Functional Safety of Proximity
Detection and Collision
Avoidance Systems in Mines
2
MarcusPunchPty.Ltd.www.marcuspunch.com
RiskandReliability0432168849
February 2011Copyright 2011.
This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.
 Objectives
The objectives of this presentation are:
 To prepare the end-users (mine personnel) for the
rest of the seminar - so that you know what
questions to ask the manufacturers / designers /
suppliers.
 To give an appreciation of the regulatory environment
and the obligations on mines and manufacturers /
designers / suppliers regarding functional safety.
 To provide guidance on how the functional safety
approach may be undertaken when proximity detection
and collision avoidance technologies are to be used for
risk reduction in mines.
3
MarcusPunchPty.Ltd.www.marcuspunch.com
RiskandReliability0432168849
February 2011Copyright 2011.
This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.
 MINE: Requisite Standard of Care
NSW Coal Mine Health and Safety Regulation 2006, Clause 13:
Clause 13(1)(e)(v)…. to provide electrical safeguards for electrical and
non-electrical hazards, with a probability of failure appropriate to the
degree of risk posed by the hazard.
Clause 13(1)(f) (viii)…. to provide safeguards for mechanical plant and
installations, with a probability of failure appropriate to the degree of risk
posed by the hazard.
NSW DPI Legislation Update LU07-05 (CMH&SR2006)
Mandates the use of AS61508, AS62061 and/or AS4024 to fulfil these
requirements.
MDG15 (Guideline for Mobile and Transportable Equipment for Use
in Mines) Amendment No.2, Clause 2.4.6.1:
“The appropriate integrity level or category level shall be applied to
safety critical systems in accordance with AS 4024:1501 & 4024:1502,
AS/IEC 62061, AS/IEC 61508 or other similar standards”.
4
MarcusPunchPty.Ltd.www.marcuspunch.com
RiskandReliability0432168849
February 2011Copyright 2011.
This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.
 MINE: Go Back to Basics
safeguards .... with a probability of failure appropriate
to the degree of risk posed by the hazard.
That is, for each plant installation:
1.What are the hazards?
2.What is the risk posed?
3.What are the safeguards to be used against the hazards?
4.What is an appropriate probability of dangerous failure to
be specified for those safeguard/s?
5.Will the specified probability of dangerous failure of the
safeguard/s be achieved?
5
MarcusPunchPty.Ltd.www.marcuspunch.com
RiskandReliability0432168849
February 2011Copyright 2011.
This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.
 SUPPLIERS: Requisite Standard of Care
NSW OH&S Act, Part II, Division 1, Clause 11:
 A person who designs, manufactures or supplies any plant or
substance for use by people at work must
(a) ensure that the plant or substance is safe and without risks to
health when properly used, and
(b) provide, or arrange for the provision of, adequate information
about the plant or substance to the persons to whom it is
supplied to ensure its safe use.
NSW OH&S Regulation, Chapter 5, Part 5.2, Division 2, Clause 99:
Importers of plant manufactured outside the State to ensure that
manufacturer’s responsibilities are met.
NOH&SC Safe Design Project 2001, page 17-18:
Standards, guidelines and codes of practice may be used as evidence
of what a reasonable duty holder would do to comply with the legal
obligation for which the document provides guidance.
6
MarcusPunchPty.Ltd.www.marcuspunch.com
RiskandReliability0432168849
February 2011Copyright 2011.
This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.
Analysis
Realisation
Operation
 AS61508 - a Full Life-cycle Process !
Concept & Scope
MINE (1-2)
MINE (3-5)
SUPPLIER/S (9-12)
MINE (6-8,13)
MINE (14-16)
7
MarcusPunchPty.Ltd.www.marcuspunch.com
RiskandReliability0432168849
February 2011Copyright 2011.
This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.
 AS62061: a Realisation Process
Realisation
SUPPLIER (1-10)
8
MarcusPunchPty.Ltd.www.marcuspunch.com
RiskandReliability0432168849
February 2011Copyright 2011.
This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.
 AS4024: an Analysis & Realisation Process
Analysis
Realisation
MINE (1-3)
SUPPLIER/S (4-5)
9
MarcusPunchPty.Ltd.www.marcuspunch.com
RiskandReliability0432168849
February 2011Copyright 2011.
This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.
 MINE: Concept and Scope Stage
Develop a Functional Safety Management Plan
1. Describe the overall policy and strategy to achieve the functional safety
requirements.
2. Identify the relevant safety lifecycle activities that are to be conducted.
3. Identify the persons and organizations responsible for carrying out the
safety lifecycle activities,
4. Identify the procedures for recording and maintaining information
relevant to functional safety,
5. Describe the overall strategy to achieve functional safety for the
application software.
6. Describe a strategy for configuration (engineering change)
management,
7. Establish the need for a verification plan,
8. Establish the need for a validation plan,
10
MarcusPunchPty.Ltd.www.marcuspunch.com
RiskandReliability0432168849
February 2011Copyright 2011.
This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.
 MINE: Hazard and Risk Analysis
Aim: Identify hazards, assess risk, determine safeguards.
 List all items of mobile/moving plant on site.
 Consider all potentially dangerous interactions.
 Machine–to-Machine.
 Machine-to-Person.
 Machine-to-Infrastructure.
 Assess consequences and likelihood of each – use your standard
risk assessment procedures and risk matrix.
 Also refer to the risk assessment process and techniques in
MDG1010 and MDG1014.
 Use the hierarchy of risk controls to determine the most effective
and appropriate risk controls.
 Remember - hazard elimination / substitution trumps an
engineered electronic protection system.
11
MarcusPunchPty.Ltd.www.marcuspunch.com
RiskandReliability0432168849
February 2011Copyright 2011.
This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.
 MINE: Hazard and Risk Analysis
The following collision hazards are ones where risk
‘elimination’ or ‘substitution’ may be an option:
Manned dozer falls into coal valve – fatality.
 Option 1 (Prevention): Collision avoidance, but at SIL3.
 Option 2 (Substitution): Remote control dozer.
HV / HV head-tail collision (reversing / rear-ender) – fatality.
 Option 1 (Prevention): Collision avoidance, but at SIL2.
 Option 2 (Elimination): Re-design to prevent nose-to-tail
collisions crushing a driver’s cabin.
12
MarcusPunchPty.Ltd.www.marcuspunch.com
RiskandReliability0432168849
February 2011Copyright 2011.
This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.
 MINE: Hazard and Risk Analysis
HV / HV head-head collision (drive-by opposite directions)
 Option 1 (Prevention): Collision avoidance, but at SIL2.
 Option 2 (Substitution): One-way or divided traffic flows
on mine roads used by heavy vehicles.
13
MarcusPunchPty.Ltd.www.marcuspunch.com
RiskandReliability0432168849
February 2011Copyright 2011.
This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.
 MINE: Safety Requirements Allocation
 If possible attempt one of the ‘quantitative’ or semi-quantitative methods of
SIL allocation, per AS61508-5. These methods include:
 Fault Tree Analysis (FTA).
 Event Tree Analysis (ETA).
 Layer of Protection Analysis (LOPA).
 Absolutely avoid the temptation to skip this step and just
specify everything as SIL2 etc.... SIL allocation is an opportunity
for us to think more deeply about hazards and the sequence of
events that leads to harm.
 And always keep the following in mind:
 What is my ‘tolerable risk target’. Is it reasonable? How will I justify it?
 Can I reasonably achieve a lower target for certain hazards?
 The hierarchy of risk controls - is hazard elimination / substitution still
possible?
 Will my risk be ALARP with all safeguards in place?
14
MarcusPunchPty.Ltd.www.marcuspunch.com
RiskandReliability0432168849
February 2011Copyright 2011.
This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.
The Safety Requirements Specification (SRS) is the key
interface between ‘analysis’ and ‘realisation’ stages.
 The specification should fundamentally address the
following:
Functional requirements and safety integrity (ie. SIL)
requirements for the electrical / electronic safety-related
systems,
Functional requirements and safety integrity (ie. CAT)
requirements for the ‘other technology’ (ie. mechanical,
hydraulic, pneumatic, etc...) safety-related systems,
Information on the other risk reduction facilities to be used
(eg. guards, exclusion zones, procedures, etc...)
See AS61508-2 Clause 7.2 for a full checklist of what
should be included in the specification.
 MINE: Safety Requirements Specification
15
MarcusPunchPty.Ltd.www.marcuspunch.com
RiskandReliability0432168849
February 2011Copyright 2011.
This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.
Any argument or dispute arising from a supplier’s assertion or
opinion may that they do not need to comply with AS61508 /
AS4024 / AS62061 can be avoided, if the contract requires
compliance and the payment schedule is linked to successful
delivery.
The Safety Requirements Specification (SRS) should therefore
be clear and unambiguous, referencing the key requirements of
the standards and be a core part of the Statement of Work
(SOW) and the contract of supply.
Simply stating: “...the supplier shall comply with AS61508”, or
words to that effect, is not enough.
 MINE: Safety Requirements Specification
Ask the suppliers if they agree in principle that they are obliged to
comply with the functional safety / machinery safety standards!
Ask them if they already have (or are in the process of) implementing a
design approach based on one of the relevant standards!
Ask the suppliers if they sell into the EU, and if so, do their products
comply with Machinery Directive 2006/42/EC!
16
MarcusPunchPty.Ltd.www.marcuspunch.com
RiskandReliability0432168849
February 2011Copyright 2011.
This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.
 SUPPLIERS: The AS61508/AS62061 Approach
 Under AS61508 and AS62061 the following
fundamental aspects are to be demonstrated in order
to substantiate a SIL claim for each safety function.
Probability of Failure Prediction, appropriate to the ‘demand’ mode
Probability of Failure on Demand (low demand)
Probability of Dangerous Failure per Hour (high / continuous demand)
“Architectural” SIL Claim Limit, based on
Hardware Fault Tolerance
Safe Failure Fraction
System Type
Systematic Failure Avoidance and Control
General requirements on system performance, design techniques and
activities that shall / should be undertaken (see AS62061 and
AS61508 Parts 2, 3 & 6).
Ask the suppliers what SIL capability they claim for their
product /s and how they can prove it to you!
17
MarcusPunchPty.Ltd.www.marcuspunch.com
RiskandReliability0432168849
February 2011Copyright 2011.
This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.
 SUPPLIERS: A New Approach
 AS61508:1999/2001 is based on IEC61508:1998.
 IEC61508:1998 was updated in 2010 as IEC61508:2010
 This standard is now under review by a Standards
Australia committee for adoption as AS61508:201?.
 Under IEC61508:2010 there are now two (2) routes
available for SIL verification, including a ‘proven-in-use’
approach (Route 2) for the verification of safety devices
with previous field use.
 A legal precedent exists concerning the status of
international and draft Australian standards: see Engineers
Australia March 2009 issue, pages 38-39.
18
MarcusPunchPty.Ltd.www.marcuspunch.com
RiskandReliability0432168849
February 2011Copyright 2011.
This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.
 SUPPLIERS: A New Approach
Route 1 (‘probabilistic’ and ‘deterministic’ verification of
un-fielded / new design)
 As per AS61508 requirements (shown on previous slide).
Route 2 (‘proven-in-use’ verification of fielded / existing design)
 SIL2 (high demand) and SIL3 only allowed for redundant designs.
 SIL2 (low demand) and SIL1 allowed for non-redundant designs.
 All devices containing programmable logic elements must be
capable of detecting ≥60% of dangerous failures.
 Dangerous failure probability to be calculated on the basis of field
feedback data (at 90% confidence).
 ‘Proven-in-use’ argument to be made for all hardware and
software.
Ask the suppliers what SIL capability they claim for their
product/s and how they can prove it to you!
19
MarcusPunchPty.Ltd.www.marcuspunch.com
RiskandReliability0432168849
February 2011Copyright 2011.
This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.
•System designers and suppliers of safety devices are not
exempt from the safety lifecycle. If they are responsible for a
portion of the safety lifecycle then they need to be aware of and
achieve the requirements.
•Audits by the supplier and on the supplier should be performed
and documented to ensure compliance.
•For the process to work past Phase 5, the scope of supply
needs to be clear, responsibilities known and the SIL / CAT
targets and other requirements stated, as part of the contract.
•The key document is the Safety Requirements Specification.
•A safety validation (Phase 13) should be conducted during /
after commissioning to ensure that the requirements of the
Safety Requirements Specification are met. (See AS62061
Clause 8)
 MINE/SUPPLIER: The Relationship
20
MarcusPunchPty.Ltd.www.marcuspunch.com
RiskandReliability0432168849
February 2011Copyright 2011.
This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.
Designers, manufacturer’s and suppliers should be expected to
produce information sufficient to allow independent verification
that the safety requirements have been met within their scope of
supply, such as:
1.Safety-related system architecture and detailed design,
2.PFD / PFH and SIL Claim Limit calculations, design FMEA
and supporting data,
3.Evidence of compliance to systematic failure avoidance and
control (for SIL) or equivalent (for CAT).
4.Documentation of Safety Lifecycle activities undertaken.
5.“Information for use” per AS62061 Clause 7.
All of this is consistent with the designer / manufacturer /
supplier obligations under NSW OH&S Act, Part II, Division 1,
Clause 11.
 MINE/SUPPLIER: The Relationship
Ask the suppliers if they have this information available now!
21
MarcusPunchPty.Ltd.www.marcuspunch.com
RiskandReliability0432168849
February 2011Copyright 2011.
This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.
 MINE/SUPPLIER: The Relationship
IEC61508-2:2010 Clause 7.4.9.7, Note 2:
“ There may be commercial or legal restrictions on the
availability of evidence. These restrictions are outside
the scope of this standard. If such restrictions deny
the functional safety assessment adequate access to
the evidence, then the element is not suitable for
use in E/E/PE safety-related systems”.
Ask the suppliers if they will provide access to all evidence of
compliance!
22
MarcusPunchPty.Ltd.www.marcuspunch.com
RiskandReliability0432168849
February 2011Copyright 2011.
This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.
At the end of commissioning, ‘operations’ must take
operational ownership of the SRS.
- Operations must be satisfied that the SRS and risk
reduction facilities are all tested and operational.
- The Operators should have an understanding via formal
training and/or commissioning exposure as to the extent
and functionality of the SRS.
 MINE: Operations Responsibilities
Key Issue: Operator awareness, understanding and
competence.
23
MarcusPunchPty.Ltd.www.marcuspunch.com
RiskandReliability0432168849
February 2011Copyright 2011.
This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.
The Maintenance personnel have the following roles:
- Perform preventative / periodic maintenance on the risk
reduction measures.
- Perform functional tests as per the PFD / PFH calculation
results.
- Respond to reported failures.
- Be aware of what other protection layers are in place.
 MINE: Maintenance Responsibilities
- The logging of the functional test results and any failure
details so that ‘real’ equipment failure rates can be
documented.
Key Issue: Compliance to maintenance requirements.
24
MarcusPunchPty.Ltd.www.marcuspunch.com
RiskandReliability0432168849
February 2011Copyright 2011.
This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.
This “owner” has several responsibilities:-
- Single point of contact regarding the ‘state’ of the SRS.
- Advising other personnel as to modifications,
functionality, procedures etc.
- Audits on procedures
- Spares and technical support is available
- Security / passwords are current
- Any conditions of use are complied with.
 MINE: Engineering Responsibilities
Key Issue: Control of engineering changes.
- Configuration (engineering change) management.
25
MarcusPunchPty.Ltd.www.marcuspunch.com
RiskandReliability0432168849
February 2011Copyright 2011.
This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.
 Finally, a short note about the possible...
Other industries have dealt with the
dual issues of compliance to the
functional safety approach and the
introduction of proximity detection &
collision avoidance technologies.
Rail industry suppliers, through
considerable ‘encouragement’ by railway
owners, have pioneered ‘collision
avoidance’ protection for trains.
The suppliers are now able to deliver
systems that have been independently
certified to SIL4.
This happened because the customer
demanded it and was willing to pay for it,
and the supplier saw the future
competitive advantage to be gained by
complying.
26
MarcusPunchPty.Ltd.www.marcuspunch.com
RiskandReliability0432168849
February 2011Copyright 2011.
This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.
 Thankyou for listening.......

