Smart City Summit, Nashik - Urban Overhaul: Greenfield Planning, Infrastructure Development and Swachha Bharat Mission: Panel Discussion - Rajendra Jagtap, Additional Commissioner, Pune Municipal Corporation & CEO, Pune Smart City Ltd, Government of Maharashtra
4. 3|
Hence, Pune created a vision that is “future proof”
Pune aspires to become one of the
most livable cities in India, by
solving its core infrastructure
issues in a “Future-Proof” way, and
by making its neighborhoods
beautiful, clean, green and livable
5. 4|
51 projects were identified in the Smart City Plan
Water
Waste water recycling1
Storm water use2
Adequate water supply3
Rainwater harvesting4
Smart metering (water)5
River water cleaning6
7 Pilot DMA for 24X7 Water
8 Bulk Meters
9 Helium leak identification
10 Smart Commercial Meters
11 Smart Domestic Meters
12 Customer Survey
13 STP Energy Generation
Mobile app and website14
Consumer Awareness15
SWM and Sanitation
Solid waste management1
Sanitation2 Start up zone1
Marquee
ICT
e-gov1
IT connectivity2
Bus System ITMS4
e-Chalaan7
Adaptive Traffic Control System3
Command Control Center5
Intelligent Road Management6
Road and road widening1
100 Electric buses2
Smart parking3
BRT4
Express airport services5
e-rickshaws6
7 Transit hub
8 Total Smart Parking
9 Traffic modelling system
Transport
Redesign of streets1
Footpaths (additional and retrofit)2
Place making3
Bicycles4
Bus stops (revamp 54 stations)5
Junction redesign for 14 junctions6
7 Non-motorised street
8 Street lighting
9 Riverfront development
10 Open spaces
Urban planning
Others
Electricity distribution – Smart grid & metering1
Solar energy supply2
Fire stations – 24
Connectivity costs7
Security3
Low income skill development & healthcare5
Build affordable housing6
6. 5|
410
283
434
345
2,197
579
Marquee Others Total
146 0
Urban
Planning
ICT OpexWaterTransport
670
160
238239
ICT
33
Water TotalOpexOthersTransport
Funding requirement (INR cr)
ABB
2,8701TOTAL
2,200
670Pan city
Funding plan for 51 projects
1 PSCDCL contributes into Pune Municipal Corporation's overall outlay of 35,000 Cr for the above projects.
7. 6|
Pune has moved substantially on several projects
1. Express Airport Services
2. Bus Stops
3. Smart Parking
4. Solar development
5. Placemaking Nala
6. Public Bicycle
7. E-rickshaw
8. Waste water
9. Sanitation
10.Smart Grid
11.Security
1. 100 e-buses
2. River cleaning
3. Road Development -
6.5 kms
4. Transit Hub
5. ATMS, RLVD and e-
challan
1. 24x7 water – Tender II
smart meters
2. 24x7 water – Tender III
distribution pipelines &
SCADA
1. Smart Elements
2. Road Asset
Management
3. Start-up Hub
4. Street and Junction Re-
design
5. Storm Water use
6. Bus ITMS
7. Traffic Command
Control Centre
8. Place making and open
spaces - pilot
9. City App, Open Data
portal and website
10.Street Lighting
11.Lighthouse project
12.Water 24x7 – Tender 1
Reservoirs
13.BRT for ABB area
14.Capability Building
– VCF
– Property Tax
– Advertisement
Revenue
A B C D
Define technical scope
and RFP creation (6 nos)
Concept note and strategy
definition (14 nos)
Bid management, evalua-
tion and award (5 nos)
Implementation/ in
progress (15 nos)
10. 9|
Street Redesign – 1.5 kms of street redesigned with construction
completed for 0.5 km; 6 km more in advanced DPR stage
Before After
▪ Narrow and pedestrian unfriendly walkways
conventional and low quality materials
▪ Continuous level and observation free pedestrian
facilities
▪ Organized parking on street leading to obstructed
roads
▪ Controlled parking in designated areas
▪ Improved material finish with tactile paving for
