KINGDOM OF SAUDI ARABIA
ROYAL COMMISSION FOR JUBAIL & YANBU
ROYAL COMMISSION IN JUBAIL
CONTRACT NO : 641-C46
REHABILITATION OF RC HOSPITAL
SITE INFRASTRUCTURE
GMTA PRESENTATION
AUGUST 2014
AGENDA
1. INTRODUCTION
2. POTENTIAL REHABILITATION
3. CONDITION SURVEY
1. MECHANICAL
2. ELECTRICAL
3. STRUCTURAL
4. PIPING DISTRIBUTION OPTIONS
1. OPTION 1 – TUNNEL OPTIMIZATION
2. OPTION 2A – OVERHEAD BRIDGE
3. OPTION 2B – TUNNEL & OVERHEAD
4. OPTION 3 – COMBINE ESSENTIAL & NONESSENTIAL CHW
5. SUMMARY
2
HIGHWAY4HIGHWAY4
EMERGENCY
ENTRANCE
INTRODUCTION
The Scope of the project is to rehabilitate and update the existing RC Hospital site
infrastructure to bring the existing facilities to current code requirements.
OVERALL SITE
LAYOUT
HIGHWAY4HIGHWAY4
EMERGENCY
ENTRANCE
OVERALL SITE LAYOUT
THE SCOPE OF WORK INCLUDE:
 STUDY AND INSPECTION OF EXISTING SITE UTILITIES
 RENEWAL / REHABILITATION OF EXISTING UTILITY
SYSTEMS
 BRING EXISTING FACILITIES TO CURRENT CODE
REQUIREMENTS
 REPLACEMENT / REHABILITATION OF CONTROL
SYSTEMS ASSOCIATED WITH MECHANICAL SYSTEMS
 CHANGING MEDIUM VOLTAGE TO LOW VOLTAGE FOR
THE CHILLERS
POTENTIAL REHABILITATION INCLUDES:
 CHILLED WATER SYSTEM
 STEAM SUPPLY SYSTEM
 HOT AND COLD WATER SYSTEMS
 DISTRIBUTION PIPING SYSTEMS
 EMERGENCY POWER
 MEDICAL GAS SYSTEMS
 ELECTRICAL SUPPLY
 TELECOMMUNICATION SYSTEM
 FIRE HYDRANTS
POTENTIAL REHABILITATION
 CHILLED WATER SYSTEM
 STEAM SUPPLY SYSTEM
 HOT AND COLD WATER SYSTEMS
 DISTRIBUTION PIPING SYSTEMS
 EMERGENCY POWER
 MEDICAL GAS SYSTEMS
 ELECTRICAL SUPPLY
THE SCOPE OF REHABILITATION INCLUDES:
CONDITION SURVEY-CHILLER COMPOUND
CHILLER COMPOUND
LAYOUT
KEY PLAN
MAIN PIPES GOES THRU
TUNNEL THEN UNDER RAMP
MAIN PIPE HEADER WITH
SUPPORTS
NE.CH-7
PROPOSED
 REPLACE CHILLERS:
OPTION 1 – 8 CHILLERS FOR N+2 VERSUS
OPTION 2 – 11 CHILLERS FOR 100% REDUNDANCY
 PIPING HEADERS REPLACED BACK TO PUMP HOUSE
 MOVE NEW CHILLERS TO MEET CHILLER
MANUFACTURER CLEARANCE RECOMMENDATION
 ADD SUPERVISORY CONTROLS AND METERING
OPTION-2
EXISTING CONDITION
 FOURTEEN (14) TRANE AIR-COOLED CHILLERS
 ELEVEN (11) TRANE AIR-COOLED CHILLERS INSTALLED IN 1980s
 286 TON CENTRIFUGAL CHILLERS (OBSOLETE)
 4160V MACHINES
 FIVE (5) ARE IN WORKING CONDITION, REMAINING CHILLERS ARE OUT OF
SERVICE
 THREE (3) TRANE AIR-COOLED CHILLERS INSTALLED IN 2008
 400 TON SCREW CHILLERS
 480V MACHINES
 THE CHILLED WATER PIPING FROM CHILLER COMPOUND TO CHILLED WATER PUMP ROOM DOES NOT
SHOW VISUAL SIGNS OF LEAKAGE EXCEPT AT SPECIFIC TIE IN POINTS TO THE CHILLERS.
CONDITION SURVEY-CHILLER COMPOUND
CHILLER COMPOUND
LAYOUT
KEY PLAN
MAIN PIPES GOES THRU
TUNNEL THEN UNDER RAMP
THREE SCREW TYPE CHILLERS-2010
400 TON
480V MACHINES
EXISTING CONDITION:
ELEVEN CENTRIFUGAL CHILLERS(OBSELETE)-1986
300 TON
4160V MACHINES
FIVE (5) ARE IN WORKING CONDITION, REMAINING
CHILLERS ARE OUT OF SERVICE
MAIN PIPE HEADER WITH
SUPPORTS
NE.CH-7
CONDITION SURVEY-CHILLER COMPOUND
CHILLER COMPOUND
LAYOUT
KEY PLAN
MAIN PIPES GOES THRU
TUNNEL THEN UNDER RAMP
MAIN PIPE HEADER WITH
SUPPORTS
NE.CH-7
RECOMMENDATIONS:
REPLACE CHILLERS:
OPTION 1 – 8 CHILLERS FOR N+2 VERSUS
OPTION 2 – 11 CHILLERS FOR 100% REDUNDANCY
PIPING HEADERS REPLACED BACK TO PUMP HOUSE
ADD SUPERVISORY CONTROLS AND METERING
OPTION-2
CONDITION SURVEY-CHILLED WATER PUMP ROOM
CHILLED WATER PUMP ROOM
LAYOUT
KEY PLAN
NE.CHWP-1&2
UTILITY TUNNEL ACCESS
PROPOSED
 REPLACE 3 CHILLED WATER PUMPS
 REPLACE PIPING WHEN PUMPS ARE REPLACED
 EXPAND OPD PUMP ROOM TO PROVIDE ACCESS TO PUMPS
 ADD SUPERVISORY CONTROLS AND METERING
NEW OPD PUMP ROOM WITH 2
NE.CHW.PUMPS
EXISTING CONDITION
 SIX (6) CHILLED WATER PUMPS SERVING ESSENTIAL AND NON-ESSENTIAL
 TWO (2) HORIZONTAL SPLIT CASE PUMPS
 SERVING OPD CHILLED WATER CIRCUIT
 TWO (2) HORIZONTAL SPLIT CASE PUMPS
 SERVING NON-ESSENTIAL CHILLED WATER CIRCUIT
 ONE PUMP IS NOT IN SERVICE
 TWO (2) HORIZONTAL SPLIT CASE PUMPS
 SERVING ESSENTIAL CHILLED WATER CIRCUIT
 THE CHILLED WATER PIPING HEADERS SHOW MINOR SIGNS OF LEAKAGE
EXPANSION OF OPD
PUMP ROOM
CONDITION SURVEY-CHILLED WATER PUMP ROOM
CHILLED WATER PUMP ROOM
LAYOUT
KEY PLAN
NE.CHWP-1&2
UTILITY TUNNEL ACCESS
NEW OPD PUMP ROOM WITH 2
NE.CHW.PUMPS
EXISTING CONDITION:
TWO (2) HORIZONTAL SPLIT CASE PUMPS
SERVING OPD CHILLED WATER CIRCUIT
TWO (2) HORIZONTAL SPLIT CASE PUMPS
SERVING NON-ESSENTIAL CHILLED WATER CIRCUIT
ONE PUMP IS NOT IN SERVICE
TWO (2) HORIZONTAL SPLIT CASE PUMPS
SERVING ESSENTIAL CHILLED WATER CIRCUIT
CONDITION SURVEY-CHILLED WATER PUMP ROOM
CHILLED WATER PUMP ROOM
LAYOUT
KEY PLAN
NE.CHWP-1&2
UTILITY TUNNEL ACCESS
RECOMMENDATIONS:
REPLACE 3 CHILLED WATER PUMPS
REPLACE PIPING WHEN PUMPS ARE REPLACED
EXPAND OPD PUMP ROOM TO PROVIDE ACCESS TO
PUMPS
ADD SUPERVISORY CONTROLS AND METERING
NEW OPD PUMP ROOM WITH 2
NE.CHW.PUMPS
S.NO. ROOM NAME CODE REQUIREMENT
COMPLIANCE WITH
CODE
RECOMMENDATION
1 Chiller Compound
Mechanical utilities shall have
proper access, clearance and
location and must be as per RC
engineering requirements.
Refer to RC Engineering
Manual, Chapter 6 section
6.16(C, D, E).
Yes
Install new chillers per
manufacturer required
clearance
2
Chilled Water Pump
Room (Old)
Yes
Piping replacement and
relocation will improve tunnel
access.
3
Chilled Water Pump
Room (New)
No
The new chilled water pump
room is recommended for
expansion so as to gain space
for both the existing pumps.
CODE COMPLIANCE SUMMARY
CONDITION SURVEY-POWER
PLANT
KEY PLAN
POWER PLANT LAYOUT
CALORIFIERS
STEAM HEADER
BOILER PIPES AND FLUE STACK
PROPOSED
 REPLACE BOILER 1, BLOW DOWN TANK ,
2 CALORIFIERS
 RENOVATE ONE BOILER
 REPLACE PIPING IN PLANT
 ADD SUPERVISORY CONTROLS AND METERING
EXISTING CONDITION
STEAM PRODUCED WITH 2 FIRE-TUBE BOILERS
 COCHRAN 1254 kW FIRE-TUBE BOILERS
 INSTALLED IN 2001 AND 2010
 REPORTED TUBE LEAKS, ISSUES WITH CHEMICAL TREATMENT
 MANUAL BLOWDOWN VALVE
 CONDENSATE RETURN TANK AND DEAREATOR REPLACED IN 2010
 BLOW DOWN TANK INSTALLED IN 1980s
 FOUR (4) FUEL OIL PUMPS INSTALLED IN 1980s
 WATER TREATMENT REPLACED IN 2010