More Related Content

What's hot

Skidsteer training Hawkins Contracting
Skidsteer training Hawkins ContractingSkidsteer training Hawkins Contracting
Skidsteer training Hawkins ContractingNickHawkins19
 
Rischio meccanico - Materiale didattico 1
Rischio meccanico - Materiale didattico 1Rischio meccanico - Materiale didattico 1
Rischio meccanico - Materiale didattico 1seagruppo
 
TMHE’s 25 Tips for Working Safely with Counterbalanced Forklifts
TMHE’s 25 Tips for Working Safely with Counterbalanced ForkliftsTMHE’s 25 Tips for Working Safely with Counterbalanced Forklifts
TMHE’s 25 Tips for Working Safely with Counterbalanced ForkliftsToyota Material Handling Europe
 
Rischio meccanico - Materiale didattico 3
Rischio meccanico - Materiale didattico 3Rischio meccanico - Materiale didattico 3
Rischio meccanico - Materiale didattico 3seagruppo
 
Corso di formazione e aggiornamento GRU A TORRE
Corso di formazione e aggiornamento GRU A TORRECorso di formazione e aggiornamento GRU A TORRE
Corso di formazione e aggiornamento GRU A TORRELisa Servizi
 
12 sheet piling operations (temporary works) risk assessment templates
12 sheet piling operations (temporary works) risk assessment templates12 sheet piling operations (temporary works) risk assessment templates
12 sheet piling operations (temporary works) risk assessment templatesDwarika Bhushan Sharma
 
Espaço confinado NR-33
Espaço confinado NR-33Espaço confinado NR-33
Espaço confinado NR-33Deoclides Neto
 
Forklift Study Guide
Forklift Study GuideForklift Study Guide
Forklift Study GuideM.T.H Group
 
infortuni ed uso delle attrezzature di lavoro
infortuni ed uso delle attrezzature di lavoroinfortuni ed uso delle attrezzature di lavoro
infortuni ed uso delle attrezzature di lavoroCorrado Cigaina
 
22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templates22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templatesDwarika Bhushan Sharma
 
Práticas operacionais básicas com cestos aéreos
Práticas operacionais básicas com cestos aéreosPráticas operacionais básicas com cestos aéreos
Práticas operacionais básicas com cestos aéreosVeronezi Guindastes
 

What's hot (20)

Skidsteer training Hawkins Contracting
Skidsteer training Hawkins ContractingSkidsteer training Hawkins Contracting
Skidsteer training Hawkins Contracting
 
Rischio meccanico - Materiale didattico 1
Rischio meccanico - Materiale didattico 1Rischio meccanico - Materiale didattico 1
Rischio meccanico - Materiale didattico 1
 
TMHE’s 25 Tips for Working Safely with Counterbalanced Forklifts
TMHE’s 25 Tips for Working Safely with Counterbalanced ForkliftsTMHE’s 25 Tips for Working Safely with Counterbalanced Forklifts
TMHE’s 25 Tips for Working Safely with Counterbalanced Forklifts
 
Rischio meccanico - Materiale didattico 3
Rischio meccanico - Materiale didattico 3Rischio meccanico - Materiale didattico 3
Rischio meccanico - Materiale didattico 3
 
Corso di formazione e aggiornamento GRU A TORRE
Corso di formazione e aggiornamento GRU A TORRECorso di formazione e aggiornamento GRU A TORRE
Corso di formazione e aggiornamento GRU A TORRE
 
12 sheet piling operations (temporary works) risk assessment templates
12 sheet piling operations (temporary works) risk assessment templates12 sheet piling operations (temporary works) risk assessment templates
12 sheet piling operations (temporary works) risk assessment templates
 
Mewp rescue plan
Mewp rescue plan Mewp rescue plan
Mewp rescue plan
 
Safety ppt
Safety pptSafety ppt
Safety ppt
 
14 l avorare in sicurezza con le gru
14   l avorare in sicurezza con le gru14   l avorare in sicurezza con le gru
14 l avorare in sicurezza con le gru
 
NR 35 ATUALIZADA 2021.pptx
NR 35 ATUALIZADA 2021.pptxNR 35 ATUALIZADA 2021.pptx
NR 35 ATUALIZADA 2021.pptx
 
Checklist escadas2
Checklist escadas2Checklist escadas2
Checklist escadas2
 
Espaço confinado NR-33
Espaço confinado NR-33Espaço confinado NR-33
Espaço confinado NR-33
 
ACT&RULE West Bengal.ppt
ACT&RULE West Bengal.pptACT&RULE West Bengal.ppt
ACT&RULE West Bengal.ppt
 
Forklift Study Guide
Forklift Study GuideForklift Study Guide
Forklift Study Guide
 
MOVING FALLING OBJECTS SAFETY
MOVING FALLING OBJECTS SAFETYMOVING FALLING OBJECTS SAFETY
MOVING FALLING OBJECTS SAFETY
 
infortuni ed uso delle attrezzature di lavoro
infortuni ed uso delle attrezzature di lavoroinfortuni ed uso delle attrezzature di lavoro
infortuni ed uso delle attrezzature di lavoro
 