disabled citizens along with uninterrupted access for
wheelchair users
Project # 2
12. 11|
▪ Energy saving equivalent to 2,000 tons of coal per year
▪ Integration of command and control centre with SCADA for remote, efficient operation of streetlights
▪ No cost to PMC as private operator shares energy savings with PMC
14,823 kw/day
Current power consumption
6,000 kw/day
Consumption after street light
replacement
77,000 lights replaced by June 2017
80% lights out of 77,000 already converted to LED
Command and Control Centre Operational
Street lighting project to result in 60% saving in power consumption
Project # 3
14. 13|
Creating employability
for underprivileged
Youth from slum
communities
Helping youth to
envisage long-term
career opportunities
Act as community
hubs which engage in
activities through the
year for the
community
Outreach
Foundation
Course
Counseling &
market exploration
Skills training
Internship
Graduation
Lighthouse program aims to empower unprivileged youth for sustainable
livelihood generation
Four months back there was a road block, a
set of painful questions, why me? What
next? Now there is a hope for newer
possibilities, my heart is filled with gratitude
“
The Lighthouse has allowed me to have
clarity about my goals. I was a house-maid,
and I hope to soon achieve my dream of
becoming a graphic designer…
“
If you believe in your dreams, the
Lighthouse can help you achieve them
“
Our goal is to launch a total of 15 lighthouses by end of 2019, with an annual enrolment target of 600
youth per lighthouse (i.e. 9,000 youth per year)
Project # 4
15. 14|
Lighthouse program aims to empower unprivileged youth for sustainable
livelihood generation
Aundh Yerawada Hadapsar
Project # 4
▪ 13 months of operations, 30
batches
▪ 79% Enrolments through
references and walk-ins
▪ 30 courses, 15 Skilling Partners
▪ Relationship building in more than
15 communities; top 5 being Indira
Vasahat, Ambedkar Nagar,
Ambedkar Vasahat, Chandramani
Vasahat, Bopodi
▪ 12 months of operations, 31
batches
▪ 84% Enrolments through
references and walk-ins
▪ 21 courses, 11 Skilling Partners
▪ Relationship building in more than
15 communities; top 5 being
Yashwant Nagar, Laxmi Nagar,
Gandhi Nagar, Ganesh Nagar, Jai
Prakash Nagar
▪ Launched on 24th July 2017
▪ 2 batches ongoing
16. 15|
Implementation in advanced stages for Smart Element project for critical
IT infra including SCOC1, Wi-Fi network, Environmental Sensors etc.
▪ 80% of the construction already completed
▪ Many use cases operational on ground (wi-fi, VMD)
6 key elements to be created as a part of Smart Element
Wi-Fi
Environment
Sensors
PA System
Emergency box
Variable messaging
▪ 150+ Variable Message System for broadcasting informative
messages, alerts and city updates supported with commercial
▪ Emergency response system for citizen safety, to seek help in
case of emergency situations and accidents
▪ 125+ Public announcement system at key locations to broadcast
general and emergency messages for public awareness
▪ 50+ Environmental monitoring systems at various locations to
monitor critical parameters across sound, temperature, air quality,
noise pollution etc.
▪ 200+ Wifi hotspots to be created across strategic locations
including parks, hospitals, other important public spaces. Limited
free access to citizens supporting digital transformation.
Smart City
Operations Center
▪ State of art command and control centre which will seamlessly
integrate with all elements to monitor & manage entire city
operations from single command centre.
