SlideShare a Scribd company logo
1 of 45
Download to read offline
> M i n e r a l P r o c e s s i n g > E n g i n e e r i n g D e s i g n > T r a i n i n g > S p e c i a l i s t S e r v i c e s> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Perth Brisbane Melbourne Noosa
L 6, 524 Hay St
Perth WA 6000
P: (+61 8) 9421 9000
PO Box 5778
St Georges Tce WA 6831
U 4,14 Merivale St
South Brisbane QLD 4101
P: (+61 7) 3029 6220
117 Miller St
Thornbury VIC 3071
P: (+61 3) 9495 2666
Se 7&16, L 1 Cooloola Centre
97 Poinciana Av, Tewantin QLD 4565
P: (+61 7) 5449 7137
PO Box 1153
Tewantin QLD 4565
ABN 66 009 357 171
E: info@metsengineering.com
W: www.metsengineering.com
SME Annual Meeting
Critical Issues With Water & Iron
Ore Beneficiation Plants
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
> DISCLAIMER
With respect to all the information contained herein, neither Mineral Engineering Technical Services Pty
Ltd, nor any officer, servant, employee, agent or consultant thereof make any representations or give
any warranties, expressed or implied, as to the accuracy, reliability or completeness of the information
contained herein, including but not limited to opinions, information or advice which may be provided to
users of the document. No responsibility is accepted to users of this document for any consequence of
relying on the contents hereof.
> COPYRIGHT ©
Passing of this document to a third party, duplication or re-use of this document, in whole or part,
electronically or otherwise, is not permitted without the expressed written consent of Mineral
Engineering Technical Services Pty Ltd.
> ACKNOWLEDGEMENTS
This document is a dynamic record of the knowledge and experience of personnel at Mineral
Engineering Technical Services. As such it has been built upon over the years and is a collaborative
effort by all those involved. We are thankful for the material supplied by and referenced from various
equipment manufacturers, vendors, industry research and project partners.
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Key Attributes
> Working globally since 1988
> Dynamic and innovative niche consultancy
> Dedicated team providing customised service
> Specialist in Mineral Processing & Engineering Projects
> Unique solution finder
Pragmatic, efficient, complete engineering through
quality, personalised & exceptional service delivery
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
The Group
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
> Water is critical for ore processing and in short supply
> Three magnetite projects - 3 different solutions
> Balmoral Magnetite Project
> Karara Magnetite Project
> Southdown Magnetite Project
> Common themes and differences with each project
> Specific issues to magnetite processing - new industry for WA
> Summary & findings
Introduction
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Water Scarcity in Australia
new
magnetite
projects
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Water Use In Australia
70%
8%
8%
6%
3%
3% 2%
Agriculture
Households
Water servcies
Electricity and gas
Manufacturing
Mining
Other
Agriculture
Households
Water services
Electricity and gas
Manufacturing
Mining
Other
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Total Water Use In WA 1999-2000
> Total: 1790 GL/ yr
> Mining: 430 GL/yr
Irrigated agriculture,
40%
Mining, 24%
Industry, 4%
Services, 7%
Parks and Gardens, 4%
Households, 13%
Garden bores, 5%
Stock water, 3%
Mining % is growing - 2007 it was 72% of all water used in Pilbara
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Water Licence Allocation By Minerals
in WA 1999-2000
Gold, 50%
Iron, 16%
Nickel, 12%
Manganese, 8%
Heavy Mineral
Sands, 6%
Alumina, 2%
Coal, 2%
Base metals, 2%
Others, 1%
Diamonds, 1%
GOLD, IRON, MANGANESE and
NICKEL account for 86% of total
water allocation
Competing uses for water
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Important Aspects Water
> Australia is one of the driest continents
> No large rivers
> Murray-Darling is in trouble
> Significant rainfall in the tropical north - short duration, rapid run off, no
storage
> Many competing uses for water - mining has no special privilege
> Attitudes to water use are changing
> Roxby- Great Artesian Basin - mound springs
> Millstream - water millions of years old - drawdown