22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templates22 casting of concrete columns risk assessment templates
22 casting of concrete columns risk assessment templates
 
Práticas operacionais básicas com cestos aéreos
Práticas operacionais básicas com cestos aéreosPráticas operacionais básicas com cestos aéreos
Práticas operacionais básicas com cestos aéreos
 
Plano de resgate NR33.pdf
Plano de resgate NR33.pdfPlano de resgate NR33.pdf
Plano de resgate NR33.pdf
 
Worker safety hand book
Worker    safety hand bookWorker    safety hand book
Worker safety hand book
 

Viewers also liked

Advanced mining technologies manufacturer presentation
Advanced mining technologies   manufacturer presentationAdvanced mining technologies   manufacturer presentation
Advanced mining technologies manufacturer presentationNSW Environment and Planning
 
The case for improving our approach to collision avoidance Peter Standish
The case for improving our approach to collision avoidance Peter StandishThe case for improving our approach to collision avoidance Peter Standish
The case for improving our approach to collision avoidance Peter StandishNSW Environment and Planning
 
Functional Safety and Security: ICS Cyber Security is Part of Functional Safety
Functional Safety and Security: ICS Cyber Security is Part of Functional SafetyFunctional Safety and Security: ICS Cyber Security is Part of Functional Safety
Functional Safety and Security: ICS Cyber Security is Part of Functional SafetyWalt Boyes
 
BEC Controls & Automation
BEC Controls & AutomationBEC Controls & Automation
BEC Controls & Automationbjohnsonbec
 
IP PCIe
IP PCIeIP PCIe
IP PCIeSILKAN
 
Bolter miner @ Russia
Bolter miner @ RussiaBolter miner @ Russia
Bolter miner @ RussiaVR M
 
Complying with New Functional Safety Standards
Complying with New Functional Safety StandardsComplying with New Functional Safety Standards
Complying with New Functional Safety StandardsDesign World
 
Transportation in underground mines
Transportation  in underground mines Transportation  in underground mines
Transportation in underground mines vanam mareswara rao
 
Haulage Management System
Haulage Management SystemHaulage Management System
Haulage Management SystemTumsifu Kaoza
 
Hydraulic excavator
Hydraulic excavatorHydraulic excavator
Hydraulic excavatorShahid Akram
 
Intrinsic safety and flameproof apparatus in mines
Intrinsic safety and flameproof apparatus in minesIntrinsic safety and flameproof apparatus in mines
Intrinsic safety and flameproof apparatus in minesJayachandra Jitendra
 
Mining Machinery Learning Material
Mining Machinery Learning MaterialMining Machinery Learning Material
Mining Machinery Learning MaterialBhaskar Naidu
 
Brett Roberts - Some aspects of electrical power system protection in undergr...
Brett Roberts - Some aspects of electrical power system protection in undergr...Brett Roberts - Some aspects of electrical power system protection in undergr...
Brett Roberts - Some aspects of electrical power system protection in undergr...NSW Environment and Planning
 
Working with Dragline
Working with DraglineWorking with Dragline
Working with DraglineVR M
 

Viewers also liked (20)

Advanced mining technologies manufacturer presentation
Advanced mining technologies   manufacturer presentationAdvanced mining technologies   manufacturer presentation
Advanced mining technologies manufacturer presentation
 
The case for improving our approach to collision avoidance Peter Standish
The case for improving our approach to collision avoidance Peter StandishThe case for improving our approach to collision avoidance Peter Standish
The case for improving our approach to collision avoidance Peter Standish
 
Earthing systems in mines - Phillip Wall
Earthing systems in mines - Phillip WallEarthing systems in mines - Phillip Wall
Earthing systems in mines - Phillip Wall
 
IEC61508
IEC61508IEC61508
IEC61508
 
Functional Safety and Security: ICS Cyber Security is Part of Functional Safety
Functional Safety and Security: ICS Cyber Security is Part of Functional SafetyFunctional Safety and Security: ICS Cyber Security is Part of Functional Safety
Functional Safety and Security: ICS Cyber Security is Part of Functional Safety
 
BEC Controls & Automation
BEC Controls & AutomationBEC Controls & Automation
BEC Controls & Automation
 
IP PCIe
IP PCIeIP PCIe
IP PCIe
 
IEC 61508
IEC 61508IEC 61508
IEC 61508
 
Continuous miner
Continuous minerContinuous miner
Continuous miner
 
Bolter miner @ Russia
Bolter miner @ RussiaBolter miner @ Russia
Bolter miner @ Russia
 
Iec61508 guide
Iec61508 guideIec61508 guide
Iec61508 guide
 
Complying with New Functional Safety Standards
Complying with New Functional Safety StandardsComplying with New Functional Safety Standards
Complying with New Functional Safety Standards
 
Transportation in underground mines
Transportation  in underground mines Transportation  in underground mines
Transportation in underground mines
 
Haulage Management System
Haulage Management SystemHaulage Management System
Haulage Management System
 
Hydraulic excavator
Hydraulic excavatorHydraulic excavator
Hydraulic excavator
 
Intrinsic safety and flameproof apparatus in mines
Intrinsic safety and flameproof apparatus in minesIntrinsic safety and flameproof apparatus in mines
Intrinsic safety and flameproof apparatus in mines
 
Proximity detection and anti collision workshop
Proximity detection and anti collision workshopProximity detection and anti collision workshop
Proximity detection and anti collision workshop
 
Mining Machinery Learning Material
Mining Machinery Learning MaterialMining Machinery Learning Material
Mining Machinery Learning Material
 
Brett Roberts - Some aspects of electrical power system protection in undergr...
Brett Roberts - Some aspects of electrical power system protection in undergr...Brett Roberts - Some aspects of electrical power system protection in undergr...
Brett Roberts - Some aspects of electrical power system protection in undergr...
 
Working with Dragline
Working with DraglineWorking with Dragline
Working with Dragline
 

Similar to Functional safety of collision avoidance systems in mines marcus punch

Chris Wraith: Elevating work platforms - an international perspective
Chris Wraith: Elevating work platforms - an international perspectiveChris Wraith: Elevating work platforms - an international perspective
Chris Wraith: Elevating work platforms - an international perspectiveNSW Environment and Planning
 
Safety Based Estimation FINAL
Safety Based Estimation FINALSafety Based Estimation FINAL
Safety Based Estimation FINALMelissa Spencer
 
2017-Collision-Avoidance-Systems-WP-v1.pdf
2017-Collision-Avoidance-Systems-WP-v1.pdf2017-Collision-Avoidance-Systems-WP-v1.pdf
2017-Collision-Avoidance-Systems-WP-v1.pdfAlexSandroBorgesPere
 
Zahir - Technical Safety - 2017
Zahir - Technical Safety - 2017Zahir - Technical Safety - 2017
Zahir - Technical Safety - 2017Zahir Patel
 
New Models and New Technologies for an Integrated Risk Management in Complex ...
New Models and New Technologies for an Integrated Risk Management in Complex ...New Models and New Technologies for an Integrated Risk Management in Complex ...
New Models and New Technologies for an Integrated Risk Management in Complex ...Community Protection Forum
 
