SlideShare a Scribd company logo
1 of 4
Download to read offline
Valve Testing Guidelines
in accordance with
ASME B16.34 & MSS-SP-99
Prepared By: Nilesh Mistry E-Mail: mistrynilesh@icloud.com
Shell Test
Seat Test
(Closure Test)
Shell Test
Seat Test
(Closure Test)
Shell Test
Seat Test
(Closure Test)
Shell Test
Seat Test
(Closure Test)
Test Fluid Water Water
Air, Nitrogen or other Gas of
Similar or Lower Viscosity
Air, Nitrogen or other Gas of
Similar or Lower Viscosity
Water Water Gas for NPS ≤ 4 - Class ≤ 2500
Test Pressure
Minimum 1.5 times the CWP
Rating of Valve
1.1 Times the CWP Rating of
Valve
Minimum 80 psi Minimum 80 psi
Min 1.5 Times the 38°C
(100°F) Pressure Rating of
Valve (Gage Pressure)
Minimum 110% of the 38°C
(100°F) Pressure Rating of
Valve (Gage Pressure)
Minimum 5.5 bar (80 psi)
(Gage Pressure)
Test Duration Minimum 15 Seconds Minimum 15 Seconds Minimum 15 Seconds Minimum 15 Seconds
Minimum 15 Seconds for
Valve Sizes NPS ≤ 2
(After the valve is prepared
and is under Shell Pressure)
Minimum 15 Seconds for
Valve Sizes NPS ≤ 2
(After the valve is prepared
and is under Full Pressure)
Minimum 15 Seconds for Valve
Sizes NPS ≤ 2
(After the valve is prepared and is
under Full Pressure)
Temperature of Test Fluid 50°F to 125°F 50°F to 125°F - - Maximum 50°C (125°F) Maximum 50°C (125°F) Maximum 50°C (125°F)
Test Condition - - - -
Test shall be made with Valve
in Partially Open Condition.
-
The Closure Tightness
Requirements vary with Intended
Service Application.
Acceptance No Visible Leakage No Visible Leakage
No Visible Leakage when
Immersed in Water or Coated
with Leak Detection Solution
No Visible Leakage when
Immersed in Water or Coated
with Leak Detection Solution
No Visually Detactable
Leakage
Closure Test Leakage
Acceptance Criteria shall be
by Agreement between
Manufacturer and Purchaser.
Closure Test Leakage Acceptance
Criteria shall be by Agreement
between Manufacturer and
Purchaser.
Valve Testing Guidelines
Hydrostatic Testing Hydrostatic Testing Pnuematic Testing
-
Pnuematic Testing
MSS-SP-99 ASME B16.34
Description
E-Mail: mistrynilesh@icloud.comPrepared By: Nilesh Mistry
Shell Test
Seat Test
(Closure Test)
Shell Test
Seat Test
(Closure Test)
Test Fluid Water Water
Air, Nitrogen or other Gas of
Similar or Lower Viscosity
Air, Nitrogen or other Gas of
Similar or Lower Viscosity
Test Pressure
Minimum 1.5 times the CWP
Rating of Valve
1.1 Times the CWP Rating of
Valve
Minimum 80 psi Minimum 80 psi
Test Duration Minimum 15 Seconds Minimum 15 Seconds Minimum 15 Seconds Minimum 15 Seconds
Temperature of Test Fluid 50°F to 125°F 50°F to 125°F - -
Test Condition - - - -
Acceptance No Visible Leakage No Visible Leakage
No Visible Leakage when
Immersed in Water or Coated
with Leak Detection Solution
No Visible Leakage when
Immersed in Water or Coated
with Leak Detection Solution
Valve Testing Guidelines - MSS-SP-99
Description
MSS-SP-99
Hydrostatic Testing Pnuematic Testing
E-Mail: mistrynilesh@icloud.comPrepared By: Nilesh Mistry
Shell Test
Seat Test
(Closure Test)
Shell Test
Seat Test
(Closure Test)
Test Fluid Water Water Gas for NPS ≤ 4 - Class ≤ 2500
Test Pressure
Min 1.5 Times the 38°C (100°F)
Pressure Rating of Valve (Gage
Pressure)
Minimum 110% of the 38°C (100°F)
Pressure Rating of Valve (Gage
Pressure)
Minimum 5.5 bar (80 psi)
(Gage Pressure)
Test Duration
Minimum 15 Seconds for Valve
Sizes NPS ≤ 2
(After the valve is prepared and is
under Shell Pressure)
Minimum 15 Seconds for Valve
Sizes NPS ≤ 2
(After the valve is prepared and is
under Full Pressure)
Minimum 15 Seconds for Valve
Sizes NPS ≤ 2
(After the valve is prepared and is
under Full Pressure)
Temperature of Test Fluid Maximum 50°C (125°F) Maximum 50°C (125°F) Maximum 50°C (125°F)
Test Condition
Test shall be made with Valve in
Partially Open Condition.
-
The Closure Tightness
Requirements vary with Intended
Service Application.
Acceptance No Visually Detactable Leakage
Closure Test Leakage Acceptance
Criteria shall be by Agreement
between Manufacturer and
Purchaser.
Closure Test Leakage Acceptance
Criteria shall be by Agreement
between Manufacturer and
Purchaser.
-
Valve Testing Guidelines - ASME B16.34
Description
ASME B16.34
Hydrostatic Testing Pnuematic Testing
E-Mail: mistrynilesh@icloud.comPrepared By: Nilesh Mistry

