IRON ORE 2015
What is the Future for Magnetite Projects in Australia and Why Have Some
of the New Projects Been so Problematic?
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
• DISCLAIMER
With respect to all the information contained herein, neither Mineral Engineering Technical Services, nor
any officer, servant, employee, agent or consultant thereof make any representations or give any
warranties, expressed or implied, as to the accuracy, reliability or completeness of the information
contained herein, including but not limited to opinions, information or advice which may be provided to
users of the document. No responsibility is accepted to users of this document for any consequence of
relying on the contents hereof.
• COPYRIGHT ©
Passing of this document to a third party, duplication or re-use of this document, in whole or part,
electronically or otherwise, is not permitted without the expressed written consent of Mineral
Engineering Technical Services.
• ACKNOWLEDGEMENTS
This document is a dynamic record of the knowledge and experience of personnel at Mineral
Engineering Technical Services. As such it has been built upon over the years and is a collaborative
effort by all those involved. We are thankful for the material supplied by and referenced from various
equipment manufacturers, vendors, industry research and project partners.
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Key Attributes
• Working globally since 1988
• Dynamic and innovative niche consultancy
• Dedicated team providing customised service
• Specialist in Mineral Processing & Engineering Projects
• Unique solution finder
• A division of Midas Engineering Group
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Introduction
• Australia’s history is one of DSO of high grade hematite ores such as Mt
Tom price and Mt Newman
• Magnetite ore processing requires much higher OPEX and CAPEX
compared to Direct Shipping Ores (DSO)
• Magnetite projects presented are Savage River, Project Magnet, Sino
Iron and Karara
• Some new projects have been highly problematic-why is this?
• Overseas projects have been successfully processing magnetite ores
for long periods of time
• Does magnetite processing have a future in Australia?
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Iron Ore Price
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Savage River Project
• Started operation 1966 in
Tasmania
• 70 kms north west of Burnie
• Mine and beneficiation plant at
Savage River
• Slurry pipeline from the mine to
Port Latta
• Fully integrated pellet plant
• Currently coming under tight
cost pressures
• CAPEX depreciated long ago
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Open Pits
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Savage River
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Operations
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Product Prices
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Operations
Mining
• Open pits 100 to 150m deep
• Hydraulic excavators and conventional dump trucks
• Grade control from drill blast holes
Processing
• 54/74 Primary gyratory to 200 mm, 100 t stockpile
• 2 by Hardinge 9.75m by 3.66m autogenous grinding mills
• 2 Nordberg 8.84m by 3.96m ball mills
• Magnetic separation
Slurry Pipeline
• 83 kms through 229mm steel pipe
• 50% w/w, 14 hours transport time
Pellet Plant
• Green pellets formed on balling disks with bentonite
• 5 Midland Ross shaft pellet furnaces
• 4.5 hrs heat induction, diesel fired
• Fines screened out
• Pellets stockpiled for shipment
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Project Performance
• Well established operation with a track record
• Highly efficient operation, many improvements over time
• Fully integrated to sell high value good quality pellets
• Energy is a major cost in producing pellets
• Small producer- 2.5 Mtpa on a global scale
• Current cost $86.50/tonne and sale price $118.8/tonne (falling)
• Current low iron ore prices are putting enormous pressure on the project
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Project Magnet
• Long established hematite DSO
operation, pellet plant and steelworks
• Changed Whyalla steelworks from
hematite to magnetite $400M project
• Operational in 2007 with early
commissioning problems
• Mine, concentrator and slurry pipeline
• Integrated to produce pellets and steel
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Project Magnet
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Project Magnet Flowsheet
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Operations
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Project Performance
• Early processing problems overcome
• Exceeding design by 15%, CAPEX was modest
• Achieving < 4.5% silica in concentrate
• No reverse flotation or screening
• All of the concentrate going to pellet production and blast
furnaces, fully integrated project
• Successful project although low prices are squeezing margins
• Local shipment advantage - rail infrastructure
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Citic Pacific-Sino Iron-Magnetite
Project
• Located near Dampier in the Pilbara region of
Western Australia.
• Citic Pacific Magnetite project (Pilbara region of
WA) sources process water from a seawater
desalination plant
• Massive $A11BN project
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Citic Pacific Project
• Large open cut 80 Mtpa
magnetite ore - massive
projects
• 24 Mtpa magnetite
concentrate
• 40 GLpa desalination plant
• 600 MW combined cycle
power station
• Co-disposal tailings rapid
water recovery
Typical BIF magnetite core
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Sino Iron Project