Project # 5
19. 18|
Provide access to
and enable collabo-
ration amongst
▪ Mentors
▪ Investors
▪ Corporate Buyers
▪ Shared Services
▪ Government
agencies
Conduct various
events
▪ Workshops
▪ Master classes
▪ Conferences
▪ Pitch Days
▪ Job fairs
Provide
Infrastructure to
▪ Startups
▪ Incubators
▪ Accelerators
▪ Investors
▪ Centers of
Excellence
Create awareness
▪ Promote Pune
as a startup hub
nationally and
internationally
▪ Attract marquee
names to the city
▪ Policy inputs for
state and central
government
schemes
Boosting Pune’s start-up ecosystem
through proposed Pune Idea Factory –
a non-profit organization
under PSCDCL
Section 8 company (100% PSCDCL subsidiary) incorporated to promote start-ups in Pune
Project # 5
20. 19|
Incorporated a non-profit organization “Pune
Idea Factory Foundation” as a dedicated
organization under PSCDCL1
Financial commitment of Rs. 5 crore per year
for next 3 years from PSCDCL
Appointed the first set of Board members and
advisors
Recruitment for CEO and Project Manager in
progress, to be completed soon
1 Pune Smart City Development Corporation Ltd.
Good progress has been made over the past few months
Project # 5
22. 21|
Pune Smart city initiative to develop 24/7 water supply infrastructure
▪ Installing bulk meters
▪ Pumping
▪ Distribution lines
▪ Leak detection
Tender 3
▪ Building reservoir
capacity
▪ New construction of
reservoirs
▪ Augment current
reservoirs
Tender 1
▪ Installing smart meters
– Residential meters
– Commercial meters
▪ Customer mapping &
survey
▪ Citizen awareness
Tender 2
Projectphases
▪ To ensure safe & equitable water
supply to the entire population in
Pune city for the next 30 years
▪ To ensure the distribution of the water
during the entire day (24x7 modality)
▪ To reduce the level of water losses
and Non-Revenue Water
▪ To ensure the technical and
economical sustainability of the water
supply service
Key objectives
▪ PMC is the first urban local body to raise funds
through selling bonds, rated A++ (highest
rating for municipal bonds)
▪ The issue was oversubscribed six times, Pune
raised USD 3.1 Million
▪ India’s largest Municipal Bonds program
(USD 35 Million) listed on BSE on
June 22, 2017
▪ The proceeds will be used to provide
uninterrupted municipal water supply in the city
Financing
Project # 1
23. Adaptive Traffic Management System for Pune to manage real time traffic
demand & improve traffic compliance
Project objectives
Real time
information,
event tracking
and response
i
Quick access
to stored traffic
information
Improved
public
awareness
Improved
enforcement
through
e-challan
Increased
operational
efficiency for
traffic police
Improved
customer
services
Improved
journey time
reliability
Increased
traffic signal
efficiency
Improved
safety
Increased
productivity for
Pune-based
logistics and
commerce
Traffic lights with
RLVD cameras
Variable messaging display
boards
Electronic e-challan system for
traffic violations
Junction
controllers
Key components
24. 23|
Proposed Transit hub; multi-modal exchange at Balewadi between Metro,
MSRTC, PMPML & Private buses, and Auto rickshaws & Private vehicles
Location Map
1 Strategic location
2 Very good connectivity
3 Conducive for hub and spoke model
4 Commercially monetizable
25. 24|
Vision and objectives of Pune’s river rejuvenation project
INTEGRATED
▪ Create a network of gardens, open spaces, public
promenades that will preserve the natural
environment and turn the Pune rivers into an
important asset for the city
▪ Integrate with city development
▪ Improve access and connectivity
BEAUTIFUL
▪ Create continuous public realm along the river
▪ Induce water based activities
▪ Integrate historical and significant structures
▪ Create image of the city
CLEAN
▪ Curb the sewage flowing into the river
▪ Removing pollution from the river by treating and
diverting the sewage that currently floods the river
▪ Retain the water in the river throughout the year and
replenish it with treated water
SAFE
▪ Strengthen the river edge
▪ Minimize flood risk for low lying areas and for the city
▪ Increase flood carrying capacity
Reduce risk of flooding
Clean the River and make
it pollution free
Retain and replenish water
Create a continuous public
realm along the river
Conserve and enhance
heritage structures
26. 25|
Snapshots of the proposed river front transformation
ProposedExisting