Drilling Rigs
OKORO SOLOMON .U.
OUTLINE
Systems of a drilling rig
Broad classification of drilling rigs
• Parts/ Features
• Specificity
• Capacity ranges
• Pros and Cons
• Evolution : 1st to Current Generation
Types of drilling rigs (6 offshore rigs)
Systems of a drilling rig
 Hoisting system
 Rotating system
 Circulating system
 Well control system
 Power system
 Well monitoring system
 Mooring system (offshore)
Broad classification of drilling Rigs
Classification
of drilling
rigs
By Power used: Mechanical, Electric,
Hydraulic, Pneumatic and Steam
By location, Pipe used (cable,
conventional and coiled tubing
By Height: Single, double
and triple
By method of Rotation: non-rotation, rotary
table, top drive, sonic, hammer.
Types of Drilling Rigs
Drilling
Rigs
Land
Rigs
Conventional
Mobile
Offshore
Rigs
Floating
Semi-submersible
Drill Ship
Bottom
Supported
Platform
Barge
Jack-up etc.
Semi-submersible
 Parts / Features
• Subsea wellhead
• Submerged pontoon keeps it afloat
• Bottled or column stabilized
• Connected to deck by columns
• Moonpool below the derrick
• Less cross-sectional area in the water line
• High degree of stability
• Dynamic positioning / anchor mooring
Source: Offshore drilling volume 1
Semi-submersible specificity
 Transportation: Towed / self propelled
 Spudding the Rig: Temporary and permanent guide base adopted
 Stability: Tolerates harsh conditions as a result of space between the columns.
compensate vertical motion using telescopic joint; tensioner system ; Wave
motion compensator system
 Anchoring: use of conventional mooring / dynamic positioning with thrusters
{short baseline system (4 hydrophones and at least one transponder) or Long
baseline system (4 transducers and 4 transponders)}
 Functionality: Utilized in drilling exploratory and development wells.
Semi-submersible
 Capacity Ranges Specification Range
Size (ft.) L*W*H 246 *230* 90 to 390* 260* 150
Water Depth (ft.) up to 12,000
Drilling depth (ft.) 25,000 to 40,000
Variable deck load (LT) 1,700 to 10,000 LT
Hook load (ST) 200 t0 1500
Displacement 15,000 to 60,000 LT
BOP rating psi 10,000 to 15,000
Derrick load 1,000,000 to > 2,000,000 lbs
Mud pumps 2 to 6 pumps
Quarters capacity 68 to 180 persons
Semi-submersible
Pros
• Mobile with high transit speed (~10
kts)
• Highly stable with minimal response to
wave action
• Large deck area
 Pros and Cons
Cons
• High initial and operating costs
• Limited deck load (due to buoyancy)
• Structural fatigue
• Expensive to move over large distances
• Limited dry-docking facilities available
• Difficulty in handling mooring systems
and landing BOP stack in rough seas
Semi-submersible
• Constructed 1961 - 1972
• Max depth - 1,500 ft.
• Max variable deck load –
2k tons
• BOP stack – 10,000 psi
rating
• Conventional mooring
• No top drive
1st Gen
• Constructed 1973 -
1979
• Max water depth –
2,000 ft.
• Conventional mooring
• No top drive
2nd Gen • Constructed 1980 - 1985
• Avg. WD – 2,500 ft. Max
– 4000 ft.
• Conventional and DP
• No top drive
• Built for harsh
environments e.g. North
Sea
3rd Gen
• Constructed 1986 -1997
• Water depth- 2,500 to
6,500 ft.
• DP and conventional
• Top drive available
• e.g. Oceanics Smith 3
4th Gen
 Evolution (First Semi-submersible: Shell’s Blue Water 1- 1962)
Semi-submersible
• Constructed 1998 - 2004
• Water depth – 7,000 to
10,000 ft.
• Most are DP (Dynamically
positioned)
• e.g. Sedco Forex Express
2000 5th Gen
• Constructed 2009 onwards
• Max water depth – 10,000 ft.
• Dual derrick
• Drilling depth > 30,000 ft
• e.g. Ensco 8500s
6th Gen • 2015 onwards
• Max water depth – 12,000 ft.
• Dual derrick
• Larger Variable deck load >
10,000 T
• Drilling depth up to 40,000 ft.
• Can accommodate dual BOPs
7th Gen
 Evolution
Drill Ship
 Parts / Features
• Subsea wellhead
• Self propelled
• High storage capacity
• Capacity for dual derrick
• Dynamic positioning / anchor mooring
Source: Offshore drilling volume 1
Drill Ship specificity
 Transportation: Self propelled
 Spudding the Rig: Temporary and permanent guide base adopted
 Stability: compensate vertical motion using telescopic joint; tensioner system ;
Wave motion compensator system
 Anchoring: use of conventional mooring / dynamic positioning with thrusters
{short baseline system (4 hydrophones and at least one transponder) or Long
baseline system (4 transducers and 4 transponders)}
 Functionality: Utilized in drilling exploratory and development wells.
Drill Ship
 Capacity Ranges Specification Range
Size (ft.) L*W 500 *120 to 800* 180
Water Depth (ft.) up to 14,000
Drilling depth (ft.) 20,000 to 45,000
Variable deck load (T) 3,000 to 30,000 T
