2. SKY TRAIN PEDESTRIAN BRIDGE "The installation of the 125'+ long girders required extensive logistical planning. Coreslab coordinated the operation including; special transports with steerable dollies, temporary transportation routes, special 500 ton cranes, and the passing of girders from one crane to another crane to set the girders over the SRP canal without incident." per Leslie A. Moat, Project Manager HenselPhelps Construction Company Owner: City of Phoenix, Aviation Department Engineer: Gannett Fleming, Inc. General Contractor: Hensel Phelps Construction Company Coreslab Structures (ARIZ) Inc. recently fabricated, delivered, and erected 125' long 'U' 54 precast beams for Hensel Phelps Construction Company, utilized in the City of Phoenix Sky Train Bridge Crossing into the 40th Street station. April 2011
3.
4. Coreslab provided a preliminary schedule which was exceeded by two weeks on the garage.March 2011
5.
6. Precast raker walls supported the corner precast stadia units and accommodated the mechanical plenum.
10. The project team utilized BIM in the virtual design process which enabled Coreslab to complete shop drawings & begin fabrication before the design was 50% complete.
11. Architectural precast concrete components; individual round column covers, custom form liner spandrels, louvered ventilation panels, as well as cast-in lettering in panels.
16. HAVE A PROJECT IN MIND? Contact your Coreslab Project Consultant. We are experts when it comes to early design, estimating, budgeting, value engineering, BIM modeling, capturing LEED points, project fabrication, product delivery, field installation, on through to project closeout.