PROJECT COMUNICATIONS
     MANAGEMENT
ÍNDICE
 10.1 Identify Stakeholders

 10.2 Plan Communications

 10.3 Distribute Information

 10.4 Manage Stakeholders Expectations

 10.5 Report Performance


                          Roberto A. Rodríguez Pérez
.1 STAKEHOLDER ANALYSIS

1. Process of systematically gathering and analyzing quantitative and

   qualitative

2. information to determine whose interests should be taken into account

   throughout the project.

3. It identifies the interests, expectations, and influence of the

   stakeholders and relates them to the purpose of the project.

4. It also helps identify stakeholder relationships that can be leveraged to

   build coalitions and potential partnerships to enhance the project’s

                10.1.2
   chance of success    Identify Stakeholders: Tools and
                  technics
STEPS
 Step 1: Identify all potential project stakeholders and relevant
 information, such as their roles, departments, interests, knowledge
 levels, expectations, and influence levels
           Identifying other stakeholders is usually done by interviewing
           identified stakeholders and expanding the list until all potential
           stakeholders are included.

            Step 2: Identify the potential impact or support each stakeholder could
            generate, and classify them so as to define an approach strategy
                    Classification models:
                        1.   Power/interest grid, grouping the stakeholders based on their level of authority
 Escala de Likert




                             (“power”) and their level or concern (“interest”) regarding the project outcomes;
                        2.   Power/influence grid, grouping the stakeholders based on their level of authority
                             (“power”) and their active involvement (“influence”) in the project;
                        3.   Influence/impact grid, grouping the stakeholders based on their active involvement
                             (“influence”) in the project and their ability to effect changes to the project’s planning
                             or execution (“impact”); and
                        4.   Salience model, describing classes of stakeholders based on their power (ability to
                             impose their will), urgency (need for immediate attention), and legitimacy (their
                             involvement is appropriate).


                             10.1.2 Identify Stakeholders: Tools and
                             technics
POWER/INTEREST GRID




       10.1.2 Identify Stakeholders: Tools and
       technics
STEPS
  Step 3: Assess how key stakeholders are likely to react or respond in
  various situations, in order to plan how to influence them to enhance
  their support and mitigate potential negative impacts.




                 10.1.2 Identify Stakeholders: Tools and
                 technics
.2 EXPERT JUDGMENT
 1. Judgment and expertise should be sought from groups or individuals
    with specialized training or knowledge on the subject area such as:
     i. Senior management,
     ii. Other units within the organization, Identified key stakeholders,
     iii. Project managers who have worked on projects in the same area
          (directly or through lessons learned),
     iv. Subject matter experts (SMEs) in business or project area,
     v. Industry groups and consultants, and
     vi. Professional and technical associations.

 Expert judgment can be obtained through individual consultations (one-on-
 one meetings,
 interviews, etc.) or through a panel format (focus groups, surveys etc).




               10.1.2 Identify Stakeholders: Tools and
               technics
.1 STAKEHOLDER REGISTER
Details related to the identified stakeholders including, but not limited to:

1. Identification information: Name, organizational position, location,
   role in the project, contact information;
2. Assessment information: Major requirements, main expectations,
   potential influence in the project, phase in the life cycle with the most
   interest; and
3. Stakeholder classification: Internal/ external,
   supporter/neutral/resistor, etc.




                 10.1.3 Identify Stakeholders: Outputs
.2 STAKEHOLDER MANAGEMENT
    STRATEGY
      Increase the support and minimize negative impacts of stakeholders. It includes
      elements such as:

          1. Key stakeholders who can significantly impact the project,
          2. Level of participation in the project desired for each identified
             stakeholder, and
          3. Stakeholder groups and their management (as groups).

      A common way of representing the stakeholder management strategy is a
      stakeholder analysis matrix.




Back to Index          10.1.3 Identify Stakeholders: Outputs
.2 PLAN COMMUNICATIONS
.2 PLAN COMMUNICATIONS
.1 Communications Requirements Analysis

    Information needs of the project stakeholders.
    These requirements are defined by combining the type and format of information
    needed with an analysis of the value of that information.

    Number of potential communication channels or paths as an indicator of the
    complexity of a project’s communications.


                                       n(n-1)/2
    Where n represents the number of stakeholders.