Hook load (ST) 200 to 1500
Power (kw) up to 100,000
BOP rating psi 10,000 to 20,000
Mud pumps 2 to 6 pumps
Quarters capacity 68 to 250 persons
Drill Ship
Pros
• Mobile with high transit speed up to 16
kts
• Greater deck and total load capacity
than semi-submersible and jack-ups
• Low mobilization costs
• Low initial and operating costs
• Superior sea worthiness and survival
capability
 Pros and Cons
Cons
• Poor stability in rough sea areas
• Minimum deck area
• Difficulty in handling mooring systems
and landing BOP stack in rough seas
Drill Ship
• Constructed 1961 –
1970
• Drilling depth – 20,000
ft.
• Max water depth – 1,000
ft.
• Conventional mooring1st Gen
• Constructed 1971 –
1979
• Max water depth – 1,500
ft.
• Max drilling depth –
20,000 ft.
• Conventional mooring
2nd Gen
• Constructed 1980 – 1985
• Max water depth – 3,000
ft.
• Max drilling depth -
~20,000 ft.
• Conventional mooring
3rd Gen
• Constructed 1986 -1997
• Max water depth – 7,000
ft.
• Max drilling depth –
25,000 ft.
• Dynamic positioning
• VDL up to 8,000 T
4th Gen
 Evolution (Global Marine Drilling Company commissioned the first drill
ship, CUSS I in 1956)
Drill Ship
• Constructed 1998 – 2005
• Max water depth – 10,000 ft.
• Dynamic Positioning
• Drilling depth up to 30,000 ft.
• Dual derrick
• e.g. Saipem 10000
5th Gen
• Constructed 2006 onwards
• Max water depth – 10,000 ft.
• Dynamic positioning
• Dual activity
• e.g. Ocean Rig Olympia
6th Gen
• Constructed 2010 onwards
• Max water depth – 12,000 ft.
• Dynamic positioning
• Dual activity rig
• e.g. Ocean rig Athena
7th Gen
 Evolution
Jack-up Rig
 Parts / Features
• Self Elevating
• Surface wellhead
• Movable legs
• Derrick package as cantilever/ non
cantilever
• Jack-up legs: columnar or truss type
• Hull (for ballasting and de-ballasting)
Truss type Jack-up rig
Source: Offshore drilling volume 1
Columnar Jack-up rig
Source: Petrowiki.org
Jack-up Rigs specificity
Jack-up Rigs
Legs
Columnar type
Open Truss type
Stabilization
Mat supported
Spud can
Elevating devices
Hydraulics
Rack and pinion gears
Jack-up Rigs specificity
 Transportation: Self propelled / Towed
 Spudding the Rig: adequate soil testing; preloading (ballasting) the hull
 Stability: 3 legs are common, Truss legs aid stability. Air gap requirement.
 Anchoring: through the Legs of the jack-up; secondary anchors may be
deployed
 Functionality: Utilized in drilling exploratory and also development wells
(cantilever).
Jack-up Rig
 Capacity Ranges Specification Range
Size (ft.) L*W*H 157* 132* 18 to 291* 336*39
Water Depth (ft.) Up to 625
Drilling depth (ft.) Up to 25,000
Cantilever load (lbm) 1m to 3mlb.
Cantilever length (ft.) 25 to 90
Hook load capacity (kips) 1,400 to 2000
BOP rating psi 10,000 to 15,000
Variable Deck load (T) 1500 to 10,000
Mud pumps pressure (psi) Up to 7,500
Quarters capacity 50 to 120 persons
Jack-up Rig
Pros
• Mobility
• Stable when elevated
• Low cost (construction and
maintenance)
• Efficient
 Pros and Cons
Cons
• Dependent on weather windows for
placement
• Restricted to shallow areas
• Sea flour erosion
• Possible collapse as a result of soil
fluidization from blowouts.
Jack-up Rig
• Max depth - 300 ft.
• Drilling variable deck load –
2k tons
• Leg length – 300 to 400 ft.
• No Cantilever
1970-1988
• Max water depth – 250 ft.
• Drilling VDL – 1,900 tons
• Leg length – 162 to 336 ft.
• Cantilever load rating – 1m lbs.
1978 - 1982
• Max water depth – 300 ft.
• Drilling VDL – 2,200 tons
• Leg length – 251 to 417 ft.
• Cantilever load rating – 1m
lbs.
1981 - 1983
 Evolution (Colonel Leon B Delong: first jack-up drilling rig, 1954 (Delong Corporation))
Jack-up Rig
• Max water depth – 400 ft.
• Drilling VDL – 4000 tons
• Leg length – 496 to 540 ft.
• Cantilever load rating – 1m to
2.5m lbs
1986 - date
• Max water depth – 625 ft.
• Drilling VDL – 10,000 tons
• Leg length – up to 673 ft.
• Cantilever load rating – 3m lbs.
2003 - date
 Evolution
Tension Leg Platform
 Parts / Features
Source: www.phb/wordpress.com/2009/TLP
• Drilling / Production
• Vertical anchoring by tendons to piled seafloor
templates
• Tendons maintained in tension by buoyancy
• Drilling through a drilling template
• Hull: combination of Pontoons and columns
• Use of pontoons in maintaining stability
• Drilled with subsea wellhead. Tie-back to surface
tree for production.
Tension Leg Platform specificity
 Transportation: Topsides lift / modular installed (foundation is built onshore
and towed to site)
 Spudding the Rig: Foundation set using concrete piles (hammered), structure
follows
 Stability: Provided by the tendons in tension. Ballasting to control tension. Use
of hydraulic tensioners.