> National policies are being formulated- COAG Water Reforms
– Water trading
– Ground water management plans
– Equitable allocations
– Charging for extraction
– Economically sustainable
– Environmental acceptance
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Just As Important As The Ore
> Transport of ores and waste
> Grinding and separation-critical-must have
> Mineral separation
> Cooling
> Dust suppression
> Washing equipment
> Human consumption
> Manage mine dewatering
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Magnetite Advantages
> Previously based on DSO hematite ores
> New projects for Western Australia
> Exothermic in processing
> Easily upgraded to high grade concentrates (68-71% Fe)
> Low in deleterious elements (silica only issue)
> Suitable for high quality pellets
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Balmoral South Project
> Large open cut 80 Mtpa
magnetite ore - massive
projects
> 24 Mtpa magnetite
concentrate
> 40 GLpa desalination
plant
> 600 MW combined cycle
power station
> Filtration of tailings and
dry stacking
80 km South West of Karratha
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Water Loss For Balmoral Project
Area of Use
Annual
Activity
Water Usage Rate
Water
Consumption (GLpa)
Mining Dust Suppression 160Mtpa total movement in the mine 3% of material moved 4.8
Water in concentrate exiting the filter plant 24Mtpa produced 9% 2.2
Water in screened and filtered coarse
tailings leaving the plant
56Mtpa 15% 8.4
Additional water for discharge of fine
tailing
56Mtpa 28% 15.7
Evaporation in the plant 10% of water used in plant 2.0
Pellet Plant 14Mtpa 8% of pellets produced 1.1
Port Stockyard 24Mtpa 3% of material handled 0.7
Power Station 450MW for 7800 hrs 1.28m3/MWh, mostly evaporated in
cooling tower
4.5
Camp 4000 people 0.4m3/day 0.6
Total 40.0
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Reverse Osmosis Supply & Water Balance
> Sea water feed-little choice
> Energy recovery by recuperators
> Producing 40 GLpa
> (GL=1X109 and ML=1X106)
Area of Use
Annual
Activity
Water Usage Rate
Water
Consumption (GLpa)
Mining Dust Supression 160Mtpa total movement in
the mine
3% of material moved 4.8
Water in concentrate exiting the
filter plant
24Mtpa produced 9% 2.2
Water in screened and filtered
coarse tailings leaving the plant
56Mtpa 15% 8.4
Additional water for discharge of
fine tailing
56Mtpa 28% 15.7
Evaporation in the plant 10% of water used in plant 2.0
Pellet Plant 14Mtpa 8% of pellets produced 1.1
Port Stockyard 24Mtpa 3% of material handled 0.7
Power Station 450MW for 7800 hrs 1.28m3
/MWh, mostly
evaporated in cooling tower
4.5
Camp 4000 people 0.4m3
/day 0.6
Total 40.0
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Reverse Osmosis (RO)
> Separates dissolved solids
> Membrane technology getting
better - cost/life
> Yield of product depends on
feed quality
> Energy biggest cost $$$-
recuperators
> Scaling, fouling, chemical
cleaning
> Some opposition from Green
groups re brine outfall
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Reverse Osmosis – 1
(Including Ultrafiltration & Nanofiltration)
> Reverse Osmosis (RO)
- Non-selective soluble salts removal
> Ultrafiltration (UF) / Nanofiltration
(NF)
- Selective soluble salts removal
> Desalination / Demineralisation
- multi-stage / two pass
> Water Recovery
- 50 to 95% vol., limited by SiO2 and
gypsum, etc.
> Salt Rejection
- generally 95-99.8%
> 50% waste stream from seawater
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Chemicals Used in Water Treatment
Dosing chemical Purpose
Dosing
concentrat’n
ppm
Discharge
concentration
ppm
Modelled Mixing-
zone boundary
concentration ppm
(refer Appendix F)
Sodium Hypochlorite NaOCl Intake. Intermittent
oxidiser
5 nil nil
Sulphuric Acid H2SO4 Pre-treatment.
Continuous
29 nil nil
Ferric Sulphate Fe2(SO4)3 Pre-treatment.
Continuous
12 8.0 – discharged as
Ferrous Hydroxide
0.3
0.2
Polymer (anionic
polyacrilic such as Nalco 8103 Plus
or equivalent)
Flocculant. Continuous 0.3 0.5 Nil
SBS (Sodium Bisulphite) Pre-treat
intermittent oxidiser
10 nil nil
Anti-scalant (Permatreat PC 191 or
equivalent)
RO. Continuous 1.5 2.2 0.05
Lime Pre-treatment.
Continuous
46 2 – discharged as
silicate impurities
0.05
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
> Selective Separation
- based on ionic radius and molecular charge
