PRESENTATION OF MODEL IN INITIAL CONFIGURATION SHOWING TOOL PART # 1
PRESENTATION OF MODEL IN INITIAL CONFIGURATION SHOWING TOOL PART # 1 CLAMP ARM TOOL PART # 1 TOOL TIGHTENING BOLT TIGHTENING BOLT JAMB NUT CLAMP ARM JAMB NUT (UPPER) CLAMP ARM JAMB NUT (LOWER) FLAT PLAIN WASHER FLAT PLAIN WASHER FLAT PLAIN WASHER FLAT PLAIN WASHER THREADED ROD THREADED ROD NUT MACHINE PLATEN SHIM STOCK
PRESENTATION OF MODEL IN INITIAL CONFIGURATION SHOWING MATERIAL STORES FOR TOOL PART # 1 CLAMP ARM TOOL PART # 1 MACHINE PLATEN MATERIALS STORES SUPPORT POST SMALL WASHERS (MATERIAL STORES FOR TOOL PART # 1)
PRESENTATION OF MODEL IN INITIAL CONFIGURATION SHOWING TOOL PART # 1 THREADED ROD  SMALL WASHERS (MATERIAL STORES FOR TOOL PART # 1) TOOL PART # 1 MATERIAL STORES SUPPORT POST
TOOL PART #1 ALIGNMENT SETUP DIMENSIONS 1.6000” 0.3120” TOOL PART # 1
1.0000” 2.0225” 2.0225” TOOL PART #1 ALIGNMENT SETUP DIMENSIONS TOOL PART # 1
PRESENTATION OF MODEL IN INITIAL CONFIGURATION SHOWING TOOL PART # 2 CLAMP ARM TOOL PART # 2 TOOL TIGHTENING BOLT TIGHTENING BOLT JAMB NUT CLAMP ARM JAMB NUT (UPPER) CLAMP ARM JAMB NUT (LOWER) FLAT PLAIN WASHER FLAT PLAIN WASHER FLAT PLAIN WASHER FLAT PLAIN WASHER THREADED ROD THREADED ROD NUT MACHINE PLATEN SHIM STOCK
PRESENTATION OF MODEL IN INITIAL CONFIGURATION SHOWING MATERIAL STORES FOR TOOL PART # 2 CLAMP ARM MACHINE PLATEN MATERIALS STORES SUPPORT POST LARGE WASHERS (MATERIAL STORES FOR TOOL PART # 2) TOOL PART # 2 5/16”-18 X ½” SET SCREW
PRESENTATION OF MODEL IN INITIAL CONFIGURATION SHOWING TOOL PART # 2 THREADED ROD  MATERIAL STORES SUPPORT POST LARGE WASHERS (MATERIAL STORES FOR TOOL PART # 2) TOOL PART # 2
TOOL PART #2 ALIGNMENT SETUP DIMENSIONS 1.6000” 0.3120” CLAMP ARM TOOL PART # 2
0.5000” 1.5225” 1.5225” TOOL PART #2 ALIGNMENT SETUP DIMENSIONS TOOL PART # 2
PRESENTATION OF MODEL IN FINAL CONFIGURATION SHOWING ALL FINAL IMPROVEMENTS CLAMP ARM TOOL TIGHTENING WING SCREW TIGHTENING BOLT JAMB WING NUT CLAMP ARM JAMB WING NUT (UPPER) CLAMP ARM JAMB WING NUT (LOWER) FLAT PLAIN WASHER FLAT PLAIN WASHER FLAT PLAIN WASHER FLAT PLAIN WASHER THREADED ROD THREADED ROD NUT MACHINE PLATEN TOOL STANDOFF ADAPTOR TOOL STANDOFF ADAPTOR CENTERING DOWEL PIN  TOOL STANDOFF ADAPTOR LOCATION DOWEL PINS TOOL PART # 1
PRESENTATION OF MODEL IN FINAL CONFIGURATION SHOWING MATERIAL STORES IMPROVEMENT CLAMP ARM MACHINE PLATEN MATERIALS STORES SUPPORT POST WITH COLLAR SMALL WASHERS (MATERIAL STORES FOR TOOL PART # 1) TOOL PART # 1
PRESENTATION OF MODEL IN FINAL CONFIGURATION SHOWING ALL FINAL IMPROVEMENTS CLAMP ARM TOOL TIGHTENING WING SCREW TIGHTENING BOLT JAMB WING NUT CLAMP ARM JAMB WING NUT (UPPER) CLAMP ARM JAMB WING NUT (LOWER) FLAT PLAIN WASHER FLAT PLAIN WASHER FLAT PLAIN WASHER FLAT PLAIN WASHER THREADED ROD THREADED ROD NUT MACHINE PLATEN TOOL STANDOFF ADAPTOR TOOL STANDOFF ADAPTOR CENTERING DOWEL PIN  TOOL STANDOFF ADAPTOR LOCATION DOWEL PINS TOOL PART # 2 5/16”-18 X ½” SET SCREW
PRESENTATION OF MODEL IN FINAL CONFIGURATION SHOWING MATERIAL STORES IMPROVEMENT CLAMP ARM MACHINE PLATEN MATERIALS STORES SUPPORT POST WITH COLLAR LARGE WASHERS (MATERIAL STORES FOR TOOL PART # 2) TOOL PART # 2
PRESENTATION OF MODEL IN FINAL CONFIGURATION SHOWING ALL FINAL IMPROVEMENTS SUPPORT POST LARGE WASHERS (MATERIAL STORES FOR TOOL PART # 2) SMALL WASHERS (MATERIAL STORES FOR TOOL PART # 1) TOOL STANDOFF ADAPTOR LOCATION DOWEL PIN TOOL STANDOFF ADAPTOR LOCATION DOWEL PIN TOOL PART # 1 TOOL PART # 2 TOOL STANDOFF ADAPTOR CENTERING DOWEL PIN
PRESENTATION OF MODEL IN FINAL CONFIGURATION SHOWING ALL FINAL IMPROVEMENTS
- INTRODUCTION - ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
- SYMBOLS USED IN THIS TRAINER INSTRUCTIONS - USE THE FLIP CHART AS A COMMUNICATION TOOL. SLIDE NUMBER DISPLAY THE APPROPRIATE SLIDE ON PROJECTOR SCREEN. TIMED EXERCISE SEQUENCE. DISPLAY THE RECORDED ELEMENT OF THE TOOL CHANGEOVER. ADVISE COMMENTS & NOTES COMMENTS TO BE ADDED BY THE TRAINER.  BLUE FONT COLOR: POINTS THE TRAINER SHOULD BEAR IN MIND DURING THE TRAINING COURSE .
- DESCRIPTION OF THE TRAINING KIT - THE TRAINING KIT CONTAINS THE FOLLOWING ITEMS: 1 MACHINE FITTED WITH INTERCHANGEABLE TOOLS COMPRISING 1 CLAMP ARM 1 5/16”-18 X 6” ALL THREAD ROD 4 5/16”-18 HEX NUTS 4 5/16” PLAIN FLAT WASHERS 1 5/16”-18 X 1 ½“ CLAMP ARM ALLEN CAP BOLT  1 5/16”-18 X ½“ SET SCREW 2 TOOLS (TOOL PART # 1 & TOOL PART # 2) 1 BOX OF SHIM STOCK (VARIOUS GAUGES FOR SETTING HEIGHT OF TOOL PART # 1 & TOOL PART # 2) 1 MATERIAL STORES PART # 1 SUPPORT POST 1 MATERIAL STORES PART # 2 SUPPORT POST 1 BOX OF ACCESSORIES COMPRISING 1 5/16”-18 X 1 ½“ WING SCREW 3 5/16”-18 WING NUTS 2 5/16” D X 1 ½” L  TOOL STANDOFF ADAPTOR LOCATION DOWEL PINS 1 5/16” D X 1 ½” L  TOLL STANDOFF ADAPTOR CENTERING DOWEL PIN 1 MATERIAL STORES PART # 1 SUPPORT POST (WITH COLLAR) 1 MATERIAL STORES PART # 2 SUPPORT POST (WITH COLLAR) 1 0.3120” DISTANCE GAUGE 1 TOOL STANDOFF ADAPTER (DIAMETER 3.0000” - HEIGHT 0.5500”) 1 TOOL STANDOFF ADAPTER 5/16” D X 1” L DOWEL PIN 1 BOX OF SMALL WASHERS CHANGEOVER MATERIALS STORES FOR TOOL PART # 1 1 BOX OF LARGE WASHERS CHANGEOVER MATERIALS STORES FOR TOOL PART # 2 1 BOX OF HAND TOOLS COMPRISING 1 SET OF OPEN & CLOSED END STANDARD WRENCHES (3/8” to 9/16”) 1 SET OF STANDARD ALLEN WRENCHES (1/16” to 3/8”) 1 MEASURING CALIPERS