More Related Content

What's hot

control valve functional testing - Swetha
control valve functional testing - Swethacontrol valve functional testing - Swetha
control valve functional testing - Swetha
Swetha Sundaram
 
Pressure Relief Devices_Presenation
Pressure Relief Devices_PresenationPressure Relief Devices_Presenation
Pressure Relief Devices_Presenation
sumit handa
 

What's hot (20)

Wellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACEWellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACE
 
control valve functional testing - Swetha
control valve functional testing - Swethacontrol valve functional testing - Swetha
control valve functional testing - Swetha
 
Control valve
Control valveControl valve
Control valve
 
Pressure relief system_design
Pressure relief system_designPressure relief system_design
Pressure relief system_design
 
Hot Tapping Requirement
Hot Tapping RequirementHot Tapping Requirement
Hot Tapping Requirement
 
Natural gas processing technology dehydration 3
Natural gas processing technology   dehydration 3Natural gas processing technology   dehydration 3
Natural gas processing technology dehydration 3
 
Mechanical Valve
Mechanical ValveMechanical Valve
Mechanical Valve
 
Piping basics knowledge
Piping basics knowledgePiping basics knowledge
Piping basics knowledge
 
Difference Types of Control Valves Presentation.pdf
Difference Types of Control Valves Presentation.pdfDifference Types of Control Valves Presentation.pdf
Difference Types of Control Valves Presentation.pdf
 
Pressure Relief Devices_Presenation
Pressure Relief Devices_PresenationPressure Relief Devices_Presenation
Pressure Relief Devices_Presenation
 
Static equipment in oil and gas industry
Static equipment in oil and gas industryStatic equipment in oil and gas industry
Static equipment in oil and gas industry
 
1. sequance of well drilling and completion part 1
1. sequance of well drilling and completion part 11. sequance of well drilling and completion part 1
1. sequance of well drilling and completion part 1
 
1. completion sequance
1. completion sequance1. completion sequance
1. completion sequance
 
Control valves
Control valvesControl valves
Control valves
 
valve maintenance
valve maintenancevalve maintenance
valve maintenance
 
Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1
 
Piping & piping materials redefined
Piping & piping materials redefinedPiping & piping materials redefined
Piping & piping materials redefined
 
INTRODUCTION TO PIPING AND PIPE LINES.pptx
INTRODUCTION TO PIPING AND PIPE LINES.pptxINTRODUCTION TO PIPING AND PIPE LINES.pptx
INTRODUCTION TO PIPING AND PIPE LINES.pptx
 
1- history of petroleum engineering and organic theory
1- history of petroleum engineering and organic theory1- history of petroleum engineering and organic theory
1- history of petroleum engineering and organic theory
 
Safety valve in process industry1
Safety valve in process industry1Safety valve in process industry1
Safety valve in process industry1
 

Viewers also liked

Pressure safety valves
Pressure safety valvesPressure safety valves
Pressure safety valves
Amol Dudhate
 
Control valve positioners
Control valve positionersControl valve positioners
Control valve positioners
Sagar Jathan
 
Thermometers calibration
Thermometers calibrationThermometers calibration
Thermometers calibration
Hanns Muller
 