- eg. sulphate (multivalent) / chloride
(monovalent)
> Capital Cost (1-5 ML/day plant size):
(reducing yr on yr)
- Brackish: $600/ML/day product water
- Seawater: $1,200/ML/day product
water
> Operating cost:
> (reducing yr on yr)
-Brackish: $0.40/kL produced
-Seawater: $0.70 to 1.40/kL produced
Reverse Osmosis CAPEX OPEX
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Process Flowsheet
> HPGR to 3mm
> Coarse cobbing
> Primary grind P80 55 µm
> Intermediate magnetic
separation
> Final magnetic separation
> Reverse flotation reduce
silica<5%
> Filtration concentrate to
9% moisture
> Dry stacked tailings
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Karara Magnetite Project
> 225 km east of Geraldton
> JV Gindalbie Metals Ltd &
Anshan Iron & Steel Group
> 20 Mtpa raw feed to produce
8 Mtpa concentrate 68% Fe
> Water supply from bore-field
> Dry stacked tailings
> Slurry pipeline concentrates
to Geraldton
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Ground Water Analysis
Groundwater Sub Area and Aquifer Twin Hills GWSA
(Yarragadee aquifer)
Available for allocation (GL/a) 48
Allocation being sought (GL/a) 6.6
pH - 6.6
TDS mg/l 780 (grav)
Silica mg/l 23
Sulphate mg/l 110
Iron mg/l 0.58
Manganese mg/l 0.08
Nitrate mg/l <0.02
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Karara Process Flowsheet
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Southdown Magnetite Project
> 90 km northeast of Albany
> 6.6 Mtpa concentrate -120 km
concentrate pipeline
> Water supply from pit
dewatering and precipitation
run off
> Conventional tailings dam and
tailings return water
> Low evaporation rates
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Thickener Components - Water Recovery
FEED
OVERFLOW
UNDERFLOW
Sludge Rake
Feed Well
Overflow
Launder
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Filter Presses - Final Water Recovery
> Set of vertical, recessed plates
> Plates
– Covered with filter medium
– Central feed port
– Ports at corners to collect filtrate
> Plates are pressed together to form series of
chambers
Typical Filter Press
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Filter Press Operation Cycle
> Chamber filling
> Slurry pumped into feed port
> Chambers fill with slurry
> Pressing
> Uses hydraulic or mechanical system
> Applies pressure to plates ~6 bar
> Liquor squeezed into filter media
> Wash water may be added and sequence
repeats
> Cake collection
> Plates separate and cake falls free
> Plates return to original position
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Filter Press Sequence
CHAMBER FILLING
PRESSING
CAKE COLLECTION
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Southdown Magnetite Process Flowsheet
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Magnetite Processing Common
Themes & Differences
> Availability of water, water conservation and high cost of water are
common themes
> Water is scarce and the cost of acquiring process water is increasing
> Water quality is important with chloride limits in the product &
processing issues
> Balmoral use sea water, Karara use bore water and Southdown use pit
dewatering and run off water
> Water is a sensitive environmental issue
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Water Quality For Processing
> Salinity
- Fresh water - Less than 1,000 ppm
- Slightly saline water - From 1,000
ppm to 3,000 ppm
- Moderately saline water - From
3,000 ppm to 10,000 ppm
- Highly saline water - From 10,000
ppm to 35,000 ppm
- Ocean water contains about 35,000
ppm of salt
- Hypersaline - >35,000 ppm TDS
> Acidity alkalinity
> Chemical analysis
> Pollutants
> Hardness
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Water Quality For Processing
> Water quality is an important issue in mineral processing operations
such as flotation, flocculation, gravity & magnetic separation, grinding,
thickening and filtration
> Approximately 80% of water utilised by the mineral industry is sourced
from underground- bore fields- desalination is a relatively new source
> Water strategy in terms of quality: “fit for purpose”
> Examples:
- Mt Keith Nickel Project: uses 15,000 – 20,000 mg/L TDS
- Some gold projects in WA: use 300,000 mg/L TDS with pH 3-3.5 for CIP/CIL
- Plutonic good quality water- SRB’s (sulphate reducing bacteria)
- Paddington- HCN gas levels