- PRESENTATION OF THE MODEL IN INITIAL CONFIGURATION -
- SUMMARY: TRAINING COURSE IMPLEMENTATION - THE RAPID CHANGEOVER EXERCISE IS USED TO ILLUSTRATE THE SMED METHOD. THE GOAL THEREFORE IS TO ALLOW PARTICIPANTS TO DISCOVER CHRONOLOGICALLY THE VARIOUS IMPROVEMENT PHASES INCLUDED IN THIS METHOD. EXERCISE PHASES ALTERNATE WITH DEBRIEFING PHASES DURING WHICH THE TRAINER MY USE SLIDES TO PRESENT THE IMPORTANT ASPECTS OF THE APPROACH MORE ACCURATELY. AFTER INTRODUCING THE SMED, THE TRAINER PRESENTS THE EXERCISE & ALLOCATES ROLES TO PARTICIPANTS CLEARING SPECIFYING THE GOALS. A  NON-PREPARED TOOL CHANGEOVER  CONCEALING A CERTAIN NUMBER FAILURES IS THEN TIMED. GENERALLY THE FIRST TIME MEASUREMENT IS AROUND 5 MINUTES. THE GROUP THINKS ABOUT WHAT HAS JUST TAKEN PLACE & CONTINUES BY  INTERNAL & EXTERNAL CATEGORIZATION  OF OPERATIONS & PREPARATION CHECKLIST – THIS IS THE FIRST IMPROVEMENT STEP OF THE SMED METHOD. WHEN THE CHANGEOVER IS TIMED A 2 ND  TIME, IT BECOMES EVIDENT THAT  ALMOST 50% OF THE TIME IS GAINED PURELY TO IMPROVED ORGANIZATION  (5S & HAVING A PREPARATION CHECKLIST) THE NEXT PHASE CONSISTS OF STUDYING THE TOOL CHANGEOVER OPERATIONS & LOOKING FOR ANY POSSIBLE IMPROVEMENTS. NEXT, ALL IDEAS PUT FORWARD ARE DIVIDED INTO TWO CATEGORIES: IDEAS REQUIRING LITTLE OR NO INVESTMENT & IDEAS REQUIRING A LARGER INVESTMENT. TO BEGIN WITH ONLY LOW-COST MODIFICATIONS ARE SELECTED. THE ACCESSORIES CONTAINED IN THE TRAINING KIT MAKE IT POSSIBLE TO PRODUCE  A NUMBER OF SUCH IMPROVEMENTS. A 3 RD  TIMING CONVEYS THE FACT THAT  WITHOUT MAJOR MODIFICATIONS IT IS POSSIBLE TO REDUCE THE TIME IN RELATION TO THE PREVIOUS TIMING BY ANOTHER 50%. DURING THE NEXT PHASE OF THE EXERCISE A FEW MORE EXPENSIVE MODIFICATIONS (STANDARDIZATION OF TOOLS, INVESTMENT IN THE MACHINE) ARE IMPLEMENTED & MAKE IT POSSIBLE TO REDUCE THE TOOL CHANGEOVER TIME BY APPROXIMATELY 10 SECONDS. AT THIS POINT THE TRAINER MUST INSIST ON  SYNCHRONIZING  ( SIMULTANEOUS ) TASKS, WHICH IS A CRUCIAL POINT IN THE RECOGNIZING OF A DIE CHANGEOVER (ONE WAY OF EMPHASIZING THIS POINT IS TO INTRODUCE IT AFTER THE 4 TH  TIMING IT IS THEN OBSERVED THAT  PURELY BY SYNCHRONIZING THE CHANGEOVER  -
- SUMMARY: TRAINING COURSE IMPLEMENTATION  CONT.  - TIME CAN BE CUT BY HALF OR MORE ) THE CONCLUSION IS THAT DIE CHANGEOVER TIMES CAN BE VASTLY REDUCED FIRSTLY THROUGH  IMPROVEMENT IN ORGANIZATION & SECONDLY BY MEANS OF MINOR MODIFICATIONS , CHANGES TO WHICH OPERATORS ARE MORE RESISTANT TO AS THEY ARE AFFECTED MORE DIRECTLY.
- TRAINING COURSE IMPLEMENTATION - TIME MEANS USED TRAINING SESSION IMPLEMENTATION ADVICE/COMMENTS/NOTES FOR TRAINER WHAT IS S.M.E.D? BY TRYING TO UNDERSTAND WHAT SMED MEANS THE GROUP WILL GRADUALLY DEFINE IT. THE FLIPCHART MAY BE USED TO RECORD GOOD SUGGESTIONS FROM THE GROUP. SLIDE 1. ACCURATE DEFINITION OF PRODUCTION CHANGEOVER TIME. REPRODUCE THE FOLLOWING DIAGRAM ON THE FLIPCHART: SINGLE MINUTE:  A SINGLE DIGIT UNIT (LESS THAN 10 MINUTES) EXCHANGE:  CHANGEOVER DIE:  TOOL SINGLE MINUTE OF EXCHANGE OF DIE PRODUCTION CHANGEOVER OF LESS THAN 10 MINUTES PRODUCTION CHANGEOVER TIME =  THE TIME BETWEEN THE LAST GOOD PART OF CURRENT PRODUCTION RUN & THE FIRST GOOD PART OF NEXT PRODUCTION RUN.
- TRAINING COURSE IMPLEMENTATION - TIME MEANS USED TRAINING SESSION IMPLEMENTATION ADVICE/COMMENTS/NOTES FOR TRAINER WHY MUST XYZ CORPORATION USE SMED TELL THE FOLLOWING STORY: IN THE 1920s AT THE FORD MOTOR COMPANY YOU COULD ORDER A MODEL T CAR IN ANY COLOR YOU WANT AS LONG AS IT IS BLACK. IN THE 1960s WHEN THE FRENCH MOTOR COMPANY CITROEN FIRST LAUNCHED THE 2CV CAR THERE WAS AS MUCH AS A ONE YEAR LEAD TIME (WAITING LIST) FOR BLUE. IN THE 1980s THE TOYOTA COROLLA CAR COMBINING A WHOLE RANGE OF INTERIOR/EXTERIOR COLORS, ENGINE, TRANSMISSION OPTIONS, MOTORIZATIONS VARIATIONS & THE CUSTOMER COULD EXPECT DELIVERY WITHIN 3 WEEKS OF PLACING AN ORDER. SLIDE 2. WHY USE SMED? SLIDE 3. WHAT DOES REDUCING MANUFACTURING LOT SIZE MEAN? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
- TRAINING COURSE IMPLEMENTATION - TIME MEANS USED TRAINING SESSION IMPLEMENTATION ADVICE/COMMENTS/NOTES FOR TRAINER ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],THE PURPOSE OF THIS EXERCISE IS TO USE THE SMED METHOD TO SUCCEED IN IMPROVING THE CHANGEOVER OF A VERY SIMPLE TOOL IN THE SAME WAY THAT ONE MIGHT IMPROVE A DIE CHANGEOVER. THE APPROACH APPLIED HERE CAN BE APPLIED IN ITS ENTIRETY TO A 2000 TON PRESS.
- TRAINING COURSE IMPLEMENTATION - TIME MEANS USED TRAINING SESSION IMPLEMENTATION ADVICE/COMMENTS/NOTES FOR TRAINER 5m TO 6m ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
