsInsaf Ali Soomro PMP
 
Software Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project ManagementSoftware Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project ManagementAhsan Rahim
 
Understand the Project Cycle Management & Its Phases Introduction
Understand the Project Cycle Management & Its Phases IntroductionUnderstand the Project Cycle Management & Its Phases Introduction
Understand the Project Cycle Management & Its Phases IntroductionDivya Malik
 
Fundamentals of project management july 7, 2012 revised
Fundamentals of project management july 7, 2012 revisedFundamentals of project management july 7, 2012 revised
Fundamentals of project management july 7, 2012 revisedgorby626
 
It Project Management
It Project ManagementIt Project Management
It Project ManagementTJ Rains
 
project-management.pdffjfjfwjfwoifjweoifjwefoi
project-management.pdffjfjfwjfwoifjweoifjwefoiproject-management.pdffjfjfwjfwoifjweoifjwefoi
project-management.pdffjfjfwjfwoifjweoifjwefoiEarlFrancisGalino
 
Project Management
Project ManagementProject Management
Project ManagementPrarthan P
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptxHarsimratDeo1
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptxHarsimratDeo1
 
A guide for the rolling out of a software delivery project
A guide for the rolling out of a software delivery projectA guide for the rolling out of a software delivery project
A guide for the rolling out of a software delivery projectProject Management Solutions
 
Project Management Process Groups
Project Management Process GroupsProject Management Process Groups
Project Management Process GroupsTechNoleGirl
 

Similar to Stomp presentation v1.5.1 (20)

Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
 
Northern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentNorthern Finishing School: IT Project Managment
Northern Finishing School: IT Project Managment
 
Project management
Project managementProject management
Project management
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800
 
Project lifecycle
Project lifecycleProject lifecycle
Project lifecycle
 
Project Management Process and Its Phases
Project Management Process and Its PhasesProject Management Process and Its Phases
Project Management Process and Its Phases
 
Milestones
MilestonesMilestones
Milestones
 
12 Terms You Should Know Project Management Fundamentals
12 Terms You Should Know Project Management Fundamentals12 Terms You Should Know Project Management Fundamentals
12 Terms You Should Know Project Management Fundamentals
 
Software Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project ManagementSoftware Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project Management
 
Understand the Project Cycle Management & Its Phases Introduction
Understand the Project Cycle Management & Its Phases IntroductionUnderstand the Project Cycle Management & Its Phases Introduction
Understand the Project Cycle Management & Its Phases Introduction
 
Fundamentals of project management july 7, 2012 revised
Fundamentals of project management july 7, 2012 revisedFundamentals of project management july 7, 2012 revised
Fundamentals of project management july 7, 2012 revised
 
It Project Management
It Project ManagementIt Project Management
It Project Management
 
Project made easy
Project made easyProject made easy
Project made easy
 
project-management.pdffjfjfwjfwoifjweoifjwefoi
project-management.pdffjfjfwjfwoifjweoifjwefoiproject-management.pdffjfjfwjfwoifjweoifjwefoi
project-management.pdffjfjfwjfwoifjweoifjwefoi
 
Project Management
Project ManagementProject Management
Project Management
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
 
PMO Daily Operations using Scrum Methodology
PMO Daily Operations using Scrum MethodologyPMO Daily Operations using Scrum Methodology
PMO Daily Operations using Scrum Methodology
 
A guide for the rolling out of a software delivery project
A guide for the rolling out of a software delivery projectA guide for the rolling out of a software delivery project
A guide for the rolling out of a software delivery project
 
Project Management Process Groups
Project Management Process GroupsProject Management Process Groups
Project Management Process Groups
 

Recently uploaded

Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 

Recently uploaded (20)

Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 

Stomp presentation v1.5.1

  • 1. An Introduction to Streamlined Task Orientated Management of Projects Providing Project Visibility & Understanding to the Wider Audience... By Patrick.M.Cannon Nov ’09 – Version 1.5
  • 2. Presentation Objective • This presentation has been created to explain the common stages of a project regardless of which underlying methodology is being used. • It will show how a business will benefit by using STOMP to give all resources effected by the project a general understanding of the processes that the project follow. Providing Project Visibility & Understanding to the Wider Audience...
  • 3. Streamlined Task Orientated Management of Projects
  • 4. What is a Project? • A project is a piece of work that is not part of an organisation’s core business, with a definite start and end. e.g. Building or relocating an office for an Insurance Company. • A methodology is a group of processes, set out in a defined order to deliver a project. e.g. PRINCE2, Six-Sigma. • Project Tools are usually PC or networked applications that help project resources deliver projects and report more efficiently. e.g. MS Project, Primavera. Providing Project Visibility & Understanding to the Wider Audience...
  • 5. What are Project Phases? • All projects will have various phases of work, breaking up the project into phases allows better tracking of progress & makes the project more manageable. • No matter what type of project it is, the same phases will exist in all projects, the difference will be what each of these phases include. • When a Project Plan is created at the start of a project each of these phases will be covered. Providing Project Visibility & Understanding to the Wider Audience...
  • 6. Streamlined Task Orientated Management of Projects Design Build Test Deliver All projects will have these phases, however the content & duration of the phase will differ dependant on the type of project. Providing Project Visibility & Understanding to the Wider Audience... Post-Project Process (Post Project Review, Ongoing Support,, etc…) Pre-Project Process (Request for Tender, Statement of Work, Order, etc…) Planning (Continuously monitored and amended throughout the project lifecycle)
  • 7. Streamlined Task Orientated Management of Projects
  • 8. What is STOMP? • STOMP is high level project methodology designed to sit on top of an organisations detailed methodology, that enables all resources in the organisation to understand the process without the need for them fully understanding a detailed project management structure such as PRINCE2, Six Sigma etc… • The objective of STOMP is to enable project teams to provide information on the overall progress of a project to any level of an organisation using terminology that is easy to understand and for management to make decisions without fully understanding the underlying processes being utilised. Providing Project Visibility & Understanding to the Wider Audience...
  • 9. Streamlined Task Orientated Management of Projects
  • 10. Streamlined Task Orientated Management of Projects Project Completion Timeline This slide shows the principle of the STOMP process. The key element of all detailed methodologies are very similar, they all include pre-project activities, project initiation, a timeline, project completion and many will include a post-project element. Underlying Project Methodology (PRINCE, Six Sigma, Etc…) Providing Project Visibility & Understanding to the Wider Audience... Post-Project Process (Post Project Review, Ongoing Support,, etc…) Pre-Project Process (Request for Tender, Statement of Work, Order, etc…) Project Initiation
  • 11. Streamlined Task Orientated Management of Projects Project Completion Timeline STOMP is designed to sit on top of complex project methodologies like PRINCE2, Six-Sigma or Bespoke Solutions. We will not look at the detail of this aspect, however, it is important to remember that constraints may be placed on the project by the underlying process being used. Underlying Project Methodology (PRINCE, Six Sigma, Etc…) Providing Project Visibility & Understanding to the Wider Audience... Post-Project Process (Post Project Review, Ongoing Support,, etc…) Pre-Project Process (Request for Tender, Statement of Work, Order, etc…) Project Initiation
  • 12. Streamlined Task Orientated Management of Projects Project Completion Timeline Pre-Project Activities are in many occasions taken as a separate activity, with the project starting from the next step. However some methodologies will include the Request for Tender, Statement of Work or Bidding Process in the overall methodology. Underlying Project Methodology (PRINCE, Six Sigma, Etc…) Providing Project Visibility & Understanding to the Wider Audience... Post-Project Process (Post Project Review, Ongoing Support,, etc…) Pre-Project Process (Request for Tender, Statement of Work, Order, etc…) Project Initiation
  • 13. Streamlined Task Orientated Management of Projects Project Completion Timeline The Project Initiation or Project Start is one of the most critical aspects of all projects. Here the project scope, timescale, budget, sponsors, deliverables, reporting method, change control process & project management methodology will be defined and agreed by all parties involved in the project. Underlying Project Methodology (PRINCE, Six Sigma, Etc…) Providing Project Visibility & Understanding to the Wider Audience... Post-Project Process (Post Project Review, Ongoing Support,, etc…) Pre-Project Process (Request for Tender, Statement of Work, Order, etc…) Project Initiation
  • 14. Streamlined Task Orientated Management of Projects Project Completion Timeline The Timeline or Project Duration will vary in all projects. Sometimes it will be set in stone due to business constraints or regulatory changes that must be adhered to by a fixed date. Other times the timescale will be flexible and effected by outside influences like financial circumstances, resource availability or other projects. Underlying Project Methodology (PRINCE, Six Sigma, Etc…) Providing Project Visibility & Understanding to the Wider Audience... Post-Project Process (Post Project Review, Ongoing Support,, etc…) Pre-Project Process (Request for Tender, Statement of Work, Order, etc…) Project Initiation
  • 15. Streamlined Task Orientated Management of Projects Project Completion Timeline Project Completion or Close is often a very difficult aspect of the project, the success of this stage is totally reliant on the quality of the Project Initiation stage. At this point the project will be formally closed and all responsibility passed on to the business. Underlying Project Methodology (PRINCE, Six Sigma, Etc…) Providing Project Visibility & Understanding to the Wider Audience... Post-Project Process (Post Project Review, Ongoing Support,, etc…) Pre-Project Process (Request for Tender, Statement of Work, Order, etc…) Project Initiation
  • 16. Streamlined Task Orientated Management of Projects Project Completion Timeline The Post-Project Process is often an aspect of a project that is missed out. However, it is a very important part of the project that should be completed. One important aspect is the Post Project Review, this will include a ‘Lessons Learnt’ report which will help the organisation deliver better projects in the future and the final knowledge transfer from the project team to the business team. Underlying Project Methodology (PRINCE, Six Sigma, Etc…) Providing Project Visibility & Understanding to the Wider Audience... Post-Project Process (Post Project Review, Ongoing Support,, etc…) Pre-Project Process (Request for Tender, Statement of Work, Order, etc…) Project Initiation
  • 17. Streamlined Task Orientated Management of Projects
  • 18. What is a Project Plan? • All projects must have a plan. • Tasks from the project definition are placed into a plan at the start of the project, this is checked and modified throughout the lifecycle of the project. • Dependant on the complexity of the project these can be simple high level plans, but can be complex multi-tier plans, these are usually broken up into phases. • Plans are usually documented in the form of a Gantt Chart, this shows the tasks in an easy to follow way (usually produced using a project tool.) Providing Project Visibility & Understanding to the Wider Audience...
  • 19. Elements of a Project Plan? • All projects will have the following elements:• • • • Project Start Tasks Milestones (Key Points) Project End Example of a Plan (Gantt Chart) Project start/initiation Task Milestone Project end/completion Providing Project Visibility & Understanding to the Wider Audience...
  • 20. What is Change Control? • All projects are likely to have changes to the deliverables during their lifecycle, these could be financial, regulatory or business related changes. • Not all changes mean additional work, sometimes an element of a project may be removed from the main list of deliverables to be included in a future project. • All changes should be documented and agreed by all parties involved. • Changes can be requested for work not yet started or work that has already been performed. Providing Project Visibility & Understanding to the Wider Audience...
  • 21. The Change Control Process • At the start of a project the Change Control Process must be defined, this will include:• • • • Change Request Process & Form Change Control Database Definition Change Control Meeting Cycle Change Control Panel Members • Without a clearly defined and agreed Change Control Process closure of a project is almost impossible to achieve! Providing Project Visibility & Understanding to the Wider Audience...
  • 22. Streamlined Task Orientated Management of Projects Planning & Change Control Process Project Completion At the Project Initiation stage the Project Scope & Change Control Process are agreed and signed off by the Project Sponsors. Underlying Project Methodology (PRINCE, Six Sigma, Etc…) Providing Project Visibility & Understanding to the Wider Audience... Post-Project Process (Post Project Review, Ongoing Support,, etc…) Pre-Project Process (Request for Tender, Statement of Work, Order, etc…) Project Initiation
