San Francisco Public Utilities Commission Headquarters
Location: San Francisco, CA
Submitted by: Tipping Mar, Structural Engineering
Owner: San Francisco Public Utilities Commission
Architect(s): KMD Architects / Stevens Associates Architect
Engineer(s): Seismic Engineer: Tipping Mar, Structural Engineering; Engineer –of-
record: SOHA Engineers
Contractor: Webcor Builders Inc.
PT Supplier: AVAR Construction Systems, Inc.
Other Contributors: Mechanical engineer: ARUP; architectural interiors: Tom Eliot
Fisch; concrete vendor: Central Concrete Supply Company; sustainability
consultants: Simon and Associates Inc.; curtain wall: Benson Industries LLC
San Francisco Public Utilities Commission Headquarters
Project Highlights:
• The innovative post-tensioned design replaced two structural steel
alternates.
• The PT redesign resulted in a significant cost savings—over $30
million on the $200 million project.
• An innovative use of post-tensioned concrete core shear walls is
featured.
• A “sustainability showcase” that exemplifies post-tensioning’s
capabilities to save material, improve seismic resilience, enhance
functionality, and speed construction
San Francisco Public Utilities Commission Headquarters
Project Overview:
The LEED Platinum-designed San Francisco Public Utilities Commission
(SFPUC) headquarters at 525 Golden Gate Avenue opened in June 2012 after a long
saga of budget crises, value engineering, design, and redesign. Called a “sustainability
showcase” by Engineering News Record, SFPUC is the product of a host of
sustainable-design strategies such as a living machine, which reclaims gray, black, and
stormwater; wind turbines; solar arrays; low-cement concrete; and much more. It
stands today as a model for water conservation, energy performance, and indoor air
quality. Moreover, the novel, vertically post-tensioned concrete structure gives the
SFPUC building superior resilience and the ability to self-center after a large
earthquake, with only minimal damage resulting, and makes immediate reoccupation
possible.
At the project’s genesis, SFPUC mandated that the new headquarters be designed to
essential-use-facility standards: in the event of a large earthquake, it should be easily
repaired and immediately reoccupiable. This dictated a standard of seismic
performance that would limit structural deformations during a major shock and allow
the building to return to its original position, thereby protecting all the building’s
systems
San Francisco Public Utilities Commission Headquarters
Project Overview Continued:
The original SFPUC plan called for base isolation to fulfill the performance
requirement on the 12-story building; however, owing to budget constraints,
that plan had to be shelved in favor of a system of steel moment frames with
viscous dampers. However, the costs were still too high—approximately
$62 million more than the $133 million budget.
To cost-effectively meet the performance mandate, the engineers proceeded to
redesign the structure using a vertically post-tensioned concrete shear- wall system
with composite link-beams. The resulting solution met three important challenges:
• Immediate reoccupancy performance;
• A negligible cost over conventional design; and
• Use of floor-and-column grid set during design development.
In short, the PT shear-wall system redesign allowed the oft-stalled 8-year-old
project to finally proceed to completion.
San Francisco Public Utilities Commission Headquarters
SFPUC Headquarters PT Concrete Saves $30M

More Related Content

What's hot

Raleigh Durham International Airport – PG-1 Structural Modifications
Raleigh Durham International Airport – PG-1 Structural ModificationsRaleigh Durham International Airport – PG-1 Structural Modifications
Raleigh Durham International Airport – PG-1 Structural ModificationsPostTensioningInstitute
 
Joint Traffic Management Center Parking Structure
Joint Traffic Management Center Parking StructureJoint Traffic Management Center Parking Structure
Joint Traffic Management Center Parking StructurePostTensioningInstitute
 
Marquette plaza agresh & snehansu
Marquette plaza agresh & snehansuMarquette plaza agresh & snehansu
Marquette plaza agresh & snehansuKumar Snehansu
 
Aldar Headquarters Dubai
Aldar Headquarters DubaiAldar Headquarters Dubai
Aldar Headquarters DubaiNeha Rampuria
 
Construction technology i singapore gold sand marina bay hotel
Construction technology i   singapore gold sand marina bay hotelConstruction technology i   singapore gold sand marina bay hotel
Construction technology i singapore gold sand marina bay hotelYo Ksen
 