- TRAINING COURSE IMPLEMENTATION - TIME MEANS USED TRAINING SESSION IMPLEMENTATION ADVICE/COMMENTS/NOTES FOR TRAINER ANALYSIS THE TOOL CHANGEOVER INVITE ONE OF THE PARTICIPANTS TO THE FLIP CHART & ASK THE GROUP TO ITEMIZE IN CHRONOLOGICAL ORDER EACH OPERATION (ELEMENT) PERFORMED BY THE PERSON SETTING UP THE TOOL. (A MODEL BREAKDOWN IS INCLUDED AT THE BEGINNING OF THIS PRESENTATION FOR REFERENCE PURPOSES). WHICH OPERATIONS IN THE EXERCISE CAN BE PERFORMED WHILE THE MACHINE IS RUNNING & WHICH MUST BE PERFORMED WHILE THE MACHINE IS STOPPED? WRITE  (FOR EXAMPLE, ON THE FLIP CHART)  A PREPARATION CHECKLIST & AN CHANGEOVER PROCEDURE FOR THE CHANGEOVER. IT IS IMPORTANT TO POINT OUT THAT EVERYBODY HAS PROBLEMS AGREEING ON THE CHANGEOVER PROCEDURE USED BY THE PERSON SETTING UP THE TOOL. A GOOD WAY OF ANALYZING THE DIE CHANGEOVER PROCEDURE PROPERLY IS THE TO USE THE RECORD  VIDEO OF THE CHANGEOVER . DIVIDE THE OPERATIONS INTO CATEGORIES DIRECTLY ON THE FLIP CHART (FOR EXAMPLE, BY UNDERLINING EXTERNAL OPERATIONS). AS FAR AS POSSIBLE, ASK A PERSON FROM THE GROUP TO COME & WRITE ON THE FLIP CHART. A MODEL CHECKLIST & OPERATING PROCEDURE ARE INCLUDED IN THIS TRAINING KIT.
- TRAINING COURSE IMPLEMENTATION - TIME MEANS USED TRAINING SESSION IMPLEMENTATION ADVICE/COMMENTS/NOTES FOR TRAINER 1m 30s TO 2m ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],EMPHASIZE THE DIFFERENCE BETWEEN INTERNAL & EXTERNAL OPERATIONS (ELEMENTS OF THE TOOL CHANGEOVER). THE BEST WAY OF NOT FORGETTING ANYTHING WHEN PREPARING A DIE CHANGEOVER IS TO WRITE A PREPARATION CHECKLIST. HOWEVER, TO BE EFFICIENT, A CHECKLIST & A CHANGEOVER PROCEDURE MUST TO USED.  GET INTO THE HABIT OF OBSERVING A CHECKLIST OR AN CHANGEOVER PROCEDURE. TO MAKE PARTICIPANT FULLY AWARE OF THE IMPORTANCE OF A CLEARLY DEFINED (WRITTEN) CHECKLIST & CHANGEOVER PROCEDURE EXCHANGE PARTICIPANTS’ ROLES ESPECIALLY THAT OF THE OPERATOR CHANGING THE TOOL. THIS MAKES IT POSSIBLE TO PICK UP ON THE FACT THAT PRACTICE & THEREFORE KNOWLEDGE OF THE OPERATING PROCEDURE PLAYS AN IMPORTANT PART IN THE EFFICIENCY OF THE TEAM CHANGING THE TOOL. DO NOT FORGET TO TIME THIS EXERCISE SEQUENCE DEPENDING ON THE TRAINER, ONE MIGHT REACH THE CONCLUSION INTERACTIVELY BY THE GROUP WHAT CAN BE CONCLUDED FROM THIS 2 ND  SEQUENCE AFTER ORGANIZING THE TOOL CHANGEOVER. USE FLIP CHART.
- TRAINING COURSE IMPLEMENTATION - TIME MEANS USED TRAINING SESSION IMPLEMENTATION ADVICE/COMMENTS/NOTES FOR TRAINER ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
- TRAINING COURSE IMPLEMENTATION - TIME MEANS USED TRAINING SESSION IMPLEMENTATION ADVICE/COMMENTS/NOTES FOR TRAINER 40s TO 1m ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
- TRAINING COURSE IMPLEMENTATION - TIME MEANS USED TRAINING SESSION IMPLEMENTATION ADVICE/COMMENTS/NOTES FOR TRAINER 40s TO 1m ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],DO NOT FORGET TO TIME THIS EXERCISE SEQUENCE. AFTER THE PARTICIPANTS HAVE JUST SEEN, DO THEY THINK THEIR DIE CHANGEOVER IS PERFORMED AS EFFICIENTLY AS POSSIBLE?
- TRAINING COURSE IMPLEMENTATION - TIME MEANS USED TRAINING SESSION IMPLEMENTATION ADVICE/COMMENTS/NOTES FOR TRAINER 3s TO 4s 5 TH  TIMING: ADDING ONE PERSON SLIDES 5 & 6. PHASE 2 OF THE SMED METHOD IMPROVING ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
- TRAINING COURSE IMPLEMENTATION - TIME MEANS USED TRAINING SESSION IMPLEMENTATION ADVICE/COMMENTS/NOTES FOR TRAINER ,[object Object],[object Object],[object Object],[object Object],[object Object],COMMENT: THE GRAPH DEMONSTRATES THAT AN IMPORTANT PART OF TIME SAVING IS DUE TO ORGANIZATION (5S) & EASILY IMPLEMENTED MODIFICATIONS. BY COMPARISON, COSTLY MODIFICATIONS PRODUCE TIME GAINS WHICH ARE HOWEVER SLIGHT IN RELATION TO THOSE GAINED PREVIOUSLY. IT IS THEREFORE INDISPENSABLE, BEFORE DOING ANYTHING ELSE, TO WORK IN THE ORGANIZATION OF THE PRODUCTION CHANGEOVER BEFORE UNDERTAKING ANY INVESTMENT. REMINDER OF THE CHRONOLOGICAL ORDER OF THE SMED METHOD. EMPHASIZE THE FACT THAT THIS IS THE APPROACH WHICH WILL HENCEFORTH  BE USED TO IMPROVE PRODUCTION CHANGEOVER ON THE MACHINE ON WHICH PARTICIPANTS WORK. THIS CONSISTS OF A FEW TIPS TO MAKE SMED A SUCCESSFUL PROGRAM.
- TRAINING COURSE IMPLEMENTATION - TIME MEANS USED TRAINING SESSION IMPLEMENTATION ADVICE/COMMENTS/NOTES FOR TRAINER ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
- APPENDIX 1 - CHANGEOVER PREPARATION CHECKLIST ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
- APPENDIX 2 - ELEMENTS OF THE TOOL CHANGEOVER TIME (SEC.) SUGGESTED IMPROVEMENTS - LOOSEN THE TOOL USING A 9/16” OPEN/CLOSED ENDED WRENCH 5 ,[object Object],[object Object],[object Object],- REMOVE THE TOOL 3 - PUT THE IN-GOING TOOL ON THE MACHINE PLATEN 5 ,[object Object],[object Object],80 ,[object Object],[object Object],[object Object],[object Object],[object Object],- TIGHTEN THE TOOL USING 9/16” OPEN/CLOSED ENDED WRENCH 10 LOOSEN TOOL USING 9/16” WRENCH - REMOVE THE MATERIAL STORES 20 ,[object Object],[object Object],[object Object],35 - INSPECTION ELIMINATION THANKS TO THE VARIOUS STANDARDS ESTABLISHED.
- APPENDIX 3 - CHANGEOVER PREPARATION CHECKLIST ,[object Object],[object Object],[object Object],[object Object],[object Object],TOOL CHANGEOVER PROCEDURE (FROM TOOL PART # 1 TO TOOL PART # 2) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]