 Anchoring: Anchored using the tendons.
 Functionality: Utilized mainly for development wells
Tension Leg Platform
 Capacity Ranges Specification Range
Height (ft.) 100 to 180
Water Depth (ft.) up to 5,000
Drilling depth (ft.) 20,000 to 25,000
Concrete piles (ft.) L*W Up to 500*100
Displacement (T) 10,000 to 100,000
Number of columns 1 to 4
BOP rating psi 10,000 to 15,000
Design Conventional / extended TLP
Quarters capacity 68 to 150+ persons
Tension Leg Platform
Pros
• Mobile and reusable
• Good stability with minimal vertical
motion
• Low incremental cost with increasing
depth
• Low maintenance cost
• Possible in deep water
 Pros and Cons
Cons
• Initial cost is high
• High subsea cost
• Tension leg fatigue with time
• Difficulty in maintaining subsea systems
• Little storage capacity
Tension Leg Platform
 Evolution (First TLP built for Conoco Phillips’s Hutton Field 1984)
1984 (482 ft.) 2006 (5,000 ft.)
Spar Platform
 Parts / Features
Spar platform. Source: www.worldoceanreview.com
• SPAR: Single Point Anchor Reservoir
• Drilling / Production
• Catenary or taut mooring system
• 3 designs available: Classic, truss and cell spar
• Drilling through the center of the cylinder.
• Drilled with subsea/surface wellhead.
• Buoyancy cans adopted for stability
Spar specificity
 Transportation: Towed; Topside installed on site
 Spudding the Rig: Rig is towed to location and ballasted upright.
 Stability: Deep draft hull(90% submerged)/ buoyancy cans. Use of spiral fins /
truss frame reduced vortex induced vibrations (VIV).
 Anchoring: Anchored using catenary or taut mooring system.
 Functionality: Utilized mainly for development wells
Spar
 Capacity Ranges Specification Range
Height* width (ft.) 300 * 75 to 750 * 150
Water Depth (ft.) up to 8,000
Drilling depth (ft.) 20,000 to 30,000
Topside (T) Up to 4000
Draft (ft.) Up to 90% of height
Number of well slots 15 to 30
BOP rating psi 10,000 to 15,000
Design 3 variations
Quarters capacity 70 to 150+ persons
Spar
Pros
• Good degree of stability
• Use of surface wellhead possible with
reduced heave.
• Lower costs with truss spar
• Mobile
 Pros and Cons
Cons
• Susceptible vortex induced vibration.
(classic spar)
• Cost intensive with increasing water
depth
• Requires large facilities for
manufacturing
Spar Platform
 Evolution (Genesis Spar 1998: First Spar with drilling facilities)
• Classic Spar
• Max water depth - 3,000 ft.
• length – 700 to 750 ft.
• Diameter – 70 to 120 ft.
• e.g. Genesis Spar
1st Gen
• Truss Spar
• Max water depth – 6,000 ft.
• Length – 500 to 650 ft.
• Diameter – 90 to 110 ft.
• e.g. Holstein Spar
2nd Gen
• Cell Spar
• Max water depth – 6,000 ft.
• Length – up to 600 ft.
• Diameter up to 100 ft.
• e.g. Red Hawk Spar
3rd Gen
Spar Platform
 Evolution
Classic Spar (WD
2000 – 5000 ft.)
Cell Spar (WD
6,000 ft.)
Truss Spar (WD 3500 – 6000 ft.)
Concrete Platform
 Parts / Features
Concrete platform. Source: www.bolohair.uk
• Gravity based, seat on seabed
• Drilling / Production
• No mooring required
• Drilling through the center of the structure.
• High storage capacity.
• Variation: monopod and multi-pod.
Concrete Platform specificity
 Transportation: bottom section constructed in dry dock; towed to site and
lowered to seabed; Topside installed on site.
 Spudding the Rig: Platform is towed to location and ballasted to seabed.
 Stability: stabilized by the weight of the structure (up to 850,000 T) resting on
seabed.
 Anchoring: No anchoring system required.
 Functionality: Utilized for development wells (drilling and production).
Concrete Platform
 Capacity Ranges Specification Range
Water Depth (ft.) up to 1200
Drilling depth (ft.) 20,000 to 30,000
Topside weight (T) 10,000 to 50,000
Substructure weight (T) 100,000 to 850,000
Number of well slots 30 to 50
Storage capacity mbbl 1m to 2m
Design 2 variations
Quarters capacity 100 to 180+ persons
Concrete Platform
Pros
• Cheap and easy installation
• Low maintenance required
• High storage capacity
• Can withstand severe
• No reduction in load carrying capacity
with time.
 Pros and Cons
Cons
• Expensive capital cost
• Challenges with decommissioning
Concrete Platform
 Evolution (First installed 1975: Beryl . A. Condeep)
Source: www.industrytap.com
References
 Bradley H.B. (1992) “Petroleum engineering handbook”, Richardson,
Society of Petroleum Engineers.
 Nguyen J.P. (2000) Drilling, Paris, Technip.
 Paolo Macini (2002) Offshore drilling, Volume 1.
 www. Petrowiki .org/history-of-offshore-drilling-units
 www. Essie.ufl.edu / ~sheppard/OCE3016/Offshore%20Structures.pdf
 www. Ocean-rig.com/ fleet
 www. Saipem.com
 www. Rigzone.com/training

More Related Content

What's hot

02 wireline
02 wireline02 wireline
02 wirelineJohan RC
 
Offshore platform-design
Offshore platform-designOffshore platform-design
Offshore platform-designRahul Ranakoti
 
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei
 
RIG COMPONENTS - Definitions
RIG COMPONENTS - DefinitionsRIG COMPONENTS - Definitions
RIG COMPONENTS - DefinitionsLatif Hyder Wadho
 
Types of Offshore Oil and Gas rigs
Types of Offshore Oil and Gas rigsTypes of Offshore Oil and Gas rigs
Types of Offshore Oil and Gas rigsNilotpal Nath
 
2.2 rig components
2.2 rig components2.2 rig components
2.2 rig componentsElsayed Amer
 
Oil Production Facilities
Oil Production FacilitiesOil Production Facilities
Oil Production FacilitiesInGu Lee
 
Liner hanger design and operations
Liner hanger design and operationsLiner hanger design and operations
Liner hanger design and operationsAbdulkadir Tekin
 
Offshore Structures Presentation
Offshore Structures PresentationOffshore Structures Presentation
Offshore Structures Presentationsurya3303
 
Drilling operation and components
Drilling operation and componentsDrilling operation and components
Drilling operation and componentsChoong KW
 
Fundamentals of Petroleum Engineering Module 4
Fundamentals of Petroleum Engineering Module 4Fundamentals of Petroleum Engineering Module 4
Fundamentals of Petroleum Engineering Module 4Aijaz Ali Mooro
 
Intro to offshore drilling
Intro to offshore drilling Intro to offshore drilling
Intro to offshore drilling amrhaggag
 
Offshore fixed platforms
Offshore fixed platformsOffshore fixed platforms
Offshore fixed platformsAmit Purohit
 
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVERWELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVERAndi Anriansyah
 

What's hot (20)

02 wireline
02 wireline02 wireline
02 wireline
 
Offshore platform-design
Offshore platform-designOffshore platform-design
Offshore platform-design
 
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
 
RIG COMPONENTS - Definitions
RIG COMPONENTS - DefinitionsRIG COMPONENTS - Definitions
RIG COMPONENTS - Definitions
 
Types of Offshore Oil and Gas rigs
Types of Offshore Oil and Gas rigsTypes of Offshore Oil and Gas rigs
Types of Offshore Oil and Gas rigs
 
Type of rig
Type of rigType of rig
Type of rig
 
2.2 rig components
2.2 rig components2.2 rig components
2.2 rig components
 
Introduction to Offshore Oil and Gas Surface Facilities
Introduction to Offshore Oil and Gas Surface FacilitiesIntroduction to Offshore Oil and Gas Surface Facilities
Introduction to Offshore Oil and Gas Surface Facilities
 
Oil Production Facilities
Oil Production FacilitiesOil Production Facilities
Oil Production Facilities
 
2.1 rig types
2.1 rig types2.1 rig types
2.1 rig types
 
Liner hanger design and operations
Liner hanger design and operationsLiner hanger design and operations
Liner hanger design and operations
 
Introduction to offshore structure
Introduction to offshore structure Introduction to offshore structure
Introduction to offshore structure
 
Offshore Structures Presentation
Offshore Structures PresentationOffshore Structures Presentation
Offshore Structures Presentation
 
Drilling operation and components
Drilling operation and componentsDrilling operation and components
Drilling operation and components
 
Drilling operations
Drilling operationsDrilling operations
Drilling operations
 
Fundamentals of Petroleum Engineering Module 4
Fundamentals of Petroleum Engineering Module 4Fundamentals of Petroleum Engineering Module 4
Fundamentals of Petroleum Engineering Module 4
 
Intro to offshore drilling
Intro to offshore drilling Intro to offshore drilling
Intro to offshore drilling
 
Offshore fixed platforms
Offshore fixed platformsOffshore fixed platforms
Offshore fixed platforms
 
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVERWELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
 
Wellhead basics
Wellhead basicsWellhead basics
Wellhead basics
 

Similar to Offshore Drilling rigs (6) i

DRILLING ROTARY RIGS ENGINEERING ANALYSIS .ppt
DRILLING ROTARY RIGS ENGINEERING ANALYSIS .pptDRILLING ROTARY RIGS ENGINEERING ANALYSIS .ppt
DRILLING ROTARY RIGS ENGINEERING ANALYSIS .pptOKORIE1
 
Presentation 1 drilling rigs
Presentation 1 drilling rigsPresentation 1 drilling rigs
Presentation 1 drilling rigsAli Trichelli
 
construction equipments.pptx
construction equipments.pptxconstruction equipments.pptx
construction equipments.pptxzaindeen6
 
Mine 417 Research-WPS Office.pptx
Mine 417 Research-WPS Office.pptxMine 417 Research-WPS Office.pptx
Mine 417 Research-WPS Office.pptxEmmanuelTokpahII
 
4.2 Offshore platform.pptx
4.2 Offshore platform.pptx4.2 Offshore platform.pptx
4.2 Offshore platform.pptxVijayalakshmiR64
 
The Akashi-Kaikyo Suspension Bridge
The Akashi-Kaikyo Suspension BridgeThe Akashi-Kaikyo Suspension Bridge
The Akashi-Kaikyo Suspension Bridgeelsayed ahmed
 
B3 Sverrir Þórhallsson Slim wells for geothermal exploration
B3 Sverrir Þórhallsson Slim wells for geothermal explorationB3 Sverrir Þórhallsson Slim wells for geothermal exploration
B3 Sverrir Þórhallsson Slim wells for geothermal explorationGEORG Geothermal Workshop 2016
 
Drag line excavator
Drag line excavatorDrag line excavator
Drag line excavatorParth Desani
 
OFFSHORE GEOTECHNICAL INTRODUCTION
OFFSHORE GEOTECHNICAL INTRODUCTIONOFFSHORE GEOTECHNICAL INTRODUCTION
OFFSHORE GEOTECHNICAL INTRODUCTIONNardipta Pratama
 
Basement construction
Basement constructionBasement construction
Basement constructionGouthamIps1
 
Working with Dragline
Working with DraglineWorking with Dragline
Working with DraglineVR M
 
Dragline machine at dhudhichua project ,singrauli
Dragline machine at dhudhichua project ,singrauliDragline machine at dhudhichua project ,singrauli
Dragline machine at dhudhichua project ,singrauliTauhid Mohammad
 

Similar to Offshore Drilling rigs (6) i (20)

DRILLING ROTARY RIGS ENGINEERING ANALYSIS .ppt
DRILLING ROTARY RIGS ENGINEERING ANALYSIS .pptDRILLING ROTARY RIGS ENGINEERING ANALYSIS .ppt
DRILLING ROTARY RIGS ENGINEERING ANALYSIS .ppt
 
Cac loai gian khoan
Cac loai gian khoanCac loai gian khoan
Cac loai gian khoan
 
Presentation 1 drilling rigs
Presentation 1 drilling rigsPresentation 1 drilling rigs
Presentation 1 drilling rigs
 
Jamrani dam ppt
Jamrani dam pptJamrani dam ppt
Jamrani dam ppt
 
construction equipments.pptx
construction equipments.pptxconstruction equipments.pptx
construction equipments.pptx
 
Offshore_Technology.pptx
Offshore_Technology.pptxOffshore_Technology.pptx
Offshore_Technology.pptx
 
Mine 417 Research-WPS Office.pptx
Mine 417 Research-WPS Office.pptxMine 417 Research-WPS Office.pptx
Mine 417 Research-WPS Office.pptx
 
Report on High Rise buildings.
Report  on High Rise buildings.  Report  on High Rise buildings.
Report on High Rise buildings.
 
4.2 Offshore platform.pptx
4.2 Offshore platform.pptx4.2 Offshore platform.pptx
4.2 Offshore platform.pptx
 
The Akashi-Kaikyo Suspension Bridge
The Akashi-Kaikyo Suspension BridgeThe Akashi-Kaikyo Suspension Bridge
The Akashi-Kaikyo Suspension Bridge
 
B3 Sverrir Þórhallsson Slim wells for geothermal exploration
B3 Sverrir Þórhallsson Slim wells for geothermal explorationB3 Sverrir Þórhallsson Slim wells for geothermal exploration
B3 Sverrir Þórhallsson Slim wells for geothermal exploration
 
Underground Mining System Question Pattern and Answer
Underground Mining System Question Pattern and AnswerUnderground Mining System Question Pattern and Answer
Underground Mining System Question Pattern and Answer
 
Drag line excavator
Drag line excavatorDrag line excavator
Drag line excavator
 
Offshore structures
Offshore structuresOffshore structures
Offshore structures
 
OFFSHORE GEOTECHNICAL INTRODUCTION
OFFSHORE GEOTECHNICAL INTRODUCTIONOFFSHORE GEOTECHNICAL INTRODUCTION
OFFSHORE GEOTECHNICAL INTRODUCTION
 
Basement construction
Basement constructionBasement construction
Basement construction
 
Working with Dragline
Working with DraglineWorking with Dragline
Working with Dragline
 
Dragline machine at dhudhichua project ,singrauli
Dragline machine at dhudhichua project ,singrauliDragline machine at dhudhichua project ,singrauli
Dragline machine at dhudhichua project ,singrauli
 
Floating tunnel
Floating tunnelFloating tunnel
Floating tunnel
 
Presentation on Highwall Mining
Presentation on Highwall MiningPresentation on Highwall Mining
Presentation on Highwall Mining
 

Recently uploaded

Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 

Recently uploaded (20)

Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 

Offshore Drilling rigs (6) i

  • 2. OUTLINE Systems of a drilling rig Broad classification of drilling rigs • Parts/ Features • Specificity • Capacity ranges • Pros and Cons • Evolution : 1st to Current Generation Types of drilling rigs (6 offshore rigs)
  • 3. Systems of a drilling rig  Hoisting system  Rotating system  Circulating system  Well control system  Power system  Well monitoring system  Mooring system (offshore)
  • 4. Broad classification of drilling Rigs Classification of drilling rigs By Power used: Mechanical, Electric, Hydraulic, Pneumatic and Steam By location, Pipe used (cable, conventional and coiled tubing By Height: Single, double and triple By method of Rotation: non-rotation, rotary table, top drive, sonic, hammer.
  • 5. Types of Drilling Rigs Drilling Rigs Land Rigs Conventional Mobile Offshore Rigs Floating Semi-submersible Drill Ship Bottom Supported Platform Barge Jack-up etc.
  • 6. Semi-submersible  Parts / Features • Subsea wellhead • Submerged pontoon keeps it afloat • Bottled or column stabilized • Connected to deck by columns • Moonpool below the derrick • Less cross-sectional area in the water line • High degree of stability • Dynamic positioning / anchor mooring Source: Offshore drilling volume 1
  • 7. Semi-submersible specificity  Transportation: Towed / self propelled  Spudding the Rig: Temporary and permanent guide base adopted  Stability: Tolerates harsh conditions as a result of space between the columns. compensate vertical motion using telescopic joint; tensioner system ; Wave motion compensator system  Anchoring: use of conventional mooring / dynamic positioning with thrusters {short baseline system (4 hydrophones and at least one transponder) or Long baseline system (4 transducers and 4 transponders)}  Functionality: Utilized in drilling exploratory and development wells.
  • 8. Semi-submersible  Capacity Ranges Specification Range Size (ft.) L*W*H 246 *230* 90 to 390* 260* 150 Water Depth (ft.) up to 12,000 Drilling depth (ft.) 25,000 to 40,000 Variable deck load (LT) 1,700 to 10,000 LT Hook load (ST) 200 t0 1500 Displacement 15,000 to 60,000 LT BOP rating psi 10,000 to 15,000 Derrick load 1,000,000 to > 2,000,000 lbs Mud pumps 2 to 6 pumps Quarters capacity 68 to 180 persons
  • 9. Semi-submersible Pros • Mobile with high transit speed (~10 kts) • Highly stable with minimal response to wave action • Large deck area  Pros and Cons Cons • High initial and operating costs • Limited deck load (due to buoyancy) • Structural fatigue • Expensive to move over large distances • Limited dry-docking facilities available • Difficulty in handling mooring systems and landing BOP stack in rough seas
  • 10. Semi-submersible • Constructed 1961 - 1972 • Max depth - 1,500 ft. • Max variable deck load – 2k tons • BOP stack – 10,000 psi rating • Conventional mooring • No top drive 1st Gen • Constructed 1973 - 1979 • Max water depth – 2,000 ft. • Conventional mooring • No top drive 2nd Gen • Constructed 1980 - 1985 • Avg. WD – 2,500 ft. Max – 4000 ft. • Conventional and DP • No top drive • Built for harsh environments e.g. North Sea 3rd Gen • Constructed 1986 -1997 • Water depth- 2,500 to 6,500 ft. • DP and conventional • Top drive available • e.g. Oceanics Smith 3 4th Gen  Evolution (First Semi-submersible: Shell’s Blue Water 1- 1962)
  • 11. Semi-submersible • Constructed 1998 - 2004 • Water depth – 7,000 to 10,000 ft. • Most are DP (Dynamically positioned) • e.g. Sedco Forex Express 2000 5th Gen • Constructed 2009 onwards • Max water depth – 10,000 ft. • Dual derrick • Drilling depth > 30,000 ft • e.g. Ensco 8500s 6th Gen • 2015 onwards • Max water depth – 12,000 ft. • Dual derrick • Larger Variable deck load > 10,000 T • Drilling depth up to 40,000 ft. • Can accommodate dual BOPs 7th Gen  Evolution
  • 12. Drill Ship  Parts / Features • Subsea wellhead • Self propelled • High storage capacity • Capacity for dual derrick • Dynamic positioning / anchor mooring Source: Offshore drilling volume 1
  • 13. Drill Ship specificity  Transportation: Self propelled  Spudding the Rig: Temporary and permanent guide base adopted  Stability: compensate vertical motion using telescopic joint; tensioner system ; Wave motion compensator system  Anchoring: use of conventional mooring / dynamic positioning with thrusters {short baseline system (4 hydrophones and at least one transponder) or Long baseline system (4 transducers and 4 transponders)}  Functionality: Utilized in drilling exploratory and development wells.
  • 14. Drill Ship  Capacity Ranges Specification Range Size (ft.) L*W 500 *120 to 800* 180 Water Depth (ft.) up to 14,000 Drilling depth (ft.) 20,000 to 45,000 Variable deck load (T) 3,000 to 30,000 T Hook load (ST) 200 to 1500 Power (kw) up to 100,000 BOP rating psi 10,000 to 20,000 Mud pumps 2 to 6 pumps Quarters capacity 68 to 250 persons
  • 15. Drill Ship Pros • Mobile with high transit speed up to 16 kts • Greater deck and total load capacity than semi-submersible and jack-ups • Low mobilization costs • Low initial and operating costs • Superior sea worthiness and survival capability  Pros and Cons Cons • Poor stability in rough sea areas • Minimum deck area • Difficulty in handling mooring systems and landing BOP stack in rough seas
  • 16. Drill Ship • Constructed 1961 – 1970 • Drilling depth – 20,000 ft. • Max water depth – 1,000 ft. • Conventional mooring1st Gen • Constructed 1971 – 1979 • Max water depth – 1,500 ft. • Max drilling depth – 20,000 ft. • Conventional mooring 2nd Gen • Constructed 1980 – 1985 • Max water depth – 3,000 ft. • Max drilling depth - ~20,000 ft. • Conventional mooring 3rd Gen • Constructed 1986 -1997 • Max water depth – 7,000 ft. • Max drilling depth – 25,000 ft. • Dynamic positioning • VDL up to 8,000 T 4th Gen  Evolution (Global Marine Drilling Company commissioned the first drill ship, CUSS I in 1956)
  • 17. Drill Ship • Constructed 1998 – 2005 • Max water depth – 10,000 ft. • Dynamic Positioning • Drilling depth up to 30,000 ft. • Dual derrick • e.g. Saipem 10000 5th Gen • Constructed 2006 onwards • Max water depth – 10,000 ft. • Dynamic positioning • Dual activity • e.g. Ocean Rig Olympia 6th Gen • Constructed 2010 onwards • Max water depth – 12,000 ft. • Dynamic positioning • Dual activity rig • e.g. Ocean rig Athena 7th Gen  Evolution
  • 18. Jack-up Rig  Parts / Features • Self Elevating • Surface wellhead • Movable legs • Derrick package as cantilever/ non cantilever • Jack-up legs: columnar or truss type • Hull (for ballasting and de-ballasting) Truss type Jack-up rig Source: Offshore drilling volume 1 Columnar Jack-up rig Source: Petrowiki.org
  • 19. Jack-up Rigs specificity Jack-up Rigs Legs Columnar type Open Truss type Stabilization Mat supported Spud can Elevating devices Hydraulics Rack and pinion gears
  • 20. Jack-up Rigs specificity  Transportation: Self propelled / Towed  Spudding the Rig: adequate soil testing; preloading (ballasting) the hull  Stability: 3 legs are common, Truss legs aid stability. Air gap requirement.  Anchoring: through the Legs of the jack-up; secondary anchors may be deployed  Functionality: Utilized in drilling exploratory and also development wells (cantilever).
  • 21. Jack-up Rig  Capacity Ranges Specification Range Size (ft.) L*W*H 157* 132* 18 to 291* 336*39 Water Depth (ft.) Up to 625 Drilling depth (ft.) Up to 25,000 Cantilever load (lbm) 1m to 3mlb. Cantilever length (ft.) 25 to 90 Hook load capacity (kips) 1,400 to 2000 BOP rating psi 10,000 to 15,000 Variable Deck load (T) 1500 to 10,000 Mud pumps pressure (psi) Up to 7,500 Quarters capacity 50 to 120 persons
  • 22. Jack-up Rig Pros • Mobility • Stable when elevated • Low cost (construction and maintenance) • Efficient  Pros and Cons Cons • Dependent on weather windows for placement • Restricted to shallow areas • Sea flour erosion • Possible collapse as a result of soil fluidization from blowouts.
  • 23. Jack-up Rig • Max depth - 300 ft. • Drilling variable deck load – 2k tons • Leg length – 300 to 400 ft. • No Cantilever 1970-1988 • Max water depth – 250 ft. • Drilling VDL – 1,900 tons • Leg length – 162 to 336 ft. • Cantilever load rating – 1m lbs. 1978 - 1982 • Max water depth – 300 ft. • Drilling VDL – 2,200 tons • Leg length – 251 to 417 ft. • Cantilever load rating – 1m lbs. 1981 - 1983  Evolution (Colonel Leon B Delong: first jack-up drilling rig, 1954 (Delong Corporation))
  • 24. Jack-up Rig • Max water depth – 400 ft. • Drilling VDL – 4000 tons • Leg length – 496 to 540 ft. • Cantilever load rating – 1m to 2.5m lbs 1986 - date • Max water depth – 625 ft. • Drilling VDL – 10,000 tons • Leg length – up to 673 ft. • Cantilever load rating – 3m lbs. 2003 - date  Evolution
  • 25. Tension Leg Platform  Parts / Features Source: www.phb/wordpress.com/2009/TLP • Drilling / Production • Vertical anchoring by tendons to piled seafloor templates • Tendons maintained in tension by buoyancy • Drilling through a drilling template • Hull: combination of Pontoons and columns • Use of pontoons in maintaining stability • Drilled with subsea wellhead. Tie-back to surface tree for production.
  • 26. Tension Leg Platform specificity  Transportation: Topsides lift / modular installed (foundation is built onshore and towed to site)  Spudding the Rig: Foundation set using concrete piles (hammered), structure follows  Stability: Provided by the tendons in tension. Ballasting to control tension. Use of hydraulic tensioners.  Anchoring: Anchored using the tendons.  Functionality: Utilized mainly for development wells