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Large Scale – Sino Iron CITIC
Pacific Mining
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Process Flowsheet
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Process Flowsheet
• HPGR to 3mm
• Coarse cobbing
• Primary grind P80 55 µm
• Intermediate magnetic separation
• Final magnetic separation
• Reverse flotation reduce silica <5%
• Filtration concentrate to 9% moisture
• Tailings flocculated co-disposal
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Large Scale - Sino Iron CITIC
Pacific Mining
• Not just the largest but perhaps the
highest?!
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Predicted OPEX Magnetite
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Reverse Osmosis Supply & Water
Balance
• Sea water feed-little choice
• Energy recovery by recuperators
• Producing 40 GLpa
• (GL=1X109 and ML=1X106)
Area of Use
Annual
Activity
Water Usage Rate
Water
Consumption (GLpa)
Mining Dust Supression 160Mtpa total movement in
the mine
3% of material moved 4.8
Water in concentrate exiting the
filter plant
24Mtpa produced 9% 2.2
Water in screened and filtered
coarse tailings leaving the plant
56Mtpa 15% 8.4
Additional water for discharge of
fine tailing
56Mtpa 28% 15.7
Evaporation in the plant 10% of water used in plant 2.0
Pellet Plant 14Mtpa 8% of pellets produced 1.1
Port Stockyard 24Mtpa 3% of material handled 0.7
Power Station 450MW for 7800 hrs 1.28m3
/MWh, mostly
evaporated in cooling tower
4.5
Camp 4000 people 0.4m3
/day 0.6
Total 40.0
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Project Performance
• Citic as China’s largest conglomerate, its businesses include financial
services, resources and energy, manufacturing, real estate and
infrastructure, engineering contracting, and other businesses in China and
overseas.
• Eight years to develop the project
• Plagued with delays and cost over runs
• All infrastructure - power, water and port had to be established
• Cultural language issues, issues with contractors
• Painful learning process
• Long life project so important to Chinese steel mills
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Karara Magnetite Project
• 225 km east of Geraldton, WA
• JV Gindalbie Metals Ltd &
Ansteel Group - $1.8BN to
$2.5BN
• 20 Mtpa raw feed to produce 8
Mtpa concentrate 68% Fe
• Water supply from Tathra
bore-field 140 kms
• Dry stacked tailings
• 80 km rail spur for
concentrates to Geraldton
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Gindalbie Project – Project Review
Magnetite Project – Gindalbie Metals Ltd
• High quality magnetite concentrate produced – approximately 8 Mtpa
• Products:
― Mass Recovery: 41% with high Fe grade of 68.8%
• Proposes three-stage grinding followed by magnetic separation
• Proposes High Pressure Grinding Roll (HPGR) in the comminution
circuit and magnetic separation in the beneficiation steps
• Proposed Start of Operations: 2010
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Gindalbie Magnetite
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Gindalbie Magnetite (cont.)
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Gindalbie Metals Flowsheet
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Gindalbie Metals Flowsheet (cont.)
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Cost Differential
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Project Performance
• Plant bottlenecks based on ASX announcements
• Ore body not well understood
• CAPEX blowout
• OPEX higher than predicted
• Low iron ore prices have exacerbated the issues
• Ansteel has been a solid backer of the project
• ASX announcements highlight the difficult situation the company
finds itself in
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Conclusions
• Infrastructure cost for greenfield projects can be significant impediment for the
development of magnetite projects
• Savage River had power, water and was also depreciated years ago, coming
under cost pressure.
• Project Magnetite is an integrated project and has been a success although
margins are being squeezed
• Karara has struggled and survived because of Ansteel solid support
• Citic Pacific has struggled and has been a very difficult project from a delivery
and operation perspective
• Current low iron ore price is a problem. Falling energy and labour costs will
help
• Lower returns will be accepted in line with falling interest rates
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Conclusions
• With the exception of FMG’s Iron Bridge North Star magnetite
project all other magnetite projects are on hold
• High grade DSO ores are being depleted and the future resources
are magnetite ores
• The characteristics of magnetite ores varies widely in hardness,
liberation size and silica levels achievable
• NPV & IRR for magnetite projects are currently problematic
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
What did you get out of this presentation?
Please share your thoughts in an informal discussion
Questions ?
Attendee Outcomes
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
Acknowledgement
• Thanks to AusIMM for the opportunity to present
• Thanks to various companies, colleagues, engineers
• METS staff and consultants
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
References
• Grange Resources, 2007. Southdown Magnetite Proposal. Albany Iron
Ore Project Public Environmental Review.
• Gindalbie Metals Ltd, Karara Mining Ltd, Anshan Iron and Steel
Corporation, 2008. Karara Iron Ore Project Public Environmental
Review. Gindalbie Metals Ltd. www.gindalbie.com.au
• Arrium Mining & Materials. www.arrium.com
• Citic Pacific Mining. www.citicpacificmining.com
ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE
THANK YOU
www.metsengineering.com

More Related Content

What's hot

Nickel Processing and The Rise of Laterites
Nickel Processing and The Rise of LateritesNickel Processing and The Rise of Laterites
Nickel Processing and The Rise of LateritesMidas Engineering Group
 
Pre- Feasibility study of a low grade iron ore http://mineralprocessingconsul...
Pre- Feasibility study of a low grade iron ore http://mineralprocessingconsul...Pre- Feasibility study of a low grade iron ore http://mineralprocessingconsul...
Pre- Feasibility study of a low grade iron ore http://mineralprocessingconsul...Basdew Rooplal
 
Types of classifiers
Types of classifiersTypes of classifiers
Types of classifiersPramoda Raj
 
Mine dewatering techniques
Mine dewatering techniquesMine dewatering techniques
Mine dewatering techniquesMartin Preene
 
introduction to directional drilling
introduction to directional drillingintroduction to directional drilling
introduction to directional drillingyoucef benferdi
 
Mine Waste Management
Mine Waste ManagementMine Waste Management
Mine Waste ManagementRahul Kumar
 
Flotation mecanism
Flotation mecanismFlotation mecanism
Flotation mecanismhamidfara
 
Pellet and its use in blast furnace
Pellet  and its use in blast furnacePellet  and its use in blast furnace
Pellet and its use in blast furnaceAnil Mistry
 
Lean Iron Ore Beneficiation in India
Lean Iron Ore Beneficiation in IndiaLean Iron Ore Beneficiation in India
Lean Iron Ore Beneficiation in IndiaKrishna Kumar Sharma
 
Paper on-classification-and-classifiers
Paper on-classification-and-classifiersPaper on-classification-and-classifiers
Paper on-classification-and-classifiersacarneirinho
 
Mineral Processing
Mineral ProcessingMineral Processing
Mineral ProcessingSyed Tanveer
 
Minning waste management
Minning waste managementMinning waste management
Minning waste managementMubbara Arshad
 

What's hot (20)

Uranium deposits
Uranium depositsUranium deposits
Uranium deposits
 
Beneficiation and mineral processing of sand and silica sand
Beneficiation and mineral processing of  sand and silica sandBeneficiation and mineral processing of  sand and silica sand
Beneficiation and mineral processing of sand and silica sand
 
Nickel Processing and The Rise of Laterites
Nickel Processing and The Rise of LateritesNickel Processing and The Rise of Laterites
Nickel Processing and The Rise of Laterites
 
Pre- Feasibility study of a low grade iron ore http://mineralprocessingconsul...
Pre- Feasibility study of a low grade iron ore http://mineralprocessingconsul...Pre- Feasibility study of a low grade iron ore http://mineralprocessingconsul...
Pre- Feasibility study of a low grade iron ore http://mineralprocessingconsul...
 
Uranium Ore Deposits
Uranium Ore DepositsUranium Ore Deposits
Uranium Ore Deposits
 
Types of classifiers
Types of classifiersTypes of classifiers
Types of classifiers
 
nickel Ore
nickel Orenickel Ore
nickel Ore
 
Mine dewatering techniques
Mine dewatering techniquesMine dewatering techniques
Mine dewatering techniques
 
Topic 2 the mining cycle
Topic 2  the mining cycleTopic 2  the mining cycle
Topic 2 the mining cycle
 
introduction to directional drilling
introduction to directional drillingintroduction to directional drilling
introduction to directional drilling
 
Phosphite ore deposits
Phosphite ore depositsPhosphite ore deposits
Phosphite ore deposits
 
Mine Waste Management
Mine Waste ManagementMine Waste Management
Mine Waste Management
 
Flotation mecanism
Flotation mecanismFlotation mecanism
Flotation mecanism
 
Pellet and its use in blast furnace
Pellet  and its use in blast furnacePellet  and its use in blast furnace
Pellet and its use in blast furnace
 
Uses of talc
Uses of talcUses of talc
Uses of talc
 
Lean Iron Ore Beneficiation in India
Lean Iron Ore Beneficiation in IndiaLean Iron Ore Beneficiation in India
Lean Iron Ore Beneficiation in India
 
Paper on-classification-and-classifiers
Paper on-classification-and-classifiersPaper on-classification-and-classifiers
Paper on-classification-and-classifiers
 
MINERAL PROCESSING SIMULATION USING MODSIM SOFWARE
MINERAL PROCESSING SIMULATION USING MODSIM SOFWAREMINERAL PROCESSING SIMULATION USING MODSIM SOFWARE
MINERAL PROCESSING SIMULATION USING MODSIM SOFWARE
 
Mineral Processing
Mineral ProcessingMineral Processing
Mineral Processing
 
Minning waste management
Minning waste managementMinning waste management
Minning waste management
 

Similar to Magnetite Projects in Australia

Nippon Dragon Resources Inc. Hard rock revolution has arrived!
Nippon Dragon Resources Inc. Hard rock revolution has arrived!Nippon Dragon Resources Inc. Hard rock revolution has arrived!
Nippon Dragon Resources Inc. Hard rock revolution has arrived!Nick Vukovich
 
Ken Edgar CV
Ken Edgar CVKen Edgar CV
Ken Edgar CVKen Edgar
 
HydroWorks innovation
HydroWorks innovationHydroWorks innovation
HydroWorks innovationIan McInnes
 
Hydroworks innovation
Hydroworks innovationHydroworks innovation
Hydroworks innovationIan McInnes
 
Blue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drillBlue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drillDeanGarratt
 
JacoBotha2015CV
JacoBotha2015CVJacoBotha2015CV
JacoBotha2015CVJaco Botha
 
APC Corporative Presentation
APC Corporative PresentationAPC Corporative Presentation
APC Corporative PresentationAna Piumbini
 
Recovery of Cyanide From Tailings Using Resins
Recovery of Cyanide From Tailings Using ResinsRecovery of Cyanide From Tailings Using Resins
Recovery of Cyanide From Tailings Using ResinsMidas Engineering Group
 
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South AustraliaMine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South AustraliaStephen McKnight
 
GWDC business-brochure-green PDF
GWDC business-brochure-green PDFGWDC business-brochure-green PDF
GWDC business-brochure-green PDFMiguel Roberg
 
Manhattan Small Scale Mining Plants
Manhattan Small Scale Mining PlantsManhattan Small Scale Mining Plants
Manhattan Small Scale Mining Plantsmanhattancorp
 
AZMET-Company Profile
AZMET-Company ProfileAZMET-Company Profile
AZMET-Company ProfileRuan Kukard
 

Similar to Magnetite Projects in Australia (20)

Managing our Most Precious Resource
Managing our Most Precious ResourceManaging our Most Precious Resource
Managing our Most Precious Resource
 
Removing Uranium & Thorium From Zircon
Removing Uranium & Thorium From ZirconRemoving Uranium & Thorium From Zircon
Removing Uranium & Thorium From Zircon
 
Nippon Dragon Resources Inc. Hard rock revolution has arrived!
Nippon Dragon Resources Inc. Hard rock revolution has arrived!Nippon Dragon Resources Inc. Hard rock revolution has arrived!
Nippon Dragon Resources Inc. Hard rock revolution has arrived!
 