More Related Content

What's hot

PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)Inter Alliance Werardt
 
SMED - Quick Change Over
SMED - Quick Change OverSMED - Quick Change Over
SMED - Quick Change OverOskar Olofsson
 
Autonomous maintenance ppt
Autonomous maintenance pptAutonomous maintenance ppt
Autonomous maintenance pptSuraj1911
 
Reduce SMT Changeover Time
Reduce SMT Changeover TimeReduce SMT Changeover Time
Reduce SMT Changeover TimeDamian Denis
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive MaintenanceAnand Subramaniam
 
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSJulian Kalac P.Eng
 
16 big losses for manufacturing and services
16 big losses for manufacturing and services16 big losses for manufacturing and services
16 big losses for manufacturing and servicesVishy Chandra
 
How to implement Single minute exchange of die
How to implement Single minute exchange of die How to implement Single minute exchange of die
How to implement Single minute exchange of die Nikunj Rana
 
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALACLEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALACJulian Kalac P.Eng
 
Total productive maintenance(TPM)
Total productive maintenance(TPM)Total productive maintenance(TPM)
Total productive maintenance(TPM)Md.Muzahid Khan
 

What's hot (20)

PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
 
SMED - Quick Change Over
SMED - Quick Change OverSMED - Quick Change Over
SMED - Quick Change Over
 
Autonomous maintenance ppt
Autonomous maintenance pptAutonomous maintenance ppt
Autonomous maintenance ppt
 
Reduce SMT Changeover Time
Reduce SMT Changeover TimeReduce SMT Changeover Time
Reduce SMT Changeover Time
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)
 
Tpm
TpmTpm
Tpm
 
My machine camp
My machine campMy machine camp
My machine camp
 
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
 
13 smed methodology_v2
13 smed methodology_v213 smed methodology_v2
13 smed methodology_v2
 
SMED-Observation Training
SMED-Observation TrainingSMED-Observation Training
SMED-Observation Training
 
16 big losses for manufacturing and services
16 big losses for manufacturing and services16 big losses for manufacturing and services
16 big losses for manufacturing and services
 
How to implement Single minute exchange of die
How to implement Single minute exchange of die How to implement Single minute exchange of die
How to implement Single minute exchange of die
 
TPM Implementation Strategy
TPM Implementation StrategyTPM Implementation Strategy
TPM Implementation Strategy
 
The Six Big Losses of OEE
The Six Big Losses of OEEThe Six Big Losses of OEE
The Six Big Losses of OEE
 
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALACLEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
 
Tpm preview
Tpm previewTpm preview
Tpm preview
 
OEE CALCULATION PPT
OEE CALCULATION PPTOEE CALCULATION PPT
OEE CALCULATION PPT
 
Total productive maintenance(TPM)
Total productive maintenance(TPM)Total productive maintenance(TPM)
Total productive maintenance(TPM)
 
SMED Kaizen Event
SMED Kaizen EventSMED Kaizen Event
SMED Kaizen Event
 

Viewers also liked

Lean Manufacturing SMED
Lean Manufacturing SMEDLean Manufacturing SMED
Lean Manufacturing SMEDLean Sigma
 
SMED Alistamiento Rápido de Equipos - Lean Manufacturing -
SMED Alistamiento Rápido de Equipos - Lean Manufacturing -SMED Alistamiento Rápido de Equipos - Lean Manufacturing -
SMED Alistamiento Rápido de Equipos - Lean Manufacturing -BOM Consulting Group
 
Smed تعویض قالب تک دقیقه ای
Smed تعویض قالب تک دقیقه ایSmed تعویض قالب تک دقیقه ای
Smed تعویض قالب تک دقیقه ایMousa Jafarzadeh
 
SMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction ProcessSMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction ProcessW3 Group Canada Inc.
 
SMED Setup & Lead Time Reduction
SMED Setup & Lead Time ReductionSMED Setup & Lead Time Reduction
SMED Setup & Lead Time ReductionAnand Subramaniam
 
Living the Dream - A Tool & Die Engineer Controls His Destiny (May 2015)
Living the Dream - A Tool & Die Engineer Controls His Destiny (May 2015)Living the Dream - A Tool & Die Engineer Controls His Destiny (May 2015)
Living the Dream - A Tool & Die Engineer Controls His Destiny (May 2015)Mark Shortt
 

Viewers also liked (10)

Lean Manufacturing SMED
Lean Manufacturing SMEDLean Manufacturing SMED
Lean Manufacturing SMED
 
Quick Smed Sample
Quick Smed SampleQuick Smed Sample
Quick Smed Sample
 
SMED Alistamiento Rápido de Equipos - Lean Manufacturing -
SMED Alistamiento Rápido de Equipos - Lean Manufacturing -SMED Alistamiento Rápido de Equipos - Lean Manufacturing -
SMED Alistamiento Rápido de Equipos - Lean Manufacturing -
 
Smed تعویض قالب تک دقیقه ای
Smed تعویض قالب تک دقیقه ایSmed تعویض قالب تک دقیقه ای
Smed تعویض قالب تک دقیقه ای
 
How to reduce changeover loss
How to reduce changeover lossHow to reduce changeover loss
How to reduce changeover loss
 
SMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction ProcessSMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction Process
 
Do you SMED?
Do you SMED?Do you SMED?
Do you SMED?
 