Sfpsg best-practice-guide-for-mew ps-100715-4a
Sfpsg best-practice-guide-for-mew ps-100715-4aSfpsg best-practice-guide-for-mew ps-100715-4a
Sfpsg best-practice-guide-for-mew ps-100715-4aAlan Bassett
 
FMEA: The Good, The Bad, and The Ugly
FMEA: The Good, The Bad, and The UglyFMEA: The Good, The Bad, and The Ugly
FMEA: The Good, The Bad, and The UglyCheryl Tulkoff
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Risk Analysis
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Risk AnalysisJavier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Risk Analysis
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Risk AnalysisJ. García - Verdugo
 
Electricallockoutsop 717
Electricallockoutsop 717Electricallockoutsop 717
Electricallockoutsop 717MUHAMMAD ISHFAQ
 
GLOBAL PROCESS SAFETY COMPLIANCE STARTS HERE WITH SIGMA-HSE
GLOBAL PROCESS SAFETY COMPLIANCE STARTS HERE WITH SIGMA-HSEGLOBAL PROCESS SAFETY COMPLIANCE STARTS HERE WITH SIGMA-HSE
GLOBAL PROCESS SAFETY COMPLIANCE STARTS HERE WITH SIGMA-HSESigma-HSE (UK) Ltd
 
Revolutionising Site Monitoring and Maintenance
Revolutionising Site Monitoring and MaintenanceRevolutionising Site Monitoring and Maintenance
Revolutionising Site Monitoring and MaintenanceMilling and Grain magazine
 
AWP Best Practices Document for Training & Familiarization
AWP Best Practices Document for Training & FamiliarizationAWP Best Practices Document for Training & Familiarization
AWP Best Practices Document for Training & FamiliarizationCraig Ihde
 
COMIT March 2017 - Virtual Reality for Zero Harm
COMIT March 2017 - Virtual Reality for Zero HarmCOMIT March 2017 - Virtual Reality for Zero Harm
COMIT March 2017 - Virtual Reality for Zero HarmComit Projects Ltd
 

Similar to Functional safety of collision avoidance systems in mines marcus punch (20)

Marcus Punch - When SIL2 will just not do!
Marcus Punch - When SIL2 will just not do!Marcus Punch - When SIL2 will just not do!
Marcus Punch - When SIL2 will just not do!
 
EESS 2018 Day 1 - Marcus Punch
EESS 2018 Day 1 - Marcus PunchEESS 2018 Day 1 - Marcus Punch
EESS 2018 Day 1 - Marcus Punch
 
1 Technology
1 Technology1 Technology
1 Technology
 
Chris Wraith: Elevating work platforms - an international perspective
Chris Wraith: Elevating work platforms - an international perspectiveChris Wraith: Elevating work platforms - an international perspective
Chris Wraith: Elevating work platforms - an international perspective
 
Timann-box
Timann-boxTimann-box
Timann-box
 
Current trends involving PROFIsafe - Peter Brown
Current trends involving PROFIsafe - Peter BrownCurrent trends involving PROFIsafe - Peter Brown
Current trends involving PROFIsafe - Peter Brown
 
Safety Based Estimation FINAL
Safety Based Estimation FINALSafety Based Estimation FINAL
Safety Based Estimation FINAL
 
2017-Collision-Avoidance-Systems-WP-v1.pdf
2017-Collision-Avoidance-Systems-WP-v1.pdf2017-Collision-Avoidance-Systems-WP-v1.pdf
2017-Collision-Avoidance-Systems-WP-v1.pdf
 
Zahir - Technical Safety - 2017
Zahir - Technical Safety - 2017Zahir - Technical Safety - 2017
Zahir - Technical Safety - 2017
 
New Models and New Technologies for an Integrated Risk Management in Complex ...
New Models and New Technologies for an Integrated Risk Management in Complex ...New Models and New Technologies for an Integrated Risk Management in Complex ...
New Models and New Technologies for an Integrated Risk Management in Complex ...
 
Sfpsg best-practice-guide-for-mew ps-100715-4a
Sfpsg best-practice-guide-for-mew ps-100715-4aSfpsg best-practice-guide-for-mew ps-100715-4a
Sfpsg best-practice-guide-for-mew ps-100715-4a
 
Profisafe update - Pete Brown
Profisafe update  - Pete BrownProfisafe update  - Pete Brown
Profisafe update - Pete Brown
 
FMEA: The Good, The Bad, and The Ugly
FMEA: The Good, The Bad, and The UglyFMEA: The Good, The Bad, and The Ugly
FMEA: The Good, The Bad, and The Ugly
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Risk Analysis
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Risk AnalysisJavier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Risk Analysis
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Risk Analysis
 
Electricallockoutsop 717
Electricallockoutsop 717Electricallockoutsop 717
Electricallockoutsop 717
 
GLOBAL PROCESS SAFETY COMPLIANCE STARTS HERE WITH SIGMA-HSE
GLOBAL PROCESS SAFETY COMPLIANCE STARTS HERE WITH SIGMA-HSEGLOBAL PROCESS SAFETY COMPLIANCE STARTS HERE WITH SIGMA-HSE
GLOBAL PROCESS SAFETY COMPLIANCE STARTS HERE WITH SIGMA-HSE
 
Revolutionising Site Monitoring and Maintenance
Revolutionising Site Monitoring and MaintenanceRevolutionising Site Monitoring and Maintenance
Revolutionising Site Monitoring and Maintenance
 
Safety of life study
Safety of life study Safety of life study
Safety of life study
 
AWP Best Practices Document for Training & Familiarization
AWP Best Practices Document for Training & FamiliarizationAWP Best Practices Document for Training & Familiarization
AWP Best Practices Document for Training & Familiarization
 
COMIT March 2017 - Virtual Reality for Zero Harm
COMIT March 2017 - Virtual Reality for Zero HarmCOMIT March 2017 - Virtual Reality for Zero Harm
COMIT March 2017 - Virtual Reality for Zero Harm
 

More from NSW Environment and Planning

06. how the regulator communicates with the industry
06. how the regulator communicates with the industry06. how the regulator communicates with the industry
06. how the regulator communicates with the industryNSW Environment and Planning
 
Fires on mobile plant refuelling (Ross Stutchbury)
Fires on mobile plant refuelling (Ross Stutchbury)Fires on mobile plant refuelling (Ross Stutchbury)
Fires on mobile plant refuelling (Ross Stutchbury)NSW Environment and Planning
 
Mobile plant rollovers and collisions (Bill McGlynn)
Mobile plant rollovers and collisions (Bill McGlynn)Mobile plant rollovers and collisions (Bill McGlynn)
Mobile plant rollovers and collisions (Bill McGlynn)NSW Environment and Planning
 
Electrical performance presentation (Craig Harris)
Electrical performance presentation (Craig Harris)Electrical performance presentation (Craig Harris)
Electrical performance presentation (Craig Harris)NSW Environment and Planning
 