Seminar on capital gate building
Seminar on capital gate buildingSeminar on capital gate building
Seminar on capital gate buildingNayan Rao
 
8th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 20158th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 2015City Brandon
 
Kinematics & dynamics assgn
Kinematics & dynamics assgnKinematics & dynamics assgn
Kinematics & dynamics assgnAshfaq Ahmed. A
 

What's hot (20)

I-64 Kanawha River Bridge
I-64 Kanawha River BridgeI-64 Kanawha River Bridge
I-64 Kanawha River Bridge
 
Veterans' Glass City Skyway Bridge
Veterans' Glass City Skyway BridgeVeterans' Glass City Skyway Bridge
Veterans' Glass City Skyway Bridge
 
Vidalta Bridge
Vidalta BridgeVidalta Bridge
Vidalta Bridge
 
Trump Tower Chicago
Trump Tower ChicagoTrump Tower Chicago
Trump Tower Chicago
 
Glacier Skywalk
Glacier SkywalkGlacier Skywalk
Glacier Skywalk
 
Raleigh Durham International Airport – PG-1 Structural Modifications
Raleigh Durham International Airport – PG-1 Structural ModificationsRaleigh Durham International Airport – PG-1 Structural Modifications
Raleigh Durham International Airport – PG-1 Structural Modifications
 
The Memorial Wall at Ground Zero
The Memorial Wall at Ground ZeroThe Memorial Wall at Ground Zero
The Memorial Wall at Ground Zero
 
Edward Rice House
Edward Rice HouseEdward Rice House
Edward Rice House
 
Fallingwater Residence
Fallingwater ResidenceFallingwater Residence
Fallingwater Residence
 
Green Screen Parking Structure
Green Screen Parking StructureGreen Screen Parking Structure
Green Screen Parking Structure
 
McKinney Place Garage
McKinney Place GarageMcKinney Place Garage
McKinney Place Garage
 
Joint Traffic Management Center Parking Structure
Joint Traffic Management Center Parking StructureJoint Traffic Management Center Parking Structure
Joint Traffic Management Center Parking Structure
 
BDE80_p10
BDE80_p10BDE80_p10
BDE80_p10
 
Marquette plaza agresh & snehansu
Marquette plaza agresh & snehansuMarquette plaza agresh & snehansu
Marquette plaza agresh & snehansu
 
Al dar hq
Al dar hqAl dar hq
Al dar hq
 
Aldar Headquarters Dubai
Aldar Headquarters DubaiAldar Headquarters Dubai
Aldar Headquarters Dubai
 
Construction technology i singapore gold sand marina bay hotel
Construction technology i   singapore gold sand marina bay hotelConstruction technology i   singapore gold sand marina bay hotel
Construction technology i singapore gold sand marina bay hotel
 
Seminar on capital gate building
Seminar on capital gate buildingSeminar on capital gate building
Seminar on capital gate building
 
8th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 20158th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 2015
 
Kinematics & dynamics assgn
Kinematics & dynamics assgnKinematics & dynamics assgn
Kinematics & dynamics assgn
 

Similar to SFPUC Headquarters PT Concrete Saves $30M

SIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERINGSIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERINGWilliam Wieners
 
CB_SeptOct_2015_bridges
CB_SeptOct_2015_bridgesCB_SeptOct_2015_bridges
CB_SeptOct_2015_bridgesRebecca Abel
 
Linkedin Presentation Krysyian Gnysinski
Linkedin Presentation Krysyian GnysinskiLinkedin Presentation Krysyian Gnysinski
Linkedin Presentation Krysyian GnysinskiKrystian Gnysinski
 
Tarek Ewiss Resume- to date 2016 1
Tarek Ewiss Resume- to date 2016 1Tarek Ewiss Resume- to date 2016 1
Tarek Ewiss Resume- to date 2016 1Tarek Ewiss
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016Sher Chuhan
 
Sample Design Portfolio
Sample Design PortfolioSample Design Portfolio
Sample Design Portfoliotonytso
 