                    10.2.2 Plan Communications: Tools and Techniques
.2 PLAN COMMUNICATIONS
Information typically used to determine project communication requirements
includes:

  • Organization charts,
  • Project organization and stakeholder responsibility relationships,
  • Disciplines, departments, and specialties involved in the project,
  • Logistics of how many persons will be involved with the project and at
    which locations,
  • Internal information needs (e.g., communicating across organizations),
  • External information needs (e.g., communicating with the media, public,
    or contractors), and
  • Stakeholder information from the stakeholder register and the
    stakeholder management strategy.




                10.2.2 Plan Communications: Tools and Techniques
.2 PLAN COMMUNICATIONS
                                                 .2 Communication Technology
Factors that can affect the project include:
   • Urgency of the need for information. Is project success dependent
       upon having frequently updated information available on a moment’s
       notice, or would regularly issued written reports suffice?

   •   Availability of technology. Are appropriate systems already in place or
       do project needs warrant change? For example, do the intended
       stakeholder(s) have access to a selected communications technology?

   •   Expected project staffing. Are the proposed communication systems
       compatible with the experience and expertise of the project participants, or
       is extensive training and learning required?

   •   Duration of the project. Is the available technology likely to change
       before the project is over?

   •   Project environment. Does the team meet and operate on a face-to-face
       basis or in a virtual environment?

                   10.2.2 Plan Communications: Tools and Techniques
.2 PLAN COMMUNICATIONS
 .3 Communication Models


   •   Encode.

   •   Medium.

   •   Noise.

   •   Decode.




                   Notas: KM y Ciclo de satisfacción y que tan bien vamos



                10.2.2 Plan Communications: Tools and Techniques
.2 PLAN COMMUNICATIONS
                                                        .4 Communication Methods

 •   Interactive communication. Between two or more parties performing a
     multidirectional exchange of information. It is the most efficient way to ensure a
     common understanding by all participants on specified topics, and includes
     meetings, phone calls, video conferencing, etc.

 •   Push communication. Sent to specific recipients who need to know the
     information. This ensures that the information is distributed but does not certify
     that it actually reached or was understood by the intended audience. Push
     communication includes letters, memos, reports, emails, faxes, voice mails,
     press releases etc.

 •   Pull communication. Used for very large volumes of information, or for very
     large audiences, that requires the recipients to access the communication
     content at their own discretion. These methods include intranet sites, e-
     learning, and knowledge repositories, etc. The project manager decides,
     based on communication requirements, what, how, and when communication
     methods are to be used in the project.


                10.2.2 Plan Communications: Tools and Techniques
.1 Communications Management Plan

The communications management plan can be formal or informal, highly detailed or broadly
framed, and based on the needs of the project. The communications management plan
usually provides:

   •   Stakeholder communication requirements;
   •   Information to be communicated, including language, format, content, and level of detail;
   •   Reason for the distribution of that information;
   •   Time frame and frequency for the distribution of required information;
   •   Person responsible for communicating the information;
   •   Person responsible for authorizing release of confidential information;
   •   Person or groups who will receive the information;
   •   Methods or technologies used to convey the information, such as memos, e-mail, and/or press
       releases;
   •   Resources allocated for communication activities, including time and budget;
   •   Escalation process identifying time frames and the management chain (names) for escalation of
       issues that cannot be resolved at a lower staff level;
   •   Method for updating and refining the communications management plan as the project progresses
       and develops;
   •   Glossary of common terminology;
   •   F low charts of the information flow in the project, workflows with possible sequence of
       authorization, list of reports, and meeting plans, etc.; and

   Communication constraints, usually derived from specific legislation or regulation, technology, and
   organizational policies, etc. The communications management plan can also include guidelines and
   templates for project status meetings, project team meetings, e-meetings, and e-mail. The use of a
   project website and project management software can also be included if they are used in the project.
                        10.2.2 Plan Communications: Outputs
.3 DISTRIBUTE INFORMATION
Process of making relevant information available to project stakeholders.
Effective information distribution includes a number of techniques including:

  •   Sender-receiver models. Feedback loops and barriers to communication.

  •   Choice of media. Situation specifics of when to communicate in writing
      versus orally, when to write an informal memo versus a formal report, and
      when to communicate face-to-face versus by e-mail.