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Water Quality Issues
> Accumulation of chemical species in recycled water
> Climate impacts on recycled water - build up of salts
> Use of ground water impacts on quality
> Increased cost of water
> Increased maintenance - corrosion issues
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Conduct A Water Audit & Analysis
> The water quality circuit constitutes a complex system
> System analysis - absolutely necessary
> Three main levels at which a system can be identified
Level 1 – Unit Operations
Level 2 – Processing Plant
Level 3 – Site Water Tasks
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Possible Outcomes from Circuit Analysis
> Model water circuit - scenarios
> Classify water qualities
> Highlight areas of water loss
> Possibilities for re-use
> Economics of water sourcing &
re-use
> Conclusions &
recommendations from above
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Licences & Regulations
> Water licence quota – Department of Water (DoW-
Western Australia)
> Bore-field Monitoring and reporting of draw down,
volume and analysis of water quality
> Seepage monitoring bores adjacent to tailings dams
and heavy metal maximum levels in the
groundwater allowable
> Annual reporting requirement
> Draft Pilbara Water In Mining Guideline, DoW, Feb
2009
> Final Pre-Feasibility Study Report On Pilbara
Integrated Water Supply, DoW, May 2009.
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Methodology for Appraising a
Waste Water Re-use Project
> Internal recycling
- Low tech, low risk
- Fast track, greatest impact
- Lowest capital and operating cost
> Holistic Approach – Consider
- Total capital and operating cost (life cost)
- Mineral processing plus waste management
- Various waste treatment options
- Various water quality requirements
- Minimise processing of water
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Classify Water Types & Quality
> Start paying attention to types, use and quality
> Raw water (bore water, sea water, stream)
> Tailings return water
> Process water (worked water)
> Potable water (drinking)
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Water Balance
> Water In= Water out but can
you account for it ?
> Seasonal changes upset the
balance - tropical vs. dry
climate
> Ore type can change the
balance - clays
> Cant manage what you don’t
measure
> High evaporation rates
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Specific Magnetite Issues
> Water quality important for reverse flotation (no slimes)
> Product has limits with respect to salt content
> Balmoral/Karara/Southdown different approaches - location
> Filtration of large volumes of tailings is mandatory and has
not been done before
> Desalination has environmental issues with respect to
reject stream dispersion
> Bores can only be used on a sustainable basis - reporting,
license, no drawdown, black art
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Specific Magnetite Issues
> Mineral processing can improve its management of water
quality
> Mineral processing plants can improve recycling
> Auditing and system analysis will assist and is the most
appropriate
> Water circuits are complex
> Industry will face a number of challenges with water
> Desalination is only a part of the solution
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Summary
> Water has to be managed as a precious
resource
> Quantity & quality
> Cost likely to increase - fees for extraction?
> Recycling should be a high priority
> Carry out a risk assessment
> Assess effect of water on process
> Management based on measurement - Risk
Analysis
> Water Issues are complex and cannot be
considered in isolation - many impacting
factors
> Mining companies must win the
environmental hearts and minds of people in
the cities
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
What did you get out of this presentation?
Please share your thoughts in an informal discussion
Questions ?
Attendee Outcomes
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
Acknowledgement
> Thanks to SME for the opportunity to present
> Thanks to various companies, colleagues, engineers
> METS staff and consultants
> Thanks to laboratory staff
> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services
THANK YOU
www.metsengineering.com

