Specialty Construction works as follows: …

Specialty Construction works as follows:
1. Vacuum Dewatered Flooring
2. Industrial Floorings like
Ø PE foam floorings
Ø Epoxy floorings
3. Dust proofing of concrete floors with
Ø Impregnation chemicals
Ø Epoxy coatings
4. Waterproofing works for Basements, Sunken, Terrace
Gardens, Terraces, Walls etc using:
Ø Polymer modified cementations membranes
Ø Polyurethane membranes,
Ø Box-type method using Kota/Agra stone
Ø Injection Grouting
Ø APP modified bituminous membranes/ Tar felt
Ø Brickbat Coba
Ø EPDM Membranes
Ø PVC Membranes
5. Insulation of buildings with
Ø Foam concrete
Ø Expanded H.D. polystyrene
Ø Extruded Polystyrene (XPS)
Ø Thermal insulating plaster/ Vermiculite plaster
Ø Closed cell-structure PE sheets
6. Core Cutting
7. Structure Strengthening
8. Interior Works for Residences, Showrooms
9. Minor Civil Works
10. Consultancy for Specialized Civil Works
11. Trading of Construction Chemicals
12. Project Management Services
13. Road Work (RCC, SMC, PCC)
14. Expansion Joint Work

Published in: Business

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
3,213
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
94
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. EPA EPA Infrastructure Pvt. Ltd. COMPANY PROFILE
  • 2. Registered office: COMPANY DETAILS EPA Infrastructure Pvt. Ltd. B-267/ 268, North-Ex Mall Sector-9, Rohini, Delhi-110085 Phone: +91-11-47068181/51/52 Fax: 011-47068156 Email ID: info@epa-infrastructure.com Website: www.epa-infrastructure.com Type of Company: Private Limited Business Operation: Specialty Construction works as follows: 1. Vacuum Dewatered Flooring 2. Industrial Floorings like Ø PE foam floorings Ø Epoxy floorings 3. Dust proofing of concrete floors with Ø Impregnation chemicals Ø Epoxy coatings 4. Waterproofing works for Basements, Sunken, Terrace Gardens, Terraces, Walls etc using: Ø Polymer modified cementations membranes Ø Polyurethane membranes, Ø Box-type method using Kota/Agra stone Ø Injection Grouting Ø APP modified bituminous membranes/ Tar felt Ø Brickbat Coba Ø EPDM Membranes Ø PVC Membranes
  • 3. 5. Insulation of buildings with Ø Foam concrete Ø Expanded H.D. polystyrene Ø Extruded Polystyrene (XPS) Ø Thermal insulating plaster/ Vermiculite plaster Ø Closed cell-structure PE sheets 6. Core Cutting 7. Structure Strengthening 8. Interior Works for Residences, Showrooms 9. Minor Civil Works 10. Consultancy for Specialized Civil Works 11. Trading of Construction Chemicals 12. Project Management Services 13. Road Work (RCC, SMC, PCC) 14. Expansion Joint Work VACUUM DEWATERED FLOORING
  • 4. EPOXY FLOORING
  • 5. WATERPROOFING INJECTION GROUTING
  • 6. FOAM CONCRETE STRUCTURAL STRENTHENING
  • 7. ANTI CORROSIVE COATING AT RAIL TRACKS OF RELIANCE METRO NEW DELHI- DHOLA KUAN STATION (DAMEPL) HEAT AND CHEMICAL RESISTANT PAINT
  • 8. Company's Turnover For Last Three Years. Sno. Year Company’s TurnOver (In Lacs) 1 2012-2013 600 2 2011-2012 550 3 2010-2011 200 Promoter: Mr. Paramjit Singh Sahai, B.Tech(Civil), IIT Delhi, 1977 batch, promoted this company in 2003. He has over 3 decades of experience in design, planning, marketing, execution and project management of civil construction projects/ turnkey chemical process plants/ turnkey waste water treatment plants. During his tenure of 25 years with reputed consultancy and construction companies, Mr. Paramjit Singh Sahai developed great interest in Protection of Concrete, Specialty Constructions, Consultancy, and Project Management. After achieving success in the specialized works, EPA Infrastructure is adding activities of Civil Works and Interior Works. He has also initiated the formation of an NGO called Sandeep Foundation for community welfare and EPA Home Pvt. Ltd for facilitation of development of mass housing in the country.