HOT WATER PRODUCED WITH 6 CALORIFIERS
 FOUR (4) SERVE DOMESTIC HW (N+2)
 TWO (2) INSTALLED IN 2010
 TWO CURRENTLY NOT IN SERVICE
 TWO (2) SERVE LAUNDRY, INSTALLED IN 2010
STEAM PIPES AND VALVES SHOW VISIBLE SIGNS OF LEAKAGE AND TEMPORARY REPAIRS
CONDITION SURVEY-POWER
PLANT
KEY PLAN
POWER PLANT LAYOUT
2.CALORIFIERS
1.STEAM HEADER
BOILER PIPES AND FLUE STACK
TWO FIRE TUBE STEAM BOILERS
BOILER-1 INSTALLED IN 2012
BOILER-2 INSTALLED IN 2001
REPORTED TUBE LEAKS, ISSUES WITH CHEMICAL TREATMENT
SYSTEM
SIX CALORIFIERS, FOUR NEW AND TWO OLD(NOT IN SERVICE)
NEW CONDENSATE RECEIVER TANK AND DEAREATOR
STEAM PIPING AND VALVES SHOW VISIBLE SIGNS OF LEAKAGE
CONDITION SURVEY-POWER
PLANT
KEY PLAN
POWER PLANT LAYOUT
2.CALORIFIERS
1.STEAM HEADER
BOILER PIPES AND FLUE STACK
RECOMMENDATIONS:
REPLACE BOILER-2, BLOW DOWN TANK,
2 CALORIFIERS
RENOVATE BOILER-1
REPLACE PIPING IN PLANT
ADD SUPERVISORY CONTROLS AND METERING
S.NO. ROOM NAME CODE REQUIREMENT
COMPLIANCE WITH
CODE
RECOMMENDATION
4 Power Plant
Mechanical utilities shall have
proper access, clearance and
location and must be as per RC
engineering requirements.
Refer to RC Engineering
Manual, Chapter 6 section
6.16(C, D, E).
Yes
Piping replacements will result
in improved tunnel access.
5 Utility Tunnel No
The work inside the tunnel must
be as per approved mechanical
option.
6
Water Reservoir and
Pump room
Yes
Water reservoir and pump room
are currently being upgraded.
Proper ventilation must be
provided as per code
requirements.
CODE COMPLAINCE SUMMARY
CONDITION SURVEY-FUEL STORAGE
TANKS
REPLACE FILL STATION
PROVIDE CONTAINMENT PAD AT FILL STATION
ADD SUPERVISORY CONTROLS AND METERING
FUEL STORAGE TANK
LAYOUT
2 FUEL
TANKS
FILL
STATION
FUEL PIPING IN
TRENCH
CONDITION SURVEY-MEDICAL GAS
SYSTEM
OXYGEN STORAGE TANK
LAYOUT
REPLACE 1 COMPLETE TANK ASSEMBLY
REPLACE PIPING TO MANIFOLD ROOM
ADD SUPERVISORY CONTROLS AND METERING
ADD BOLLARDS AROUND OXYGEN STORAGE TANK AREA
2 OXYGEN
TANKS
OLD OXYGEN
TANK
19
CONDITION SURVEY-UTILITY TUNNEL
HOSPITAL
SHAFT
POWER
PLANT
MECHANICAL
ROOM
MANY PIPE LEAKS
AND PATCHES
PIPING EXPANSION
PROBLEMS LEAD TO
STEAM LEAK
LIMITED MEANS OF
EGRESS AND LIMITED
SPACE FOR REMOVAL,
REPLACEMENT,
MAINTENANCE
PUMP
HOUSE
LIFE SAFETY REQUIREMENTS
UTILITY TUNNEL SATISFIES SAFETY RECOMMENDATIONS
 NFPA 101 40.2.1.2 – NORMALLY
UNOCCUPIED UTILITY CHASES THAT ARE
SECURED FROM UNAUTHORIZED ACCESS
AND ARE USED EXCLUSIVELY FOR
ROUTING OF ELECTRICAL, MECHANICAL,
OR PLUMBING EQUIPMENT SHALL NOT BE
REQUIRED TO COMPLY WITH THE
PROVISIONS OF CHAPTER 7 (MEANS OF
EGRESS)
 STANDARD INDUSTRY PRACTICE
RECOMMENDS MEANS OF EGRESS EVERY
100 METERS (TUNNEL MAXIMUM 80 M)
 OSHA 1926.1023 LADDERS (TUNNEL OK)
ACCESS TO
TUNNEL FROM
POWER PLANT
ROOM
ACCESS TO
TUNNEL FROM
CHILLED
WATER PUMP
ROOM
POWER
PLANT
CHILLED
WATER PUMP
ROOM
UTILITY
TUNNEL
PIPES RISING IN
MECHANICAL
ROOM FROM
TUNNEL
Switchgear & chilled water pump house building
Current MV Normal Switchgear
Proposed location for LV
Switchgear
KEY PLAN
EXISTING CONDITION:
THE MV-SWITCHGEAR AND CHILLER CONTROL PANELS ARE
OLD AND OBSOLETE.
Existing MV Switchgear Room
Current MV Essential Switchgear
CONDITION SURVEY-ELECTRICAL SYSTEM
Switchgear & chilled water pump house building
Existing MV Switchgear Room
KEY PLAN
Current MV Normal Switchgear
Proposed location for LV
Switchgear
Current MV Essential Switchgear
RECOMMENDATION:
THE MEDIUM VOLTAGE SWITCHGEAR PANEL, CHILLER CONTROL
PANELS, POWER AND LIGHTING PANELS, SHALL BE REPLACED
DUE TO THE CHANGE IN THE NOMINAL VOLTAGE.
SWITCHING FROM MEDIUM VOLTAGE TO LOW VOLTAGE
REQUIRES ADDITIONAL CHANGES IN POWER.
ADD NEW GENERATOR TO FULFILL THE INCREASED LOAD
REQUIREMENTS AND SEPARATING CHILLER BACKUP POWER.
CONDITION SURVEY-ELECTRICAL SYSTEM
Structural Constraints
for
Widening of the Existing Tunnel
Existing service Tunnel (yellow) shown on Pile layout plan
Tunnel Section Inside
Building Edge
Tunnel Section Outside
Building Edge
A A
Section A-A
B B
Section B-B
Existing Tunnel
Outside Building
Edge
Outside Building
Edge
Concrete
Piles
26
EXISTING PIPING NETWORK
NE CHW
E CHW
STM & COND
NECHW
ECHW
STM&COND
PUMP
HOUSE
NE CHWS
E CHWS
NE CHWR
E CHWR
POWER
PLANT
HOSPITAL
SHAFT
MECHANICAL
ROOM
CW
HW
CW
HW
CW
HW
A
C
B
D
HOSPITAL
SHAFT
POWER
PLANT
MECHANICAL
ROOM
PUMP
HOUSE
CHILLER
YARD
CHILLER
YARD
MU
E CHW
E CHWR
NE CHWR
STM & COND
APPROACH: CREATE ROOM IN TUNNEL BY
RELOCATING COLD WATER, HOT WATER AND
NON-ESSENTIAL CHILLED WATER PIPING
REPLACE REMAINING PIPING IN PHASES,
CREATING DUPLICATE PATHWAYS, THEN
DEMOLISH EXISTING PIPE
MAINTENANCE SPACE CREATED FOR STEAM
PIPING
OPTION 1 – TUNNEL
OPTIMIZATION
Option 1
EXISTING TUNNEL
28
OPTION 1 – Phasing
A
C
B
D
HOSPITAL
SHAFT
POWER
PLANT
MECHANICAL
ROOM
PUMP
HOUSE
CHILLER
YARD
NEW BOX TRENCH:
6 COLD AND HOT
WATER PIPES
NEW BOX TRENCH:
2 CHILLED WATER
PIPES
EXISTING TUNNEL:
4 TO 6 CHILLED
WATER AND STEAM
PIPES
Step 1 – create dual path for cold and hot water(Box trench)
Step 2 – connect new piping and demo old
Step 3 – create dual path for chilled water(Box trench)
Step 4 – connect new piping and demo old
Step 5 – create dual path for STEAM(Tunnel A,B,C&D)
Step 6 – connect new piping and demo old
Step 7 – create dual path for E CHW (Tunnel A)
Step 8 – connect new piping and demo old
Step 9 – create dual path for NE CHW (Tunnels D&C). Steps 9 & 10 must be
completed one pipe at a time (supply, then return)
Step 10 – connect new piping and demo old
Step 11 – create dual path for E CHW (Tunnels B, C, D). Steps 11 & 12 must be
completed one pipe at a time (supply, then return)
Step 12 – connect new piping and demo old
29
OPTION 1 – STEP 12 Connect new pipe
& demo
HOSPITAL
SHAFT
POWER
PLANT
MECHANICAL
ROOM
PUMP
HOUSE
CHILLER
YARD
E CHW
ECHW
PUMP
HOUSE
POWER
PLANT
HOSPITAL
SHAFT
MECHANICAL
ROOM
CHILLER
YARD
CW
HW
NECHW
STM & COND
STM&COND
MU
STM & COND
E CHWE CHWR
E CHWS
E CHWR
NE CHW
NE CHWR
NE CHWS
NEW BOX TRENCH:
6 COLD AND HOT
WATER PIPES
NEW BOX TRENCH:
2 CHILLED WATER
PIPES
EXISTING TUNNEL:
4 TO 6 CHILLED