  • 23. Streamlined Task Orientated Management of Projects Planning & Change Control Process Project Completion Project tasks & milestones planned / scheduled At the start of the project the tasks are put into the order that the need to be performed and put into the project plan. (This is called a Gantt Chart) Underlying Project Methodology (PRINCE, Six Sigma, Etc…) Providing Project Visibility & Understanding to the Wider Audience... Post-Project Process (Post Project Review, Ongoing Support,, etc…) Pre-Project Process (Request for Tender, Statement of Work, Order, etc…) Project Initiation
  • 24. Streamlined Task Orientated Management of Projects Planning & Change Control Process Project Completion Project tasks & milestones planned / scheduled At the start of the project the tasks are put into the order that the need to be performed and put into the project plan. (This is called a Gantt Chart) Underlying Project Methodology (PRINCE, Six Sigma, Etc…) Providing Project Visibility & Understanding to the Wider Audience... Post-Project Process (Post Project Review, Ongoing Support,, etc…) Pre-Project Process (Request for Tender, Statement of Work, Order, etc…) Project Initiation
  • 25. Streamlined Task Orientated Management of Projects Planning & Change Control Process Completed tasks Incomplete task Project Completion Scheduled tasks/milestones Tasks are tracked against the plan and the progress is reported to the project sponsors as per meeting schedule agreed at the project initiation. Underlying Project Methodology (PRINCE, Six Sigma, Etc…) Providing Project Visibility & Understanding to the Wider Audience... Post-Project Process (Post Project Review, Ongoing Support,, etc…) Pre-Project Process (Request for Tender, Statement of Work, Order, etc…) Project Initiation
  • 26. Streamlined Task Orientated Management of Projects Planning & Change Control Process Completed tasks Incomplete task Project Completion Scheduled tasks/milestones Tasks are tracked against the plan and the progress is reported to the project sponsors as per meeting schedule agreed at the project initiation. Underlying Project Methodology (PRINCE, Six Sigma, Etc…) Providing Project Visibility & Understanding to the Wider Audience... Post-Project Process (Post Project Review, Ongoing Support,, etc…) Pre-Project Process (Request for Tender, Statement of Work, Order, etc…) Project Initiation
  • 27. Streamlined Task Orientated Management of Projects Planning & Change Control Process Completed tasks Incomplete task Project Completion Scheduled tasks/milestones Tasks are tracked against the plan and the progress is reported to the project sponsors as per meeting schedule agreed at the project initiation. Underlying Project Methodology (PRINCE, Six Sigma, Etc…) Providing Project Visibility & Understanding to the Wider Audience... Post-Project Process (Post Project Review, Ongoing Support,, etc…) Pre-Project Process (Request for Tender, Statement of Work, Order, etc…) Project Initiation
  • 28. Streamlined Task Orientated Management of Projects Planning & Change Control Process Project Completion Changes are usually related to an existing task but can be a completely new task. In this example we will look at the 5th task in our project. Underlying Project Methodology (PRINCE, Six Sigma, Etc…) Providing Project Visibility & Understanding to the Wider Audience... Post-Project Process (Post Project Review, Ongoing Support,, etc…) Pre-Project Process (Request for Tender, Statement of Work, Order, etc…) Project Initiation
  • 29. Streamlined Task Orientated Management of Projects Planning & Change Control Process Project Completion Change Request Form The Change Request Form is received by the Project Manager or PMO (Project Management Office) Underlying Project Methodology (PRINCE, Six Sigma, Etc…) Providing Project Visibility & Understanding to the Wider Audience... Post-Project Process (Post Project Review, Ongoing Support,, etc…) Pre-Project Process (Request for Tender, Statement of Work, Order, etc…) Project Initiation
  • 30. Streamlined Task Orientated Management of Projects Planning & Change Control Process Project Completion Change Request Form The Change Request Form is received by the Project Manager or PMO (Project Management Office) Underlying Project Methodology (PRINCE, Six Sigma, Etc…) Providing Project Visibility & Understanding to the Wider Audience... Post-Project Process (Post Project Review, Ongoing Support,, etc…) Pre-Project Process (Request for Tender, Statement of Work, Order, etc…) Project Initiation
  • 31. Streamlined Task Orientated Management of Projects Planning & Change Control Process Change Request Form Change Request Database The Change Request details are entered into the Change Request database. Providing Project Visibility & Understanding to the Wider Audience...
  • 32. Streamlined Task Orientated Management of Projects Planning & Change Control Process Change Request Form Change Request Database SME The Change Request details are then passed onto the SME (Subject .Matter Expert) so they can review the change request and make recommendations. Providing Project Visibility & Understanding to the Wider Audience...