  • 9. Date of Establishment: 01April, 2003 Erstwhile: Sole Proprietor Bankers: HDFC, Punjab National Bank, S.B.I, I.D.B.I Auditors: R. P. Narang & Co. 59/1, Janak Palace, New Market (Near Liberty Cinema) New Rohtak Road, New Delhi-110005
  • 10. OUR MISSION EPA Infrastructure Pvt. Ltd. is focused on bringing out the best in all persons involved with it, whether employees, sub-contractors, vendors or customers. The company constantly makes an effort to give each employee the maximum freedom and trust possible to perform his or her duties. At appointment stage and at periodic intervals, the company asks employees to take on the role best liked by them to ensure they will enjoy performing their work. The company takes on new fields of act ivity, whenever an employee/ associate or vendor shows proficiency in that particular activity. To ensure that more and more people get this opportunity from the company, the company believes in fast growth both in terms of employee/ sub-contractor/ vendor base as well as customer base. The company's vision is to work at grassroots level and include act ivities which are needed by each person, namely homes, food, healthcare, education etc. OUR VISION To be known as a good company to work for To be known as a provider of excellent quality goods and services To be known as an organization that walks its talk To grown into an institution that lasts generations
  • 11. OUR VALUES The company fosters growth of the following values in its employees and seeks customers who have similar value systems: Ownership: This is our company. We accept personal responsibility and accountability to meet business needs Passion for Winning: We all are leaders in our area of responsibility, with a deep commitment to deliver results. We are determined to be the best at doing what matters most People Development: People are our most important asset. We add value through result driven training, and we encourage & reward excellence Customer Focus: We understand customer needs and build Specialty Construction works to fulfill them better Team Work: We work together on the principle of mutual trust & transparency in a boundary- less organization. We are intellectually honest in advocating proposals, including recognizing risks Innovation: Continuous innovation in products & processes is the basis of our success Integrity: We are committed to the achievement of business success with integrity. We are honest with consumers, with business partners and with each other. OUR APPROACH TOWARDS WORK 1. Understanding Requirements 2. Developing Correct Strategy 3. Delivering the best of design 4. Work Methodologies 5. Project Management 6. Quality Assurance 7. Client Satisfaction
  • 12. ORGANISATIONAL STRUCTURE FOUNDER & CEO MARKETING (MANAGER) MARKETING (EXECUTIVE) MARKETING (ASST.) MANAGER (OPERATION) PROJECT ENGINEER (FLOORING) SR. SUPERVISOR SUPERVISOR SUPERVISOR SUPERVISOR STORE KEPEER PROJECT ENGINEER (WATERPROOFI NG) SR. SUPERVISOR SUPERVISOR SUPERVISOR SUPERVISOR SECETARY (MD) DIRECTOR (HRM,F&A) SR. EXECUTIVE (ACCOUNTS) ACCOUNT (ASST.) EXECUTIVE (ADMIN.) PURCHASE (EXECUTIVE) EXECUTIVE (HR)
  • 13. PROJECTS UNDER-EXECUTION List of Current Work S.No Description Types of work Status 1 Ansal Proprieties & Infrastructure Ltd. in Barota. Waterproofing Treatment for deck Slab. Rs 86.96lacs.Work In Progress. 2 Ansal Proprieties & Infrastructure Ltd. in Barota. Allied Civil Works for Deck Slab. Rs.86.63lac Work In Progress. 3 Delhi Airport Metro Express Pvt Ltd Anti Corrosive Coating Work for Tracks Rs.110lacs. Work In Progress 4 Dharampal Satyapal Ltd. Kullu (Himanchal) V.D. Flooring Rs.35lacs.Work in Progress 5 CEC – Soma For DMRC Projects (Race Course , Jorbagh, INA, AIIMS Station) Grouting with Low Viscosity Arcrylate Polymer Injection Grouting Work In Progress 6 DLF Utilities Ltd. Building No 10, Shankar Chowk, Gurgaon Heat & Chemical resistant painting Work In Progress
  • 14. List Of Works Executed in Year 2012-13 S.No Description Types of work Status 1 Nirmal Bharti School in Dwarka, Delhi Civil &Waterproofing work Rs. 71.63 lacs. Building handed over in 2013. 2 BSBK Engineers Pvt. Ltd. in Bherod. 140 mm thick Welded wire Mesh Reinforced VD Flooring Rs 174lacs.Building handed over in 2013. 3 S.C.C.L For Mother son Automotive & Technology in Pathridi (Raj) Civil & Waterproofing work Rs.81.70lacs.Building handed over in 2013. 4 SAFEXPRESS Logistic in Ambala (for Assets Max Developer) 150 mm thick Welded wire Mesh Reinforced VD Flooring Rs.91.31lacs.Building handed over in 2013. 5 Sterling vehicle and general sales private limited Civil work & Interiors Rs.165.29.lacs.Building handed over in 2012. 6 Automobile sterling Demolition & Dismantling Works Rs.37.57.lacs.Building handed over in 2012.