CV_2016_rev_4_RW
CV_2016_rev_4_RWCV_2016_rev_4_RW
CV_2016_rev_4_RW
 
Ken Edgar CV
Ken Edgar CVKen Edgar CV
Ken Edgar CV
 
HydroWorks innovation
HydroWorks innovationHydroWorks innovation
HydroWorks innovation
 
Hydroworks innovation
Hydroworks innovationHydroworks innovation
Hydroworks innovation
 
Blue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drillBlue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drill
 
JacoBotha2015CV
JacoBotha2015CVJacoBotha2015CV
JacoBotha2015CV
 
APC Corporative Presentation
APC Corporative PresentationAPC Corporative Presentation
APC Corporative Presentation
 
Recovery of Cyanide From Tailings Using Resins
Recovery of Cyanide From Tailings Using ResinsRecovery of Cyanide From Tailings Using Resins
Recovery of Cyanide From Tailings Using Resins
 
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South AustraliaMine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
 
GWDC business-brochure-green PDF
GWDC business-brochure-green PDFGWDC business-brochure-green PDF
GWDC business-brochure-green PDF
 
Manhattan Small Scale Mining Plants
Manhattan Small Scale Mining PlantsManhattan Small Scale Mining Plants
Manhattan Small Scale Mining Plants
 
Concept to production - "The challenges of PM in the RNLI"
Concept to production - "The challenges of PM in the RNLI"Concept to production - "The challenges of PM in the RNLI"
Concept to production - "The challenges of PM in the RNLI"
 
Work Experience
Work ExperienceWork Experience
Work Experience
 
Dhanaji suravase resume
Dhanaji suravase resumeDhanaji suravase resume
Dhanaji suravase resume
 
AZMET-Company Profile
AZMET-Company ProfileAZMET-Company Profile
AZMET-Company Profile
 
AZMET-Company Profile
AZMET-Company ProfileAZMET-Company Profile
AZMET-Company Profile
 
AZMET-Company Profile
AZMET-Company ProfileAZMET-Company Profile
AZMET-Company Profile
 

More from Midas Engineering Group

More from Midas Engineering Group (6)

Heat Exchanges & Tubesheets - Design & Verification
Heat Exchanges & Tubesheets - Design & VerificationHeat Exchanges & Tubesheets - Design & Verification
Heat Exchanges & Tubesheets - Design & Verification
 
Focus on Local Value
Focus on Local ValueFocus on Local Value
Focus on Local Value
 
Solvent Extraction
Solvent ExtractionSolvent Extraction
Solvent Extraction
 
Occupational Health & Safety
Occupational Health & SafetyOccupational Health & Safety
Occupational Health & Safety
 
Flotation
FlotationFlotation
Flotation
 
Critical Issues with Water
Critical Issues with WaterCritical Issues with Water
Critical Issues with Water
 

Recently uploaded

UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Recently uploaded (20)

UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 

Magnetite Projects in Australia

  • 1. > M i n e r a l P r o c e s s i n g > E n g i n e e r i n g D e s i g n > T r a i n i n g > S p e c i a l i s t S e r v i c e s A division of Midas Engineering Group IRON ORE 2015 What is the Future for Magnetite Projects in Australia and Why Have Some of the New Projects Been so Problematic?
  • 2. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE • DISCLAIMER With respect to all the information contained herein, neither Mineral Engineering Technical Services, nor any officer, servant, employee, agent or consultant thereof make any representations or give any warranties, expressed or implied, as to the accuracy, reliability or completeness of the information contained herein, including but not limited to opinions, information or advice which may be provided to users of the document. No responsibility is accepted to users of this document for any consequence of relying on the contents hereof. • COPYRIGHT © Passing of this document to a third party, duplication or re-use of this document, in whole or part, electronically or otherwise, is not permitted without the expressed written consent of Mineral Engineering Technical Services. • ACKNOWLEDGEMENTS This document is a dynamic record of the knowledge and experience of personnel at Mineral Engineering Technical Services. As such it has been built upon over the years and is a collaborative effort by all those involved. We are thankful for the material supplied by and referenced from various equipment manufacturers, vendors, industry research and project partners.
  • 3. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Key Attributes • Working globally since 1988 • Dynamic and innovative niche consultancy • Dedicated team providing customised service • Specialist in Mineral Processing & Engineering Projects • Unique solution finder • A division of Midas Engineering Group
  • 4. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Introduction • Australia’s history is one of DSO of high grade hematite ores such as Mt Tom price and Mt Newman • Magnetite ore processing requires much higher OPEX and CAPEX compared to Direct Shipping Ores (DSO) • Magnetite projects presented are Savage River, Project Magnet, Sino Iron and Karara • Some new projects have been highly problematic-why is this? • Overseas projects have been successfully processing magnetite ores for long periods of time • Does magnetite processing have a future in Australia?
  • 5. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Iron Ore Price
  • 6. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Savage River Project • Started operation 1966 in Tasmania • 70 kms north west of Burnie • Mine and beneficiation plant at Savage River • Slurry pipeline from the mine to Port Latta • Fully integrated pellet plant • Currently coming under tight cost pressures • CAPEX depreciated long ago
  • 7. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Open Pits
  • 8. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Savage River
  • 9. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Operations
  • 10. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Product Prices
  • 11. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Operations Mining • Open pits 100 to 150m deep • Hydraulic excavators and conventional dump trucks • Grade control from drill blast holes Processing • 54/74 Primary gyratory to 200 mm, 100 t stockpile • 2 by Hardinge 9.75m by 3.66m autogenous grinding mills • 2 Nordberg 8.84m by 3.96m ball mills • Magnetic separation Slurry Pipeline • 83 kms through 229mm steel pipe • 50% w/w, 14 hours transport time Pellet Plant • Green pellets formed on balling disks with bentonite • 5 Midland Ross shaft pellet furnaces • 4.5 hrs heat induction, diesel fired • Fines screened out • Pellets stockpiled for shipment
  • 12. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Project Performance • Well established operation with a track record • Highly efficient operation, many improvements over time • Fully integrated to sell high value good quality pellets • Energy is a major cost in producing pellets • Small producer- 2.5 Mtpa on a global scale • Current cost $86.50/tonne and sale price $118.8/tonne (falling) • Current low iron ore prices are putting enormous pressure on the project
  • 13. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Project Magnet • Long established hematite DSO operation, pellet plant and steelworks • Changed Whyalla steelworks from hematite to magnetite $400M project • Operational in 2007 with early commissioning problems • Mine, concentrator and slurry pipeline • Integrated to produce pellets and steel
  • 14. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Project Magnet
  • 15. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Project Magnet Flowsheet
  • 16. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Operations
  • 17. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Project Performance • Early processing problems overcome • Exceeding design by 15%, CAPEX was modest • Achieving < 4.5% silica in concentrate • No reverse flotation or screening • All of the concentrate going to pellet production and blast furnaces, fully integrated project • Successful project although low prices are squeezing margins • Local shipment advantage - rail infrastructure
  • 18. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Citic Pacific-Sino Iron-Magnetite Project • Located near Dampier in the Pilbara region of Western Australia. • Citic Pacific Magnetite project (Pilbara region of WA) sources process water from a seawater desalination plant • Massive $A11BN project
  • 19. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Citic Pacific Project • Large open cut 80 Mtpa magnetite ore - massive projects • 24 Mtpa magnetite concentrate • 40 GLpa desalination plant • 600 MW combined cycle power station • Co-disposal tailings rapid water recovery Typical BIF magnetite core