  •   Writing style. Active versus passive voice, sentence structure, and word
      choice.

  •   Meeting management techniques. Preparing an agenda and dealing with
      conflicts.

  •   Presentation techniques. Body language and design of visual aids.

  •   Facilitation techniques. Building consensus and overcoming obstacles.
.3 DISTRIBUTE INFORMATION
 .1 Project Management Plan

 .2 Performance Reports

 .3 Organizational Process Assets

    The organizational process assets (see Section 2.4.3) that can influence
    the Distribute Information process include, but are not limited to:

        • Policies, procedures, and guidelines regarding information
          distribution,

        • Templates, and

        • Historical information and lessons learned. Note: KM


              10.3.1 Distribute Information: Inputs
.3 DISTRIBUTE INFORMATION
 .1 Communication Methods
     Individual and group meetings, video and audio conferences, computer
     chats, and other remote communications methods are used to distribute
     information.

 .2 Information Distribution Tools
      Project information can be distributed using a variety of tools, including:
          • Hard-copy document distribution, manual filing systems, press
              releases, and shared-access electronic databases;

          •   Electronic communication and conferencing tools, such as e-mail,
              fax, voice mail, telephone, video and web conferencing, websites
              and web publishing; and

          •   Electronic tools for project management, such as web interfaces
              to scheduling and project management software, meeting and
              virtual office support software, portals, and collaborative work
              management tools. NOTE: Gmail and CRM

                 10.3.2 Distribute Information: Tools and Techniques
.3 DISTRIBUTE INFORMATION
  .1 Organizational Process Assets Updates

       • Stakeholder notifications. Information may be provided to
         stakeholders about resolved issues, approved changes, and
         general project status

       • Project reports

       • Project presentations

       • Project records

       • Feedback from stakeholders

       • Lessons learned documentation



             10.3.3 Distribute Information: Outputs
.4 MANAGE STAKEHOLDERS
EXPECTATIONS
 Process of communicating and working with stakeholders to meet their
 needs and addressing issues as they occur. Involves communication
 activities directed toward project stakeholders to influence their
 expectations, address concerns, and resolve issues, such as:


   •   Actively managing to increase the likelihood of project acceptance by
       negotiating and influencing their desires to achieve and maintain the
       project goals,

   •   Addressing concerns that have not become issues yet.

   •   Clarifying and resolving issues.

More Related Content

What's hot

Project Stakeholder Engagement
Project Stakeholder EngagementProject Stakeholder Engagement
Project Stakeholder EngagementMark Ritchie
 
13.4 Monitor Stakeholder Engagement
13.4 Monitor Stakeholder Engagement13.4 Monitor Stakeholder Engagement
13.4 Monitor Stakeholder EngagementDavidMcLachlan1
 
Project Stakeholder Management - PMBOK6
Project Stakeholder Management - PMBOK6Project Stakeholder Management - PMBOK6
Project Stakeholder Management - PMBOK6Agus Suhanto
 
Project stakeholder management by Nelson Mandela Anyomi
Project stakeholder management by Nelson Mandela AnyomiProject stakeholder management by Nelson Mandela Anyomi
Project stakeholder management by Nelson Mandela AnyomiNelson Mandela Anyomi
 
Project communication management
Project communication managementProject communication management
Project communication managementTakudzwa Chatora
 
How to do Stakeholder Analysis
How to do Stakeholder AnalysisHow to do Stakeholder Analysis
How to do Stakeholder AnalysisAberdeen CES
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project ManagementKris Kimmerle
 
Project stakeholder management
Project stakeholder managementProject stakeholder management
Project stakeholder managementSaad Al Jabri
 
Stakeholder Analysis Pauline Hall
Stakeholder Analysis Pauline HallStakeholder Analysis Pauline Hall
Stakeholder Analysis Pauline Hallklenihan
 
13.0 Project Stakeholder Management Overview
13.0 Project Stakeholder Management Overview13.0 Project Stakeholder Management Overview
13.0 Project Stakeholder Management OverviewDavidMcLachlan1
 

What's hot (20)

Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
 
Stakeholder analysis
Stakeholder analysisStakeholder analysis
Stakeholder analysis
 