  • 15. List of Industrial (VD) Flooring Work S.N. Description Types of work Brief Detail 1 M/s H.S.I for their expansion project at Bahadurgarh. Vaccum Dewatered Flooring for 75 mm thk PCC floor for completed work 2004 2 For M/s SeatoEngineering Works Reinforced VD flooring 100 mm thk. completed work 2004 3 M/s Ahuja Builders at Gurgaon RCC VD Flooring 200 thk with Floor Hardener completed work 2004 4 M/s Bridge & Roofthrough M/s Sana Industries with Sana makes equipment.at Timarpur. RCC VD Flooring Completed work 2005 5 M/s GS Developers & Contractors Pvt Ltd at Rudrapur. RCC VD Flooring completed work 2005 6 M/s Raj furniture thru’ M/s Uni- Construction, Gurgaon PCC, VD flooring completed work 2005 7 VD Flooring of Floor of Factory Building of Action Shoes at Baddi (Himachal) RCC VD Flooring 125 mm thick for M/s Inder Construction Co. completed work 2005 8 VD Flooring at Kirby factory at 200 mm thk. RCC 18,000 Sqm. With Hardener for GS Developers & Contractors Pvt. Ltd. 200 mm thk. RCC Flooring completed work 2006 9 VD Flooring of parking basements of Aggarwal City Mall, Aggarwal City Plaza and Fun city. RCC VD flooring for M/s Unity group in slope towards drains. completed work 2006 10 VD Flooring of factory of M/s Euro Solar Systems at Baddi for M/s Sanghvi Construction. 150 mm thk. RCC VD Flooring with PP fibers with groove Filling completed work 2006
  • 16. 11 VD Flooring for Vardhman Malls at Pitampura, Dwarka and Faridabad. 100 mm thk. RCC Flooring. completed work 2006 12 VD Flooring of 12rd and 14th floors of Unitech’s Cyber Park at Sector-39, Gurgaon VD flooring as specified in the BOQ completed work 2007 13 Olympus (India) Pvt. Ltd V.D.Flooring completed work 2007 14 Jaksons Buildwell Pvt. Ltd. V.D.Flooring completed work 2007 15 Aspire Global V.D.Flooring completed work 2007 16 Work for INDIA LAND AND SPACE WAREHOUSE for SAFEXPRESS AHEMDABAD V.D. Flooring Groove cutting, Groove filling and expansion joint Treatment completed work 2008 17 Work for SAFEXPRESS in Chennai for SAFEXPRESS Cargo Pvt. Ltd V.D. Flooring Groove cutting, Groove filling and expansion joint Treatment completed work 2008 18 ATHENA BUSSINESS SOLUTION Pvt. Ltd. for GURUBAKSH SINGH B.A. Builders Pvt. Ltd. V.D. Flooring Groove cutting, Groove filling and expansion joint Treatment Completed work 2008 19 B.K Consortium engineers Pvt. Ltd For SMCC Location: IMT Manesar. V.D. Flooring Groove cutting, Groove filling and expansion joint Treatment. completed work 2008 20 Client: Jackson Build well Pvt Ltd Location: V-35 Ring road Mall V.D. Flooring, Groove cutting, Groove filling and expansion joint Treatment. completed work 2008
  • 17. 21 India Land and Space Warehousing Pvt.Ltd V.D. Flooring, Groove cutting, Groove filling and expansion joint Treatment. completed work 2008 22 B.k Consortium Engineers Pvt Ltd V.D. Flooring, Groove cutting, Groove filling and expansion joint Treatment. completed work 2008 23 Jacksons Developer pvt.Ltd V.D. Flooring, Groove cutting, Groove filling and expansion joint Treatment. completed work 2008 24 Shri Ram Poly Tech V.D. Flooring, Groove cutting, Groove filling and expansion joint Treatment. Completed work 2008 25 Client : BMF Total solution Pvt. Ltd Location : Holding No.02, Main