HOT PROJECTS!
SKY TRAIN PEDESTRIAN BRIDGE "The installation of the 125'+ long girders required extensive logistical planning. Coreslab coordinated the operation including; special transports with steerable dollies, temporary transportation routes, special 500 ton cranes, and the passing of girders from one crane to another crane to set the girders over the SRP canal without incident." per Leslie A. Moat, Project Manager HenselPhelps Construction Company   Owner: City of Phoenix, Aviation Department Engineer: Gannett Fleming, Inc. General Contractor: Hensel Phelps Construction Company Coreslab Structures (ARIZ) Inc. recently fabricated, delivered, and erected 125' long 'U' 54 precast beams for Hensel Phelps Construction Company, utilized in the City of Phoenix Sky Train Bridge Crossing into the 40th Street station. April 2011
FOUNTAINHEAD OFFICE PLAZA “On behalf of all of us at Sundt including Managers, Marty Hedlund, & Jeff Esgar , and our entire field staff, we would like to extend our appreciation to Coreslab, and to Jesse Steichen and the Coreslab field staff for superb execution of management, coordination and installation of the structural precast scope for the six story parking garage, six story office building and ten story office building on the Fountainhead project.”    per Brian Kleve, Project Manager Sundt Construction Owner: USAA Architect: DAVIS Engineer: TLCP Structural  General Contractor: Sundt Construction ,[object Object]
Coreslab provided a preliminary schedule which was exceeded by two weeks on the garage.March 2011
GRAND CANYON UNIVERSITY EVENT CENTER “The owner and the design team have commented that the precast is the best they have seen and have expressed their appreciation to Perini and Coreslab for performing above their expectations.” Per Tony Meyer, Project Manager        Perini Building Company Owner: Grand Canyon University Architect:: Architekton + Three Sixty Architecture Engineer: Paragon Structural Design, Inc. General Contractor: Perini Building Company ,[object Object]
Precast raker walls supported the corner precast stadia units and accommodated the mechanical plenum.
 Precast walls form the vomitory entrances.

More Related Content

What's hot (20)

CVAQ5
CVAQ5CVAQ5
CVAQ5
 
NA
NANA
NA
 
1. MAQ CV-
1. MAQ CV-1. MAQ CV-
1. MAQ CV-
 
Long Resume
Long ResumeLong Resume
Long Resume
 
Construction Manager Resume
Construction Manager ResumeConstruction Manager Resume
Construction Manager Resume
 
CV Mahmoud Farid PM
CV Mahmoud Farid PMCV Mahmoud Farid PM
CV Mahmoud Farid PM
 
i+iconUSA Corporate Presentation
i+iconUSA Corporate Presentationi+iconUSA Corporate Presentation
i+iconUSA Corporate Presentation
 
AroResume(SK)
AroResume(SK)AroResume(SK)
AroResume(SK)
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
Cv Presentation
Cv PresentationCv Presentation
Cv Presentation
 
GLASS, Ian (Mar15)
GLASS, Ian (Mar15)GLASS, Ian (Mar15)
GLASS, Ian (Mar15)
 
CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016
 
Robin dargavel consutant mechanical - facilities engineer
Robin dargavel   consutant mechanical - facilities engineerRobin dargavel   consutant mechanical - facilities engineer
Robin dargavel consutant mechanical - facilities engineer
 
Epw Cv 2009
Epw Cv 2009Epw Cv 2009
Epw Cv 2009
 
CV Presentation May16
CV Presentation May16CV Presentation May16
CV Presentation May16
 
Projects presentation1
Projects presentation1Projects presentation1
Projects presentation1
 
site proj 1
site proj 1site proj 1
site proj 1
 
Simon Murphy CV
Simon Murphy CVSimon Murphy CV
Simon Murphy CV
 
CV - AGK LinkedIn
CV - AGK LinkedInCV - AGK LinkedIn
CV - AGK LinkedIn
 
CV Updated 8-10-16
CV Updated 8-10-16CV Updated 8-10-16
CV Updated 8-10-16
 

Similar to Linked in presentation

SIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERINGSIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERINGWilliam Wieners
 
William Faoro - 4pResumeM1
William Faoro - 4pResumeM1William Faoro - 4pResumeM1
William Faoro - 4pResumeM1William Faoro PE
 
Structural E.I.T. Armen Miskarov
Structural E.I.T. Armen MiskarovStructural E.I.T. Armen Miskarov
Structural E.I.T. Armen MiskarovArmen Miskarov
 
170117 Liam Kimble Resume
170117 Liam Kimble Resume170117 Liam Kimble Resume
170117 Liam Kimble ResumeLiam Kimble EIT
 
Echelon Resorts Las Vegas Construction Progress Photos and Management Philos...
 Echelon Resorts Las Vegas Construction Progress Photos and Management Philos... Echelon Resorts Las Vegas Construction Progress Photos and Management Philos...
Echelon Resorts Las Vegas Construction Progress Photos and Management Philos...MikeClynes
 
Project Management - Marina bay Sands
Project Management - Marina bay SandsProject Management - Marina bay Sands
Project Management - Marina bay SandsBimenpreet Kaur
 
Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16Mark Koenig
 
San Francisco Public Utilities Commission Headquarters
San Francisco Public Utilities Commission HeadquartersSan Francisco Public Utilities Commission Headquarters
San Francisco Public Utilities Commission HeadquartersPostTensioningInstitute
 
Ken Neyer Plumbing Case Study_June 2015
Ken Neyer Plumbing Case Study_June 2015Ken Neyer Plumbing Case Study_June 2015
Ken Neyer Plumbing Case Study_June 2015Jim Mercer
 