WATER AND STEAM
PIPES
ADVANTAGES:
Results in adequate maintenance space for steam and
condensate piping
DISADVANTAGES:
Multiple times when contractor will be coordinating temporary
interruptions for switching utilities with phased approach
Difficult working conditions will increase time for demolition
and replacement
Additional piping routed through mechanical room
Contractor will be working in tunnel with live steam leak
OPTION 1 – TUNNEL OPTIMIZATION
SUMMARY
OPTION 2A – OVERHEAD
BRIDGE
CREATE DUAL PATHWAY FROM
PUMP HOUSE AND POWER
PLANT TO MECHANICAL
ROOM AND HOSPITAL SHAFT
REMOVE EXISTING PIPING IN
TUNNEL LEAVING ELECTRICAL
TRAY OR ABANDON
COMPLETELY EXISTING
TUNNEL MOVING ELECTRICAL
TRAY TO NEW BRIDGE.
PROPOSED WALK OVER
UTILITY BRIDGE
POWER PLANT
CHILLER
COMPOUND
RC HOSPITAL
LEVEL-2 ROOF
RC HOSPITAL
LEVEL-5
ROOF
CHILLED WATER PUMP ROOM &
SWITCH GEAR ROOM
PROPOSED SHAFT IN
MECHANICAL ROOM
PROPOSED
HOSPITAL SHAFT
OPTION 2A – OVERHEAD
BRIDGE
SECTION A SHOWING PIPE ARRANGEMENT ON
THE BRIDGE
1500 mm
A
OPTION 2A – OVERHEAD BRIDGE
SUMMARY
ADVANTAGES:
Overhead bridge will be constructed before demolishing any of
the existing pipes
Mechanical system will remain in service until new utilities are
replaced
Results in adequate space for ease of maintenance
DISADVANTAGES:
Some architectural modifications are required within
hospital building to accommodate new mechanical shafts
OPTION 2B – TUNNEL & OVERHEAD
BRIDGE
CREATE DUAL PATHWAY FROM
PUMP HOUSE AND POWER
PLANT TO MECHANICAL ROOM
AND HOSPITAL SHAFT
REMOVE EXISTING PIPING IN
TUNNEL LEAVING ELECTRICAL
TRAY OR ABANDON THE
EXISTING TUNNEL COMPLETELY
MOVING ELECTRICAL TRAY TO
NEW TUNNEL.
PROPOSED
TUNNEL-2PROPOSED
TUNNEL-1
RC HOSPITAL
LEVEL-2 ROOF
RC HOSPITAL
LEVEL-5
ROOF
PROPOSED SHAFT IN
MECHANICAL ROOM
PROPOSED
HOSPITAL SHAFT
POWER PLANT
CHILLED WATER PUMP ROOM &
SWITCH GEAR ROOM
CHILLER
COMPOUND
OPTION 2B – TUNNEL AND OVERHEAD
BRIDGE
SECTION A SHOWING PIPE ARRANGEMENT IN THE
NEW TUNNEL
1500 mm
A
ADVANTAGES:
Tunnel and overhead bridge will be constructed before
demolishing any of the existing pipes
Mechanical system will remain in service until new utilities are
replaced
Results in adequate space for ease of maintenance
DISADVANTAGES:
Higher initial cost
Some architectural modifications are required within hospital
building to accommodate new mechanical shaft
Requires construction above hospital ceiling space for cold and hot
water piping
OPTION 2B – TUNNEL AND OVERHEAD
BRIDGE
CREATE ROOM IN TUNNEL BY RELOCATING COLD
WATER, HOT WATER AND NON-ESSENTIAL CHILLED
WATER PIPING
REPLACE REMAINING PIPING IN PHASES,
COMBINING NON-ESSENTIAL AND ESSENTIAL
PIPING TO CREATE MORE AVAILABLE SPACE
ADD NECESSARY VALVING AND CONTROLS TO
ISOLATE ESSENTIAL PIPING
OPTION 3 – COMBINE NE & E CHW
PIPING
EXISTING TUNNEL
ADVANTAGES:
Results in fewer pipes to maintain/creates additional space
DISADVANTAGES:
Multiple switch over required with phased approach
Temporary piping will run through hallway during (Section D)
demolition and replacement
Difficult working conditions will increase time for demolition
and replacement
Requires use of ceiling space for cold and hot water piping
Contractor working in tunnel with live steam
Requires window welds to install pipe
Due to risk associated with constructability of Option 3, we do
not recommend moving forward with Option 3
OPTION 3 – COMBINE NE & E CHW PIPING
SUMMARY
EQUIPMENT
NO INTERRUPTIONS OF SERVICE TO HOSPITAL(ALL EQUIPMENTS
WITH REDUNDANCY)
SEQUENCING AND SERVICE INTERRUPTIONS
THE EXISTING REDUNDANCY OF THE SYSTEMS WILL ALLOW A PHASED
REPLACEMENT OF EQUIPMENT WITHOUT INTERUPTION TO THE
HOSPITAL OPERATIONS
CHILLERS
CHILLED WATER PUMPS
BOILERS
CALORIFIERS
OXYGEN TANK SYSTEM
OPTIONS 1 OR 2 WILL ALLOW A REDUNDANT STEAM, CONDENSATE,
CHILLED WATER, AND HOT & COLD WATER PATHWAY TO BE CREATED
BEFORE THE EXISTING PIPING SYSTEMS ARE REMOVED
PROVIDE NEW GENERATOR BEFORE DISCONNECTING POWER TO
CHILLERS
SEQUENCING AND SERVICE INTERRUPTIONS
GIVEN THE RISKS ASSOCIATED WITH THE CONSTRUCTABILITY OF
OPTIONS 1 & 3, THE RISKS OF HAVING CONTRACTORS WORKING NEAR
LIVE STEAM LEAKS, AND THE RISKS TO HOSPITAL OPERATIONS BY
CONDUCTING MULTIPLE SWITCH OVERS (FROM OLD TO NEW PIPING),
WE RECOMMEND MOVING FORWARD WITH OPTION 2.
THE DIFFERENCE IN COST BETWEEN 2A AND 2B IS WITHIN THE
UNCERTAINTY OF THE COST ESTIMATES.
OPTION 2A IS EASIER TO ROUTE PIPE TO THE EXISTING CONNECTION
LOCATIONS AND WILL BE MORE MAINTAINABLE DUE TO BETTER
ACCESS TO PIPES.
THE THREE OPTIONS HAVE BEEN PRESENTED TO END USER DURING
WORKSHOPS, AND THEY FAVORED OPTION 2A – OVERHEAD
DISTRIBUTION.
PIPING DISTRIBUTION RECOMMENDATION
RECOMMEND MOVING FORWARD WITH:
CHILLED WATER SYSTEM
REPLACING 11 CHILLERS
REPLACING 3 CHILLED WATER PUMPS
REPLACING ALL CHILLED WATER PIPING
HOT WATER SYSTEM
REPLACING BOILER 1, RENOVATING BOILER 2
REPLACING IDENTIFIED ANCILLARY EQUIPMENT
REPLACING TWO CALORIFIERS
FUEL OIL SYSTEM
REPLACE FILL STATION
ADD CONTAINMENT PAD
RECOMMENDATION
RECOMMEND MOVING FORWARD WITH (CONTINUED):
MEDICAL GAS SYSTEM
REPLACE ONE OXYGEN TANK SYSTEM
REPLACE PIPING FROM TANKS TO MANIFOLD
ADD ISOLATION BOLLARDS
DISTRIBUTION PIPING
REPLACE ALL PIPING AND FITTINGS
ROUTE PIPE IN NEW OVERHEAD BRIDGE (OPTION 2A)
RECOMMENDATION
RECOMMEND MOVING FORWARD WITH (CONTINUED):
ELECTRICAL SYSTEM
CONSTRUCT NEW LV - SWITCHGEAR ROOM
REPLACE SWITCHGEAR PANEL, CHILLER CONTROL PANELS
CWSA, CWSG AND CWH1, POWER AND LIGHTING PANELS
CWA, CWB AND CWB
REPLACE MOTOR CONTROL CENTRES
INSTALL NEW GENERATOR 1750 KVA
UPGRADE FIRE ALARM SYSTEM FOR SWITCHGEAR AND
CHILLED WATER PUMP HOUSE.
RECOMMENDATION
SUMMARY
OPTION 1 OPTION 2A OPTION 2B OPTION 3
TUNNEL
OPTIMIZATION
OVERHEAD BRIDGE TUNNEL AND
OVERHEAD
COMBINE NE & E
CHW
COST 59,111,000 55,658,000 57,640,000
NOT
RECOMMENDED
PHASING Complex phasing Simple phasing Simple phasing
COMPLEXITY
Difficult working
conditions and
limited access
Not complex and
easy installation
Not complex and
easy installation