Road, Jamshedpur V.D. Flooring, Groove cutting, Groove filling and expansion joint Treatment. completed work 2008 26 Client: Future Warehouse Pvt Ltd Location: Galan, Reliance Road, Ghaziabad V.D. Flooring, Groove cutting, Groove filling and expansion joint Treatment. completed work 2009 27 Nile Tech Limited V.D. Flooring, Groove cutting, Groove filling and expansion joint Treatment. completed work 2009 28 Vinayak City Center V.D. Flooring, Groove cutting, Groove filling and expansion joint, completed work 2009 29 Gurbakhsh Singh B.A.Builder Pvt.Ltd V.D. Flooring, Groove cutting, Groove filling and expansion joint Treatment. completed work 2010
  • 18. 30 Classic Engineers V.D. Flooring, Groove cutting, Groove filling and expansion joint Treatment. completed work 2010 31 Dharampal Premchand Ltd. V.D. Flooring, Groove cutting, Groove filling and expansion joint Treatment. completed work 2010 32 Sajeev kumar & Bros. V.D. Flooring, Groove cutting, Groove filling and expansion joint Treatment. completed work 2011 33 Kicaid Agri Project Pvt.Ltd Tress Screed RCC Flooring for CA store Groove cutting, Groove filling and expansion joint Treatment. completed work 2011 34 MGF Market Place V.D. Flooring, Groove cutting, Groove filling and expansion joint, completed work 2011 35 ISBT Kashmere Gate V.D. Flooring, Groove cutting, Groove filling and expansion joint Treatment. completed work 2011 36 Auto Venture Private Limited Assets Max Developer V.D. Flooring, Groove cutting, Groove filling and expansion joint Treatment. completed work 2011 37 BSBK Engineers Pvt. Ltd. V.D. Flooring, Groove cutting, Groove filling and expansion joint Treatment. completed work 2011 38 Systematic conscom Ltd. V.D. Flooring, Groove cutting, Groove filling and expansion joint completed work 2011
  • 19. Treatment. 39 Shruti Agriculture & Holding Pvt Ltd For Safexpress in Indore. V.D. Flooring, Groove cutting, Groove filling and expansion joint Treatment. completed work 2011 40 Bharat Industries Agra. V.D. Flooring, Groove cutting, Groove filling and expansion joint Treatment. Completed work 2011 41 RDS Project LTD. Truss Screed with Steel Fiber Beaker, Groove cutting and filling and Expansion Joint Treatment. Completed work in Aug 2012 List of Waterproofing Works S.No Description Types of work Brief Detail 1 Waterproofing of Basements For Silver Estate -– Housing project of Purvanchal Construction Works at F- 29, Sector-50, Noida. Box-type waterproofing using Kota/ Agra stone. completed work 2006
  • 20. 2 Waterproofing of terrace of Silver Estate (as above) Brick Bat Coba. completed work 2006 3 Waterproofing of Terrace Gardens of Silver Estate (as above) 3 layer treatment by polymer modified cementitious membrane, brickbat coba, followed by Kota stone. completed work 2006 4 Waterproofing of Water tanks with injection grouting and waterproofing plaster for Sumi Mother son thru’ Aqatec Electricals Ltd at Noida. Injection grouting and waterproofing plaster. Completed work 2006 5 Foam Concrete and APP Membrane waterproofing for Maruti - Diesel Engine Plant thru’ BL Kashyap & Sons Ltd. Foam Concrete overlaid with 3 mm thk Polyester reinforced APP Membrane. completed work 2006 6 Foam Concrete and APP Membrane waterproofing for