Project Stakeholder Engagement
Project Stakeholder EngagementProject Stakeholder Engagement
Project Stakeholder Engagement
 
Stakeholder management
Stakeholder managementStakeholder management
Stakeholder management
 
Stakeholder management
Stakeholder managementStakeholder management
Stakeholder management
 
13.4 Monitor Stakeholder Engagement
13.4 Monitor Stakeholder Engagement13.4 Monitor Stakeholder Engagement
13.4 Monitor Stakeholder Engagement
 
Project Stakeholder Management - PMBOK6
Project Stakeholder Management - PMBOK6Project Stakeholder Management - PMBOK6
Project Stakeholder Management - PMBOK6
 
Stakeholder Management
Stakeholder ManagementStakeholder Management
Stakeholder Management
 
Project stakeholder management by Nelson Mandela Anyomi
Project stakeholder management by Nelson Mandela AnyomiProject stakeholder management by Nelson Mandela Anyomi
Project stakeholder management by Nelson Mandela Anyomi
 
Stakeholder Mapping
Stakeholder MappingStakeholder Mapping
Stakeholder Mapping
 
Project stakeholder Management PMBOK Sixth
Project stakeholder Management PMBOK SixthProject stakeholder Management PMBOK Sixth
Project stakeholder Management PMBOK Sixth
 
Project stakeholders
Project stakeholdersProject stakeholders
Project stakeholders
 
Project Stakeholder Management
Project Stakeholder ManagementProject Stakeholder Management
Project Stakeholder Management
 
Project communication management
Project communication managementProject communication management
Project communication management
 
Project organisation structure
Project organisation structureProject organisation structure
Project organisation structure
 
How to do Stakeholder Analysis
How to do Stakeholder AnalysisHow to do Stakeholder Analysis
How to do Stakeholder Analysis
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Project stakeholder management
Project stakeholder managementProject stakeholder management
Project stakeholder management
 
Stakeholder Analysis Pauline Hall
Stakeholder Analysis Pauline HallStakeholder Analysis Pauline Hall
Stakeholder Analysis Pauline Hall
 
13.0 Project Stakeholder Management Overview
13.0 Project Stakeholder Management Overview13.0 Project Stakeholder Management Overview
13.0 Project Stakeholder Management Overview
 

Viewers also liked

Simplifying managing stakeholder expectations using the 9 systems 4
Simplifying managing stakeholder expectations using the 9 systems  4Simplifying managing stakeholder expectations using the 9 systems  4
Simplifying managing stakeholder expectations using the 9 systems 4Joseph KAsser
 
Affin Bank Berhad Analysis
Affin Bank Berhad AnalysisAffin Bank Berhad Analysis
Affin Bank Berhad AnalysisMior Azwan
 
Change Management Models, Stakeholder Analysis & Capacity Building in Corpora...
Change Management Models, Stakeholder Analysis & Capacity Building in Corpora...Change Management Models, Stakeholder Analysis & Capacity Building in Corpora...
Change Management Models, Stakeholder Analysis & Capacity Building in Corpora...Elijah Ezendu
 
Porters five force strategy for Banking Industry
Porters five force strategy for Banking IndustryPorters five force strategy for Banking Industry
Porters five force strategy for Banking IndustrySanjay Kumbhar
 
Project Stakeholder Management - PMBOK 5
Project Stakeholder Management - PMBOK 5Project Stakeholder Management - PMBOK 5
Project Stakeholder Management - PMBOK 5pankajsh10
 

Viewers also liked (6)

Corruption In Hong Kong
Corruption In Hong KongCorruption In Hong Kong
Corruption In Hong Kong
 
Simplifying managing stakeholder expectations using the 9 systems 4
Simplifying managing stakeholder expectations using the 9 systems  4Simplifying managing stakeholder expectations using the 9 systems  4
Simplifying managing stakeholder expectations using the 9 systems 4
 
Affin Bank Berhad Analysis
Affin Bank Berhad AnalysisAffin Bank Berhad Analysis
Affin Bank Berhad Analysis
 
Change Management Models, Stakeholder Analysis & Capacity Building in Corpora...
Change Management Models, Stakeholder Analysis & Capacity Building in Corpora...Change Management Models, Stakeholder Analysis & Capacity Building in Corpora...
Change Management Models, Stakeholder Analysis & Capacity Building in Corpora...
 
Porters five force strategy for Banking Industry
Porters five force strategy for Banking IndustryPorters five force strategy for Banking Industry
Porters five force strategy for Banking Industry
 
Project Stakeholder Management - PMBOK 5
Project Stakeholder Management - PMBOK 5Project Stakeholder Management - PMBOK 5
Project Stakeholder Management - PMBOK 5
 

Similar to Stakeholder analysis

03.stakeholders and communication PMI-RMP Risk Management Professional
03.stakeholders and communication  PMI-RMP Risk Management Professional03.stakeholders and communication  PMI-RMP Risk Management Professional
03.stakeholders and communication PMI-RMP Risk Management Professionalnanacyrah
 
PMP Exam Prep - Communications Management
PMP Exam Prep - Communications ManagementPMP Exam Prep - Communications Management
PMP Exam Prep - Communications Managementtkrikau
 
Communications Management Presentation
Communications Management PresentationCommunications Management Presentation
Communications Management Presentationbrianbish10795
 
Communication planning
Communication planningCommunication planning
Communication planningSomashekar S.M
 
Stakeholder support is very important to information technology projec.docx
Stakeholder support is very important to information technology projec.docxStakeholder support is very important to information technology projec.docx
Stakeholder support is very important to information technology projec.docxgentomega
 
Stakeholder support is very important to information technology projec.docx
Stakeholder support is very important to information technology projec.docxStakeholder support is very important to information technology projec.docx
Stakeholder support is very important to information technology projec.docxrennaknapp
 
Presentation by dhruva sen
Presentation by dhruva senPresentation by dhruva sen
Presentation by dhruva senPMI_IREP_TP
 
Project communication management
Project communication managementProject communication management
Project communication managementDikshant Ghimire
 
samrus 1.docx
samrus 1.docxsamrus 1.docx
samrus 1.docxKiyaMama
 
Project communication management
Project communication managementProject communication management
Project communication managementdyaksa hanindito
 
Communications Management PlanProject NameTable of Contents.docx
Communications Management PlanProject NameTable of Contents.docxCommunications Management PlanProject NameTable of Contents.docx
Communications Management PlanProject NameTable of Contents.docxclarebernice
 
Project communications management
Project communications managementProject communications management
Project communications managementYogender Singh Rana
 
Communications Management Plan Templatewww.ProjectManagementDo.docx
Communications Management Plan Templatewww.ProjectManagementDo.docxCommunications Management Plan Templatewww.ProjectManagementDo.docx
Communications Management Plan Templatewww.ProjectManagementDo.docxclarebernice
 
NCV 4 Project Management Hands-On Support Slide Show - Module 4
NCV 4 Project Management Hands-On Support Slide Show - Module 4NCV 4 Project Management Hands-On Support Slide Show - Module 4
NCV 4 Project Management Hands-On Support Slide Show - Module 4Future Managers
 
1) In what way does having many different stakeholders complicate th.pdf
1) In what way does having many different stakeholders complicate th.pdf1) In what way does having many different stakeholders complicate th.pdf
1) In what way does having many different stakeholders complicate th.pdfarishmarketing21
 
Topic 9 - Project Stakeholder Management.pdf
Topic 9 - Project Stakeholder Management.pdfTopic 9 - Project Stakeholder Management.pdf
Topic 9 - Project Stakeholder Management.pdfHuyNguyen657394
 

Similar to Stakeholder analysis (20)

Chapter 10
Chapter 10Chapter 10
Chapter 10
 
03.stakeholders and communication PMI-RMP Risk Management Professional
03.stakeholders and communication  PMI-RMP Risk Management Professional03.stakeholders and communication  PMI-RMP Risk Management Professional
03.stakeholders and communication PMI-RMP Risk Management Professional
 
PMP Exam Prep - Communications Management
PMP Exam Prep - Communications ManagementPMP Exam Prep - Communications Management
PMP Exam Prep - Communications Management
 
Communications Management Presentation
Communications Management PresentationCommunications Management Presentation
Communications Management Presentation
 
Communication planning
Communication planningCommunication planning
Communication planning
 
PMP_Project Communication Management
PMP_Project Communication ManagementPMP_Project Communication Management
PMP_Project Communication Management
 