More Related Content

What's hot

Regulation for cgd_technical_standard_071.8
Regulation for cgd_technical_standard_071.8Regulation for cgd_technical_standard_071.8
Regulation for cgd_technical_standard_071.8Nikhil Nangia
 
Guidelines for storage Handling and Dispensing of CNG.pptx
Guidelines for storage Handling and Dispensing of CNG.pptxGuidelines for storage Handling and Dispensing of CNG.pptx
Guidelines for storage Handling and Dispensing of CNG.pptxAbhishek Padiyar
 
T4S - Technical Standard and Specifications including Safety Standards
T4S - Technical Standard and Specifications including Safety StandardsT4S - Technical Standard and Specifications including Safety Standards
T4S - Technical Standard and Specifications including Safety StandardsAbhishek Padiyar
 
The design of_fire_pump_rooms_-_v2
The design of_fire_pump_rooms_-_v2The design of_fire_pump_rooms_-_v2
The design of_fire_pump_rooms_-_v2خالد محمود
 
Pilot Tube Guided Boring Solutions Meet Project Challenges
Pilot Tube Guided Boring Solutions Meet Project ChallengesPilot Tube Guided Boring Solutions Meet Project Challenges
Pilot Tube Guided Boring Solutions Meet Project ChallengesLaura Anderson
 
BlueScape RICE NESHAP Webinar 2-26-13
BlueScape RICE NESHAP Webinar 2-26-13BlueScape RICE NESHAP Webinar 2-26-13
BlueScape RICE NESHAP Webinar 2-26-13BlueScape
 
POX O2 Spargers- Report Summary2 Next STEP
POX O2 Spargers- Report Summary2 Next STEPPOX O2 Spargers- Report Summary2 Next STEP
POX O2 Spargers- Report Summary2 Next STEPChris Galeotti
 
Controlling Post-Completion Flow in Steam-Assisted Gravity Drainage Wells
Controlling Post-Completion Flow  in Steam-Assisted Gravity Drainage WellsControlling Post-Completion Flow  in Steam-Assisted Gravity Drainage Wells
Controlling Post-Completion Flow in Steam-Assisted Gravity Drainage WellsBaker Hughes
 
BD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders WorksBD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders WorksMaja Myall
 
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012ggurudev
 
Debris / Junk Catcher Manifold - Worldwide Oilfield Machine
Debris / Junk Catcher Manifold - Worldwide Oilfield MachineDebris / Junk Catcher Manifold - Worldwide Oilfield Machine
Debris / Junk Catcher Manifold - Worldwide Oilfield Machinewomgroup
 

What's hot (20)

Nitrogen purging
Nitrogen  purgingNitrogen  purging
Nitrogen purging
 
04 ingestive-cleaning-es9-62-rev-l-pdf
04 ingestive-cleaning-es9-62-rev-l-pdf04 ingestive-cleaning-es9-62-rev-l-pdf
04 ingestive-cleaning-es9-62-rev-l-pdf
 
Regulation for cgd_technical_standard_071.8
Regulation for cgd_technical_standard_071.8Regulation for cgd_technical_standard_071.8
Regulation for cgd_technical_standard_071.8
 
Guidelines for storage Handling and Dispensing of CNG.pptx
Guidelines for storage Handling and Dispensing of CNG.pptxGuidelines for storage Handling and Dispensing of CNG.pptx
Guidelines for storage Handling and Dispensing of CNG.pptx
 
T4S - Technical Standard and Specifications including Safety Standards
T4S - Technical Standard and Specifications including Safety StandardsT4S - Technical Standard and Specifications including Safety Standards
T4S - Technical Standard and Specifications including Safety Standards
 