  • 20. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Sino Iron Project
  • 21. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Large Scale – Sino Iron CITIC Pacific Mining
  • 22. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Process Flowsheet
  • 23. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Process Flowsheet • HPGR to 3mm • Coarse cobbing • Primary grind P80 55 µm • Intermediate magnetic separation • Final magnetic separation • Reverse flotation reduce silica <5% • Filtration concentrate to 9% moisture • Tailings flocculated co-disposal
  • 24. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Large Scale - Sino Iron CITIC Pacific Mining • Not just the largest but perhaps the highest?!
  • 25. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Predicted OPEX Magnetite
  • 26. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Reverse Osmosis Supply & Water Balance • Sea water feed-little choice • Energy recovery by recuperators • Producing 40 GLpa • (GL=1X109 and ML=1X106) Area of Use Annual Activity Water Usage Rate Water Consumption (GLpa) Mining Dust Supression 160Mtpa total movement in the mine 3% of material moved 4.8 Water in concentrate exiting the filter plant 24Mtpa produced 9% 2.2 Water in screened and filtered coarse tailings leaving the plant 56Mtpa 15% 8.4 Additional water for discharge of fine tailing 56Mtpa 28% 15.7 Evaporation in the plant 10% of water used in plant 2.0 Pellet Plant 14Mtpa 8% of pellets produced 1.1 Port Stockyard 24Mtpa 3% of material handled 0.7 Power Station 450MW for 7800 hrs 1.28m3 /MWh, mostly evaporated in cooling tower 4.5 Camp 4000 people 0.4m3 /day 0.6 Total 40.0
  • 27. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Project Performance • Citic as China’s largest conglomerate, its businesses include financial services, resources and energy, manufacturing, real estate and infrastructure, engineering contracting, and other businesses in China and overseas. • Eight years to develop the project • Plagued with delays and cost over runs • All infrastructure - power, water and port had to be established • Cultural language issues, issues with contractors • Painful learning process • Long life project so important to Chinese steel mills
  • 28. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Karara Magnetite Project • 225 km east of Geraldton, WA • JV Gindalbie Metals Ltd & Ansteel Group - $1.8BN to $2.5BN • 20 Mtpa raw feed to produce 8 Mtpa concentrate 68% Fe • Water supply from Tathra bore-field 140 kms • Dry stacked tailings • 80 km rail spur for concentrates to Geraldton
  • 29. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Gindalbie Project – Project Review Magnetite Project – Gindalbie Metals Ltd • High quality magnetite concentrate produced – approximately 8 Mtpa • Products: ― Mass Recovery: 41% with high Fe grade of 68.8% • Proposes three-stage grinding followed by magnetic separation • Proposes High Pressure Grinding Roll (HPGR) in the comminution circuit and magnetic separation in the beneficiation steps • Proposed Start of Operations: 2010
  • 30. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Gindalbie Magnetite
  • 31. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Gindalbie Magnetite (cont.)
  • 32. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Gindalbie Metals Flowsheet
  • 33. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Gindalbie Metals Flowsheet (cont.)
  • 34. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Cost Differential
  • 35. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Project Performance • Plant bottlenecks based on ASX announcements • Ore body not well understood • CAPEX blowout • OPEX higher than predicted • Low iron ore prices have exacerbated the issues • Ansteel has been a solid backer of the project • ASX announcements highlight the difficult situation the company finds itself in
  • 36. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Conclusions • Infrastructure cost for greenfield projects can be significant impediment for the development of magnetite projects • Savage River had power, water and was also depreciated years ago, coming under cost pressure. • Project Magnetite is an integrated project and has been a success although margins are being squeezed • Karara has struggled and survived because of Ansteel solid support • Citic Pacific has struggled and has been a very difficult project from a delivery and operation perspective • Current low iron ore price is a problem. Falling energy and labour costs will help • Lower returns will be accepted in line with falling interest rates
  • 37. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Conclusions • With the exception of FMG’s Iron Bridge North Star magnetite project all other magnetite projects are on hold • High grade DSO ores are being depleted and the future resources are magnetite ores • The characteristics of magnetite ores varies widely in hardness, liberation size and silica levels achievable • NPV & IRR for magnetite projects are currently problematic
  • 38. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE What did you get out of this presentation? Please share your thoughts in an informal discussion Questions ? Attendee Outcomes
  • 39. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE Acknowledgement • Thanks to AusIMM for the opportunity to present • Thanks to various companies, colleagues, engineers • METS staff and consultants
  • 40. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE References • Grange Resources, 2007. Southdown Magnetite Proposal. Albany Iron Ore Project Public Environmental Review. • Gindalbie Metals Ltd, Karara Mining Ltd, Anshan Iron and Steel Corporation, 2008. Karara Iron Ore Project Public Environmental Review. Gindalbie Metals Ltd. www.gindalbie.com.au • Arrium Mining & Materials. www.arrium.com • Citic Pacific Mining. www.citicpacificmining.com
  • 41. ENVIRONMENTAL PROCESSING DESIGN & VERIFICATION PRODUCT INNOVATION PROJECT MANAGEMENT OPERATIONS TRAINING SKILLS HIRE THANK YOU www.metsengineering.com