How to calibrate an ir thermometer, frank liebmann, 2013 05-07
How to calibrate an ir thermometer, frank liebmann, 2013 05-07How to calibrate an ir thermometer, frank liebmann, 2013 05-07
How to calibrate an ir thermometer, frank liebmann, 2013 05-07
Jesus Enrique Oliva Salazar
 
Electrical Risk Management
Electrical Risk ManagementElectrical Risk Management
Electrical Risk Management
guest81e1c7
 

Viewers also liked (19)

Safety valves
Safety valvesSafety valves
Safety valves
 
Pressure Relief valve sizing and design
Pressure Relief valve sizing and designPressure Relief valve sizing and design
Pressure Relief valve sizing and design
 
Safety Relief Valve sizing, selection & quotation software
Safety Relief Valve sizing, selection & quotation software Safety Relief Valve sizing, selection & quotation software
Safety Relief Valve sizing, selection & quotation software
 
Pressure safety valves
Pressure safety valvesPressure safety valves
Pressure safety valves
 
Control valve ppt
Control valve pptControl valve ppt
Control valve ppt
 
Control valve positioners
Control valve positionersControl valve positioners
Control valve positioners
 
Fisher FIELDVUE Instrument ValveLink Mobile Update
Fisher FIELDVUE Instrument ValveLink Mobile UpdateFisher FIELDVUE Instrument ValveLink Mobile Update
Fisher FIELDVUE Instrument ValveLink Mobile Update
 
Thermometers calibration
Thermometers calibrationThermometers calibration
Thermometers calibration
 
Calibration dasibi-ozone
Calibration dasibi-ozoneCalibration dasibi-ozone
Calibration dasibi-ozone
 
High Voltage Safety Operating Procedures for Engineers and Technicians
High Voltage Safety Operating Procedures for Engineers and TechniciansHigh Voltage Safety Operating Procedures for Engineers and Technicians
High Voltage Safety Operating Procedures for Engineers and Technicians
 
How to calibrate an ir thermometer, frank liebmann, 2013 05-07
How to calibrate an ir thermometer, frank liebmann, 2013 05-07How to calibrate an ir thermometer, frank liebmann, 2013 05-07
How to calibrate an ir thermometer, frank liebmann, 2013 05-07
 
Electrical Risk Management
Electrical Risk ManagementElectrical Risk Management
Electrical Risk Management
 
Preassure Safety Valve
Preassure Safety ValvePreassure Safety Valve
Preassure Safety Valve
 
Instrumentation positioner presentation
Instrumentation positioner presentationInstrumentation positioner presentation
Instrumentation positioner presentation
 
Digital thermometer ppt
Digital thermometer pptDigital thermometer ppt
Digital thermometer ppt
 
Assembly Language Lecture 5
Assembly Language Lecture 5Assembly Language Lecture 5
Assembly Language Lecture 5
 
Electrical Safety and Risk Assessments
Electrical Safety and Risk AssessmentsElectrical Safety and Risk Assessments
Electrical Safety and Risk Assessments
 
Equipment calibration PPT by Shravan Kumar
Equipment calibration PPT by Shravan KumarEquipment calibration PPT by Shravan Kumar
Equipment calibration PPT by Shravan Kumar
 
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & MarkingPipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
Pipe Hydrotest , Inspection, Visual and Dimensional Inspection & Marking
 

Recently uploaded

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 

Recently uploaded (20)

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptx
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 

