Energy Management System Upgrade - Johns Creek, Georgia
1.
2. Project Name
Macy’s Pilot Project
for Upgrade
Project Location
Johns Creek, Georgia
Project Team
Owner: Macy’s, Inc.
Engineer: McKenney’s, Inc.
Specializations
bdoc
Energy Management
Markets
Retail
3. McKenney’s completed a pilot project to upgrade an energy monitoring
system at Macy’s stores nationwide.
4. The Challenge
Macy’s had an existing Tridium Niagara R2 platform for energy
management in place that monitored everything from space temperature
and light status to water use and trash compactors. When Macy’s
decided to upgrade to the latest Tridium AX technology, McKenney’s
conducted a pilot to show the retailer it could seamlessly import critical
data into the AX platform while duplicating existing R2 functionality.
The Solution
The McKenney’s team developed custom software tools and unique code
to automate the conversion of store databases while maintaining existing
data integrity. This customization ensured that no functionality was lost
while also providing updated capabilities and higher levels of data
assurance. In addition, the McKenney’s team enhanced Macy’s data
analytics capabilities.
The content of this document is not intended as an endorsement.
5. The Results
Due to the success of the pilot and procedures established, a full-scale
AX upgrade is now underway at all 800-plus Macy’s stores.
6. Atlanta Office: 1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316
P: 404-622-5000
Charlotte Office: 3601 Performance Road
Charlotte, North Carolina 28214
P: 704-357-1200
sales@mckenneys.com
www.mckenneys.com