Maruti - Diesel Engine Plant thru’ BL Kashyap & Sons Ltd. Foam Concrete overlaid with 3 mm thick Polyester reinforced APP Membrane. completed work 2006 7 Roof waterproofing of Station buildings of DMRC for JMC Projects Brick Bat Coba completed work 2006 8 Waterproofing of Sunken Toilets, for Sumi Motherson at E-4. Sector- 59, Noida. Polymer modified cementitious membrane/ inject ion grouting completed work 2006 9 Waterproofing of construction joints between buildings of M/s Nova dairy in Gwalior. APP modified 3 mm 5Polyester reinforced membrane. completed work 2006 10 Waterproofing of Sunken toilets in Anand Ashray for M/s Samiah International Builders Pvt. Ltd., Noida. Polymer modified cementitious coating Using Starcrete. Completed work 2006 11 Waterproofing of Basements, Sunken portion, Terrace, Terrace Box type waterproofing system using Agra Stone, completed
  • 21. Gardens of Vrinda City for M/s Samiah International Builders Pvt. Ltd., Noida. Polymer modified coating for sunken, box type for Terrace Gardens. work 2007 12 Kamakhya Oil Company Waterproofing work completed work 2007 13 UNITY INFRA. PROJECT location: Major Dhyanchand Stadium Under –C.P.W.D.- Commonwealth games 2010 Brick Bat Coba and kota box type completed work 2008 14 B.L. KASHYAP For BELSONICA AUTO COMPONENT Location: I .M.T Manesar Brick Bat Coba,Gola making, plaster, APP membrane completed work 2008 15 Narsi Waterproofing work completed work 2008 16 SMCC Construction India Limited Waterproofing work completed work 2008 17 C& S himoinsa Waterproofing work completed work 2008 18 Unity Infraproject limited Waterproofing work Completed work 2008 19 Unity Infraproject limited Waterproofing work Completed work 2008 20 Unity Infraproject limited Waterproofing work Completed work 2008 21 BSBK Engineers Pvt. Ltd. Waterproofing work completed work 2008 22 S.C.C.L For Mother son Automotive & Technology Location: B-135,Phase II Noida Waterproofing work completed work 2008 23 S.C.C.L For Mother son Automotive & Technology Waterproofing work completed
  • 22. Location: B-135,Phase II Noida work 2008 24 S.C.C.L For Mother son Automotive & Technology Location: B-135,Phase II Noida Waterproofing work completed work 2008 25 Consolidated Construction Consortium Ltd. for Infosys, Jaipur Project Brick bat coba, APP Membrane, Inject ion Grouting, China Mosaic Tiles work completed work 2009 26 S.C.C.L For Mother son Automotive & Technology Location: B-135,Phase II Noida Removing and applying bitumen, tar felt, APP Membrane completed work 2009 27 Panasonic AVC Networks India Co. Limited Waterproofing work completed work 2009 28 Unity Infraproject limited Waterproofing work completed work 2009 29 HCL technology Limited Waterproofing work completed work 2009 30 Simplex Project Limited Waterproofing work completed work 2010 31 Infosys Limited Waterproofing work completed work 2010 32 Infosys Limited Waterproofing work completed work 2010 33 Consolited Construction Consortium Ltd. Waterproofing work completed work 2010 34 Subros Ltd Waterproofing work completed work 2010 35 Samiah Interational Builder Pvt. Ltd. Waterproofing work completed work 2010 36 S.C.C.L For Mother son Automotive & Technology Location: B-135,Phase II Noida Waterproofing work Completed work 2010