Compact Clean Steam Generator
Compact Clean Steam GeneratorCompact Clean Steam Generator
Compact Clean Steam Generator
 
The design of_fire_pump_rooms_-_v2
The design of_fire_pump_rooms_-_v2The design of_fire_pump_rooms_-_v2
The design of_fire_pump_rooms_-_v2
 
Pilot Tube Guided Boring Solutions Meet Project Challenges
Pilot Tube Guided Boring Solutions Meet Project ChallengesPilot Tube Guided Boring Solutions Meet Project Challenges
Pilot Tube Guided Boring Solutions Meet Project Challenges
 
BlueScape RICE NESHAP Webinar 2-26-13
BlueScape RICE NESHAP Webinar 2-26-13BlueScape RICE NESHAP Webinar 2-26-13
BlueScape RICE NESHAP Webinar 2-26-13
 
Richard Martinez #1 PDF
Richard Martinez #1 PDFRichard Martinez #1 PDF
Richard Martinez #1 PDF
 
POX O2 Spargers- Report Summary2 Next STEP
POX O2 Spargers- Report Summary2 Next STEPPOX O2 Spargers- Report Summary2 Next STEP
POX O2 Spargers- Report Summary2 Next STEP
 
Controlling Post-Completion Flow in Steam-Assisted Gravity Drainage Wells
Controlling Post-Completion Flow  in Steam-Assisted Gravity Drainage WellsControlling Post-Completion Flow  in Steam-Assisted Gravity Drainage Wells
Controlling Post-Completion Flow in Steam-Assisted Gravity Drainage Wells
 
OSX1 FPSO Buyers Rev2
OSX1 FPSO Buyers Rev2OSX1 FPSO Buyers Rev2
OSX1 FPSO Buyers Rev2
 
Punch point
Punch pointPunch point
Punch point
 
BD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders WorksBD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders Works
 
Oilandgas Civil Engineers 1
Oilandgas Civil Engineers 1Oilandgas Civil Engineers 1
Oilandgas Civil Engineers 1
 
Back pressure valves for industrial process control
Back pressure valves for industrial process controlBack pressure valves for industrial process control
Back pressure valves for industrial process control
 
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
 
L 003-cr
L 003-crL 003-cr
L 003-cr
 
Debris / Junk Catcher Manifold - Worldwide Oilfield Machine
Debris / Junk Catcher Manifold - Worldwide Oilfield MachineDebris / Junk Catcher Manifold - Worldwide Oilfield Machine
Debris / Junk Catcher Manifold - Worldwide Oilfield Machine
 

Similar to Summary Presentation UpdateRev20

Stakeholder weekly report-20th May 2023.pptx
Stakeholder weekly report-20th May 2023.pptxStakeholder weekly report-20th May 2023.pptx
Stakeholder weekly report-20th May 2023.pptxbalajikollu3
 
Presentation on NHPC (TLDP-III)
Presentation on NHPC (TLDP-III)Presentation on NHPC (TLDP-III)
Presentation on NHPC (TLDP-III)Anuj Ranjan
 
Lanchkhuti WS Project Overview
Lanchkhuti WS Project OverviewLanchkhuti WS Project Overview
Lanchkhuti WS Project OverviewVladimir Popovic
 
Rehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgiaRehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgiaVladimir Popovic
 
Ws project ozurgeti, georgia
Ws project ozurgeti, georgiaWs project ozurgeti, georgia
Ws project ozurgeti, georgiaVladimir Popovic
 
Ozurgeti City / Water Supply Project
Ozurgeti City / Water Supply ProjectOzurgeti City / Water Supply Project
Ozurgeti City / Water Supply ProjectVladimir Popovic
 
Steam Blowing by Ankit Goyal
Steam Blowing by Ankit GoyalSteam Blowing by Ankit Goyal
Steam Blowing by Ankit GoyalAnkit Goyal
 
Solving Reactor Water Clean-Up System Anomalies Using RELAP5 MOD33.pdf
Solving Reactor Water Clean-Up System Anomalies Using RELAP5 MOD33.pdfSolving Reactor Water Clean-Up System Anomalies Using RELAP5 MOD33.pdf
Solving Reactor Water Clean-Up System Anomalies Using RELAP5 MOD33.pdfJoe Miller
 
Obra Presentaton Ash Handling Sysytem 28032023.pptx
Obra Presentaton Ash Handling Sysytem 28032023.pptxObra Presentaton Ash Handling Sysytem 28032023.pptx
Obra Presentaton Ash Handling Sysytem 28032023.pptxmrujjavalsinghvarana
 
ASH HANDLING PRESENTATION ON POWER PLANT
ASH HANDLING PRESENTATION ON POWER PLANTASH HANDLING PRESENTATION ON POWER PLANT
ASH HANDLING PRESENTATION ON POWER PLANTneerajshopping
 
BJ INDONESIA CT and NITROGEN UNIT.doc
BJ INDONESIA CT and NITROGEN UNIT.docBJ INDONESIA CT and NITROGEN UNIT.doc
BJ INDONESIA CT and NITROGEN UNIT.docizzyguy
 
Hisham hajaj, stanley consultants
Hisham hajaj, stanley consultantsHisham hajaj, stanley consultants
Hisham hajaj, stanley consultantsSarah El Akkad
 
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESHppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESHAKHILESH KUMAR
 
Waste water project derventa, bosnia
Waste water project derventa, bosniaWaste water project derventa, bosnia
Waste water project derventa, bosniaVladimir Popovic
 
STUDIO PRESENTATIO.pptx
STUDIO PRESENTATIO.pptxSTUDIO PRESENTATIO.pptx
STUDIO PRESENTATIO.pptxAgohaChinonso
 
1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAM
1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAM1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAM
1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAMChad Kurdi, P.E.
 

Similar to Summary Presentation UpdateRev20 (20)

Stakeholder weekly report-20th May 2023.pptx
Stakeholder weekly report-20th May 2023.pptxStakeholder weekly report-20th May 2023.pptx
Stakeholder weekly report-20th May 2023.pptx
 
Presentation on NHPC (TLDP-III)
Presentation on NHPC (TLDP-III)Presentation on NHPC (TLDP-III)
Presentation on NHPC (TLDP-III)
 
WIRed
WIRedWIRed
WIRed
 
Lanchkhuti WS Project Overview
Lanchkhuti WS Project OverviewLanchkhuti WS Project Overview
Lanchkhuti WS Project Overview
 
Derventa City WW Project
Derventa City WW ProjectDerventa City WW Project
Derventa City WW Project
 
Rehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgiaRehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgia
 
Ws project ozurgeti, georgia
Ws project ozurgeti, georgiaWs project ozurgeti, georgia
Ws project ozurgeti, georgia
 
Ozurgeti City / Water Supply Project
Ozurgeti City / Water Supply ProjectOzurgeti City / Water Supply Project
Ozurgeti City / Water Supply Project
 
Steam Blowing by Ankit Goyal
Steam Blowing by Ankit GoyalSteam Blowing by Ankit Goyal
Steam Blowing by Ankit Goyal
 
Solving Reactor Water Clean-Up System Anomalies Using RELAP5 MOD33.pdf
Solving Reactor Water Clean-Up System Anomalies Using RELAP5 MOD33.pdfSolving Reactor Water Clean-Up System Anomalies Using RELAP5 MOD33.pdf
Solving Reactor Water Clean-Up System Anomalies Using RELAP5 MOD33.pdf
 
Obra Presentaton Ash Handling Sysytem 28032023.pptx
Obra Presentaton Ash Handling Sysytem 28032023.pptxObra Presentaton Ash Handling Sysytem 28032023.pptx
Obra Presentaton Ash Handling Sysytem 28032023.pptx
 
ASH HANDLING PRESENTATION ON POWER PLANT
ASH HANDLING PRESENTATION ON POWER PLANTASH HANDLING PRESENTATION ON POWER PLANT
ASH HANDLING PRESENTATION ON POWER PLANT
 
BJ INDONESIA CT and NITROGEN UNIT.doc
BJ INDONESIA CT and NITROGEN UNIT.docBJ INDONESIA CT and NITROGEN UNIT.doc
BJ INDONESIA CT and NITROGEN UNIT.doc
 
Hisham hajaj, stanley consultants
Hisham hajaj, stanley consultantsHisham hajaj, stanley consultants
Hisham hajaj, stanley consultants
 
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESHppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
 
Pintu raj
Pintu rajPintu raj
Pintu raj
 
Ntpc training report
Ntpc training reportNtpc training report
Ntpc training report
 
Waste water project derventa, bosnia
Waste water project derventa, bosniaWaste water project derventa, bosnia
Waste water project derventa, bosnia
 
STUDIO PRESENTATIO.pptx
STUDIO PRESENTATIO.pptxSTUDIO PRESENTATIO.pptx
STUDIO PRESENTATIO.pptx
 
1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAM
1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAM1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAM
1902 01_SouthSide Works_Sheet - E400 - ELECTRICAL RISER DIAGRAM
 

