1. - 1 -
CIRCULAR DEMOLITION OF THE HOSPITAL BUILDINGS ERASMUS MC
30th
November 2016
RE-FINANCE GROUP 2 | Re-finance of a timber facade frame system and
load-bearing steel structure
1st
2nd
3rd
4th
5th
6th
-1st
Hs
Assignment
Re-finance group 2 is asked to develop a strategy that incorporates the following questions:
• How can Erasmus approach the industry in order to remove their buildings and let it have
a high quality reuse by disassembly and replacement of the building?
• Identify business models to allow reuse?
The proposed strategy should should be approached from different levels of reuse:
• Reuse of facade system
• Reuse of structural system
• Reuse of seperate elements
At the end of the workshop group one is asked to present the findings of both cases in a pitch
of 2-3 minutes to the other groups, see page 7.
2. - 2 -
CIRCULAR DEMOLITION OF THE HOSPITAL BUILDINGS ERASMUS MC
30th
November 2016
installations
Floor level
+ 2700
Technical specification
4. - 4 -
CIRCULAR DEMOLITION OF THE HOSPITAL BUILDINGS ERASMUS MC
30th
November 2016
1782
1478
PVC window frames
Delivery date 09-03-2004
Type insulation glass 6-15-4 mm
*HR++ U=1,2 W/m2
K
ZTA = 39%
LTA = 70%
Color inside Ral 9010
outside Ral 7021
* complies with current building code in NL,
minimum is average of 1,65 W/m2
K
Trespa panels
Amount (times 68) Size label
2 1802 x 856 A
2 1802 x 1285 B
1 1184 x 856 C
1 1184 x 1520 D
1 1184 x 1285 E
1 1162 x 856 F
1 1162 x 1520 G
1 1162 x 1285 H
B
D
E B
G
H
Technical specification
5. - 5 -
CIRCULAR DEMOLITION OF THE HOSPITAL BUILDINGS ERASMUS MC
30th
November 2016
Technical specification - Steel structure (2005)
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
7. - 7 -
CIRCULAR DEMOLITION OF THE HOSPITAL BUILDINGS ERASMUS MC
30th
November 2016
Strategy:
Reuse of facade system
Reuse of structural system
Reuse of seperate elements
Strategy:
Strategy: