Railways and Harbours Conference
March 2009
Expansion of the Cape Town Container Terminal
EXPANSION OF THE CAPE TOWNEXPANSION OF THE CAPE TOWN
CONTAINER TERMINALCONTAINER TERMINAL
Presentation Structure
1. Port Orientation
2. Status Quo – Port Characteristics
3. The Need for Capacity Expansion
4. Options Considered & Approved Scheme
5. CTCT Expansion – Construction Aspects
Cape Town
• FIGURE II
Main breakwater
V&A Waterfront
Duncan
Dock
Ben
Schoem
an
Dock
C
ontainerTerm
inal
Cape Town Container Terminal
Orientation
Cape Town Container Terminal
Orientation
2. Status Quo – Port Characteristics
Cape Town Container Terminal
• Infrastructure Characteristics
• Basin at depth -14m CD Port
• Quay length: 1372m (5 berths at various depths)
• Type of quay construction: Block Wall
• Original design vessel: 2500 TEU vessel, Draft = 11.7m, length = 270m, beam = 31.8m
• Terminal Characteristics
• Straddle carrier operation
• Stack area:
• concrete paving with approx. 11,000 ground slots (function of stack height),
• reefer points of 1,600
• Ship to Shore Cranes:
• Number = 6 and relatively old
• Constraint = reach, height, lifting capacity, availability of spares & end of economic
lifespan
• Yard equipment
• Straddle Carriers & Haulers/Trailers
• Above average age
• Limited stack height
Cape Town Container Terminal
Existing Characteristics
G.P.
Reefer
MT
Cape Town Container Terminal
Existing Layout
3. The Need for Capacity Expansion
Cape Town Container Terminal
TEUThrough-Put(‘000)
CTCT TEU Forecast
-
250
500
750
1,000
1,250
1,500
1,750
2,000
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
CTCT (Historical)
Capacity
Projected Demand 8%
Projected Demand 10%
Cape Town Container Terminal
The Need for Expansion
4. Options Considered & Approved Scheme
Cape Town Container Terminal
Fundamental capacity constraints:
• Stack area – insufficient stacking space
• STS Cranes – needs replacement
• Yard equipment – cannot cope with current & projected volumes
Cape Town Container Terminal
Expansion Options Considered
Options for capacity growth:
A. Reclamation option within port (Quay
501/502)
B. Stack capacity in Port Industrial Park
Site
C. Reclamation option within port (Duncan
Dock)
D. Seaward reclamation
• 300m seaward reclamation for additional stacks
• STS crane replacement (6 off)
• Yard equipment replacement (straddle carriers
+ haulers/trailers)
• Reshuffling of stacks & increase in reefer points
Extensive delays in completing EIA and
obtaining successful RoD. Needed to
expedite an alternate solution in order to
bring additional capacity on line to suit
immediate demand.
Cape Town Container Terminal
Preferred Option: Reclamation
Reconfiguration
Basin Deepening
Container Handling Equipment
Quay Refurbishment
Cape Town Container Terminal
Alternative Option: Reconfiguration
• CTCT development structured in 3 phase approach
• Phase 1 & 2 capex approved (R4.2b)
• Phase 3 future concept
Cape Town Container Terminal
Approved Expansion Scheme
• Berth Capacity
• Quay refurbishment (deck on piles)
• Increase berth depths to 15.5m below Chart Datum
• Design vessel: TEU = 6000, LOA =350m, Beam = 45m, Draft = 14.0m
• STS Crane Capacity
• Replace existing cranes (6) with Super Post Panamax size
• Increase cranes (+2) to match increased stack capacity
• Yard Equipment Capacity
• Convert from Straddles to RTGs
• To allow future capacity increases to match berths
• Stack Capacity
• Demolition of non-essential infrastructure
• Increase stacking foot print with more dense stacking
• Efficiency Improvements
• Truck Staging Area
• PIP Site Bridge
• Comms & Instrumentation (including Gate Automation & CCTV)
• Standardisation of Operational System (NAVIS)
• Entrance / exit modifications
Cape Town Container Terminal
Approved Expansion Scheme
Cape Town Container Terminal
Quay Refurbishment & Berth Deepening
Cape Town Container Terminal
Reconfiguration
6. CTCT Expansion – Construction Aspects
Cape Town Container Terminal
Cape Town Container Terminal
Construction
Quay Refurbishment &
Berth Deepening
• Deepen basin (-15.5m CD)
• Dredging 1.23 million m3 of
sand, clay & rock
• New front crane rail
beam on piles
• Suspended reinforced
concrete deck
Cape Town Container Terminal
Quay Refurbishment & Berth Deepening
Trailing Suction Hopper
Dredger (Gefion R) dredging
in Ben Schoeman Basin
Disposal of dredged material
at approved offshore
disposal site
Cape Town Container Terminal
Soft Dredging
Drilling & blasting of rock
Cape Town Container Terminal
Pre-treatment of Rock
Lifting of split hopper bargeArrival of dredging spread
on combi vessel -
comprising backhoe dredger
& 2 split hopper barges
Cape Town Container Terminal
Rock & Hard Dredging
Backhoe commences
dredging
Installing
backhoe spud
legs
Cape Town Container Terminal
Rock & Hard Dredging
Dredged rock in barge
awaiting disposal
Dredging of rock
Cape Town Container Terminal
Rock & Hard Dredging
Completed pile casingWelding of steel pile casings
Cape Town Container Terminal
Quay Refurbishment: Piling
Pitching of pile casing into
piling frame / access platform
Lifting of steel pile casing
Cape Town Container Terminal
Quay Refurbishment: Piling
Pitched pile and application
of vibrating piling hammer
Cape Town Container Terminal
Quay Refurbishment: Piling
Drilling of rock socket using wirth
drill rig & placing of drill string
Cape Town Container Terminal
Quay Refurbishment: Piling
Fabricating of reinforcing cage and placement
Cape Town Container Terminal
Quay Refurbishment: Piling
Tremie
concreting of
socket
Placing of temporary
bracing, precast concrete
pile collars and air lifting to
clear drilled socket
Cape Town Container Terminal
Quay Refurbishment: Piling
Culemborg batching plant
and precast yard
Cape Town Container Terminal
Quay Refurbishment: Precasting
Precasting of
transverse beams
Preparation work on
quayside rebates
Cape Town Container Terminal
Quay Refurbishment: Precasting
Placing of precast units
Cape Town Container Terminal
Quay Refurbishment: Precasting
Cape Town Container Terminal
Quay Refurbishment: Precasting
Cape Town Container Terminal
Quay Refurbishment: Precasting
Cape Town Container Terminal
Quay Refurbishment: Basic Stabilisation
Cape Town Container Terminal
Quay Refurbishment: Quay Furniture
Area 370, 380
and 390 not
included in
scope
Stack area – Sectional completions
Cape Town Container Terminal
Reconfiguration: Rubber Tyred Gantries
Cape Town Container Terminal
Reconfiguration: Non-Stack Areas
Cape Town Container Terminal
Reconfiguration: Non-Stack Areas
Cape Town Container Terminal
Current Status of Construction
Cape Town Container Terminal
Current Status of Construction
Cape Town Container Terminal
Current Status of Construction
Aerial Photos by Aerial Perspective: www.aerialphoto.co.za
Cape Town Container Terminal
Current Status of Construction
Cape Town Container Terminal
THANK YOU!