Summary Presentation UpdateRev20

  • 1. KINGDOM OF SAUDI ARABIA ROYAL COMMISSION FOR JUBAIL & YANBU ROYAL COMMISSION IN JUBAIL CONTRACT NO : 641-C46 REHABILITATION OF RC HOSPITAL SITE INFRASTRUCTURE GMTA PRESENTATION AUGUST 2014
  • 2. AGENDA 1. INTRODUCTION 2. POTENTIAL REHABILITATION 3. CONDITION SURVEY 1. MECHANICAL 2. ELECTRICAL 3. STRUCTURAL 4. PIPING DISTRIBUTION OPTIONS 1. OPTION 1 – TUNNEL OPTIMIZATION 2. OPTION 2A – OVERHEAD BRIDGE 3. OPTION 2B – TUNNEL & OVERHEAD 4. OPTION 3 – COMBINE ESSENTIAL & NONESSENTIAL CHW 5. SUMMARY
  • 3. 2 HIGHWAY4HIGHWAY4 EMERGENCY ENTRANCE INTRODUCTION The Scope of the project is to rehabilitate and update the existing RC Hospital site infrastructure to bring the existing facilities to current code requirements. OVERALL SITE LAYOUT
  • 4. HIGHWAY4HIGHWAY4 EMERGENCY ENTRANCE OVERALL SITE LAYOUT THE SCOPE OF WORK INCLUDE:  STUDY AND INSPECTION OF EXISTING SITE UTILITIES  RENEWAL / REHABILITATION OF EXISTING UTILITY SYSTEMS  BRING EXISTING FACILITIES TO CURRENT CODE REQUIREMENTS  REPLACEMENT / REHABILITATION OF CONTROL SYSTEMS ASSOCIATED WITH MECHANICAL SYSTEMS  CHANGING MEDIUM VOLTAGE TO LOW VOLTAGE FOR THE CHILLERS POTENTIAL REHABILITATION INCLUDES:  CHILLED WATER SYSTEM  STEAM SUPPLY SYSTEM  HOT AND COLD WATER SYSTEMS  DISTRIBUTION PIPING SYSTEMS  EMERGENCY POWER  MEDICAL GAS SYSTEMS  ELECTRICAL SUPPLY  TELECOMMUNICATION SYSTEM  FIRE HYDRANTS
  • 5. POTENTIAL REHABILITATION  CHILLED WATER SYSTEM  STEAM SUPPLY SYSTEM  HOT AND COLD WATER SYSTEMS  DISTRIBUTION PIPING SYSTEMS  EMERGENCY POWER  MEDICAL GAS SYSTEMS  ELECTRICAL SUPPLY THE SCOPE OF REHABILITATION INCLUDES:
  • 6.
  • 7. CONDITION SURVEY-CHILLER COMPOUND CHILLER COMPOUND LAYOUT KEY PLAN MAIN PIPES GOES THRU TUNNEL THEN UNDER RAMP MAIN PIPE HEADER WITH SUPPORTS NE.CH-7 PROPOSED  REPLACE CHILLERS: OPTION 1 – 8 CHILLERS FOR N+2 VERSUS OPTION 2 – 11 CHILLERS FOR 100% REDUNDANCY  PIPING HEADERS REPLACED BACK TO PUMP HOUSE  MOVE NEW CHILLERS TO MEET CHILLER MANUFACTURER CLEARANCE RECOMMENDATION  ADD SUPERVISORY CONTROLS AND METERING OPTION-2 EXISTING CONDITION  FOURTEEN (14) TRANE AIR-COOLED CHILLERS  ELEVEN (11) TRANE AIR-COOLED CHILLERS INSTALLED IN 1980s  286 TON CENTRIFUGAL CHILLERS (OBSOLETE)  4160V MACHINES  FIVE (5) ARE IN WORKING CONDITION, REMAINING CHILLERS ARE OUT OF SERVICE  THREE (3) TRANE AIR-COOLED CHILLERS INSTALLED IN 2008  400 TON SCREW CHILLERS  480V MACHINES  THE CHILLED WATER PIPING FROM CHILLER COMPOUND TO CHILLED WATER PUMP ROOM DOES NOT SHOW VISUAL SIGNS OF LEAKAGE EXCEPT AT SPECIFIC TIE IN POINTS TO THE CHILLERS.
  • 8. CONDITION SURVEY-CHILLER COMPOUND CHILLER COMPOUND LAYOUT KEY PLAN MAIN PIPES GOES THRU TUNNEL THEN UNDER RAMP THREE SCREW TYPE CHILLERS-2010 400 TON 480V MACHINES EXISTING CONDITION: ELEVEN CENTRIFUGAL CHILLERS(OBSELETE)-1986 300 TON 4160V MACHINES FIVE (5) ARE IN WORKING CONDITION, REMAINING CHILLERS ARE OUT OF SERVICE MAIN PIPE HEADER WITH SUPPORTS NE.CH-7
  • 9. CONDITION SURVEY-CHILLER COMPOUND CHILLER COMPOUND LAYOUT KEY PLAN MAIN PIPES GOES THRU TUNNEL THEN UNDER RAMP MAIN PIPE HEADER WITH SUPPORTS NE.CH-7 RECOMMENDATIONS: REPLACE CHILLERS: OPTION 1 – 8 CHILLERS FOR N+2 VERSUS OPTION 2 – 11 CHILLERS FOR 100% REDUNDANCY PIPING HEADERS REPLACED BACK TO PUMP HOUSE ADD SUPERVISORY CONTROLS AND METERING OPTION-2
  • 10. CONDITION SURVEY-CHILLED WATER PUMP ROOM CHILLED WATER PUMP ROOM LAYOUT KEY PLAN NE.CHWP-1&2 UTILITY TUNNEL ACCESS PROPOSED  REPLACE 3 CHILLED WATER PUMPS  REPLACE PIPING WHEN PUMPS ARE REPLACED  EXPAND OPD PUMP ROOM TO PROVIDE ACCESS TO PUMPS  ADD SUPERVISORY CONTROLS AND METERING NEW OPD PUMP ROOM WITH 2 NE.CHW.PUMPS EXISTING CONDITION  SIX (6) CHILLED WATER PUMPS SERVING ESSENTIAL AND NON-ESSENTIAL  TWO (2) HORIZONTAL SPLIT CASE PUMPS  SERVING OPD CHILLED WATER CIRCUIT  TWO (2) HORIZONTAL SPLIT CASE PUMPS  SERVING NON-ESSENTIAL CHILLED WATER CIRCUIT  ONE PUMP IS NOT IN SERVICE  TWO (2) HORIZONTAL SPLIT CASE PUMPS  SERVING ESSENTIAL CHILLED WATER CIRCUIT  THE CHILLED WATER PIPING HEADERS SHOW MINOR SIGNS OF LEAKAGE EXPANSION OF OPD PUMP ROOM
  • 11. CONDITION SURVEY-CHILLED WATER PUMP ROOM CHILLED WATER PUMP ROOM LAYOUT KEY PLAN NE.CHWP-1&2 UTILITY TUNNEL ACCESS NEW OPD PUMP ROOM WITH 2 NE.CHW.PUMPS EXISTING CONDITION: TWO (2) HORIZONTAL SPLIT CASE PUMPS SERVING OPD CHILLED WATER CIRCUIT TWO (2) HORIZONTAL SPLIT CASE PUMPS SERVING NON-ESSENTIAL CHILLED WATER CIRCUIT ONE PUMP IS NOT IN SERVICE TWO (2) HORIZONTAL SPLIT CASE PUMPS SERVING ESSENTIAL CHILLED WATER CIRCUIT
  • 12. CONDITION SURVEY-CHILLED WATER PUMP ROOM CHILLED WATER PUMP ROOM LAYOUT KEY PLAN NE.CHWP-1&2 UTILITY TUNNEL ACCESS RECOMMENDATIONS: REPLACE 3 CHILLED WATER PUMPS REPLACE PIPING WHEN PUMPS ARE REPLACED EXPAND OPD PUMP ROOM TO PROVIDE ACCESS TO PUMPS ADD SUPERVISORY CONTROLS AND METERING NEW OPD PUMP ROOM WITH 2 NE.CHW.PUMPS
  • 13. S.NO. ROOM NAME CODE REQUIREMENT COMPLIANCE WITH CODE RECOMMENDATION 1 Chiller Compound Mechanical utilities shall have proper access, clearance and location and must be as per RC engineering requirements. Refer to RC Engineering Manual, Chapter 6 section 6.16(C, D, E). Yes Install new chillers per manufacturer required clearance 2 Chilled Water Pump Room (Old) Yes Piping replacement and relocation will improve tunnel access. 3 Chilled Water Pump Room (New) No The new chilled water pump room is recommended for expansion so as to gain space for both the existing pumps. CODE COMPLIANCE SUMMARY
  • 14. CONDITION SURVEY-POWER PLANT KEY PLAN POWER PLANT LAYOUT CALORIFIERS STEAM HEADER BOILER PIPES AND FLUE STACK PROPOSED  REPLACE BOILER 1, BLOW DOWN TANK , 2 CALORIFIERS  RENOVATE ONE BOILER  REPLACE PIPING IN PLANT  ADD SUPERVISORY CONTROLS AND METERING EXISTING CONDITION STEAM PRODUCED WITH 2 FIRE-TUBE BOILERS  COCHRAN 1254 kW FIRE-TUBE BOILERS  INSTALLED IN 2001 AND 2010  REPORTED TUBE LEAKS, ISSUES WITH CHEMICAL TREATMENT  MANUAL BLOWDOWN VALVE  CONDENSATE RETURN TANK AND DEAREATOR REPLACED IN 2010  BLOW DOWN TANK INSTALLED IN 1980s  FOUR (4) FUEL OIL PUMPS INSTALLED IN 1980s  WATER TREATMENT REPLACED IN 2010 HOT WATER PRODUCED WITH 6 CALORIFIERS  FOUR (4) SERVE DOMESTIC HW (N+2)  TWO (2) INSTALLED IN 2010  TWO CURRENTLY NOT IN SERVICE  TWO (2) SERVE LAUNDRY, INSTALLED IN 2010 STEAM PIPES AND VALVES SHOW VISIBLE SIGNS OF LEAKAGE AND TEMPORARY REPAIRS
  • 15. CONDITION SURVEY-POWER PLANT KEY PLAN POWER PLANT LAYOUT 2.CALORIFIERS 1.STEAM HEADER BOILER PIPES AND FLUE STACK TWO FIRE TUBE STEAM BOILERS BOILER-1 INSTALLED IN 2012 BOILER-2 INSTALLED IN 2001 REPORTED TUBE LEAKS, ISSUES WITH CHEMICAL TREATMENT SYSTEM SIX CALORIFIERS, FOUR NEW AND TWO OLD(NOT IN SERVICE) NEW CONDENSATE RECEIVER TANK AND DEAREATOR STEAM PIPING AND VALVES SHOW VISIBLE SIGNS OF LEAKAGE
  • 16. CONDITION SURVEY-POWER PLANT KEY PLAN POWER PLANT LAYOUT 2.CALORIFIERS 1.STEAM HEADER BOILER PIPES AND FLUE STACK RECOMMENDATIONS: REPLACE BOILER-2, BLOW DOWN TANK, 2 CALORIFIERS RENOVATE BOILER-1 REPLACE PIPING IN PLANT ADD SUPERVISORY CONTROLS AND METERING
  • 17. S.NO. ROOM NAME CODE REQUIREMENT COMPLIANCE WITH CODE RECOMMENDATION 4 Power Plant Mechanical utilities shall have proper access, clearance and location and must be as per RC engineering requirements. Refer to RC Engineering Manual, Chapter 6 section 6.16(C, D, E). Yes Piping replacements will result in improved tunnel access. 5 Utility Tunnel No The work inside the tunnel must be as per approved mechanical option. 6 Water Reservoir and Pump room Yes Water reservoir and pump room are currently being upgraded. Proper ventilation must be provided as per code requirements. CODE COMPLAINCE SUMMARY
  • 18. CONDITION SURVEY-FUEL STORAGE TANKS REPLACE FILL STATION PROVIDE CONTAINMENT PAD AT FILL STATION ADD SUPERVISORY CONTROLS AND METERING FUEL STORAGE TANK LAYOUT 2 FUEL TANKS FILL STATION FUEL PIPING IN TRENCH
  • 19. CONDITION SURVEY-MEDICAL GAS SYSTEM OXYGEN STORAGE TANK LAYOUT REPLACE 1 COMPLETE TANK ASSEMBLY REPLACE PIPING TO MANIFOLD ROOM ADD SUPERVISORY CONTROLS AND METERING ADD BOLLARDS AROUND OXYGEN STORAGE TANK AREA 2 OXYGEN TANKS OLD OXYGEN TANK
  • 20. 19 CONDITION SURVEY-UTILITY TUNNEL HOSPITAL SHAFT POWER PLANT MECHANICAL ROOM MANY PIPE LEAKS AND PATCHES PIPING EXPANSION PROBLEMS LEAD TO STEAM LEAK LIMITED MEANS OF EGRESS AND LIMITED SPACE FOR REMOVAL, REPLACEMENT, MAINTENANCE PUMP HOUSE
  • 21. LIFE SAFETY REQUIREMENTS UTILITY TUNNEL SATISFIES SAFETY RECOMMENDATIONS  NFPA 101 40.2.1.2 – NORMALLY UNOCCUPIED UTILITY CHASES THAT ARE SECURED FROM UNAUTHORIZED ACCESS AND ARE USED EXCLUSIVELY FOR ROUTING OF ELECTRICAL, MECHANICAL, OR PLUMBING EQUIPMENT SHALL NOT BE REQUIRED TO COMPLY WITH THE PROVISIONS OF CHAPTER 7 (MEANS OF EGRESS)  STANDARD INDUSTRY PRACTICE RECOMMENDS MEANS OF EGRESS EVERY 100 METERS (TUNNEL MAXIMUM 80 M)  OSHA 1926.1023 LADDERS (TUNNEL OK) ACCESS TO TUNNEL FROM POWER PLANT ROOM ACCESS TO TUNNEL FROM CHILLED WATER PUMP ROOM POWER PLANT CHILLED WATER PUMP ROOM UTILITY TUNNEL PIPES RISING IN MECHANICAL ROOM FROM TUNNEL