  • 27. Tension Leg Platform  Capacity Ranges Specification Range Height (ft.) 100 to 180 Water Depth (ft.) up to 5,000 Drilling depth (ft.) 20,000 to 25,000 Concrete piles (ft.) L*W Up to 500*100 Displacement (T) 10,000 to 100,000 Number of columns 1 to 4 BOP rating psi 10,000 to 15,000 Design Conventional / extended TLP Quarters capacity 68 to 150+ persons
  • 28. Tension Leg Platform Pros • Mobile and reusable • Good stability with minimal vertical motion • Low incremental cost with increasing depth • Low maintenance cost • Possible in deep water  Pros and Cons Cons • Initial cost is high • High subsea cost • Tension leg fatigue with time • Difficulty in maintaining subsea systems • Little storage capacity
  • 29. Tension Leg Platform  Evolution (First TLP built for Conoco Phillips’s Hutton Field 1984) 1984 (482 ft.) 2006 (5,000 ft.)
  • 30. Spar Platform  Parts / Features Spar platform. Source: www.worldoceanreview.com • SPAR: Single Point Anchor Reservoir • Drilling / Production • Catenary or taut mooring system • 3 designs available: Classic, truss and cell spar • Drilling through the center of the cylinder. • Drilled with subsea/surface wellhead. • Buoyancy cans adopted for stability
  • 31. Spar specificity  Transportation: Towed; Topside installed on site  Spudding the Rig: Rig is towed to location and ballasted upright.  Stability: Deep draft hull(90% submerged)/ buoyancy cans. Use of spiral fins / truss frame reduced vortex induced vibrations (VIV).  Anchoring: Anchored using catenary or taut mooring system.  Functionality: Utilized mainly for development wells
  • 32. Spar  Capacity Ranges Specification Range Height* width (ft.) 300 * 75 to 750 * 150 Water Depth (ft.) up to 8,000 Drilling depth (ft.) 20,000 to 30,000 Topside (T) Up to 4000 Draft (ft.) Up to 90% of height Number of well slots 15 to 30 BOP rating psi 10,000 to 15,000 Design 3 variations Quarters capacity 70 to 150+ persons
  • 33. Spar Pros • Good degree of stability • Use of surface wellhead possible with reduced heave. • Lower costs with truss spar • Mobile  Pros and Cons Cons • Susceptible vortex induced vibration. (classic spar) • Cost intensive with increasing water depth • Requires large facilities for manufacturing
  • 34. Spar Platform  Evolution (Genesis Spar 1998: First Spar with drilling facilities) • Classic Spar • Max water depth - 3,000 ft. • length – 700 to 750 ft. • Diameter – 70 to 120 ft. • e.g. Genesis Spar 1st Gen • Truss Spar • Max water depth – 6,000 ft. • Length – 500 to 650 ft. • Diameter – 90 to 110 ft. • e.g. Holstein Spar 2nd Gen • Cell Spar • Max water depth – 6,000 ft. • Length – up to 600 ft. • Diameter up to 100 ft. • e.g. Red Hawk Spar 3rd Gen
  • 35. Spar Platform  Evolution Classic Spar (WD 2000 – 5000 ft.) Cell Spar (WD 6,000 ft.) Truss Spar (WD 3500 – 6000 ft.)
  • 36. Concrete Platform  Parts / Features Concrete platform. Source: www.bolohair.uk • Gravity based, seat on seabed • Drilling / Production • No mooring required • Drilling through the center of the structure. • High storage capacity. • Variation: monopod and multi-pod.
  • 37. Concrete Platform specificity  Transportation: bottom section constructed in dry dock; towed to site and lowered to seabed; Topside installed on site.  Spudding the Rig: Platform is towed to location and ballasted to seabed.  Stability: stabilized by the weight of the structure (up to 850,000 T) resting on seabed.  Anchoring: No anchoring system required.  Functionality: Utilized for development wells (drilling and production).
  • 38. Concrete Platform  Capacity Ranges Specification Range Water Depth (ft.) up to 1200 Drilling depth (ft.) 20,000 to 30,000 Topside weight (T) 10,000 to 50,000 Substructure weight (T) 100,000 to 850,000 Number of well slots 30 to 50 Storage capacity mbbl 1m to 2m Design 2 variations Quarters capacity 100 to 180+ persons
  • 39. Concrete Platform Pros • Cheap and easy installation • Low maintenance required • High storage capacity • Can withstand severe • No reduction in load carrying capacity with time.  Pros and Cons Cons • Expensive capital cost • Challenges with decommissioning
  • 40. Concrete Platform  Evolution (First installed 1975: Beryl . A. Condeep) Source: www.industrytap.com
  • 41. References  Bradley H.B. (1992) “Petroleum engineering handbook”, Richardson, Society of Petroleum Engineers.  Nguyen J.P. (2000) Drilling, Paris, Technip.  Paolo Macini (2002) Offshore drilling, Volume 1.  www. Petrowiki .org/history-of-offshore-drilling-units  www. Essie.ufl.edu / ~sheppard/OCE3016/Offshore%20Structures.pdf  www. Ocean-rig.com/ fleet  www. Saipem.com  www. Rigzone.com/training