More Related Content

Similar to Critical Issues with Water

CEC Experience Certificate
CEC Experience CertificateCEC Experience Certificate
CEC Experience Certificate
Ahmed Mishrif
 
Produced water overview ppt, Oct 2011, M Rashid
Produced water overview ppt, Oct 2011, M RashidProduced water overview ppt, Oct 2011, M Rashid
Produced water overview ppt, Oct 2011, M Rashid
Mahbubur Rashid
 
Andrew Theobald - 2015 Resume Rev0
Andrew Theobald - 2015 Resume Rev0Andrew Theobald - 2015 Resume Rev0
Andrew Theobald - 2015 Resume Rev0
Andrew Theobald
 

Similar to Critical Issues with Water (20)

Perusahaan Pembuat IPAL
Perusahaan Pembuat IPALPerusahaan Pembuat IPAL
Perusahaan Pembuat IPAL
 
Water & Waste Water Expert Company - Fujikasui Engineering Indonesia
Water & Waste Water Expert Company - Fujikasui Engineering IndonesiaWater & Waste Water Expert Company - Fujikasui Engineering Indonesia
Water & Waste Water Expert Company - Fujikasui Engineering Indonesia
 
Ahli Pengolah Limbah - Fujikasui Engineering Indonesia
Ahli Pengolah Limbah - Fujikasui Engineering IndonesiaAhli Pengolah Limbah - Fujikasui Engineering Indonesia
Ahli Pengolah Limbah - Fujikasui Engineering Indonesia
 
PERUSAHAAN ENGINEERING AIR
PERUSAHAAN ENGINEERING AIRPERUSAHAAN ENGINEERING AIR
PERUSAHAAN ENGINEERING AIR
 
Instalasi Pengolahan Air Limbah -- Ahlinya ya.. Fujikasui Engineering
Instalasi Pengolahan Air Limbah -- Ahlinya ya.. Fujikasui EngineeringInstalasi Pengolahan Air Limbah -- Ahlinya ya.. Fujikasui Engineering
Instalasi Pengolahan Air Limbah -- Ahlinya ya.. Fujikasui Engineering
 
DEGRÉMONT INDUSTRY CORPORATE BROCHURE 2013
DEGRÉMONT INDUSTRY CORPORATE BROCHURE 2013DEGRÉMONT INDUSTRY CORPORATE BROCHURE 2013
DEGRÉMONT INDUSTRY CORPORATE BROCHURE 2013
 
Phytorid for bio-remediation of lakes
Phytorid for bio-remediation of lakesPhytorid for bio-remediation of lakes
Phytorid for bio-remediation of lakes
 
EN - Degremont Industry presentation brochure
EN  - Degremont Industry presentation brochureEN  - Degremont Industry presentation brochure
EN - Degremont Industry presentation brochure
 
IES PPT 28.01.2016
IES PPT 28.01.2016IES PPT 28.01.2016
IES PPT 28.01.2016
 
Introducing Process Group
Introducing Process GroupIntroducing Process Group
Introducing Process Group
 
--Ragu 09-02-15
--Ragu 09-02-15--Ragu 09-02-15
--Ragu 09-02-15
 
younggeun_Lee.pdf
younggeun_Lee.pdfyounggeun_Lee.pdf
younggeun_Lee.pdf
 
IRJET- Hydraulic and Structural Design of Water Treatment Plant
IRJET- Hydraulic and Structural Design of Water Treatment PlantIRJET- Hydraulic and Structural Design of Water Treatment Plant
IRJET- Hydraulic and Structural Design of Water Treatment Plant
 
cirriculum vitae Sep15
cirriculum vitae Sep15cirriculum vitae Sep15
cirriculum vitae Sep15
 