M_Resort_Spa_Casino_Profile
M_Resort_Spa_Casino_ProfileM_Resort_Spa_Casino_Profile
M_Resort_Spa_Casino_ProfileRon Cole
 
Dickey Project Portfolio 06-20-15
Dickey Project Portfolio 06-20-15Dickey Project Portfolio 06-20-15
Dickey Project Portfolio 06-20-15Ben Dickey
 
Christian AKL CV-typ.DOC
Christian AKL CV-typ.DOCChristian AKL CV-typ.DOC
Christian AKL CV-typ.DOCChristian Akl
 

Similar to Linked in presentation (20)

SIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERINGSIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERING
 
KENRICK RAMOS 2017
KENRICK RAMOS 2017KENRICK RAMOS 2017
KENRICK RAMOS 2017
 
William Faoro - 4pResumeM1
William Faoro - 4pResumeM1William Faoro - 4pResumeM1
William Faoro - 4pResumeM1
 
Structural E.I.T. Armen Miskarov
Structural E.I.T. Armen MiskarovStructural E.I.T. Armen Miskarov
Structural E.I.T. Armen Miskarov
 
170117 Liam Kimble Resume
170117 Liam Kimble Resume170117 Liam Kimble Resume
170117 Liam Kimble Resume
 
Ilia Mayer
Ilia MayerIlia Mayer
Ilia Mayer
 
Nibor company profile presentation
Nibor company profile presentationNibor company profile presentation
Nibor company profile presentation
 
Echelon Resorts Las Vegas Construction Progress Photos and Management Philos...
 Echelon Resorts Las Vegas Construction Progress Photos and Management Philos... Echelon Resorts Las Vegas Construction Progress Photos and Management Philos...
Echelon Resorts Las Vegas Construction Progress Photos and Management Philos...
 
Project Management - Marina bay Sands
Project Management - Marina bay SandsProject Management - Marina bay Sands
Project Management - Marina bay Sands
 
Moshtak CV 2016 Pic
Moshtak CV 2016  PicMoshtak CV 2016  Pic
Moshtak CV 2016 Pic
 
Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16
 
San Francisco Public Utilities Commission Headquarters
San Francisco Public Utilities Commission HeadquartersSan Francisco Public Utilities Commission Headquarters
San Francisco Public Utilities Commission Headquarters
 
A-insinoorit
A-insinooritA-insinoorit
A-insinoorit
 
Ken Neyer Plumbing Case Study_June 2015
Ken Neyer Plumbing Case Study_June 2015Ken Neyer Plumbing Case Study_June 2015
Ken Neyer Plumbing Case Study_June 2015
 
13.ICON Brochure
13.ICON Brochure13.ICON Brochure
13.ICON Brochure
 
M_Resort_Spa_Casino_Profile
M_Resort_Spa_Casino_ProfileM_Resort_Spa_Casino_Profile
M_Resort_Spa_Casino_Profile
 
Dickey Project Portfolio 06-20-15
Dickey Project Portfolio 06-20-15Dickey Project Portfolio 06-20-15
Dickey Project Portfolio 06-20-15
 
Coates Hire - Case Study
Coates Hire - Case Study Coates Hire - Case Study
Coates Hire - Case Study
 
Ahmd Mahmoud c.v
Ahmd Mahmoud c.vAhmd Mahmoud c.v
Ahmd Mahmoud c.v
 
Christian AKL CV-typ.DOC
Christian AKL CV-typ.DOCChristian AKL CV-typ.DOC
Christian AKL CV-typ.DOC
 

Linked in presentation

  • 2. SKY TRAIN PEDESTRIAN BRIDGE "The installation of the 125'+ long girders required extensive logistical planning. Coreslab coordinated the operation including; special transports with steerable dollies, temporary transportation routes, special 500 ton cranes, and the passing of girders from one crane to another crane to set the girders over the SRP canal without incident." per Leslie A. Moat, Project Manager HenselPhelps Construction Company   Owner: City of Phoenix, Aviation Department Engineer: Gannett Fleming, Inc. General Contractor: Hensel Phelps Construction Company Coreslab Structures (ARIZ) Inc. recently fabricated, delivered, and erected 125' long 'U' 54 precast beams for Hensel Phelps Construction Company, utilized in the City of Phoenix Sky Train Bridge Crossing into the 40th Street station. April 2011
  • 3.
  • 4. Coreslab provided a preliminary schedule which was exceeded by two weeks on the garage.March 2011
  • 5.
  • 6. Precast raker walls supported the corner precast stadia units and accommodated the mechanical plenum.
  • 7. Precast walls form the vomitory entrances.
  • 8. Individual precast steps were provided to create the access aisles.March 2011
  • 9.
  • 10. The project team utilized BIM in the virtual design process which enabled Coreslab to complete shop drawings & begin fabrication before the design was 50% complete.
  • 11. Architectural precast concrete components; individual round column covers, custom form liner spandrels, louvered ventilation panels, as well as cast-in lettering in panels.
  • 12.
  • 13. Insulated wall panels 4" inside + 2" insulation + 3" exterior architectural concrete with light sandblast finish.
  • 14. Roof structure consists of long span 28" deep double tees to support the heavy piping and mechanical loads required.
  • 15. Mechanical yard surrounded by self-supporting architectural precast concrete.January 2011
  • 16. HAVE A PROJECT IN MIND? Contact your Coreslab Project Consultant. We are experts when it comes to early design, estimating, budgeting, value engineering, BIM modeling, capturing LEED points, project fabrication, product delivery, field installation, on through to project closeout.