PRESENTATION ON SEISMIC ANALYSIS AND DESIGN OF COLLEGE BUILDING
PRESENTATION ON SEISMIC ANALYSIS AND DESIGN OF COLLEGE BUILDINGPRESENTATION ON SEISMIC ANALYSIS AND DESIGN OF COLLEGE BUILDING
PRESENTATION ON SEISMIC ANALYSIS AND DESIGN OF COLLEGE BUILDINGMohammedHashim81
 
2009 Engineering Excellence Awards
2009 Engineering Excellence Awards2009 Engineering Excellence Awards
2009 Engineering Excellence AwardsACECSDES
 
2009 Presentaton For Web
2009  Presentaton For  Web2009  Presentaton For  Web
2009 Presentaton For WebACECSDES
 
ACEC/SD 2009 Engineering Excellence Awards
ACEC/SD 2009 Engineering Excellence AwardsACEC/SD 2009 Engineering Excellence Awards
ACEC/SD 2009 Engineering Excellence AwardsACECSDES
 
2009 Engineering Excellence Awards
2009 Engineering Excellence Awards2009 Engineering Excellence Awards
2009 Engineering Excellence AwardsACECSDES
 
fastrack technologies in bridges ppt
fastrack technologies in bridges pptfastrack technologies in bridges ppt
fastrack technologies in bridges pptSrinivasulu Srinu
 
IRJET- Comparative Study of Tube in Tube Structure and Frame Tube Structure
IRJET- Comparative Study of Tube in Tube Structure and Frame Tube StructureIRJET- Comparative Study of Tube in Tube Structure and Frame Tube Structure
IRJET- Comparative Study of Tube in Tube Structure and Frame Tube StructureIRJET Journal
 
Post tensioned concrete walls & frames for seismic resistance
Post tensioned concrete walls & frames for seismic resistancePost tensioned concrete walls & frames for seismic resistance
Post tensioned concrete walls & frames for seismic resistanceĐỗ Hữu Linh
 

Similar to SFPUC Headquarters PT Concrete Saves $30M (20)

SIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERINGSIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERING
 
CB_SeptOct_2015_bridges
CB_SeptOct_2015_bridgesCB_SeptOct_2015_bridges
CB_SeptOct_2015_bridges
 
Linkedin Presentation Krysyian Gnysinski
Linkedin Presentation Krysyian GnysinskiLinkedin Presentation Krysyian Gnysinski
Linkedin Presentation Krysyian Gnysinski
 
Tarek Ewiss Resume- to date 2016 1
Tarek Ewiss Resume- to date 2016 1Tarek Ewiss Resume- to date 2016 1
Tarek Ewiss Resume- to date 2016 1
 
Deh Cho Bridge
Deh Cho BridgeDeh Cho Bridge
Deh Cho Bridge
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016
 
Robert's Projects at Architectural Engineering Firms
Robert's Projects at Architectural Engineering FirmsRobert's Projects at Architectural Engineering Firms
Robert's Projects at Architectural Engineering Firms
 
Sample Design Portfolio
Sample Design PortfolioSample Design Portfolio
Sample Design Portfolio
 
PRESENTATION ON SEISMIC ANALYSIS AND DESIGN OF COLLEGE BUILDING
PRESENTATION ON SEISMIC ANALYSIS AND DESIGN OF COLLEGE BUILDINGPRESENTATION ON SEISMIC ANALYSIS AND DESIGN OF COLLEGE BUILDING
PRESENTATION ON SEISMIC ANALYSIS AND DESIGN OF COLLEGE BUILDING
 
2009 Engineering Excellence Awards
2009 Engineering Excellence Awards2009 Engineering Excellence Awards
2009 Engineering Excellence Awards
 
2009 Presentaton For Web
2009  Presentaton For  Web2009  Presentaton For  Web
2009 Presentaton For Web
 
ACEC/SD 2009 Engineering Excellence Awards
ACEC/SD 2009 Engineering Excellence AwardsACEC/SD 2009 Engineering Excellence Awards
ACEC/SD 2009 Engineering Excellence Awards
 
2009 Engineering Excellence Awards
2009 Engineering Excellence Awards2009 Engineering Excellence Awards
2009 Engineering Excellence Awards
 