More Related Content

What's hot

Terminal operation hub Ngqura and spoke model
Terminal  operation hub  Ngqura and spoke modelTerminal  operation hub  Ngqura and spoke model
Terminal operation hub Ngqura and spoke modelTransnet Port Terminals
 
Ship classification and types
Ship classification and typesShip classification and types
Ship classification and typesmuhdisys
 
Design of a Pleasure Craft with Catamaran Hull
Design of a Pleasure Craft with Catamaran HullDesign of a Pleasure Craft with Catamaran Hull
Design of a Pleasure Craft with Catamaran HullHtike Aung Kyaw
 
LNG Effect on Ship Design
LNG Effect on Ship DesignLNG Effect on Ship Design
LNG Effect on Ship DesignStephanie Camay
 
port of Hong kong
port of Hong kong port of Hong kong
port of Hong kong ihab tarek
 
Port Automation – Navigating the Underwriting Risks
Port Automation – Navigating the Underwriting RisksPort Automation – Navigating the Underwriting Risks
Port Automation – Navigating the Underwriting RisksGen Re
 
IoT Harbour solutions & smart ports by Vertical M2M with CommonSense IoT Plat...
IoT Harbour solutions & smart ports by Vertical M2M with CommonSense IoT Plat...IoT Harbour solutions & smart ports by Vertical M2M with CommonSense IoT Plat...
IoT Harbour solutions & smart ports by Vertical M2M with CommonSense IoT Plat...Robert Vivanco Salcedo
 
Presentation on warehousing and logistics hub mumbai
Presentation on warehousing and logistics hub  mumbaiPresentation on warehousing and logistics hub  mumbai
Presentation on warehousing and logistics hub mumbaiTryambakesh Shukla
 
The Panama Canal. Final Edition
The Panama Canal. Final EditionThe Panama Canal. Final Edition
The Panama Canal. Final EditionDaniel Lois Cerezo
 
Panama canal final ppt
Panama canal final pptPanama canal final ppt
Panama canal final pptPrashant Verma
 
Yovanof, "The Digital Transformation of Shipping & Clusters of Innovation", J...
Yovanof, "The Digital Transformation of Shipping & Clusters of Innovation", J...Yovanof, "The Digital Transformation of Shipping & Clusters of Innovation", J...
Yovanof, "The Digital Transformation of Shipping & Clusters of Innovation", J...Gregory Yovanof
 

What's hot (20)

Terminal operation hub Ngqura and spoke model
Terminal  operation hub  Ngqura and spoke modelTerminal  operation hub  Ngqura and spoke model
Terminal operation hub Ngqura and spoke model
 
Yard Strategies
Yard StrategiesYard Strategies
Yard Strategies
 
Ship classification and types
Ship classification and typesShip classification and types
Ship classification and types
 
Laem Chabang Port Development Project
Laem Chabang Port Development ProjectLaem Chabang Port Development Project
Laem Chabang Port Development Project
 
Design of a Pleasure Craft with Catamaran Hull
Design of a Pleasure Craft with Catamaran HullDesign of a Pleasure Craft with Catamaran Hull
Design of a Pleasure Craft with Catamaran Hull
 
LNG Effect on Ship Design
LNG Effect on Ship DesignLNG Effect on Ship Design
LNG Effect on Ship Design
 
Jebel ali port
Jebel ali portJebel ali port
Jebel ali port
 
DGF USA, about
DGF USA, aboutDGF USA, about
DGF USA, about
 
port of Hong kong
port of Hong kong port of Hong kong
port of Hong kong
 
Panama canal
Panama canalPanama canal
Panama canal
 
Port Automation – Navigating the Underwriting Risks
Port Automation – Navigating the Underwriting RisksPort Automation – Navigating the Underwriting Risks
Port Automation – Navigating the Underwriting Risks
 
IoT Harbour solutions & smart ports by Vertical M2M with CommonSense IoT Plat...
IoT Harbour solutions & smart ports by Vertical M2M with CommonSense IoT Plat...IoT Harbour solutions & smart ports by Vertical M2M with CommonSense IoT Plat...
IoT Harbour solutions & smart ports by Vertical M2M with CommonSense IoT Plat...
 
Presentation on warehousing and logistics hub mumbai
Presentation on warehousing and logistics hub  mumbaiPresentation on warehousing and logistics hub  mumbai
Presentation on warehousing and logistics hub mumbai
 
Bulk carrier
Bulk carrierBulk carrier
Bulk carrier
 
INNOVATIONS IN CONTAINER SHIPPING
INNOVATIONS IN CONTAINER SHIPPINGINNOVATIONS IN CONTAINER SHIPPING
INNOVATIONS IN CONTAINER SHIPPING
 
The Panama Canal. Final Edition
The Panama Canal. Final EditionThe Panama Canal. Final Edition
The Panama Canal. Final Edition
 
Panama canal final ppt
Panama canal final pptPanama canal final ppt
Panama canal final ppt
 
Ports In India
Ports In IndiaPorts In India
Ports In India
 
Yovanof, "The Digital Transformation of Shipping & Clusters of Innovation", J...
Yovanof, "The Digital Transformation of Shipping & Clusters of Innovation", J...Yovanof, "The Digital Transformation of Shipping & Clusters of Innovation", J...
Yovanof, "The Digital Transformation of Shipping & Clusters of Innovation", J...
 
The Port Planning Process
The Port Planning ProcessThe Port Planning Process
The Port Planning Process
 

Viewers also liked

Transportation Milton, presentation by Tim Dennis, Halton Region
Transportation Milton, presentation by Tim Dennis, Halton RegionTransportation Milton, presentation by Tim Dennis, Halton Region
Transportation Milton, presentation by Tim Dennis, Halton RegionMilton Chamber of Commerce
 
Central City Development Strategy 2008
Central City Development Strategy 2008Central City Development Strategy 2008
Central City Development Strategy 2008Mike Perk
 
Hydroponics for agriculture
Hydroponics for agricultureHydroponics for agriculture
Hydroponics for agricultureHaris Setiawan
 

Viewers also liked (6)

Bulelwa
BulelwaBulelwa
Bulelwa
 
Creative Cape Town Programme
Creative Cape Town ProgrammeCreative Cape Town Programme
Creative Cape Town Programme
 
Transportation Milton, presentation by Tim Dennis, Halton Region
Transportation Milton, presentation by Tim Dennis, Halton RegionTransportation Milton, presentation by Tim Dennis, Halton Region
Transportation Milton, presentation by Tim Dennis, Halton Region
 
2010 Regional CAPE Merit List By Subject
2010 Regional CAPE Merit List By Subject2010 Regional CAPE Merit List By Subject
2010 Regional CAPE Merit List By Subject
 
Central City Development Strategy 2008
Central City Development Strategy 2008Central City Development Strategy 2008
Central City Development Strategy 2008
 
Hydroponics for agriculture
Hydroponics for agricultureHydroponics for agriculture
Hydroponics for agriculture
 

Similar to Expansion Of The Cape Town Container Terminal

Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Association for Project Management
 
Case Study Brighton Pier 2012
Case Study   Brighton Pier 2012Case Study   Brighton Pier 2012
Case Study Brighton Pier 2012gavinrixon
 
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1patrickhudd
 
Brownfield sites in N Ireland, case study on Belfast Ship yards development
Brownfield sites in N Ireland, case study on Belfast Ship yards developmentBrownfield sites in N Ireland, case study on Belfast Ship yards development
Brownfield sites in N Ireland, case study on Belfast Ship yards developmentIES / IAQM
 
KYC Harbour Redevelopment - AGM 2013 - Status Update
KYC Harbour Redevelopment  - AGM 2013 - Status UpdateKYC Harbour Redevelopment  - AGM 2013 - Status Update
KYC Harbour Redevelopment - AGM 2013 - Status Updatekingstonyc
 
Facilities Oil Patch Orientation
Facilities Oil Patch OrientationFacilities Oil Patch Orientation
Facilities Oil Patch Orientationkarnold3
 
Offshore Drilling rigs (6) i
Offshore Drilling rigs (6) iOffshore Drilling rigs (6) i
Offshore Drilling rigs (6) iSolomon Okoro
 
J Ray Firsts
J Ray FirstsJ Ray Firsts
J Ray FirstsMyLast1
 
930DickWardTetraTechnologies.pdf
930DickWardTetraTechnologies.pdf930DickWardTetraTechnologies.pdf
930DickWardTetraTechnologies.pdfRaviNobleseas
 
Session 3 - Michael Berna Indiana Logistics Summit 2012
Session 3 - Michael Berna Indiana Logistics Summit 2012Session 3 - Michael Berna Indiana Logistics Summit 2012
Session 3 - Michael Berna Indiana Logistics Summit 2012Fred Davidson
 
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...Nick Bentley
 
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.144.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.14Kristipoom R-khubut
 
14 aneu applications of technological & engineering solutions edit
14 aneu applications of technological & engineering solutions edit 14 aneu applications of technological & engineering solutions edit
14 aneu applications of technological & engineering solutions edit Juan Carlos Bonapace
 

Similar to Expansion Of The Cape Town Container Terminal (20)

2000_Charleston_cement
2000_Charleston_cement2000_Charleston_cement
2000_Charleston_cement
 
Bridge construction methods aug 2007
Bridge construction methods aug 2007Bridge construction methods aug 2007
Bridge construction methods aug 2007
 
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
 
Case Study Brighton Pier 2012
Case Study   Brighton Pier 2012Case Study   Brighton Pier 2012
Case Study Brighton Pier 2012
 
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
 
Barker.R.CV.
Barker.R.CV.Barker.R.CV.
Barker.R.CV.
 
Body corctd
Body corctdBody corctd
Body corctd
 
Queen street station tunnel or throat development rodger querns
Queen street station tunnel or throat development  rodger quernsQueen street station tunnel or throat development  rodger querns
Queen street station tunnel or throat development rodger querns
 
Linkedin
LinkedinLinkedin
Linkedin
 
Brownfield sites in N Ireland, case study on Belfast Ship yards development
Brownfield sites in N Ireland, case study on Belfast Ship yards developmentBrownfield sites in N Ireland, case study on Belfast Ship yards development
Brownfield sites in N Ireland, case study on Belfast Ship yards development
 
KYC Harbour Redevelopment - AGM 2013 - Status Update
KYC Harbour Redevelopment  - AGM 2013 - Status UpdateKYC Harbour Redevelopment  - AGM 2013 - Status Update
KYC Harbour Redevelopment - AGM 2013 - Status Update
 
Facilities Oil Patch Orientation
Facilities Oil Patch OrientationFacilities Oil Patch Orientation
Facilities Oil Patch Orientation
 
Offshore Drilling rigs (6) i
Offshore Drilling rigs (6) iOffshore Drilling rigs (6) i
Offshore Drilling rigs (6) i
 
J Ray Firsts
J Ray FirstsJ Ray Firsts
J Ray Firsts
 
John Hart TAC Paper
John Hart TAC PaperJohn Hart TAC Paper
John Hart TAC Paper
 
930DickWardTetraTechnologies.pdf
930DickWardTetraTechnologies.pdf930DickWardTetraTechnologies.pdf
930DickWardTetraTechnologies.pdf
 
Session 3 - Michael Berna Indiana Logistics Summit 2012
Session 3 - Michael Berna Indiana Logistics Summit 2012Session 3 - Michael Berna Indiana Logistics Summit 2012
Session 3 - Michael Berna Indiana Logistics Summit 2012
 
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...
 
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.144.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
 
14 aneu applications of technological & engineering solutions edit
14 aneu applications of technological & engineering solutions edit 14 aneu applications of technological & engineering solutions edit
14 aneu applications of technological & engineering solutions edit
 

More from Railways and Harbours

Optimal Contro To Save Fuel I Hha09 Rev4
Optimal Contro To Save Fuel I Hha09 Rev4Optimal Contro To Save Fuel I Hha09 Rev4
Optimal Contro To Save Fuel I Hha09 Rev4Railways and Harbours
 
Enhancing South Africa's Competitiveness Through Rail
Enhancing South Africa's Competitiveness Through RailEnhancing South Africa's Competitiveness Through Rail
Enhancing South Africa's Competitiveness Through RailRailways and Harbours
 
The increasing role of ship repair in southern African Ports - Part 2 of 2
The increasing role of ship repair in southern African Ports - Part 2 of 2The increasing role of ship repair in southern African Ports - Part 2 of 2
The increasing role of ship repair in southern African Ports - Part 2 of 2Railways and Harbours
 
The increasing role of ship repair in southern African Ports - Part 1 of 2
The increasing role of ship repair in southern African Ports - Part 1 of 2The increasing role of ship repair in southern African Ports - Part 1 of 2
The increasing role of ship repair in southern African Ports - Part 1 of 2Railways and Harbours
 
Transnet Future strategies and meeting increasing expectations of port uses, ...
Transnet Future strategies and meeting increasing expectations of port uses, ...Transnet Future strategies and meeting increasing expectations of port uses, ...
Transnet Future strategies and meeting increasing expectations of port uses, ...Railways and Harbours
 
Expansion amidst a financial economic downturn
Expansion amidst a financial economic downturnExpansion amidst a financial economic downturn
Expansion amidst a financial economic downturnRailways and Harbours
 
Optimising a multi-load container transport corridor in South Africa
Optimising a multi-load container transport corridor in South AfricaOptimising a multi-load container transport corridor in South Africa
Optimising a multi-load container transport corridor in South AfricaRailways and Harbours
 
Role Of Salvor in Southern Africa Waters
Role Of Salvor in Southern Africa WatersRole Of Salvor in Southern Africa Waters
Role Of Salvor in Southern Africa WatersRailways and Harbours
 
Hub & Spoke Shipping in the African/Indian Ocean Region
Hub & Spoke Shipping in the African/Indian Ocean RegionHub & Spoke Shipping in the African/Indian Ocean Region
Hub & Spoke Shipping in the African/Indian Ocean RegionRailways and Harbours
 
How to make the most of the opportunities in rail and ports
How to make the most of the opportunities in rail and portsHow to make the most of the opportunities in rail and ports
How to make the most of the opportunities in rail and portsRailways and Harbours
 
Human Resources Development In Shipping And Transport
Human Resources Development In Shipping And TransportHuman Resources Development In Shipping And Transport
Human Resources Development In Shipping And TransportRailways and Harbours
 
Vessel tracking, coastal surveillance and other navigational aids, particular...
Vessel tracking, coastal surveillance and other navigational aids, particular...Vessel tracking, coastal surveillance and other navigational aids, particular...
Vessel tracking, coastal surveillance and other navigational aids, particular...Railways and Harbours
 
