North Street Capital Project Request 18 January 2011

382 views
339 views

Published on

Published in: News & Politics
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
382
On SlideShare
0
From Embeds
0
Number of Embeds
5
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

North Street Capital Project Request 18 January 2011

  1. 1. City of Northampton FORM CIP-2: Capital Project RequestDepartment:Public WorksDivision: StreetsPrepared By: Edward HuntleyDate Prepared: 01/18/111. Project Title: North Street Reconstruction2. Purpose of Project Request (Check One): ( ) New (X) Replacement ( ) Addition / Alteration3. Was this Project Request submitted last year? ( ) Yes (X) No4. Department Priority Classification (Check All): (X) Corrects health or safety hazard ( ) Mandated by state or federal regulation (X) Repairs, rehabs, or replaces facility or equipment (X) Improves efficiency5. Department Priority Ranking (Check One): ( ) Very High (X) High ( ) Medium ( ) Low6. Basis of Cost Estimate (Check One): ( ) Cost of comparable facility or equipment ( ) Rule of thumb indicator or unit cost ( ) Cost estimate from engineer, architect or vendor ( ) Cost from lowest qualified bidder (X) Preliminary Cost Estimate (best guess)7. Estimated Useful Life In Years (Circle One):5 6 7 8 9 10 15 20 25 30 indefinite8. Estimated Project Schedule: Start Finish Task (month/year) (month/year) Design ongoing Permitting Procurement spring 2012 Construction / Summer 2012-Summer 2013 Acquisition
  2. 2. 9. Project Description & Justification:Give a brief (1 2 paragraph) description of what the project includes. Provide basic information, such as the objectiveof the request, the need and background, as well as the location, size, acreage, floor capacity, etc. Attach additionalsheets as necessary.North Street reconstruction includes roadway, curbing, sidewalk construction and the replacement of all municipalutilities. In addition, it will eliminate costly maintenance (roadway patching, drain and sewer repairs).Design, contract bidding and administration to be completed in house by the DPW Engineering Division.
  3. 3. Project Title: North Street Reconstruction$350,000 water replacement$350,000 sewer replacement$300,000 storm drain replacement$400,000 roadway, curbing and sidewalks

×