  • 22. Switchgear & chilled water pump house building Current MV Normal Switchgear Proposed location for LV Switchgear KEY PLAN EXISTING CONDITION: THE MV-SWITCHGEAR AND CHILLER CONTROL PANELS ARE OLD AND OBSOLETE. Existing MV Switchgear Room Current MV Essential Switchgear CONDITION SURVEY-ELECTRICAL SYSTEM
  • 23. Switchgear & chilled water pump house building Existing MV Switchgear Room KEY PLAN Current MV Normal Switchgear Proposed location for LV Switchgear Current MV Essential Switchgear RECOMMENDATION: THE MEDIUM VOLTAGE SWITCHGEAR PANEL, CHILLER CONTROL PANELS, POWER AND LIGHTING PANELS, SHALL BE REPLACED DUE TO THE CHANGE IN THE NOMINAL VOLTAGE. SWITCHING FROM MEDIUM VOLTAGE TO LOW VOLTAGE REQUIRES ADDITIONAL CHANGES IN POWER. ADD NEW GENERATOR TO FULFILL THE INCREASED LOAD REQUIREMENTS AND SEPARATING CHILLER BACKUP POWER. CONDITION SURVEY-ELECTRICAL SYSTEM
  • 25. Existing service Tunnel (yellow) shown on Pile layout plan Tunnel Section Inside Building Edge Tunnel Section Outside Building Edge A A Section A-A B B Section B-B Existing Tunnel Outside Building Edge Outside Building Edge Concrete Piles
  • 26.
  • 27. 26 EXISTING PIPING NETWORK NE CHW E CHW STM & COND NECHW ECHW STM&COND PUMP HOUSE NE CHWS E CHWS NE CHWR E CHWR POWER PLANT HOSPITAL SHAFT MECHANICAL ROOM CW HW CW HW CW HW A C B D HOSPITAL SHAFT POWER PLANT MECHANICAL ROOM PUMP HOUSE CHILLER YARD CHILLER YARD MU E CHW E CHWR NE CHWR STM & COND
  • 28. APPROACH: CREATE ROOM IN TUNNEL BY RELOCATING COLD WATER, HOT WATER AND NON-ESSENTIAL CHILLED WATER PIPING REPLACE REMAINING PIPING IN PHASES, CREATING DUPLICATE PATHWAYS, THEN DEMOLISH EXISTING PIPE MAINTENANCE SPACE CREATED FOR STEAM PIPING OPTION 1 – TUNNEL OPTIMIZATION Option 1 EXISTING TUNNEL
  • 29. 28 OPTION 1 – Phasing A C B D HOSPITAL SHAFT POWER PLANT MECHANICAL ROOM PUMP HOUSE CHILLER YARD NEW BOX TRENCH: 6 COLD AND HOT WATER PIPES NEW BOX TRENCH: 2 CHILLED WATER PIPES EXISTING TUNNEL: 4 TO 6 CHILLED WATER AND STEAM PIPES Step 1 – create dual path for cold and hot water(Box trench) Step 2 – connect new piping and demo old Step 3 – create dual path for chilled water(Box trench) Step 4 – connect new piping and demo old Step 5 – create dual path for STEAM(Tunnel A,B,C&D) Step 6 – connect new piping and demo old Step 7 – create dual path for E CHW (Tunnel A) Step 8 – connect new piping and demo old Step 9 – create dual path for NE CHW (Tunnels D&C). Steps 9 & 10 must be completed one pipe at a time (supply, then return) Step 10 – connect new piping and demo old Step 11 – create dual path for E CHW (Tunnels B, C, D). Steps 11 & 12 must be completed one pipe at a time (supply, then return) Step 12 – connect new piping and demo old
  • 30. 29 OPTION 1 – STEP 12 Connect new pipe & demo HOSPITAL SHAFT POWER PLANT MECHANICAL ROOM PUMP HOUSE CHILLER YARD E CHW ECHW PUMP HOUSE POWER PLANT HOSPITAL SHAFT MECHANICAL ROOM CHILLER YARD CW HW NECHW STM & COND STM&COND MU STM & COND E CHWE CHWR E CHWS E CHWR NE CHW NE CHWR NE CHWS NEW BOX TRENCH: 6 COLD AND HOT WATER PIPES NEW BOX TRENCH: 2 CHILLED WATER PIPES EXISTING TUNNEL: 4 TO 6 CHILLED WATER AND STEAM PIPES
  • 31. ADVANTAGES: Results in adequate maintenance space for steam and condensate piping DISADVANTAGES: Multiple times when contractor will be coordinating temporary interruptions for switching utilities with phased approach Difficult working conditions will increase time for demolition and replacement Additional piping routed through mechanical room Contractor will be working in tunnel with live steam leak OPTION 1 – TUNNEL OPTIMIZATION SUMMARY
  • 32. OPTION 2A – OVERHEAD BRIDGE CREATE DUAL PATHWAY FROM PUMP HOUSE AND POWER PLANT TO MECHANICAL ROOM AND HOSPITAL SHAFT REMOVE EXISTING PIPING IN TUNNEL LEAVING ELECTRICAL TRAY OR ABANDON COMPLETELY EXISTING TUNNEL MOVING ELECTRICAL TRAY TO NEW BRIDGE. PROPOSED WALK OVER UTILITY BRIDGE POWER PLANT CHILLER COMPOUND RC HOSPITAL LEVEL-2 ROOF RC HOSPITAL LEVEL-5 ROOF CHILLED WATER PUMP ROOM & SWITCH GEAR ROOM PROPOSED SHAFT IN MECHANICAL ROOM PROPOSED HOSPITAL SHAFT
  • 33. OPTION 2A – OVERHEAD BRIDGE SECTION A SHOWING PIPE ARRANGEMENT ON THE BRIDGE 1500 mm A
  • 34. OPTION 2A – OVERHEAD BRIDGE SUMMARY ADVANTAGES: Overhead bridge will be constructed before demolishing any of the existing pipes Mechanical system will remain in service until new utilities are replaced Results in adequate space for ease of maintenance DISADVANTAGES: Some architectural modifications are required within hospital building to accommodate new mechanical shafts
  • 35. OPTION 2B – TUNNEL & OVERHEAD BRIDGE CREATE DUAL PATHWAY FROM PUMP HOUSE AND POWER PLANT TO MECHANICAL ROOM AND HOSPITAL SHAFT REMOVE EXISTING PIPING IN TUNNEL LEAVING ELECTRICAL TRAY OR ABANDON THE EXISTING TUNNEL COMPLETELY MOVING ELECTRICAL TRAY TO NEW TUNNEL. PROPOSED TUNNEL-2PROPOSED TUNNEL-1 RC HOSPITAL LEVEL-2 ROOF RC HOSPITAL LEVEL-5 ROOF PROPOSED SHAFT IN MECHANICAL ROOM PROPOSED HOSPITAL SHAFT POWER PLANT CHILLED WATER PUMP ROOM & SWITCH GEAR ROOM CHILLER COMPOUND
  • 36. OPTION 2B – TUNNEL AND OVERHEAD BRIDGE SECTION A SHOWING PIPE ARRANGEMENT IN THE NEW TUNNEL 1500 mm A
  • 37. ADVANTAGES: Tunnel and overhead bridge will be constructed before demolishing any of the existing pipes Mechanical system will remain in service until new utilities are replaced Results in adequate space for ease of maintenance DISADVANTAGES: Higher initial cost Some architectural modifications are required within hospital building to accommodate new mechanical shaft Requires construction above hospital ceiling space for cold and hot water piping OPTION 2B – TUNNEL AND OVERHEAD BRIDGE
  • 38. CREATE ROOM IN TUNNEL BY RELOCATING COLD WATER, HOT WATER AND NON-ESSENTIAL CHILLED WATER PIPING REPLACE REMAINING PIPING IN PHASES, COMBINING NON-ESSENTIAL AND ESSENTIAL PIPING TO CREATE MORE AVAILABLE SPACE ADD NECESSARY VALVING AND CONTROLS TO ISOLATE ESSENTIAL PIPING OPTION 3 – COMBINE NE & E CHW PIPING EXISTING TUNNEL
  • 39. ADVANTAGES: Results in fewer pipes to maintain/creates additional space DISADVANTAGES: Multiple switch over required with phased approach Temporary piping will run through hallway during (Section D) demolition and replacement Difficult working conditions will increase time for demolition and replacement Requires use of ceiling space for cold and hot water piping Contractor working in tunnel with live steam Requires window welds to install pipe Due to risk associated with constructability of Option 3, we do not recommend moving forward with Option 3 OPTION 3 – COMBINE NE & E CHW PIPING SUMMARY
  • 40. EQUIPMENT NO INTERRUPTIONS OF SERVICE TO HOSPITAL(ALL EQUIPMENTS WITH REDUNDANCY) SEQUENCING AND SERVICE INTERRUPTIONS
  • 41. THE EXISTING REDUNDANCY OF THE SYSTEMS WILL ALLOW A PHASED REPLACEMENT OF EQUIPMENT WITHOUT INTERUPTION TO THE HOSPITAL OPERATIONS CHILLERS CHILLED WATER PUMPS BOILERS CALORIFIERS OXYGEN TANK SYSTEM OPTIONS 1 OR 2 WILL ALLOW A REDUNDANT STEAM, CONDENSATE, CHILLED WATER, AND HOT & COLD WATER PATHWAY TO BE CREATED BEFORE THE EXISTING PIPING SYSTEMS ARE REMOVED PROVIDE NEW GENERATOR BEFORE DISCONNECTING POWER TO CHILLERS SEQUENCING AND SERVICE INTERRUPTIONS
  • 42. GIVEN THE RISKS ASSOCIATED WITH THE CONSTRUCTABILITY OF OPTIONS 1 & 3, THE RISKS OF HAVING CONTRACTORS WORKING NEAR LIVE STEAM LEAKS, AND THE RISKS TO HOSPITAL OPERATIONS BY CONDUCTING MULTIPLE SWITCH OVERS (FROM OLD TO NEW PIPING), WE RECOMMEND MOVING FORWARD WITH OPTION 2. THE DIFFERENCE IN COST BETWEEN 2A AND 2B IS WITHIN THE UNCERTAINTY OF THE COST ESTIMATES. OPTION 2A IS EASIER TO ROUTE PIPE TO THE EXISTING CONNECTION LOCATIONS AND WILL BE MORE MAINTAINABLE DUE TO BETTER ACCESS TO PIPES. THE THREE OPTIONS HAVE BEEN PRESENTED TO END USER DURING WORKSHOPS, AND THEY FAVORED OPTION 2A – OVERHEAD DISTRIBUTION. PIPING DISTRIBUTION RECOMMENDATION
  • 43. RECOMMEND MOVING FORWARD WITH: CHILLED WATER SYSTEM REPLACING 11 CHILLERS REPLACING 3 CHILLED WATER PUMPS REPLACING ALL CHILLED WATER PIPING HOT WATER SYSTEM REPLACING BOILER 1, RENOVATING BOILER 2 REPLACING IDENTIFIED ANCILLARY EQUIPMENT REPLACING TWO CALORIFIERS FUEL OIL SYSTEM REPLACE FILL STATION ADD CONTAINMENT PAD RECOMMENDATION
  • 44. RECOMMEND MOVING FORWARD WITH (CONTINUED): MEDICAL GAS SYSTEM REPLACE ONE OXYGEN TANK SYSTEM REPLACE PIPING FROM TANKS TO MANIFOLD ADD ISOLATION BOLLARDS DISTRIBUTION PIPING REPLACE ALL PIPING AND FITTINGS ROUTE PIPE IN NEW OVERHEAD BRIDGE (OPTION 2A) RECOMMENDATION
  • 45. RECOMMEND MOVING FORWARD WITH (CONTINUED): ELECTRICAL SYSTEM CONSTRUCT NEW LV - SWITCHGEAR ROOM REPLACE SWITCHGEAR PANEL, CHILLER CONTROL PANELS CWSA, CWSG AND CWH1, POWER AND LIGHTING PANELS CWA, CWB AND CWB REPLACE MOTOR CONTROL CENTRES INSTALL NEW GENERATOR 1750 KVA UPGRADE FIRE ALARM SYSTEM FOR SWITCHGEAR AND CHILLED WATER PUMP HOUSE. RECOMMENDATION
  • 46. SUMMARY OPTION 1 OPTION 2A OPTION 2B OPTION 3 TUNNEL OPTIMIZATION OVERHEAD BRIDGE TUNNEL AND OVERHEAD COMBINE NE & E CHW COST 59,111,000 55,658,000 57,640,000 NOT RECOMMENDED PHASING Complex phasing Simple phasing Simple phasing COMPLEXITY Difficult working conditions and limited access Not complex and easy installation Not complex and easy installation