Wilshire Grand Redevelopment Project
Wilshire Grand Redevelopment ProjectWilshire Grand Redevelopment Project
Wilshire Grand Redevelopment Project
 
fastrack technologies in bridges ppt
fastrack technologies in bridges pptfastrack technologies in bridges ppt
fastrack technologies in bridges ppt
 
IRJET- Comparative Study of Tube in Tube Structure and Frame Tube Structure
IRJET- Comparative Study of Tube in Tube Structure and Frame Tube StructureIRJET- Comparative Study of Tube in Tube Structure and Frame Tube Structure
IRJET- Comparative Study of Tube in Tube Structure and Frame Tube Structure
 
Linked In Presentation
Linked In PresentationLinked In Presentation
Linked In Presentation
 
Linked in presentation
Linked in presentationLinked in presentation
Linked in presentation
 
Long Resume
Long ResumeLong Resume
Long Resume
 
Post tensioned concrete walls & frames for seismic resistance
Post tensioned concrete walls & frames for seismic resistancePost tensioned concrete walls & frames for seismic resistance
Post tensioned concrete walls & frames for seismic resistance
 

Recently uploaded

An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
An introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxAn introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxPurva Nikam
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 

Recently uploaded (20)

An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
An introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxAn introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptx
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 

SFPUC Headquarters PT Concrete Saves $30M

  • 1. San Francisco Public Utilities Commission Headquarters
  • 2. Location: San Francisco, CA Submitted by: Tipping Mar, Structural Engineering Owner: San Francisco Public Utilities Commission Architect(s): KMD Architects / Stevens Associates Architect Engineer(s): Seismic Engineer: Tipping Mar, Structural Engineering; Engineer –of- record: SOHA Engineers Contractor: Webcor Builders Inc. PT Supplier: AVAR Construction Systems, Inc. Other Contributors: Mechanical engineer: ARUP; architectural interiors: Tom Eliot Fisch; concrete vendor: Central Concrete Supply Company; sustainability consultants: Simon and Associates Inc.; curtain wall: Benson Industries LLC San Francisco Public Utilities Commission Headquarters
  • 3. Project Highlights: • The innovative post-tensioned design replaced two structural steel alternates. • The PT redesign resulted in a significant cost savings—over $30 million on the $200 million project. • An innovative use of post-tensioned concrete core shear walls is featured. • A “sustainability showcase” that exemplifies post-tensioning’s capabilities to save material, improve seismic resilience, enhance functionality, and speed construction San Francisco Public Utilities Commission Headquarters
  • 4. Project Overview: The LEED Platinum-designed San Francisco Public Utilities Commission (SFPUC) headquarters at 525 Golden Gate Avenue opened in June 2012 after a long saga of budget crises, value engineering, design, and redesign. Called a “sustainability showcase” by Engineering News Record, SFPUC is the product of a host of sustainable-design strategies such as a living machine, which reclaims gray, black, and stormwater; wind turbines; solar arrays; low-cement concrete; and much more. It stands today as a model for water conservation, energy performance, and indoor air quality. Moreover, the novel, vertically post-tensioned concrete structure gives the SFPUC building superior resilience and the ability to self-center after a large earthquake, with only minimal damage resulting, and makes immediate reoccupation possible. At the project’s genesis, SFPUC mandated that the new headquarters be designed to essential-use-facility standards: in the event of a large earthquake, it should be easily repaired and immediately reoccupiable. This dictated a standard of seismic performance that would limit structural deformations during a major shock and allow the building to return to its original position, thereby protecting all the building’s systems San Francisco Public Utilities Commission Headquarters
  • 5. Project Overview Continued: The original SFPUC plan called for base isolation to fulfill the performance requirement on the 12-story building; however, owing to budget constraints, that plan had to be shelved in favor of a system of steel moment frames with viscous dampers. However, the costs were still too high—approximately $62 million more than the $133 million budget. To cost-effectively meet the performance mandate, the engineers proceeded to redesign the structure using a vertically post-tensioned concrete shear- wall system with composite link-beams. The resulting solution met three important challenges: • Immediate reoccupancy performance; • A negligible cost over conventional design; and • Use of floor-and-column grid set during design development. In short, the PT shear-wall system redesign allowed the oft-stalled 8-year-old project to finally proceed to completion. San Francisco Public Utilities Commission Headquarters