Stakeholder support is very important to information technology projec.docx
Stakeholder support is very important to information technology projec.docxStakeholder support is very important to information technology projec.docx
Stakeholder support is very important to information technology projec.docx
 
Stakeholder support is very important to information technology projec.docx
Stakeholder support is very important to information technology projec.docxStakeholder support is very important to information technology projec.docx
Stakeholder support is very important to information technology projec.docx
 
Presentation by dhruva sen
Presentation by dhruva senPresentation by dhruva sen
Presentation by dhruva sen
 
Project communication management
Project communication managementProject communication management
Project communication management
 
samrus 1.docx
samrus 1.docxsamrus 1.docx
samrus 1.docx
 
Project communication management
Project communication managementProject communication management
Project communication management
 
Session 16 4th edition
Session 16 4th editionSession 16 4th edition
Session 16 4th edition
 
Communications Management PlanProject NameTable of Contents.docx
Communications Management PlanProject NameTable of Contents.docxCommunications Management PlanProject NameTable of Contents.docx
Communications Management PlanProject NameTable of Contents.docx
 
Project communications management
Project communications managementProject communications management
Project communications management
 
Communications Management Plan Templatewww.ProjectManagementDo.docx
Communications Management Plan Templatewww.ProjectManagementDo.docxCommunications Management Plan Templatewww.ProjectManagementDo.docx
Communications Management Plan Templatewww.ProjectManagementDo.docx
 
NCV 4 Project Management Hands-On Support Slide Show - Module 4
NCV 4 Project Management Hands-On Support Slide Show - Module 4NCV 4 Project Management Hands-On Support Slide Show - Module 4
NCV 4 Project Management Hands-On Support Slide Show - Module 4
 
1) In what way does having many different stakeholders complicate th.pdf
1) In what way does having many different stakeholders complicate th.pdf1) In what way does having many different stakeholders complicate th.pdf
1) In what way does having many different stakeholders complicate th.pdf
 
Awareness and Communication Strategy on Mycotoxin program
Awareness and Communication Strategy on Mycotoxin programAwareness and Communication Strategy on Mycotoxin program
Awareness and Communication Strategy on Mycotoxin program
 
Topic 9 - Project Stakeholder Management.pdf
Topic 9 - Project Stakeholder Management.pdfTopic 9 - Project Stakeholder Management.pdf
Topic 9 - Project Stakeholder Management.pdf
 

Recently uploaded

Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...apidays
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelDeepika Singh
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityWSO2
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Victor Rentea
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Zilliz
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontologyjohnbeverley2021
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesrafiqahmad00786416
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Bhuvaneswari Subramani
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdfSandro Moreira
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistandanishmna97
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusZilliz
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Orbitshub
 

Recently uploaded (20)

Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 

Stakeholder analysis

  • 1. PROJECT COMUNICATIONS MANAGEMENT ÍNDICE 10.1 Identify Stakeholders 10.2 Plan Communications 10.3 Distribute Information 10.4 Manage Stakeholders Expectations 10.5 Report Performance Roberto A. Rodríguez Pérez
  • 2. .1 STAKEHOLDER ANALYSIS 1. Process of systematically gathering and analyzing quantitative and qualitative 2. information to determine whose interests should be taken into account throughout the project. 3. It identifies the interests, expectations, and influence of the stakeholders and relates them to the purpose of the project. 4. It also helps identify stakeholder relationships that can be leveraged to build coalitions and potential partnerships to enhance the project’s 10.1.2 chance of success Identify Stakeholders: Tools and technics
  • 3. STEPS Step 1: Identify all potential project stakeholders and relevant information, such as their roles, departments, interests, knowledge levels, expectations, and influence levels Identifying other stakeholders is usually done by interviewing identified stakeholders and expanding the list until all potential stakeholders are included. Step 2: Identify the potential impact or support each stakeholder could generate, and classify them so as to define an approach strategy Classification models: 1. Power/interest grid, grouping the stakeholders based on their level of authority Escala de Likert (“power”) and their level or concern (“interest”) regarding the project outcomes; 2. Power/influence grid, grouping the stakeholders based on their level of authority (“power”) and their active involvement (“influence”) in the project; 3. Influence/impact grid, grouping the stakeholders based on their active involvement (“influence”) in the project and their ability to effect changes to the project’s planning or execution (“impact”); and 4. Salience model, describing classes of stakeholders based on their power (ability to impose their will), urgency (need for immediate attention), and legitimacy (their involvement is appropriate). 10.1.2 Identify Stakeholders: Tools and technics
  • 4. POWER/INTEREST GRID 10.1.2 Identify Stakeholders: Tools and technics
  • 5. STEPS Step 3: Assess how key stakeholders are likely to react or respond in various situations, in order to plan how to influence them to enhance their support and mitigate potential negative impacts. 10.1.2 Identify Stakeholders: Tools and technics
  • 6. .2 EXPERT JUDGMENT 1. Judgment and expertise should be sought from groups or individuals with specialized training or knowledge on the subject area such as: i. Senior management, ii. Other units within the organization, Identified key stakeholders, iii. Project managers who have worked on projects in the same area (directly or through lessons learned), iv. Subject matter experts (SMEs) in business or project area, v. Industry groups and consultants, and vi. Professional and technical associations. Expert judgment can be obtained through individual consultations (one-on- one meetings, interviews, etc.) or through a panel format (focus groups, surveys etc). 10.1.2 Identify Stakeholders: Tools and technics
  • 7. .1 STAKEHOLDER REGISTER Details related to the identified stakeholders including, but not limited to: 1. Identification information: Name, organizational position, location, role in the project, contact information; 2. Assessment information: Major requirements, main expectations, potential influence in the project, phase in the life cycle with the most interest; and 3. Stakeholder classification: Internal/ external, supporter/neutral/resistor, etc. 10.1.3 Identify Stakeholders: Outputs
  • 8. .2 STAKEHOLDER MANAGEMENT STRATEGY Increase the support and minimize negative impacts of stakeholders. It includes elements such as: 1. Key stakeholders who can significantly impact the project, 2. Level of participation in the project desired for each identified stakeholder, and 3. Stakeholder groups and their management (as groups). A common way of representing the stakeholder management strategy is a stakeholder analysis matrix. Back to Index 10.1.3 Identify Stakeholders: Outputs
  • 10. .2 PLAN COMMUNICATIONS .1 Communications Requirements Analysis Information needs of the project stakeholders. These requirements are defined by combining the type and format of information needed with an analysis of the value of that information. Number of potential communication channels or paths as an indicator of the complexity of a project’s communications. n(n-1)/2 Where n represents the number of stakeholders. 10.2.2 Plan Communications: Tools and Techniques
  • 11. .2 PLAN COMMUNICATIONS Information typically used to determine project communication requirements includes: • Organization charts, • Project organization and stakeholder responsibility relationships, • Disciplines, departments, and specialties involved in the project, • Logistics of how many persons will be involved with the project and at which locations, • Internal information needs (e.g., communicating across organizations), • External information needs (e.g., communicating with the media, public, or contractors), and • Stakeholder information from the stakeholder register and the stakeholder management strategy. 10.2.2 Plan Communications: Tools and Techniques
  • 12. .2 PLAN COMMUNICATIONS .2 Communication Technology Factors that can affect the project include: • Urgency of the need for information. Is project success dependent upon having frequently updated information available on a moment’s notice, or would regularly issued written reports suffice? • Availability of technology. Are appropriate systems already in place or do project needs warrant change? For example, do the intended stakeholder(s) have access to a selected communications technology? • Expected project staffing. Are the proposed communication systems compatible with the experience and expertise of the project participants, or is extensive training and learning required? • Duration of the project. Is the available technology likely to change before the project is over? • Project environment. Does the team meet and operate on a face-to-face basis or in a virtual environment? 10.2.2 Plan Communications: Tools and Techniques