SMED Setup & Lead Time Reduction
SMED Setup & Lead Time ReductionSMED Setup & Lead Time Reduction
SMED Setup & Lead Time Reduction
 
Living the Dream - A Tool & Die Engineer Controls His Destiny (May 2015)
Living the Dream - A Tool & Die Engineer Controls His Destiny (May 2015)Living the Dream - A Tool & Die Engineer Controls His Destiny (May 2015)
Living the Dream - A Tool & Die Engineer Controls His Destiny (May 2015)
 
Harvest Pumps, Coimbatore, Plunger Pumps
Harvest Pumps, Coimbatore, Plunger PumpsHarvest Pumps, Coimbatore, Plunger Pumps
Harvest Pumps, Coimbatore, Plunger Pumps
 

Similar to Smed Training Model Trainer Instructions[1]

Tooling Design
Tooling DesignTooling Design
Tooling Designmrg timoq
 
Tpm implementation oee increment
Tpm implementation oee incrementTpm implementation oee increment
Tpm implementation oee incrementVinoth Axus
 
1 2 chem plantdesign-intro to plant design economics
1 2 chem plantdesign-intro to plant design  economics1 2 chem plantdesign-intro to plant design  economics
1 2 chem plantdesign-intro to plant design economicsayimsevenfold
 
Design and Development of Dynamo Testing Machine
Design and Development of Dynamo Testing MachineDesign and Development of Dynamo Testing Machine
Design and Development of Dynamo Testing MachineIRJET Journal
 
Application Of Workstudy
Application Of WorkstudyApplication Of Workstudy
Application Of Workstudybejayrocks
 
FDX_Report_Proposinganewcostumer
FDX_Report_ProposinganewcostumerFDX_Report_Proposinganewcostumer
FDX_Report_ProposinganewcostumerBinayak Ghosh
 
Hitachi Zaxis ZX450-3 Zx870 Excavator Service Manual.pdf
Hitachi Zaxis ZX450-3 Zx870 Excavator Service Manual.pdfHitachi Zaxis ZX450-3 Zx870 Excavator Service Manual.pdf
Hitachi Zaxis ZX450-3 Zx870 Excavator Service Manual.pdfExcavator
 
Plant connect for plastics case study
Plant connect for plastics case studyPlant connect for plastics case study
Plant connect for plastics case studyVardhman Envirotech
 
5 VARIABLES in MANUFACTURING PRODN
5 VARIABLES in MANUFACTURING PRODN5 VARIABLES in MANUFACTURING PRODN
5 VARIABLES in MANUFACTURING PRODNEd Aliño
 
Hitachi Zaxis ZX140-3 Zx310 Excavator Service Manual.pdf
Hitachi Zaxis ZX140-3 Zx310 Excavator Service Manual.pdfHitachi Zaxis ZX140-3 Zx310 Excavator Service Manual.pdf
Hitachi Zaxis ZX140-3 Zx310 Excavator Service Manual.pdfExcavator
 
Productivity improvement technique using work study in rmg sector
Productivity improvement technique using work study in rmg sectorProductivity improvement technique using work study in rmg sector
Productivity improvement technique using work study in rmg sectorEmdadul Haque
 
Terex girolift 5022 telescopic handler service repair manual
Terex girolift 5022 telescopic handler service repair manualTerex girolift 5022 telescopic handler service repair manual
Terex girolift 5022 telescopic handler service repair manualfjjskkemsmee
 
Terex girolift 3518 telescopic handler service repair manual
Terex girolift 3518 telescopic handler service repair manualTerex girolift 3518 telescopic handler service repair manual
Terex girolift 3518 telescopic handler service repair manualfjskekfseik
 
TEREX GIROLIFT 3514 TELESCOPIC HANDLER Service Repair Manual
TEREX GIROLIFT 3514 TELESCOPIC HANDLER Service Repair ManualTEREX GIROLIFT 3514 TELESCOPIC HANDLER Service Repair Manual
TEREX GIROLIFT 3514 TELESCOPIC HANDLER Service Repair Manualfudfjjkskekmdm
 
Terex girolift 3514 telescopic handler service repair manual
Terex girolift 3514 telescopic handler service repair manualTerex girolift 3514 telescopic handler service repair manual
Terex girolift 3514 telescopic handler service repair manualfkjsekksmem
 
Terex girolift 5022 telescopic handler service repair manual
Terex girolift 5022 telescopic handler service repair manualTerex girolift 5022 telescopic handler service repair manual
Terex girolift 5022 telescopic handler service repair manualfjjskkefksme
 
TEREX GIROLIFT 5022 TELESCOPIC HANDLER Service Repair Manual
TEREX GIROLIFT 5022 TELESCOPIC HANDLER Service Repair ManualTEREX GIROLIFT 5022 TELESCOPIC HANDLER Service Repair Manual
TEREX GIROLIFT 5022 TELESCOPIC HANDLER Service Repair Manualjnfmmsd ejdkmsm
 

Similar to Smed Training Model Trainer Instructions[1] (20)

Tooling Design
Tooling DesignTooling Design
Tooling Design
 
Tpm implementation oee increment
Tpm implementation oee incrementTpm implementation oee increment
Tpm implementation oee increment
 
1 2 chem plantdesign-intro to plant design economics
1 2 chem plantdesign-intro to plant design  economics1 2 chem plantdesign-intro to plant design  economics
1 2 chem plantdesign-intro to plant design economics
 
Design and Development of Dynamo Testing Machine
Design and Development of Dynamo Testing MachineDesign and Development of Dynamo Testing Machine
Design and Development of Dynamo Testing Machine
 
M.TEHSEEN
M.TEHSEENM.TEHSEEN
M.TEHSEEN
 
Tpm
Tpm Tpm
Tpm
 
Tpm
Tpm Tpm
Tpm
 
Application Of Workstudy
Application Of WorkstudyApplication Of Workstudy
Application Of Workstudy
 
FDX_Report_Proposinganewcostumer
FDX_Report_ProposinganewcostumerFDX_Report_Proposinganewcostumer
FDX_Report_Proposinganewcostumer
 
Hitachi Zaxis ZX450-3 Zx870 Excavator Service Manual.pdf
Hitachi Zaxis ZX450-3 Zx870 Excavator Service Manual.pdfHitachi Zaxis ZX450-3 Zx870 Excavator Service Manual.pdf
Hitachi Zaxis ZX450-3 Zx870 Excavator Service Manual.pdf
 
Plant connect for plastics case study
Plant connect for plastics case studyPlant connect for plastics case study
Plant connect for plastics case study
 
5 VARIABLES in MANUFACTURING PRODN
5 VARIABLES in MANUFACTURING PRODN5 VARIABLES in MANUFACTURING PRODN
5 VARIABLES in MANUFACTURING PRODN
 