Valve Testing Guidelines

  • 1. Valve Testing Guidelines in accordance with ASME B16.34 & MSS-SP-99 Prepared By: Nilesh Mistry E-Mail: mistrynilesh@icloud.com
  • 2. Shell Test Seat Test (Closure Test) Shell Test Seat Test (Closure Test) Shell Test Seat Test (Closure Test) Shell Test Seat Test (Closure Test) Test Fluid Water Water Air, Nitrogen or other Gas of Similar or Lower Viscosity Air, Nitrogen or other Gas of Similar or Lower Viscosity Water Water Gas for NPS ≤ 4 - Class ≤ 2500 Test Pressure Minimum 1.5 times the CWP Rating of Valve 1.1 Times the CWP Rating of Valve Minimum 80 psi Minimum 80 psi Min 1.5 Times the 38°C (100°F) Pressure Rating of Valve (Gage Pressure) Minimum 110% of the 38°C (100°F) Pressure Rating of Valve (Gage Pressure) Minimum 5.5 bar (80 psi) (Gage Pressure) Test Duration Minimum 15 Seconds Minimum 15 Seconds Minimum 15 Seconds Minimum 15 Seconds Minimum 15 Seconds for Valve Sizes NPS ≤ 2 (After the valve is prepared and is under Shell Pressure) Minimum 15 Seconds for Valve Sizes NPS ≤ 2 (After the valve is prepared and is under Full Pressure) Minimum 15 Seconds for Valve Sizes NPS ≤ 2 (After the valve is prepared and is under Full Pressure) Temperature of Test Fluid 50°F to 125°F 50°F to 125°F - - Maximum 50°C (125°F) Maximum 50°C (125°F) Maximum 50°C (125°F) Test Condition - - - - Test shall be made with Valve in Partially Open Condition. - The Closure Tightness Requirements vary with Intended Service Application. Acceptance No Visible Leakage No Visible Leakage No Visible Leakage when Immersed in Water or Coated with Leak Detection Solution No Visible Leakage when Immersed in Water or Coated with Leak Detection Solution No Visually Detactable Leakage Closure Test Leakage Acceptance Criteria shall be by Agreement between Manufacturer and Purchaser. Closure Test Leakage Acceptance Criteria shall be by Agreement between Manufacturer and Purchaser. Valve Testing Guidelines Hydrostatic Testing Hydrostatic Testing Pnuematic Testing - Pnuematic Testing MSS-SP-99 ASME B16.34 Description E-Mail: mistrynilesh@icloud.comPrepared By: Nilesh Mistry
  • 3. Shell Test Seat Test (Closure Test) Shell Test Seat Test (Closure Test) Test Fluid Water Water Air, Nitrogen or other Gas of Similar or Lower Viscosity Air, Nitrogen or other Gas of Similar or Lower Viscosity Test Pressure Minimum 1.5 times the CWP Rating of Valve 1.1 Times the CWP Rating of Valve Minimum 80 psi Minimum 80 psi Test Duration Minimum 15 Seconds Minimum 15 Seconds Minimum 15 Seconds Minimum 15 Seconds Temperature of Test Fluid 50°F to 125°F 50°F to 125°F - - Test Condition - - - - Acceptance No Visible Leakage No Visible Leakage No Visible Leakage when Immersed in Water or Coated with Leak Detection Solution No Visible Leakage when Immersed in Water or Coated with Leak Detection Solution Valve Testing Guidelines - MSS-SP-99 Description MSS-SP-99 Hydrostatic Testing Pnuematic Testing E-Mail: mistrynilesh@icloud.comPrepared By: Nilesh Mistry
  • 4. Shell Test Seat Test (Closure Test) Shell Test Seat Test (Closure Test) Test Fluid Water Water Gas for NPS ≤ 4 - Class ≤ 2500 Test Pressure Min 1.5 Times the 38°C (100°F) Pressure Rating of Valve (Gage Pressure) Minimum 110% of the 38°C (100°F) Pressure Rating of Valve (Gage Pressure) Minimum 5.5 bar (80 psi) (Gage Pressure) Test Duration Minimum 15 Seconds for Valve Sizes NPS ≤ 2 (After the valve is prepared and is under Shell Pressure) Minimum 15 Seconds for Valve Sizes NPS ≤ 2 (After the valve is prepared and is under Full Pressure) Minimum 15 Seconds for Valve Sizes NPS ≤ 2 (After the valve is prepared and is under Full Pressure) Temperature of Test Fluid Maximum 50°C (125°F) Maximum 50°C (125°F) Maximum 50°C (125°F) Test Condition Test shall be made with Valve in Partially Open Condition. - The Closure Tightness Requirements vary with Intended Service Application. Acceptance No Visually Detactable Leakage Closure Test Leakage Acceptance Criteria shall be by Agreement between Manufacturer and Purchaser. Closure Test Leakage Acceptance Criteria shall be by Agreement between Manufacturer and Purchaser. - Valve Testing Guidelines - ASME B16.34 Description ASME B16.34 Hydrostatic Testing Pnuematic Testing E-Mail: mistrynilesh@icloud.comPrepared By: Nilesh Mistry