Oppurtunity for future expansion of ship repair in South African ports
Oppurtunity for future expansion of ship repair in South African portsOppurtunity for future expansion of ship repair in South African ports
Oppurtunity for future expansion of ship repair in South African portsRailways and Harbours
 
Sensible Planning between Road, Rail & Ports
Sensible Planning between Road, Rail & PortsSensible Planning between Road, Rail & Ports
Sensible Planning between Road, Rail & PortsRailways and Harbours
 
Piracy at sea and its effect on commercial shipping around africa
Piracy at sea and its effect on commercial shipping around africaPiracy at sea and its effect on commercial shipping around africa
Piracy at sea and its effect on commercial shipping around africaRailways and Harbours
 
Seaports & Port Cities in southern Africa: the economic benefits and landslid...
Seaports & Port Cities in southern Africa: the economic benefits and landslid...Seaports & Port Cities in southern Africa: the economic benefits and landslid...
Seaports & Port Cities in southern Africa: the economic benefits and landslid...Railways and Harbours
 
New Simulation Systems installed by Transnet
New Simulation Systems installed by TransnetNew Simulation Systems installed by Transnet
New Simulation Systems installed by TransnetRailways and Harbours
 

More from Railways and Harbours (20)

Optimal Contro To Save Fuel I Hha09 Rev4
Optimal Contro To Save Fuel I Hha09 Rev4Optimal Contro To Save Fuel I Hha09 Rev4
Optimal Contro To Save Fuel I Hha09 Rev4
 
Transnet Supplier Development Plan
Transnet Supplier Development PlanTransnet Supplier Development Plan
Transnet Supplier Development Plan
 
Enhancing South Africa's Competitiveness Through Rail
Enhancing South Africa's Competitiveness Through RailEnhancing South Africa's Competitiveness Through Rail
Enhancing South Africa's Competitiveness Through Rail
 
The increasing role of ship repair in southern African Ports - Part 2 of 2
The increasing role of ship repair in southern African Ports - Part 2 of 2The increasing role of ship repair in southern African Ports - Part 2 of 2
The increasing role of ship repair in southern African Ports - Part 2 of 2
 
The increasing role of ship repair in southern African Ports - Part 1 of 2
The increasing role of ship repair in southern African Ports - Part 1 of 2The increasing role of ship repair in southern African Ports - Part 1 of 2
The increasing role of ship repair in southern African Ports - Part 1 of 2
 
Transnet Future strategies and meeting increasing expectations of port uses, ...
Transnet Future strategies and meeting increasing expectations of port uses, ...Transnet Future strategies and meeting increasing expectations of port uses, ...
Transnet Future strategies and meeting increasing expectations of port uses, ...
 
Expansion amidst a financial economic downturn
Expansion amidst a financial economic downturnExpansion amidst a financial economic downturn
Expansion amidst a financial economic downturn
 
Optimising a multi-load container transport corridor in South Africa
Optimising a multi-load container transport corridor in South AfricaOptimising a multi-load container transport corridor in South Africa
Optimising a multi-load container transport corridor in South Africa
 
Role Of Salvor in Southern Africa Waters
Role Of Salvor in Southern Africa WatersRole Of Salvor in Southern Africa Waters
Role Of Salvor in Southern Africa Waters
 
Hub & Spoke Shipping in the African/Indian Ocean Region
Hub & Spoke Shipping in the African/Indian Ocean RegionHub & Spoke Shipping in the African/Indian Ocean Region
Hub & Spoke Shipping in the African/Indian Ocean Region
 
How to make the most of the opportunities in rail and ports
How to make the most of the opportunities in rail and portsHow to make the most of the opportunities in rail and ports
How to make the most of the opportunities in rail and ports
 
Human Resources Development In Shipping And Transport
Human Resources Development In Shipping And TransportHuman Resources Development In Shipping And Transport
Human Resources Development In Shipping And Transport
 
Namport Walvis Bay Port Development
Namport Walvis Bay Port DevelopmentNamport Walvis Bay Port Development
Namport Walvis Bay Port Development
 
Vessel tracking, coastal surveillance and other navigational aids, particular...
Vessel tracking, coastal surveillance and other navigational aids, particular...Vessel tracking, coastal surveillance and other navigational aids, particular...
Vessel tracking, coastal surveillance and other navigational aids, particular...
 