Hitachi Zaxis ZX140-3 Zx310 Excavator Service Manual.pdf
Hitachi Zaxis ZX140-3 Zx310 Excavator Service Manual.pdfHitachi Zaxis ZX140-3 Zx310 Excavator Service Manual.pdf
Hitachi Zaxis ZX140-3 Zx310 Excavator Service Manual.pdf
 
Productivity improvement technique using work study in rmg sector
Productivity improvement technique using work study in rmg sectorProductivity improvement technique using work study in rmg sector
Productivity improvement technique using work study in rmg sector
 
Terex girolift 5022 telescopic handler service repair manual
Terex girolift 5022 telescopic handler service repair manualTerex girolift 5022 telescopic handler service repair manual
Terex girolift 5022 telescopic handler service repair manual
 
Terex girolift 3518 telescopic handler service repair manual
Terex girolift 3518 telescopic handler service repair manualTerex girolift 3518 telescopic handler service repair manual
Terex girolift 3518 telescopic handler service repair manual
 
TEREX GIROLIFT 3514 TELESCOPIC HANDLER Service Repair Manual
TEREX GIROLIFT 3514 TELESCOPIC HANDLER Service Repair ManualTEREX GIROLIFT 3514 TELESCOPIC HANDLER Service Repair Manual
TEREX GIROLIFT 3514 TELESCOPIC HANDLER Service Repair Manual
 
Terex girolift 3514 telescopic handler service repair manual
Terex girolift 3514 telescopic handler service repair manualTerex girolift 3514 telescopic handler service repair manual
Terex girolift 3514 telescopic handler service repair manual
 
Terex girolift 5022 telescopic handler service repair manual
Terex girolift 5022 telescopic handler service repair manualTerex girolift 5022 telescopic handler service repair manual
Terex girolift 5022 telescopic handler service repair manual
 
TEREX GIROLIFT 5022 TELESCOPIC HANDLER Service Repair Manual
TEREX GIROLIFT 5022 TELESCOPIC HANDLER Service Repair ManualTEREX GIROLIFT 5022 TELESCOPIC HANDLER Service Repair Manual
TEREX GIROLIFT 5022 TELESCOPIC HANDLER Service Repair Manual
 

More from exerciselean

Exercise Lean LLC_revised Brochure July 11 2011
Exercise Lean LLC_revised Brochure July 11 2011Exercise Lean LLC_revised Brochure July 11 2011
Exercise Lean LLC_revised Brochure July 11 2011exerciselean
 
F119 Team_Report_out_Sept 10, 2009
F119 Team_Report_out_Sept 10, 2009F119 Team_Report_out_Sept 10, 2009
F119 Team_Report_out_Sept 10, 2009exerciselean
 
System Kaizen Approach May 2015
System Kaizen Approach May 2015System Kaizen Approach May 2015
System Kaizen Approach May 2015exerciselean
 
Rapid Site Assessment June 27 2010
Rapid Site Assessment June 27 2010Rapid Site Assessment June 27 2010
Rapid Site Assessment June 27 2010exerciselean
 
Kaizen System Diagnosis(1)
Kaizen  System Diagnosis(1)Kaizen  System Diagnosis(1)
Kaizen System Diagnosis(1)exerciselean
 
8 Wastes - getting LEAN
8 Wastes - getting LEAN8 Wastes - getting LEAN
8 Wastes - getting LEANexerciselean
 
Setup Reduction Workshop
Setup Reduction WorkshopSetup Reduction Workshop
Setup Reduction Workshopexerciselean
 
A3 Report Out Kitting Project June 1, 2009
A3 Report Out Kitting Project June 1, 2009A3 Report Out Kitting Project June 1, 2009
A3 Report Out Kitting Project June 1, 2009exerciselean
 

More from exerciselean (10)

Exercise Lean LLC_revised Brochure July 11 2011
Exercise Lean LLC_revised Brochure July 11 2011Exercise Lean LLC_revised Brochure July 11 2011
Exercise Lean LLC_revised Brochure July 11 2011
 
F119 Team_Report_out_Sept 10, 2009
F119 Team_Report_out_Sept 10, 2009F119 Team_Report_out_Sept 10, 2009
F119 Team_Report_out_Sept 10, 2009
 
System Kaizen Approach May 2015
System Kaizen Approach May 2015System Kaizen Approach May 2015
System Kaizen Approach May 2015
 
Rapid Site Assessment June 27 2010
Rapid Site Assessment June 27 2010Rapid Site Assessment June 27 2010
Rapid Site Assessment June 27 2010
 
Tpm Presentation
Tpm PresentationTpm Presentation
Tpm Presentation
 
Kaizen System Diagnosis(1)
Kaizen  System Diagnosis(1)Kaizen  System Diagnosis(1)
Kaizen System Diagnosis(1)
 
8 Wastes - getting LEAN
8 Wastes - getting LEAN8 Wastes - getting LEAN
8 Wastes - getting LEAN
 
Setup Reduction Workshop
Setup Reduction WorkshopSetup Reduction Workshop
Setup Reduction Workshop
 
A3 Report Out Kitting Project June 1, 2009
A3 Report Out Kitting Project June 1, 2009A3 Report Out Kitting Project June 1, 2009
A3 Report Out Kitting Project June 1, 2009
 
Standardized Work
Standardized WorkStandardized Work
Standardized Work
 

Recently uploaded

Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseribangash
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 

Recently uploaded (20)

Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 

Smed Training Model Trainer Instructions[1]