Where do I stand for fire protection on mobile and transportable equipment an...
Where do I stand for fire protection on mobile and transportable equipment an...Where do I stand for fire protection on mobile and transportable equipment an...
Where do I stand for fire protection on mobile and transportable equipment an...NSW Environment and Planning
 

More from NSW Environment and Planning (20)

12 Small mines report card 2020
12 Small mines report card 202012 Small mines report card 2020
12 Small mines report card 2020
 
11 occupational hygiene monitoring of dust
11 occupational hygiene monitoring of dust11 occupational hygiene monitoring of dust
11 occupational hygiene monitoring of dust
 
09 learning from disasters
09 learning from disasters09 learning from disasters
09 learning from disasters
 
13 explosives awareness
13 explosives awareness13 explosives awareness
13 explosives awareness
 
10 incident reporting to the regulator 2020
10 incident reporting to the regulator 202010 incident reporting to the regulator 2020
10 incident reporting to the regulator 2020
 
08 dust safety and health surveillance
08 dust safety and health surveillance08 dust safety and health surveillance
08 dust safety and health surveillance
 
07 feedback and consultation
07 feedback and consultation07 feedback and consultation
07 feedback and consultation
 
06. how the regulator communicates with the industry
06. how the regulator communicates with the industry06. how the regulator communicates with the industry
06. how the regulator communicates with the industry
 
05 reviewing your SMS
05 reviewing your SMS05 reviewing your SMS
05 reviewing your SMS
 
04. slinging and lifting equipment
04. slinging and lifting equipment04. slinging and lifting equipment
04. slinging and lifting equipment
 
Control focused inspection tools (Mark Smith)
Control focused inspection tools (Mark Smith)Control focused inspection tools (Mark Smith)
Control focused inspection tools (Mark Smith)
 
Central assessment unit CAU(Steve Bentham)
Central assessment unit CAU(Steve Bentham)Central assessment unit CAU(Steve Bentham)
Central assessment unit CAU(Steve Bentham)
 
Autonomous mining equipment (Owen Barry)
Autonomous mining equipment (Owen Barry)Autonomous mining equipment (Owen Barry)
Autonomous mining equipment (Owen Barry)
 
Fires on mobile plant refuelling (Ross Stutchbury)
Fires on mobile plant refuelling (Ross Stutchbury)Fires on mobile plant refuelling (Ross Stutchbury)
Fires on mobile plant refuelling (Ross Stutchbury)
 
Mobile plant rollovers and collisions (Bill McGlynn)
Mobile plant rollovers and collisions (Bill McGlynn)Mobile plant rollovers and collisions (Bill McGlynn)
Mobile plant rollovers and collisions (Bill McGlynn)
 
Metropolitan colliery gas (Dave Gordon)
Metropolitan colliery gas (Dave Gordon)Metropolitan colliery gas (Dave Gordon)
Metropolitan colliery gas (Dave Gordon)
 
Airborne dust update (Mark Shepherd)
Airborne dust update (Mark Shepherd)Airborne dust update (Mark Shepherd)
Airborne dust update (Mark Shepherd)
 
Emergency planning (Matt U'Brien)
Emergency planning (Matt U'Brien)Emergency planning (Matt U'Brien)
Emergency planning (Matt U'Brien)
 
Electrical performance presentation (Craig Harris)
Electrical performance presentation (Craig Harris)Electrical performance presentation (Craig Harris)
Electrical performance presentation (Craig Harris)
 
Where do I stand for fire protection on mobile and transportable equipment an...
Where do I stand for fire protection on mobile and transportable equipment an...Where do I stand for fire protection on mobile and transportable equipment an...
Where do I stand for fire protection on mobile and transportable equipment an...
 

Recently uploaded

Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCNAP Global Network
 
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...SUHANI PANDEY
 
Akurdi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Akurdi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Akurdi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Akurdi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...tanu pandey
 
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...nservice241
 
Government e Marketplace GeM Presentation
Government e Marketplace GeM PresentationGovernment e Marketplace GeM Presentation
Government e Marketplace GeM Presentationgememarket11
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Call Girls in Nagpur High Profile
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Call Girls in Nagpur High Profile
 
Chakan ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Chakan ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Chakan ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Chakan ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...tanu pandey
 
best call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakur
best call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakurbest call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakur
best call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha ThakurSUHANI PANDEY
 
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...MOHANI PANDEY
 
An Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCAn Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCNAP Global Network
 
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...SUHANI PANDEY
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCNAP Global Network
 
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...robinsonayot
 
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Call Girls in Nagpur High Profile
 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)NAP Global Network
 
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 

Recently uploaded (20)

Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
 
Akurdi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Akurdi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Akurdi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Akurdi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
 
Government e Marketplace GeM Presentation
Government e Marketplace GeM PresentationGovernment e Marketplace GeM Presentation
Government e Marketplace GeM Presentation
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
 
Chakan ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Chakan ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Chakan ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Chakan ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
best call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakur
best call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakurbest call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakur
best call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakur
 
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
 
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
 
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
 
An Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCAn Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCC
 
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
 
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCC
 
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
 
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)
 