  • 23. 37 Larson &Turbo Limited Waterproofing work Completed work 2011 38 Parsvnath ladmark developer pvt. Ltd. Waterproofing work Completed work 2011 39 Rasha India Private Limited Waterproofing work Completed work 2011 40 S.C.C.L For Mother son Automotive & Technology Location: B-135,Phase II Noida Waterproofing work Completed work 2011 41 Ansal Proprieties & Infrastructure Ltd. Waterproofing work Completed work 2011 42 Subros Ltd Waterproofing work Completed work 2011 43 Amba Enterprises Waterproofing work Completed work 2011 44 Infosys Limited Waterproofing work Completed work 2011 List of Insulation Works/ Foam Concrete S.No Description Types of work Brief Detail 1 Heat Insulation of steel Prefab Building for Bharat Petroleum’s Retail outlet at Yashwant place, New Delhi. Thermal insulation ofthe building using ceramic microsphere admixed paint. Completed work 2006
  • 24. List of Consultancy Works S.No Description Types of work Brief Detail 1 M/s Malawa Power Pvt. Ltd. Power project Advisory services for management Completed work 2009 2 Foam concrete on Roof of Diesel Engine Plant of M/s Maruti Udyog Ltd. For M/s BL Kashyap & Sons Ltd at IMT, Manesar. Foam Concrete Completed work 2006 3 Foam concrete on Roof of Weld Shop and Assembly Plants of M/s Maruti Udyog Ltd. for M/s BL Kashyap & Sons Ltd at IMT, Manesar. Foam Concrete Completed work 2006 4 Foam concrete on Roof of Transmission Plant of M/s Maruti Udyog Ltd. For M/s BL Kashyap Sons Ltd at IMT, Manesar. Foam Concrete Completed work 2007 5 S.G.Lakhanpal Associates Foam Concrete Completed work 2007 6 BSBK Engineers Pvt. Ltd. Foam Concrete Completed work 2007 7 BSBK Engineers Pvt. Ltd. Foam Concrete Completed work 2007 8 Consolited Construction Consortium Ltd. Foam Concrete Completed work 2008 9 Consolited Construction Consortium Ltd. Foam Concrete Completed work 2009 10 Bella Vista Hotel & Mall F Location: Panchkula Foam Concrete Completed work 2009
  • 25. Civil Work 2 M/s Nagode International Pvt. Ltd. For selection & Finalization of order for turnkey Completed work 2009 3 M/s Delta Robotic Welding Systems As a consultancy Completed work 2009 4 Mr. Bharat Singh Yadav Project & Construction Completed work 2009
  • 26. List of Key Personnel S.N. Name Designation 1 Mr. Paramjit Singh Sahai Managing Director & CEO 2 Mrs. Kawaljeet Sahai Director ( F&A ) 3 Mrs. Ruchi EXECUTIVE/SECETARY (MD) 4 Mr. Arun Bhatia Manager ( Marketing ) 5 Mr. Vijay Singh Gangwar Project Manager 6 Mr. Pawan Kumar Asst. Manager ( Finance & Accounts ) 7 Mr. Aman Aneja Project Engineer 8 Mr. Devi Lal Sr. Executive (Waterproofing Div.) 9 Miss Amrita Tewari Executive Accounts 10 Mrs. Shilpi Srivastava Executive HR 11 Mr. Bipul Sardar Marketing 12 Mr. Pradeep Gupta Management Trainee (Marketing) 13 Mr. Anees Siddiqui Executive – Interiors 14 Mr. Umesh Chandra Gupta Site Incharge 15 Mr. Brajesh Kumar Sr. Supervisor 16 Mr. Moti Lal Sr. Supervisor 17 Mr. Madan Kumar Mishra Sr. Supervisor 18 Mr. Ashwani Kumar Site Supervisor 19 Mr. Rosan Kumar Supervisor 20 Mr. Jiva Lal Supervisor 21 Mr. Ajay Kumar Supervisor 22 Mr. Inder Kumar Supervisor 23 Mr. Amit Kumar Supervisor 24 Mr. Sandeep Kumar Assistant (Front Office & Accounts) 25 Mr. Sarvesh Driver