  • 1. PRESENTATION OF MODEL IN INITIAL CONFIGURATION SHOWING TOOL PART # 1
  • 2. PRESENTATION OF MODEL IN INITIAL CONFIGURATION SHOWING TOOL PART # 1 CLAMP ARM TOOL PART # 1 TOOL TIGHTENING BOLT TIGHTENING BOLT JAMB NUT CLAMP ARM JAMB NUT (UPPER) CLAMP ARM JAMB NUT (LOWER) FLAT PLAIN WASHER FLAT PLAIN WASHER FLAT PLAIN WASHER FLAT PLAIN WASHER THREADED ROD THREADED ROD NUT MACHINE PLATEN SHIM STOCK
  • 3. PRESENTATION OF MODEL IN INITIAL CONFIGURATION SHOWING MATERIAL STORES FOR TOOL PART # 1 CLAMP ARM TOOL PART # 1 MACHINE PLATEN MATERIALS STORES SUPPORT POST SMALL WASHERS (MATERIAL STORES FOR TOOL PART # 1)
  • 4. PRESENTATION OF MODEL IN INITIAL CONFIGURATION SHOWING TOOL PART # 1 THREADED ROD SMALL WASHERS (MATERIAL STORES FOR TOOL PART # 1) TOOL PART # 1 MATERIAL STORES SUPPORT POST
  • 5. TOOL PART #1 ALIGNMENT SETUP DIMENSIONS 1.6000” 0.3120” TOOL PART # 1
  • 6. 1.0000” 2.0225” 2.0225” TOOL PART #1 ALIGNMENT SETUP DIMENSIONS TOOL PART # 1
  • 7. PRESENTATION OF MODEL IN INITIAL CONFIGURATION SHOWING TOOL PART # 2 CLAMP ARM TOOL PART # 2 TOOL TIGHTENING BOLT TIGHTENING BOLT JAMB NUT CLAMP ARM JAMB NUT (UPPER) CLAMP ARM JAMB NUT (LOWER) FLAT PLAIN WASHER FLAT PLAIN WASHER FLAT PLAIN WASHER FLAT PLAIN WASHER THREADED ROD THREADED ROD NUT MACHINE PLATEN SHIM STOCK
  • 8. PRESENTATION OF MODEL IN INITIAL CONFIGURATION SHOWING MATERIAL STORES FOR TOOL PART # 2 CLAMP ARM MACHINE PLATEN MATERIALS STORES SUPPORT POST LARGE WASHERS (MATERIAL STORES FOR TOOL PART # 2) TOOL PART # 2 5/16”-18 X ½” SET SCREW
  • 9. PRESENTATION OF MODEL IN INITIAL CONFIGURATION SHOWING TOOL PART # 2 THREADED ROD MATERIAL STORES SUPPORT POST LARGE WASHERS (MATERIAL STORES FOR TOOL PART # 2) TOOL PART # 2
  • 10. TOOL PART #2 ALIGNMENT SETUP DIMENSIONS 1.6000” 0.3120” CLAMP ARM TOOL PART # 2
  • 11. 0.5000” 1.5225” 1.5225” TOOL PART #2 ALIGNMENT SETUP DIMENSIONS TOOL PART # 2
  • 12. PRESENTATION OF MODEL IN FINAL CONFIGURATION SHOWING ALL FINAL IMPROVEMENTS CLAMP ARM TOOL TIGHTENING WING SCREW TIGHTENING BOLT JAMB WING NUT CLAMP ARM JAMB WING NUT (UPPER) CLAMP ARM JAMB WING NUT (LOWER) FLAT PLAIN WASHER FLAT PLAIN WASHER FLAT PLAIN WASHER FLAT PLAIN WASHER THREADED ROD THREADED ROD NUT MACHINE PLATEN TOOL STANDOFF ADAPTOR TOOL STANDOFF ADAPTOR CENTERING DOWEL PIN TOOL STANDOFF ADAPTOR LOCATION DOWEL PINS TOOL PART # 1
  • 13. PRESENTATION OF MODEL IN FINAL CONFIGURATION SHOWING MATERIAL STORES IMPROVEMENT CLAMP ARM MACHINE PLATEN MATERIALS STORES SUPPORT POST WITH COLLAR SMALL WASHERS (MATERIAL STORES FOR TOOL PART # 1) TOOL PART # 1
  • 14. PRESENTATION OF MODEL IN FINAL CONFIGURATION SHOWING ALL FINAL IMPROVEMENTS CLAMP ARM TOOL TIGHTENING WING SCREW TIGHTENING BOLT JAMB WING NUT CLAMP ARM JAMB WING NUT (UPPER) CLAMP ARM JAMB WING NUT (LOWER) FLAT PLAIN WASHER FLAT PLAIN WASHER FLAT PLAIN WASHER FLAT PLAIN WASHER THREADED ROD THREADED ROD NUT MACHINE PLATEN TOOL STANDOFF ADAPTOR TOOL STANDOFF ADAPTOR CENTERING DOWEL PIN TOOL STANDOFF ADAPTOR LOCATION DOWEL PINS TOOL PART # 2 5/16”-18 X ½” SET SCREW
  • 15. PRESENTATION OF MODEL IN FINAL CONFIGURATION SHOWING MATERIAL STORES IMPROVEMENT CLAMP ARM MACHINE PLATEN MATERIALS STORES SUPPORT POST WITH COLLAR LARGE WASHERS (MATERIAL STORES FOR TOOL PART # 2) TOOL PART # 2
  • 16. PRESENTATION OF MODEL IN FINAL CONFIGURATION SHOWING ALL FINAL IMPROVEMENTS SUPPORT POST LARGE WASHERS (MATERIAL STORES FOR TOOL PART # 2) SMALL WASHERS (MATERIAL STORES FOR TOOL PART # 1) TOOL STANDOFF ADAPTOR LOCATION DOWEL PIN TOOL STANDOFF ADAPTOR LOCATION DOWEL PIN TOOL PART # 1 TOOL PART # 2 TOOL STANDOFF ADAPTOR CENTERING DOWEL PIN
  • 17. PRESENTATION OF MODEL IN FINAL CONFIGURATION SHOWING ALL FINAL IMPROVEMENTS
  • 18.
  • 19. - SYMBOLS USED IN THIS TRAINER INSTRUCTIONS - USE THE FLIP CHART AS A COMMUNICATION TOOL. SLIDE NUMBER DISPLAY THE APPROPRIATE SLIDE ON PROJECTOR SCREEN. TIMED EXERCISE SEQUENCE. DISPLAY THE RECORDED ELEMENT OF THE TOOL CHANGEOVER. ADVISE COMMENTS & NOTES COMMENTS TO BE ADDED BY THE TRAINER. BLUE FONT COLOR: POINTS THE TRAINER SHOULD BEAR IN MIND DURING THE TRAINING COURSE .
  • 20. - DESCRIPTION OF THE TRAINING KIT - THE TRAINING KIT CONTAINS THE FOLLOWING ITEMS: 1 MACHINE FITTED WITH INTERCHANGEABLE TOOLS COMPRISING 1 CLAMP ARM 1 5/16”-18 X 6” ALL THREAD ROD 4 5/16”-18 HEX NUTS 4 5/16” PLAIN FLAT WASHERS 1 5/16”-18 X 1 ½“ CLAMP ARM ALLEN CAP BOLT 1 5/16”-18 X ½“ SET SCREW 2 TOOLS (TOOL PART # 1 & TOOL PART # 2) 1 BOX OF SHIM STOCK (VARIOUS GAUGES FOR SETTING HEIGHT OF TOOL PART # 1 & TOOL PART # 2) 1 MATERIAL STORES PART # 1 SUPPORT POST 1 MATERIAL STORES PART # 2 SUPPORT POST 1 BOX OF ACCESSORIES COMPRISING 1 5/16”-18 X 1 ½“ WING SCREW 3 5/16”-18 WING NUTS 2 5/16” D X 1 ½” L TOOL STANDOFF ADAPTOR LOCATION DOWEL PINS 1 5/16” D X 1 ½” L TOLL STANDOFF ADAPTOR CENTERING DOWEL PIN 1 MATERIAL STORES PART # 1 SUPPORT POST (WITH COLLAR) 1 MATERIAL STORES PART # 2 SUPPORT POST (WITH COLLAR) 1 0.3120” DISTANCE GAUGE 1 TOOL STANDOFF ADAPTER (DIAMETER 3.0000” - HEIGHT 0.5500”) 1 TOOL STANDOFF ADAPTER 5/16” D X 1” L DOWEL PIN 1 BOX OF SMALL WASHERS CHANGEOVER MATERIALS STORES FOR TOOL PART # 1 1 BOX OF LARGE WASHERS CHANGEOVER MATERIALS STORES FOR TOOL PART # 2 1 BOX OF HAND TOOLS COMPRISING 1 SET OF OPEN & CLOSED END STANDARD WRENCHES (3/8” to 9/16”) 1 SET OF STANDARD ALLEN WRENCHES (1/16” to 3/8”) 1 MEASURING CALIPERS