  • 33. Streamlined Task Orientated Management of Projects Planning & Change Control Process Change Request Form Change Request Database SME Change Control Panel The Change Request details and recommendations are reviewed by the Change Control Panel. Providing Project Visibility & Understanding to the Wider Audience...
  • 34. Streamlined Task Orientated Management of Projects Planning & Change Control Process Change Request Form Change Request Database SME Change Control Panel If the Change Control Panel reject the Change Request it is closed & the Change Request Database is updated to reflect this. Providing Project Visibility & Understanding to the Wider Audience...
  • 35. Streamlined Task Orientated Management of Projects Planning & Change Control Process Change Request Form Change Request Database SME Change Control Panel If the Change Control Panel reject the Change Request it is closed & the Change Request Database is updated to reflect this. Providing Project Visibility & Understanding to the Wider Audience...
  • 36. Streamlined Task Orientated Management of Projects Planning & Change Control Process Change Request Form Change Request Database SME If the Change Control Panel accept the Change Request it is passed on to the Project Planner & the Change Request Database is updated to reflect this. Change Control Panel Planner Providing Project Visibility & Understanding to the Wider Audience...
  • 37. Streamlined Task Orientated Management of Projects Planning & Change Control Process Change Request Form Change Request Database SME If the Change Control Panel accept the Change Request it is passed on to the Project Planner & the Change Request Database is updated to reflect this. Change Control Panel Planner Providing Project Visibility & Understanding to the Wider Audience...
  • 38. Streamlined Task Orientated Management of Projects Planning & Change Control Process If the Change Control Panel accept the Change Request it is passed on to the Project Planner & the Change Request Database is updated to reflect this. Planner Providing Project Visibility & Understanding to the Wider Audience...
  • 39. Streamlined Task Orientated Management of Projects Planning & Change Control Process If the Change Control Panel accept the Change Request it is passed on to the Project Planner & the Change Request Database is updated to reflect this. Planner Providing Project Visibility & Understanding to the Wider Audience...
  • 40. Streamlined Task Orientated Management of Projects Planning & Change Control Process The Project Planner looks at the existing Project Plan & looks at the impact of the Change Request. Project Completion Planner Underlying Project Methodology (PRINCE, Six Sigma, Etc…) Providing Project Visibility & Understanding to the Wider Audience... Post-Project Process (Post Project Review, Ongoing Support,, etc…) Pre-Project Process (Request for Tender, Statement of Work, Order, etc…) Project Initiation
  • 41. Streamlined Task Orientated Management of Projects Planning & Change Control Process The Project Planner looks at the existing Project Plan & looks at the impact of the Change Request. Project Completion Planner Underlying Project Methodology (PRINCE, Six Sigma, Etc…) Providing Project Visibility & Understanding to the Wider Audience... Post-Project Process (Post Project Review, Ongoing Support,, etc…) Pre-Project Process (Request for Tender, Statement of Work, Order, etc…) Project Initiation
  • 42. Streamlined Task Orientated Management of Projects Planning & Change Control Process The new tasks are plotted on the Gantt Chart. Project Completion Planner Underlying Project Methodology (PRINCE, Six Sigma, Etc…) Providing Project Visibility & Understanding to the Wider Audience... Post-Project Process (Post Project Review, Ongoing Support,, etc…) Pre-Project Process (Request for Tender, Statement of Work, Order, etc…) Project Initiation
  • 43. Streamlined Task Orientated Management of Projects Planning & Change Control Process The Project Plan is updated & released to the business & all project resources. Project Completion Planner Underlying Project Methodology (PRINCE, Six Sigma, Etc…) Providing Project Visibility & Understanding to the Wider Audience... Post-Project Process (Post Project Review, Ongoing Support,, etc…) Pre-Project Process (Request for Tender, Statement of Work, Order, etc…) Project Initiation
  • 44. Changes & Planning? • On larger projects many changes are likely to take place. • The role of the Project Planner is to keep the Project Plan up to date & ensure that all relevant parties are informed of changes. Providing Project Visibility & Understanding to the Wider Audience...
  • 45. Streamlined Task Orientated Management of Projects
  • 46. Understanding STOMP? • More slides to follow soon, including Reporting, Milestones, Finance & Performance……
  • 47. Streamlined Task Orientated Management of Projects
  • 48. Streamlined Task Orientated Management of Projects • Thank you for watching this presentation. • For more information contact Patrick Cannon • Email: patrick@pcannon.net
  • 49. Streamlined Task Orientated Management of Projects