Oppurtunity for future expansion of ship repair in South African ports
Oppurtunity for future expansion of ship repair in South African portsOppurtunity for future expansion of ship repair in South African ports
Oppurtunity for future expansion of ship repair in South African ports
 
Sensible Planning between Road, Rail & Ports
Sensible Planning between Road, Rail & PortsSensible Planning between Road, Rail & Ports
Sensible Planning between Road, Rail & Ports
 
Piracy at sea and its effect on commercial shipping around africa
Piracy at sea and its effect on commercial shipping around africaPiracy at sea and its effect on commercial shipping around africa
Piracy at sea and its effect on commercial shipping around africa
 
Seaports & Port Cities in southern Africa: the economic benefits and landslid...
Seaports & Port Cities in southern Africa: the economic benefits and landslid...Seaports & Port Cities in southern Africa: the economic benefits and landslid...
Seaports & Port Cities in southern Africa: the economic benefits and landslid...
 
New Simulation Systems installed by Transnet
New Simulation Systems installed by TransnetNew Simulation Systems installed by Transnet
New Simulation Systems installed by Transnet
 
N-Viro Motive (GenSet Advantages)
N-Viro Motive (GenSet Advantages)N-Viro Motive (GenSet Advantages)
N-Viro Motive (GenSet Advantages)
 

Recently uploaded

Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 

Recently uploaded (20)

Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 

Expansion Of The Cape Town Container Terminal

  • 1. Railways and Harbours Conference March 2009 Expansion of the Cape Town Container Terminal
  • 2. EXPANSION OF THE CAPE TOWNEXPANSION OF THE CAPE TOWN CONTAINER TERMINALCONTAINER TERMINAL Presentation Structure 1. Port Orientation 2. Status Quo – Port Characteristics 3. The Need for Capacity Expansion 4. Options Considered & Approved Scheme 5. CTCT Expansion – Construction Aspects
  • 4. • FIGURE II Main breakwater V&A Waterfront Duncan Dock Ben Schoem an Dock C ontainerTerm inal Cape Town Container Terminal Orientation
  • 5. Cape Town Container Terminal Orientation
  • 6. 2. Status Quo – Port Characteristics Cape Town Container Terminal
  • 7. • Infrastructure Characteristics • Basin at depth -14m CD Port • Quay length: 1372m (5 berths at various depths) • Type of quay construction: Block Wall • Original design vessel: 2500 TEU vessel, Draft = 11.7m, length = 270m, beam = 31.8m • Terminal Characteristics • Straddle carrier operation • Stack area: • concrete paving with approx. 11,000 ground slots (function of stack height), • reefer points of 1,600 • Ship to Shore Cranes: • Number = 6 and relatively old • Constraint = reach, height, lifting capacity, availability of spares & end of economic lifespan • Yard equipment • Straddle Carriers & Haulers/Trailers • Above average age • Limited stack height Cape Town Container Terminal Existing Characteristics
  • 8. G.P. Reefer MT Cape Town Container Terminal Existing Layout
  • 9. 3. The Need for Capacity Expansion Cape Town Container Terminal
  • 10. TEUThrough-Put(‘000) CTCT TEU Forecast - 250 500 750 1,000 1,250 1,500 1,750 2,000 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 CTCT (Historical) Capacity Projected Demand 8% Projected Demand 10% Cape Town Container Terminal The Need for Expansion
  • 11. 4. Options Considered & Approved Scheme Cape Town Container Terminal
  • 12. Fundamental capacity constraints: • Stack area – insufficient stacking space • STS Cranes – needs replacement • Yard equipment – cannot cope with current & projected volumes Cape Town Container Terminal Expansion Options Considered Options for capacity growth: A. Reclamation option within port (Quay 501/502) B. Stack capacity in Port Industrial Park Site C. Reclamation option within port (Duncan Dock) D. Seaward reclamation
  • 13. • 300m seaward reclamation for additional stacks • STS crane replacement (6 off) • Yard equipment replacement (straddle carriers + haulers/trailers) • Reshuffling of stacks & increase in reefer points Extensive delays in completing EIA and obtaining successful RoD. Needed to expedite an alternate solution in order to bring additional capacity on line to suit immediate demand. Cape Town Container Terminal Preferred Option: Reclamation
  • 14. Reconfiguration Basin Deepening Container Handling Equipment Quay Refurbishment Cape Town Container Terminal Alternative Option: Reconfiguration
  • 15. • CTCT development structured in 3 phase approach • Phase 1 & 2 capex approved (R4.2b) • Phase 3 future concept Cape Town Container Terminal Approved Expansion Scheme
  • 16. • Berth Capacity • Quay refurbishment (deck on piles) • Increase berth depths to 15.5m below Chart Datum • Design vessel: TEU = 6000, LOA =350m, Beam = 45m, Draft = 14.0m • STS Crane Capacity • Replace existing cranes (6) with Super Post Panamax size • Increase cranes (+2) to match increased stack capacity • Yard Equipment Capacity • Convert from Straddles to RTGs • To allow future capacity increases to match berths • Stack Capacity • Demolition of non-essential infrastructure • Increase stacking foot print with more dense stacking • Efficiency Improvements • Truck Staging Area • PIP Site Bridge • Comms & Instrumentation (including Gate Automation & CCTV) • Standardisation of Operational System (NAVIS) • Entrance / exit modifications Cape Town Container Terminal Approved Expansion Scheme
  • 17. Cape Town Container Terminal Quay Refurbishment & Berth Deepening
  • 18. Cape Town Container Terminal Reconfiguration
  • 19. 6. CTCT Expansion – Construction Aspects Cape Town Container Terminal
  • 20. Cape Town Container Terminal Construction
  • 21. Quay Refurbishment & Berth Deepening • Deepen basin (-15.5m CD) • Dredging 1.23 million m3 of sand, clay & rock • New front crane rail beam on piles • Suspended reinforced concrete deck Cape Town Container Terminal Quay Refurbishment & Berth Deepening
  • 22. Trailing Suction Hopper Dredger (Gefion R) dredging in Ben Schoeman Basin Disposal of dredged material at approved offshore disposal site Cape Town Container Terminal Soft Dredging
  • 23. Drilling & blasting of rock Cape Town Container Terminal Pre-treatment of Rock
  • 24. Lifting of split hopper bargeArrival of dredging spread on combi vessel - comprising backhoe dredger & 2 split hopper barges Cape Town Container Terminal Rock & Hard Dredging
  • 25. Backhoe commences dredging Installing backhoe spud legs Cape Town Container Terminal Rock & Hard Dredging
  • 26. Dredged rock in barge awaiting disposal Dredging of rock Cape Town Container Terminal Rock & Hard Dredging
  • 27. Completed pile casingWelding of steel pile casings Cape Town Container Terminal Quay Refurbishment: Piling
  • 28. Pitching of pile casing into piling frame / access platform Lifting of steel pile casing Cape Town Container Terminal Quay Refurbishment: Piling
  • 29. Pitched pile and application of vibrating piling hammer Cape Town Container Terminal Quay Refurbishment: Piling
  • 30. Drilling of rock socket using wirth drill rig & placing of drill string Cape Town Container Terminal Quay Refurbishment: Piling
  • 31. Fabricating of reinforcing cage and placement Cape Town Container Terminal Quay Refurbishment: Piling
  • 32. Tremie concreting of socket Placing of temporary bracing, precast concrete pile collars and air lifting to clear drilled socket Cape Town Container Terminal Quay Refurbishment: Piling
  • 33. Culemborg batching plant and precast yard Cape Town Container Terminal Quay Refurbishment: Precasting
  • 34. Precasting of transverse beams Preparation work on quayside rebates Cape Town Container Terminal Quay Refurbishment: Precasting
  • 35. Placing of precast units Cape Town Container Terminal Quay Refurbishment: Precasting
  • 36. Cape Town Container Terminal Quay Refurbishment: Precasting
  • 37. Cape Town Container Terminal Quay Refurbishment: Precasting
  • 38. Cape Town Container Terminal Quay Refurbishment: Basic Stabilisation
  • 39. Cape Town Container Terminal Quay Refurbishment: Quay Furniture
  • 40. Area 370, 380 and 390 not included in scope Stack area – Sectional completions
  • 41. Cape Town Container Terminal Reconfiguration: Rubber Tyred Gantries
  • 42. Cape Town Container Terminal Reconfiguration: Non-Stack Areas
  • 43. Cape Town Container Terminal Reconfiguration: Non-Stack Areas
  • 44. Cape Town Container Terminal Current Status of Construction
  • 45. Cape Town Container Terminal Current Status of Construction
  • 46. Cape Town Container Terminal Current Status of Construction
  • 47. Aerial Photos by Aerial Perspective: www.aerialphoto.co.za Cape Town Container Terminal Current Status of Construction
  • 48. Cape Town Container Terminal THANK YOU!