  • 21. - PRESENTATION OF THE MODEL IN INITIAL CONFIGURATION -
  • 22. - SUMMARY: TRAINING COURSE IMPLEMENTATION - THE RAPID CHANGEOVER EXERCISE IS USED TO ILLUSTRATE THE SMED METHOD. THE GOAL THEREFORE IS TO ALLOW PARTICIPANTS TO DISCOVER CHRONOLOGICALLY THE VARIOUS IMPROVEMENT PHASES INCLUDED IN THIS METHOD. EXERCISE PHASES ALTERNATE WITH DEBRIEFING PHASES DURING WHICH THE TRAINER MY USE SLIDES TO PRESENT THE IMPORTANT ASPECTS OF THE APPROACH MORE ACCURATELY. AFTER INTRODUCING THE SMED, THE TRAINER PRESENTS THE EXERCISE & ALLOCATES ROLES TO PARTICIPANTS CLEARING SPECIFYING THE GOALS. A NON-PREPARED TOOL CHANGEOVER CONCEALING A CERTAIN NUMBER FAILURES IS THEN TIMED. GENERALLY THE FIRST TIME MEASUREMENT IS AROUND 5 MINUTES. THE GROUP THINKS ABOUT WHAT HAS JUST TAKEN PLACE & CONTINUES BY INTERNAL & EXTERNAL CATEGORIZATION OF OPERATIONS & PREPARATION CHECKLIST – THIS IS THE FIRST IMPROVEMENT STEP OF THE SMED METHOD. WHEN THE CHANGEOVER IS TIMED A 2 ND TIME, IT BECOMES EVIDENT THAT ALMOST 50% OF THE TIME IS GAINED PURELY TO IMPROVED ORGANIZATION (5S & HAVING A PREPARATION CHECKLIST) THE NEXT PHASE CONSISTS OF STUDYING THE TOOL CHANGEOVER OPERATIONS & LOOKING FOR ANY POSSIBLE IMPROVEMENTS. NEXT, ALL IDEAS PUT FORWARD ARE DIVIDED INTO TWO CATEGORIES: IDEAS REQUIRING LITTLE OR NO INVESTMENT & IDEAS REQUIRING A LARGER INVESTMENT. TO BEGIN WITH ONLY LOW-COST MODIFICATIONS ARE SELECTED. THE ACCESSORIES CONTAINED IN THE TRAINING KIT MAKE IT POSSIBLE TO PRODUCE A NUMBER OF SUCH IMPROVEMENTS. A 3 RD TIMING CONVEYS THE FACT THAT WITHOUT MAJOR MODIFICATIONS IT IS POSSIBLE TO REDUCE THE TIME IN RELATION TO THE PREVIOUS TIMING BY ANOTHER 50%. DURING THE NEXT PHASE OF THE EXERCISE A FEW MORE EXPENSIVE MODIFICATIONS (STANDARDIZATION OF TOOLS, INVESTMENT IN THE MACHINE) ARE IMPLEMENTED & MAKE IT POSSIBLE TO REDUCE THE TOOL CHANGEOVER TIME BY APPROXIMATELY 10 SECONDS. AT THIS POINT THE TRAINER MUST INSIST ON SYNCHRONIZING ( SIMULTANEOUS ) TASKS, WHICH IS A CRUCIAL POINT IN THE RECOGNIZING OF A DIE CHANGEOVER (ONE WAY OF EMPHASIZING THIS POINT IS TO INTRODUCE IT AFTER THE 4 TH TIMING IT IS THEN OBSERVED THAT PURELY BY SYNCHRONIZING THE CHANGEOVER -
  • 23. - SUMMARY: TRAINING COURSE IMPLEMENTATION CONT. - TIME CAN BE CUT BY HALF OR MORE ) THE CONCLUSION IS THAT DIE CHANGEOVER TIMES CAN BE VASTLY REDUCED FIRSTLY THROUGH IMPROVEMENT IN ORGANIZATION & SECONDLY BY MEANS OF MINOR MODIFICATIONS , CHANGES TO WHICH OPERATORS ARE MORE RESISTANT TO AS THEY ARE AFFECTED MORE DIRECTLY.
  • 24. - TRAINING COURSE IMPLEMENTATION - TIME MEANS USED TRAINING SESSION IMPLEMENTATION ADVICE/COMMENTS/NOTES FOR TRAINER WHAT IS S.M.E.D? BY TRYING TO UNDERSTAND WHAT SMED MEANS THE GROUP WILL GRADUALLY DEFINE IT. THE FLIPCHART MAY BE USED TO RECORD GOOD SUGGESTIONS FROM THE GROUP. SLIDE 1. ACCURATE DEFINITION OF PRODUCTION CHANGEOVER TIME. REPRODUCE THE FOLLOWING DIAGRAM ON THE FLIPCHART: SINGLE MINUTE: A SINGLE DIGIT UNIT (LESS THAN 10 MINUTES) EXCHANGE: CHANGEOVER DIE: TOOL SINGLE MINUTE OF EXCHANGE OF DIE PRODUCTION CHANGEOVER OF LESS THAN 10 MINUTES PRODUCTION CHANGEOVER TIME = THE TIME BETWEEN THE LAST GOOD PART OF CURRENT PRODUCTION RUN & THE FIRST GOOD PART OF NEXT PRODUCTION RUN.
  • 25.
  • 26.
  • 27.
  • 28. - TRAINING COURSE IMPLEMENTATION - TIME MEANS USED TRAINING SESSION IMPLEMENTATION ADVICE/COMMENTS/NOTES FOR TRAINER ANALYSIS THE TOOL CHANGEOVER INVITE ONE OF THE PARTICIPANTS TO THE FLIP CHART & ASK THE GROUP TO ITEMIZE IN CHRONOLOGICAL ORDER EACH OPERATION (ELEMENT) PERFORMED BY THE PERSON SETTING UP THE TOOL. (A MODEL BREAKDOWN IS INCLUDED AT THE BEGINNING OF THIS PRESENTATION FOR REFERENCE PURPOSES). WHICH OPERATIONS IN THE EXERCISE CAN BE PERFORMED WHILE THE MACHINE IS RUNNING & WHICH MUST BE PERFORMED WHILE THE MACHINE IS STOPPED? WRITE (FOR EXAMPLE, ON THE FLIP CHART) A PREPARATION CHECKLIST & AN CHANGEOVER PROCEDURE FOR THE CHANGEOVER. IT IS IMPORTANT TO POINT OUT THAT EVERYBODY HAS PROBLEMS AGREEING ON THE CHANGEOVER PROCEDURE USED BY THE PERSON SETTING UP THE TOOL. A GOOD WAY OF ANALYZING THE DIE CHANGEOVER PROCEDURE PROPERLY IS THE TO USE THE RECORD VIDEO OF THE CHANGEOVER . DIVIDE THE OPERATIONS INTO CATEGORIES DIRECTLY ON THE FLIP CHART (FOR EXAMPLE, BY UNDERLINING EXTERNAL OPERATIONS). AS FAR AS POSSIBLE, ASK A PERSON FROM THE GROUP TO COME & WRITE ON THE FLIP CHART. A MODEL CHECKLIST & OPERATING PROCEDURE ARE INCLUDED IN THIS TRAINING KIT.