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
 

Functional safety of collision avoidance systems in mines marcus punch

  • 1. 1 February 2011Copyright 2010. Presented by Marcus Punch TÜV FSExpert (Machinery), ID:154/10 Marcus Punch Pty. Ltd Risk and Reliability Mobile: +61 (0)432168849 Email: marcus@marcuspunch.com Web: www.marcuspunch.com Functional Safety of Proximity Detection and Collision Avoidance Systems in Mines
  • 2. 2 MarcusPunchPty.Ltd.www.marcuspunch.com RiskandReliability0432168849 February 2011Copyright 2011. This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.  Objectives The objectives of this presentation are:  To prepare the end-users (mine personnel) for the rest of the seminar - so that you know what questions to ask the manufacturers / designers / suppliers.  To give an appreciation of the regulatory environment and the obligations on mines and manufacturers / designers / suppliers regarding functional safety.  To provide guidance on how the functional safety approach may be undertaken when proximity detection and collision avoidance technologies are to be used for risk reduction in mines.
  • 3. 3 MarcusPunchPty.Ltd.www.marcuspunch.com RiskandReliability0432168849 February 2011Copyright 2011. This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.  MINE: Requisite Standard of Care NSW Coal Mine Health and Safety Regulation 2006, Clause 13: Clause 13(1)(e)(v)…. to provide electrical safeguards for electrical and non-electrical hazards, with a probability of failure appropriate to the degree of risk posed by the hazard. Clause 13(1)(f) (viii)…. to provide safeguards for mechanical plant and installations, with a probability of failure appropriate to the degree of risk posed by the hazard. NSW DPI Legislation Update LU07-05 (CMH&SR2006) Mandates the use of AS61508, AS62061 and/or AS4024 to fulfil these requirements. MDG15 (Guideline for Mobile and Transportable Equipment for Use in Mines) Amendment No.2, Clause 2.4.6.1: “The appropriate integrity level or category level shall be applied to safety critical systems in accordance with AS 4024:1501 & 4024:1502, AS/IEC 62061, AS/IEC 61508 or other similar standards”.
  • 4. 4 MarcusPunchPty.Ltd.www.marcuspunch.com RiskandReliability0432168849 February 2011Copyright 2011. This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.  MINE: Go Back to Basics safeguards .... with a probability of failure appropriate to the degree of risk posed by the hazard. That is, for each plant installation: 1.What are the hazards? 2.What is the risk posed? 3.What are the safeguards to be used against the hazards? 4.What is an appropriate probability of dangerous failure to be specified for those safeguard/s? 5.Will the specified probability of dangerous failure of the safeguard/s be achieved?
  • 5. 5 MarcusPunchPty.Ltd.www.marcuspunch.com RiskandReliability0432168849 February 2011Copyright 2011. This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.  SUPPLIERS: Requisite Standard of Care NSW OH&S Act, Part II, Division 1, Clause 11:  A person who designs, manufactures or supplies any plant or substance for use by people at work must (a) ensure that the plant or substance is safe and without risks to health when properly used, and (b) provide, or arrange for the provision of, adequate information about the plant or substance to the persons to whom it is supplied to ensure its safe use. NSW OH&S Regulation, Chapter 5, Part 5.2, Division 2, Clause 99: Importers of plant manufactured outside the State to ensure that manufacturer’s responsibilities are met. NOH&SC Safe Design Project 2001, page 17-18: Standards, guidelines and codes of practice may be used as evidence of what a reasonable duty holder would do to comply with the legal obligation for which the document provides guidance.
  • 6. 6 MarcusPunchPty.Ltd.www.marcuspunch.com RiskandReliability0432168849 February 2011Copyright 2011. This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place. Analysis Realisation Operation  AS61508 - a Full Life-cycle Process ! Concept & Scope MINE (1-2) MINE (3-5) SUPPLIER/S (9-12) MINE (6-8,13) MINE (14-16)
  • 7. 7 MarcusPunchPty.Ltd.www.marcuspunch.com RiskandReliability0432168849 February 2011Copyright 2011. This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.  AS62061: a Realisation Process Realisation SUPPLIER (1-10)
  • 8. 8 MarcusPunchPty.Ltd.www.marcuspunch.com RiskandReliability0432168849 February 2011Copyright 2011. This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.  AS4024: an Analysis & Realisation Process Analysis Realisation MINE (1-3) SUPPLIER/S (4-5)
  • 9. 9 MarcusPunchPty.Ltd.www.marcuspunch.com RiskandReliability0432168849 February 2011Copyright 2011. This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.  MINE: Concept and Scope Stage Develop a Functional Safety Management Plan 1. Describe the overall policy and strategy to achieve the functional safety requirements. 2. Identify the relevant safety lifecycle activities that are to be conducted. 3. Identify the persons and organizations responsible for carrying out the safety lifecycle activities, 4. Identify the procedures for recording and maintaining information relevant to functional safety, 5. Describe the overall strategy to achieve functional safety for the application software. 6. Describe a strategy for configuration (engineering change) management, 7. Establish the need for a verification plan, 8. Establish the need for a validation plan,
  • 10. 10 MarcusPunchPty.Ltd.www.marcuspunch.com RiskandReliability0432168849 February 2011Copyright 2011. This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.  MINE: Hazard and Risk Analysis Aim: Identify hazards, assess risk, determine safeguards.  List all items of mobile/moving plant on site.  Consider all potentially dangerous interactions.  Machine–to-Machine.  Machine-to-Person.  Machine-to-Infrastructure.  Assess consequences and likelihood of each – use your standard risk assessment procedures and risk matrix.  Also refer to the risk assessment process and techniques in MDG1010 and MDG1014.  Use the hierarchy of risk controls to determine the most effective and appropriate risk controls.  Remember - hazard elimination / substitution trumps an engineered electronic protection system.
  • 11. 11 MarcusPunchPty.Ltd.www.marcuspunch.com RiskandReliability0432168849 February 2011Copyright 2011. This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.  MINE: Hazard and Risk Analysis The following collision hazards are ones where risk ‘elimination’ or ‘substitution’ may be an option: Manned dozer falls into coal valve – fatality.  Option 1 (Prevention): Collision avoidance, but at SIL3.  Option 2 (Substitution): Remote control dozer. HV / HV head-tail collision (reversing / rear-ender) – fatality.  Option 1 (Prevention): Collision avoidance, but at SIL2.  Option 2 (Elimination): Re-design to prevent nose-to-tail collisions crushing a driver’s cabin.
  • 12. 12 MarcusPunchPty.Ltd.www.marcuspunch.com RiskandReliability0432168849 February 2011Copyright 2011. This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.  MINE: Hazard and Risk Analysis HV / HV head-head collision (drive-by opposite directions)  Option 1 (Prevention): Collision avoidance, but at SIL2.  Option 2 (Substitution): One-way or divided traffic flows on mine roads used by heavy vehicles.
  • 13. 13 MarcusPunchPty.Ltd.www.marcuspunch.com RiskandReliability0432168849 February 2011Copyright 2011. This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.  MINE: Safety Requirements Allocation  If possible attempt one of the ‘quantitative’ or semi-quantitative methods of SIL allocation, per AS61508-5. These methods include:  Fault Tree Analysis (FTA).  Event Tree Analysis (ETA).  Layer of Protection Analysis (LOPA).  Absolutely avoid the temptation to skip this step and just specify everything as SIL2 etc.... SIL allocation is an opportunity for us to think more deeply about hazards and the sequence of events that leads to harm.  And always keep the following in mind:  What is my ‘tolerable risk target’. Is it reasonable? How will I justify it?  Can I reasonably achieve a lower target for certain hazards?  The hierarchy of risk controls - is hazard elimination / substitution still possible?  Will my risk be ALARP with all safeguards in place?
  • 14. 14 MarcusPunchPty.Ltd.www.marcuspunch.com RiskandReliability0432168849 February 2011Copyright 2011. This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place. The Safety Requirements Specification (SRS) is the key interface between ‘analysis’ and ‘realisation’ stages.  The specification should fundamentally address the following: Functional requirements and safety integrity (ie. SIL) requirements for the electrical / electronic safety-related systems, Functional requirements and safety integrity (ie. CAT) requirements for the ‘other technology’ (ie. mechanical, hydraulic, pneumatic, etc...) safety-related systems, Information on the other risk reduction facilities to be used (eg. guards, exclusion zones, procedures, etc...) See AS61508-2 Clause 7.2 for a full checklist of what should be included in the specification.  MINE: Safety Requirements Specification
