1. DP Workboats; a new era for Multicat type vessels
DP Workboats;
An new era for multicat type workboats
2. Profile
• Owner and operator of 40 workboats for coastal waters
• 40 years experience
• Independent company with a global presence
• Standard & custom built vessels
- Ultra shallow water
- Cable & pipeline (re)burial
• Headquarters in Den Helder, The Netherlands
4. Dynamic Positioning on workboats
• 2007, Acta Marine was the first operator installing DP on
workboats
• Currently 4 DP vessels in operation
• All vessels are ultra-shallow draft (draft < 2,0 m.)
• DP workboats are competing with standard OSV / PSV DP 2
vessels at a competitive workboat charter rate.
5. Thruster set-up for Acta Marine workboats
For excellent position holding capabilities the DP workboats are
equipped with:
• Stern: 2 x fixed propellor & 1 x 360˚ rudder propellor
• Bow: 1 or 2 x 360˚ horizontal propellor/jet
6. Workscope for DP workboats
Backfil of trench;
• Nordstream Pipeline, soil layers of 25 cm where backfilled in the trench
• Maasvlakte 2, shallow area spray pontoon
C.Discovery- Nordstream
7. Workscope for DP workboats
Water jetting;
Maasvlakte 2, cleaning breakwater for the installation of
an additional concrete blocks layer
8. Workscope for DP workboats
Offshore Oil & Gas maintenance;
• Change out Offshore oil bunker hose GDF SUEZ EP
• Removal and installation of splash zone constructions
9. Workscope for DP workboats
WID / Mass flow trenching;
Removed 30.000m3 sand per day in the port of Sidi Ifni Morocco
10. Workscope for DP workboats
WROV Support platform;
Explosive Ordnance Disposal German Wadden Sea OWF export
cable route
11. Workscopes for DP workboats
Vibrocoring/CPT survey;
Murmansk Offshore pipeline route Sthokman field
12. Additional workscopes for DP multicats
• Trenching with mobile trencher unit
• ROV support platform
• Accommodation (12 additional to vessel crew)
• Diving from 4p c/t anchor spread
• Offshore access to constructions
• (Heave comp) Crane works
• Cable laying
• Cable burial
• Cable survey
• Cable recovery and jointing
• Cable protection deployment (Mattresses etc)
• TP cable protection installation (Messenger wire technique)
13. NON DP Cable & Pipeline (re)burial
Remedial lowering of cables / pipeline
â—Ź Post-lay technology
- suction dredging with jetting
- 4-point mooring
- Life tracking of burial process
â—Ź Very effective and safe for
shore-ends, crossings and exposed
parts.
● Succesfully applied on “live” gas
pipelines and power cables.