  • 13. .2 PLAN COMMUNICATIONS .3 Communication Models • Encode. • Medium. • Noise. • Decode. Notas: KM y Ciclo de satisfacción y que tan bien vamos 10.2.2 Plan Communications: Tools and Techniques
  • 14. .2 PLAN COMMUNICATIONS .4 Communication Methods • Interactive communication. Between two or more parties performing a multidirectional exchange of information. It is the most efficient way to ensure a common understanding by all participants on specified topics, and includes meetings, phone calls, video conferencing, etc. • Push communication. Sent to specific recipients who need to know the information. This ensures that the information is distributed but does not certify that it actually reached or was understood by the intended audience. Push communication includes letters, memos, reports, emails, faxes, voice mails, press releases etc. • Pull communication. Used for very large volumes of information, or for very large audiences, that requires the recipients to access the communication content at their own discretion. These methods include intranet sites, e- learning, and knowledge repositories, etc. The project manager decides, based on communication requirements, what, how, and when communication methods are to be used in the project. 10.2.2 Plan Communications: Tools and Techniques
  • 15. .1 Communications Management Plan The communications management plan can be formal or informal, highly detailed or broadly framed, and based on the needs of the project. The communications management plan usually provides: • Stakeholder communication requirements; • Information to be communicated, including language, format, content, and level of detail; • Reason for the distribution of that information; • Time frame and frequency for the distribution of required information; • Person responsible for communicating the information; • Person responsible for authorizing release of confidential information; • Person or groups who will receive the information; • Methods or technologies used to convey the information, such as memos, e-mail, and/or press releases; • Resources allocated for communication activities, including time and budget; • Escalation process identifying time frames and the management chain (names) for escalation of issues that cannot be resolved at a lower staff level; • Method for updating and refining the communications management plan as the project progresses and develops; • Glossary of common terminology; • F low charts of the information flow in the project, workflows with possible sequence of authorization, list of reports, and meeting plans, etc.; and Communication constraints, usually derived from specific legislation or regulation, technology, and organizational policies, etc. The communications management plan can also include guidelines and templates for project status meetings, project team meetings, e-meetings, and e-mail. The use of a project website and project management software can also be included if they are used in the project. 10.2.2 Plan Communications: Outputs
  • 16. .3 DISTRIBUTE INFORMATION Process of making relevant information available to project stakeholders. Effective information distribution includes a number of techniques including: • Sender-receiver models. Feedback loops and barriers to communication. • Choice of media. Situation specifics of when to communicate in writing versus orally, when to write an informal memo versus a formal report, and when to communicate face-to-face versus by e-mail. • Writing style. Active versus passive voice, sentence structure, and word choice. • Meeting management techniques. Preparing an agenda and dealing with conflicts. • Presentation techniques. Body language and design of visual aids. • Facilitation techniques. Building consensus and overcoming obstacles.
  • 17. .3 DISTRIBUTE INFORMATION .1 Project Management Plan .2 Performance Reports .3 Organizational Process Assets The organizational process assets (see Section 2.4.3) that can influence the Distribute Information process include, but are not limited to: • Policies, procedures, and guidelines regarding information distribution, • Templates, and • Historical information and lessons learned. Note: KM 10.3.1 Distribute Information: Inputs
  • 18. .3 DISTRIBUTE INFORMATION .1 Communication Methods Individual and group meetings, video and audio conferences, computer chats, and other remote communications methods are used to distribute information. .2 Information Distribution Tools Project information can be distributed using a variety of tools, including: • Hard-copy document distribution, manual filing systems, press releases, and shared-access electronic databases; • Electronic communication and conferencing tools, such as e-mail, fax, voice mail, telephone, video and web conferencing, websites and web publishing; and • Electronic tools for project management, such as web interfaces to scheduling and project management software, meeting and virtual office support software, portals, and collaborative work management tools. NOTE: Gmail and CRM 10.3.2 Distribute Information: Tools and Techniques
  • 19. .3 DISTRIBUTE INFORMATION .1 Organizational Process Assets Updates • Stakeholder notifications. Information may be provided to stakeholders about resolved issues, approved changes, and general project status • Project reports • Project presentations • Project records • Feedback from stakeholders • Lessons learned documentation 10.3.3 Distribute Information: Outputs
  • 20. .4 MANAGE STAKEHOLDERS EXPECTATIONS Process of communicating and working with stakeholders to meet their needs and addressing issues as they occur. Involves communication activities directed toward project stakeholders to influence their expectations, address concerns, and resolve issues, such as: • Actively managing to increase the likelihood of project acceptance by negotiating and influencing their desires to achieve and maintain the project goals, • Addressing concerns that have not become issues yet. • Clarifying and resolving issues.