  • 15. 15 MarcusPunchPty.Ltd.www.marcuspunch.com RiskandReliability0432168849 February 2011Copyright 2011. This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place. Any argument or dispute arising from a supplier’s assertion or opinion may that they do not need to comply with AS61508 / AS4024 / AS62061 can be avoided, if the contract requires compliance and the payment schedule is linked to successful delivery. The Safety Requirements Specification (SRS) should therefore be clear and unambiguous, referencing the key requirements of the standards and be a core part of the Statement of Work (SOW) and the contract of supply. Simply stating: “...the supplier shall comply with AS61508”, or words to that effect, is not enough.  MINE: Safety Requirements Specification Ask the suppliers if they agree in principle that they are obliged to comply with the functional safety / machinery safety standards! Ask them if they already have (or are in the process of) implementing a design approach based on one of the relevant standards! Ask the suppliers if they sell into the EU, and if so, do their products comply with Machinery Directive 2006/42/EC!
  • 16. 16 MarcusPunchPty.Ltd.www.marcuspunch.com RiskandReliability0432168849 February 2011Copyright 2011. This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.  SUPPLIERS: The AS61508/AS62061 Approach  Under AS61508 and AS62061 the following fundamental aspects are to be demonstrated in order to substantiate a SIL claim for each safety function. Probability of Failure Prediction, appropriate to the ‘demand’ mode Probability of Failure on Demand (low demand) Probability of Dangerous Failure per Hour (high / continuous demand) “Architectural” SIL Claim Limit, based on Hardware Fault Tolerance Safe Failure Fraction System Type Systematic Failure Avoidance and Control General requirements on system performance, design techniques and activities that shall / should be undertaken (see AS62061 and AS61508 Parts 2, 3 & 6). Ask the suppliers what SIL capability they claim for their product /s and how they can prove it to you!
  • 17. 17 MarcusPunchPty.Ltd.www.marcuspunch.com RiskandReliability0432168849 February 2011Copyright 2011. This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.  SUPPLIERS: A New Approach  AS61508:1999/2001 is based on IEC61508:1998.  IEC61508:1998 was updated in 2010 as IEC61508:2010  This standard is now under review by a Standards Australia committee for adoption as AS61508:201?.  Under IEC61508:2010 there are now two (2) routes available for SIL verification, including a ‘proven-in-use’ approach (Route 2) for the verification of safety devices with previous field use.  A legal precedent exists concerning the status of international and draft Australian standards: see Engineers Australia March 2009 issue, pages 38-39.
  • 18. 18 MarcusPunchPty.Ltd.www.marcuspunch.com RiskandReliability0432168849 February 2011Copyright 2011. This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.  SUPPLIERS: A New Approach Route 1 (‘probabilistic’ and ‘deterministic’ verification of un-fielded / new design)  As per AS61508 requirements (shown on previous slide). Route 2 (‘proven-in-use’ verification of fielded / existing design)  SIL2 (high demand) and SIL3 only allowed for redundant designs.  SIL2 (low demand) and SIL1 allowed for non-redundant designs.  All devices containing programmable logic elements must be capable of detecting ≥60% of dangerous failures.  Dangerous failure probability to be calculated on the basis of field feedback data (at 90% confidence).  ‘Proven-in-use’ argument to be made for all hardware and software. Ask the suppliers what SIL capability they claim for their product/s and how they can prove it to you!
  • 19. 19 MarcusPunchPty.Ltd.www.marcuspunch.com RiskandReliability0432168849 February 2011Copyright 2011. This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place. •System designers and suppliers of safety devices are not exempt from the safety lifecycle. If they are responsible for a portion of the safety lifecycle then they need to be aware of and achieve the requirements. •Audits by the supplier and on the supplier should be performed and documented to ensure compliance. •For the process to work past Phase 5, the scope of supply needs to be clear, responsibilities known and the SIL / CAT targets and other requirements stated, as part of the contract. •The key document is the Safety Requirements Specification. •A safety validation (Phase 13) should be conducted during / after commissioning to ensure that the requirements of the Safety Requirements Specification are met. (See AS62061 Clause 8)  MINE/SUPPLIER: The Relationship
  • 20. 20 MarcusPunchPty.Ltd.www.marcuspunch.com RiskandReliability0432168849 February 2011Copyright 2011. This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place. Designers, manufacturer’s and suppliers should be expected to produce information sufficient to allow independent verification that the safety requirements have been met within their scope of supply, such as: 1.Safety-related system architecture and detailed design, 2.PFD / PFH and SIL Claim Limit calculations, design FMEA and supporting data, 3.Evidence of compliance to systematic failure avoidance and control (for SIL) or equivalent (for CAT). 4.Documentation of Safety Lifecycle activities undertaken. 5.“Information for use” per AS62061 Clause 7. All of this is consistent with the designer / manufacturer / supplier obligations under NSW OH&S Act, Part II, Division 1, Clause 11.  MINE/SUPPLIER: The Relationship Ask the suppliers if they have this information available now!
  • 21. 21 MarcusPunchPty.Ltd.www.marcuspunch.com RiskandReliability0432168849 February 2011Copyright 2011. This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.  MINE/SUPPLIER: The Relationship IEC61508-2:2010 Clause 7.4.9.7, Note 2: “ There may be commercial or legal restrictions on the availability of evidence. These restrictions are outside the scope of this standard. If such restrictions deny the functional safety assessment adequate access to the evidence, then the element is not suitable for use in E/E/PE safety-related systems”. Ask the suppliers if they will provide access to all evidence of compliance!
  • 22. 22 MarcusPunchPty.Ltd.www.marcuspunch.com RiskandReliability0432168849 February 2011Copyright 2011. This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place. At the end of commissioning, ‘operations’ must take operational ownership of the SRS. - Operations must be satisfied that the SRS and risk reduction facilities are all tested and operational. - The Operators should have an understanding via formal training and/or commissioning exposure as to the extent and functionality of the SRS.  MINE: Operations Responsibilities Key Issue: Operator awareness, understanding and competence.
  • 23. 23 MarcusPunchPty.Ltd.www.marcuspunch.com RiskandReliability0432168849 February 2011Copyright 2011. This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place. The Maintenance personnel have the following roles: - Perform preventative / periodic maintenance on the risk reduction measures. - Perform functional tests as per the PFD / PFH calculation results. - Respond to reported failures. - Be aware of what other protection layers are in place.  MINE: Maintenance Responsibilities - The logging of the functional test results and any failure details so that ‘real’ equipment failure rates can be documented. Key Issue: Compliance to maintenance requirements.
  • 24. 24 MarcusPunchPty.Ltd.www.marcuspunch.com RiskandReliability0432168849 February 2011Copyright 2011. This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place. This “owner” has several responsibilities:- - Single point of contact regarding the ‘state’ of the SRS. - Advising other personnel as to modifications, functionality, procedures etc. - Audits on procedures - Spares and technical support is available - Security / passwords are current - Any conditions of use are complied with.  MINE: Engineering Responsibilities Key Issue: Control of engineering changes. - Configuration (engineering change) management.
  • 25. 25 MarcusPunchPty.Ltd.www.marcuspunch.com RiskandReliability0432168849 February 2011Copyright 2011. This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.  Finally, a short note about the possible... Other industries have dealt with the dual issues of compliance to the functional safety approach and the introduction of proximity detection & collision avoidance technologies. Rail industry suppliers, through considerable ‘encouragement’ by railway owners, have pioneered ‘collision avoidance’ protection for trains. The suppliers are now able to deliver systems that have been independently certified to SIL4. This happened because the customer demanded it and was willing to pay for it, and the supplier saw the future competitive advantage to be gained by complying.
  • 26. 26 MarcusPunchPty.Ltd.www.marcuspunch.com RiskandReliability0432168849 February 2011Copyright 2011. This material may be copied or reproduced by the recipient, provided that the markings of Marcus Punch Pty. Ltd. as the source remain in place.  Thankyou for listening.......