• Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
199
On Slideshare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
0
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Storm Sewer PipeRehabilitationCompleted Storm DrainageMaintenance ProjectsSouth George Mason DrivePedestrian Bridge RepairMason DistrictProject #: WBS SD-000008-001I/O 2G25-057-000
  • 2. DESCRIPTION:The Maintenance and Stormwater Management Division completed repairs to the South George MasonDrive Pedestrian Bridge during the second half of FY 2013. The bridge hand rails were sanded, primedand painted for long term finish. A concrete epoxy was also used to make repairs to the concrete deckand piers to extend the life of the bridge as well as a deck finish was applied. The bridge maintenancewas completed with support of the Mason District Supervisors Office and the Virginia Department ofTransportation.PROJECT OVERVIEW:Fund No: 300-C30010 General Construction and Improvements300-C30060 Walkway ImprovementsProject No: WBS SD-000008-001I/O 2G25-057-000Project Name: South George Mason Drive Pedestrian Bridge RepairCompletion: 2nd Half FY 2013District: MasonTax Maps: 062-3Watersheds: Four Mile RunDPWES PROJECT TEAM:William SchellMatthew AdamsProject Details
  • 3. Project is located west of LeesburgPike on South George Mason Drive intax map grid 62-3 in the Mason District.South George MasonProject LocationSouth George Mason PedestrianBridge Repair
  • 4. Example Before and After PhotosHandrail Rusting (before) Handrail Rehabilitation (after)
  • 5. Example Before and After PhotosDamage to Concrete Bridge Deck (left)Concrete Repairs to Bridge Deck (right)
  • 6. Example Before and After PhotosBefore Painting: (below)After Painting (below)
  • 7. Example Before and After PhotosBridge Pier Before Rehabilitation (below)Bridge Pier After Concrete Patch andScreen Replacement (below)
  • 8. South George Mason PedestrianBridgeFor additional information, please callIrene Haske, Public Information Officer703-324-5821, TTY 711SWPDMail@FairfaxCounty.govwww.fairfaxcounty.gov/dpwes