Editor's Notes

  1. CONDITION ASSESSMENT: PERFORMED VISUAL INSPECTION OF EXISTING EQUIPMENT AND INTERVIEWED STAFF REGARDING MAINTENANCE HISTORY/PRACTICES EQUIPMENT: FOURTEEN (14) TRANE AIR-COOLED CHILLERS ELEVEN (11) TRANE AIR-COOLED CHILLERS INSTALLED IN 1990s 300 TON CENTRIFUGAL CHILLERS. PAST THEIR USEFUL LIFE & OBSOLETE. CAN NO LONGER GET PARTS FOR MACHINES 4160V MACHINES (NEW SERVICE WILL BE 480V) FIVE (5) ARE IN WORKING CONDITION, REMAINING CHILLERS ARE OUT OF SERVICE RECOMMEND REPLACING 4 ESSENTIAL CHILLERS WITH 300 TON CHILLERS, AND 4 OF 7 NON-ESSENTIAL MACHINES WITH 400 TON CHILLERS THREE (3) TRANE AIR-COOLED CHILLERS INSTALLED IN 2010 400 TON SCREW CHILLERS 480V MACHINES THE CHILLED WATER PIPING FROM CHILLER COMPOUND TO CHILLED WATER PUMP ROOM DOES NOT SHOW VISUAL SIGNS OF LEAKAGE EXCEPT AT SPECIFIC CONNECTIONS TO THE CHILLERS. GIVEN THE AGE OF THE PIPING NETWORK AND PAST CORROSION ISSUES DUE TO WATER QUALITY, QUOTES FOR NON-DESTRUCTIVE THICKNESS TESTING WERE OBTAINED AND ARE COSTLY ENOUGH TO RECOMMEND REPLACING PIPE INSTEAD OF HIRING TESTING SERVICES.
  2. CONDITION ASSESSMENT: PERFORMED VISUAL INSPECTION OF EXISTING EQUIPMENT AND INTERVIEWED STAFF REGARDING MAINTENANCE HISTORY/PRACTICES EQUIPMENT: FOURTEEN (14) TRANE AIR-COOLED CHILLERS ELEVEN (11) TRANE AIR-COOLED CHILLERS INSTALLED IN 1990s 300 TON CENTRIFUGAL CHILLERS. PAST THEIR USEFUL LIFE & OBSOLETE. CAN NO LONGER GET PARTS FOR MACHINES 4160V MACHINES (NEW SERVICE WILL BE 480V) FIVE (5) ARE IN WORKING CONDITION, REMAINING CHILLERS ARE OUT OF SERVICE RECOMMEND REPLACING 4 ESSENTIAL CHILLERS WITH 300 TON CHILLERS, AND 4 OF 7 NON-ESSENTIAL MACHINES WITH 400 TON CHILLERS THREE (3) TRANE AIR-COOLED CHILLERS INSTALLED IN 2010 400 TON SCREW CHILLERS 480V MACHINES THE CHILLED WATER PIPING FROM CHILLER COMPOUND TO CHILLED WATER PUMP ROOM DOES NOT SHOW VISUAL SIGNS OF LEAKAGE EXCEPT AT SPECIFIC CONNECTIONS TO THE CHILLERS. GIVEN THE AGE OF THE PIPING NETWORK AND PAST CORROSION ISSUES DUE TO WATER QUALITY, QUOTES FOR NON-DESTRUCTIVE THICKNESS TESTING WERE OBTAINED AND ARE COSTLY ENOUGH TO RECOMMEND REPLACING PIPE INSTEAD OF HIRING TESTING SERVICES.
  3. CONDITION ASSESSMENT: PERFORMED VISUAL INSPECTION OF EXISTING EQUIPMENT AND INTERVIEWED STAFF REGARDING MAINTENANCE HISTORY/PRACTICES EQUIPMENT: FOURTEEN (14) TRANE AIR-COOLED CHILLERS ELEVEN (11) TRANE AIR-COOLED CHILLERS INSTALLED IN 1990s 300 TON CENTRIFUGAL CHILLERS. PAST THEIR USEFUL LIFE & OBSOLETE. CAN NO LONGER GET PARTS FOR MACHINES 4160V MACHINES (NEW SERVICE WILL BE 480V) FIVE (5) ARE IN WORKING CONDITION, REMAINING CHILLERS ARE OUT OF SERVICE RECOMMEND REPLACING 4 ESSENTIAL CHILLERS WITH 300 TON CHILLERS, AND 4 OF 7 NON-ESSENTIAL MACHINES WITH 400 TON CHILLERS THREE (3) TRANE AIR-COOLED CHILLERS INSTALLED IN 2010 400 TON SCREW CHILLERS 480V MACHINES THE CHILLED WATER PIPING FROM CHILLER COMPOUND TO CHILLED WATER PUMP ROOM DOES NOT SHOW VISUAL SIGNS OF LEAKAGE EXCEPT AT SPECIFIC CONNECTIONS TO THE CHILLERS. GIVEN THE AGE OF THE PIPING NETWORK AND PAST CORROSION ISSUES DUE TO WATER QUALITY, QUOTES FOR NON-DESTRUCTIVE THICKNESS TESTING WERE OBTAINED AND ARE COSTLY ENOUGH TO RECOMMEND REPLACING PIPE INSTEAD OF HIRING TESTING SERVICES.
  4. CONDITION ASSESSMENT: PERFORMED VISUAL INSPECTION OF EXISTING EQUIPMENT AND INTERVIEWED STAFF REGARDING MAINTENANCE HISTORY/PRACTICES. PUMPS ARE OPERATING PROPERLY BUT ARE WELL PAST THEIR USEFUL LIFE. INSULATION MISSING FROM PIPING AND PUMPS HAVE RESULTED IN CONDENSATION AND SURFACE CORROSION. SIX (6) CHILLED WATER PUMPS SERVING ESSENTIAL AND NON-ESSENTIAL TWO (2) HORIZONTAL SPLIT CASE PUMPS SERVING OPD CHILLED WATER CIRCUIT. NEW AND WILL NOT BE REPLACED. LIMITED MAINTENANCE SPACE. MUST CLIMB OVER FIRST PUMP TO MAINTAIN SECOND PUMP. TWO (2) HORIZONTAL SPLIT CASE PUMPS SERVING NON-ESSENTIAL CHILLED WATER CIRCUIT ONE PUMP IS NOT IN SERVICE, ONE PUMP REPLACED IN 2008 TWO (2) HORIZONTAL SPLIT CASE PUMPS SERVING ESSENTIAL CHILLED WATER CIRCUIT REPORTED MAINTENANCE ISSUES. PAST USEFUL LIFE (23 YEARS) PUMPS ARE STARTED MANUALLY AND CONTROLS ARE NOT COMPATABLE WITH CONTROL ROOM SYSTEM THE CHILLED WATER PIPING HEADERS SHOW MINOR SIGNS OF LEAKAGE
  5. CONDITION ASSESSMENT: PERFORMED VISUAL INSPECTION OF EXISTING EQUIPMENT AND INTERVIEWED STAFF REGARDING MAINTENANCE HISTORY/PRACTICES. PUMPS ARE OPERATING PROPERLY BUT ARE WELL PAST THEIR USEFUL LIFE. INSULATION MISSING FROM PIPING AND PUMPS HAVE RESULTED IN CONDENSATION AND SURFACE CORROSION. SIX (6) CHILLED WATER PUMPS SERVING ESSENTIAL AND NON-ESSENTIAL TWO (2) HORIZONTAL SPLIT CASE PUMPS SERVING OPD CHILLED WATER CIRCUIT. NEW AND WILL NOT BE REPLACED. LIMITED MAINTENANCE SPACE. MUST CLIMB OVER FIRST PUMP TO MAINTAIN SECOND PUMP. TWO (2) HORIZONTAL SPLIT CASE PUMPS SERVING NON-ESSENTIAL CHILLED WATER CIRCUIT ONE PUMP IS NOT IN SERVICE, ONE PUMP REPLACED IN 2008 TWO (2) HORIZONTAL SPLIT CASE PUMPS SERVING ESSENTIAL CHILLED WATER CIRCUIT REPORTED MAINTENANCE ISSUES. PAST USEFUL LIFE (23 YEARS) PUMPS ARE STARTED MANUALLY AND CONTROLS ARE NOT COMPATABLE WITH CONTROL ROOM SYSTEM THE CHILLED WATER PIPING HEADERS SHOW MINOR SIGNS OF LEAKAGE
  6. CONDITION ASSESSMENT: PERFORMED VISUAL INSPECTION OF EXISTING EQUIPMENT AND INTERVIEWED STAFF REGARDING MAINTENANCE HISTORY/PRACTICES. PUMPS ARE OPERATING PROPERLY BUT ARE WELL PAST THEIR USEFUL LIFE. INSULATION MISSING FROM PIPING AND PUMPS HAVE RESULTED IN CONDENSATION AND SURFACE CORROSION. SIX (6) CHILLED WATER PUMPS SERVING ESSENTIAL AND NON-ESSENTIAL TWO (2) HORIZONTAL SPLIT CASE PUMPS SERVING OPD CHILLED WATER CIRCUIT. NEW AND WILL NOT BE REPLACED. LIMITED MAINTENANCE SPACE. MUST CLIMB OVER FIRST PUMP TO MAINTAIN SECOND PUMP. TWO (2) HORIZONTAL SPLIT CASE PUMPS SERVING NON-ESSENTIAL CHILLED WATER CIRCUIT ONE PUMP IS NOT IN SERVICE, ONE PUMP REPLACED IN 2008 TWO (2) HORIZONTAL SPLIT CASE PUMPS SERVING ESSENTIAL CHILLED WATER CIRCUIT REPORTED MAINTENANCE ISSUES. PAST USEFUL LIFE (23 YEARS) PUMPS ARE STARTED MANUALLY AND CONTROLS ARE NOT COMPATABLE WITH CONTROL ROOM SYSTEM THE CHILLED WATER PIPING HEADERS SHOW MINOR SIGNS OF LEAKAGE
  7. CONDITION ASSESSMENT: PERFORMED VISUAL INSPECTION OF EXISTING EQUIPMENT AND INTERVIEWED STAFF REGARDING MAINTENANCE HISTORY/PRACTICES. BOILER VENDER INSPECTED EQUIPMENT. FIRE TUBE BOILERS OF THIS AGE LAST BETWEEN 20 TO 35 YEARS DEPENDING ON MAINTENANCE AND WATER QUALITY. GIVEN REPORTS OF TUBE LEAKS AND PAST ISSUES WITH WATER QUALITY AND THE AGE OF THE EQUIPMENT, WE RECOMMEND REPLACING THE OLDER BOILER AND RENOVATING THE NEW BOILER. STEAM PRODUCED WITH 2 FIRE-TUBE BOILERS COCHRAN 1254 kW FIRE-TUBE BOILERS INSTALLED IN 2001 AND 2013 REPORTED TUBE LEAKS, ISSUES WITH CHEMICAL TREATMENT MANUAL BLOWDOWN VALVE CONDENSATE RETURN TANK AND DEAREATOR REPLACED IN 2010 BLOW DOWN TANK INSTALLED IN 1980s FOUR (4) FUEL OIL PUMPS INSTALLED IN 1980s WATER TREATMENT REPLACED IN 2010 HOT WATER PRODUCED WITH 6 CALORIFIERS FOUR (4) SERVE DOMESTIC HW (N+2) TWO (2) INSTALLED IN 2010 TWO CURRENTLY NOT IN SERVICE TWO (2) SERVE LAUNDRY, INSTALLED IN 2010 STEAM PIPES AND VALVES SHOW VISIBLE SIGNS OF LEAKAGE AND TEMPORARY PATCHES
  8. CONDITION ASSESSMENT: PERFORMED VISUAL INSPECTION OF EXISTING EQUIPMENT AND INTERVIEWED STAFF REGARDING MAINTENANCE HISTORY/PRACTICES. BOILER VENDER INSPECTED EQUIPMENT. FIRE TUBE BOILERS OF THIS AGE LAST BETWEEN 20 TO 35 YEARS DEPENDING ON MAINTENANCE AND WATER QUALITY. GIVEN REPORTS OF TUBE LEAKS AND PAST ISSUES WITH WATER QUALITY AND THE AGE OF THE EQUIPMENT, WE RECOMMEND REPLACING THE OLDER BOILER AND RENOVATING THE NEW BOILER. STEAM PRODUCED WITH 2 FIRE-TUBE BOILERS COCHRAN 1254 kW FIRE-TUBE BOILERS INSTALLED IN 2001 AND 2013 REPORTED TUBE LEAKS, ISSUES WITH CHEMICAL TREATMENT MANUAL BLOWDOWN VALVE CONDENSATE RETURN TANK AND DEAREATOR REPLACED IN 2010 BLOW DOWN TANK INSTALLED IN 1980s FOUR (4) FUEL OIL PUMPS INSTALLED IN 1980s WATER TREATMENT REPLACED IN 2010 HOT WATER PRODUCED WITH 6 CALORIFIERS FOUR (4) SERVE DOMESTIC HW (N+2) TWO (2) INSTALLED IN 2010 TWO CURRENTLY NOT IN SERVICE TWO (2) SERVE LAUNDRY, INSTALLED IN 2010 STEAM PIPES AND VALVES SHOW VISIBLE SIGNS OF LEAKAGE AND TEMPORARY PATCHES
  9. CONDITION ASSESSMENT: PERFORMED VISUAL INSPECTION OF EXISTING EQUIPMENT AND INTERVIEWED STAFF REGARDING MAINTENANCE HISTORY/PRACTICES. BOILER VENDER INSPECTED EQUIPMENT. FIRE TUBE BOILERS OF THIS AGE LAST BETWEEN 20 TO 35 YEARS DEPENDING ON MAINTENANCE AND WATER QUALITY. GIVEN REPORTS OF TUBE LEAKS AND PAST ISSUES WITH WATER QUALITY AND THE AGE OF THE EQUIPMENT, WE RECOMMEND REPLACING THE OLDER BOILER AND RENOVATING THE NEW BOILER. STEAM PRODUCED WITH 2 FIRE-TUBE BOILERS COCHRAN 1254 kW FIRE-TUBE BOILERS INSTALLED IN 2001 AND 2013 REPORTED TUBE LEAKS, ISSUES WITH CHEMICAL TREATMENT MANUAL BLOWDOWN VALVE CONDENSATE RETURN TANK AND DEAREATOR REPLACED IN 2010 BLOW DOWN TANK INSTALLED IN 1980s FOUR (4) FUEL OIL PUMPS INSTALLED IN 1980s WATER TREATMENT REPLACED IN 2010 HOT WATER PRODUCED WITH 6 CALORIFIERS FOUR (4) SERVE DOMESTIC HW (N+2) TWO (2) INSTALLED IN 2010 TWO CURRENTLY NOT IN SERVICE TWO (2) SERVE LAUNDRY, INSTALLED IN 2010 STEAM PIPES AND VALVES SHOW VISIBLE SIGNS OF LEAKAGE AND TEMPORARY PATCHES
  10. TWO FUEL OIL STORAGE TANKS USED FOR EMERGENCY POWER FOR GENERATORS AND BOILERS MECHANICAL INTEGRETY OF TANKS WAS NOT INSPECTED. VISUAL INSPECTION SHOWS NO OBSERVABLE ISSUES. FILL STATIONS SHOWS ISSUES WITH LEAKS AT FILL STATION AND WHERE FUEL OIL DELIVERY TRUCK CONNECTS. VISIBLE ISSUES WITH FUEL OIL LEVEL INDICATORS AND WITH GATE ISOLATION VALVE. EXISTING CONTROLS ARE NOT COMPATABLE WITH SYSTEM IN CONTROL ROOM. LACK OF CONCRETE CONTAINMENT PAD.
  11. TWO OXYGEN TANK ASSEMBLIES. ONE SYSTEM IS NOT IN SERVICE, ONE NEW SYSTEM. PIPING SHOWS VISIBLE SIGNS OF CORROSION CONTROLS SYSTEMS ARE NOT COMPATABLE WITH CONTROL ROOM CONTROLS.
  12. DISTRIBUTION SYSTEMS INCLUDE STEAM & CONDENSATE ESSENTIAL & NON-ESSENTIAL CHILLED WATER DOMESTIC COLD WATER LAUNDRY COLD WATER DOMESTIC HOT WATER LAUNDRY HOT WATER MULTIPLE LEAKS AND PATCHES IN PIPING NETWORK. UNSAFE CONDITIONS EXIST IN TUNNEL WITH STEAM PIPING SHOWING ISSUES WITH PIPE EXPANSION. RECOMMEND REPLACING ALL PIPING BETWEEN STEAM AND CHILLED WATER PRODUCTION AND HOSPITAL