CEC Experience Certificate
CEC Experience CertificateCEC Experience Certificate
CEC Experience Certificate
 
Produced water overview ppt, Oct 2011, M Rashid
Produced water overview ppt, Oct 2011, M RashidProduced water overview ppt, Oct 2011, M Rashid
Produced water overview ppt, Oct 2011, M Rashid
 
Sornaboopathi Resume
Sornaboopathi ResumeSornaboopathi Resume
Sornaboopathi Resume
 
NaWaTech presentation iswats
NaWaTech presentation iswatsNaWaTech presentation iswats
NaWaTech presentation iswats
 
Andrew Theobald - 2015 Resume Rev0
Andrew Theobald - 2015 Resume Rev0Andrew Theobald - 2015 Resume Rev0
Andrew Theobald - 2015 Resume Rev0
 
Aquatis brochure A4-lowres
Aquatis brochure A4-lowresAquatis brochure A4-lowres
Aquatis brochure A4-lowres
 

More from Midas Engineering Group

More from Midas Engineering Group (9)

Heat Exchanges & Tubesheets - Design & Verification
Heat Exchanges & Tubesheets - Design & VerificationHeat Exchanges & Tubesheets - Design & Verification
Heat Exchanges & Tubesheets - Design & Verification
 
Focus on Local Value
Focus on Local ValueFocus on Local Value
Focus on Local Value
 
Solvent Extraction
Solvent ExtractionSolvent Extraction
Solvent Extraction
 
Recovery of Cyanide From Tailings Using Resins
Recovery of Cyanide From Tailings Using ResinsRecovery of Cyanide From Tailings Using Resins
Recovery of Cyanide From Tailings Using Resins
 
Occupational Health & Safety
Occupational Health & SafetyOccupational Health & Safety
Occupational Health & Safety
 
Nickel Processing and The Rise of Laterites
Nickel Processing and The Rise of LateritesNickel Processing and The Rise of Laterites
Nickel Processing and The Rise of Laterites
 
HPGR and Iron Ore Processing
HPGR and Iron Ore ProcessingHPGR and Iron Ore Processing
HPGR and Iron Ore Processing
 
Flotation
FlotationFlotation
Flotation
 
Removing Uranium & Thorium From Zircon
Removing Uranium & Thorium From ZirconRemoving Uranium & Thorium From Zircon
Removing Uranium & Thorium From Zircon
 

Recently uploaded

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 

Recently uploaded (20)

MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Critical Issues with Water

  • 1. > M i n e r a l P r o c e s s i n g > E n g i n e e r i n g D e s i g n > T r a i n i n g > S p e c i a l i s t S e r v i c e s> RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Perth Brisbane Melbourne Noosa L 6, 524 Hay St Perth WA 6000 P: (+61 8) 9421 9000 PO Box 5778 St Georges Tce WA 6831 U 4,14 Merivale St South Brisbane QLD 4101 P: (+61 7) 3029 6220 117 Miller St Thornbury VIC 3071 P: (+61 3) 9495 2666 Se 7&16, L 1 Cooloola Centre 97 Poinciana Av, Tewantin QLD 4565 P: (+61 7) 5449 7137 PO Box 1153 Tewantin QLD 4565 ABN 66 009 357 171 E: info@metsengineering.com W: www.metsengineering.com SME Annual Meeting Critical Issues With Water & Iron Ore Beneficiation Plants
  • 2. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services > DISCLAIMER With respect to all the information contained herein, neither Mineral Engineering Technical Services Pty Ltd, nor any officer, servant, employee, agent or consultant thereof make any representations or give any warranties, expressed or implied, as to the accuracy, reliability or completeness of the information contained herein, including but not limited to opinions, information or advice which may be provided to users of the document. No responsibility is accepted to users of this document for any consequence of relying on the contents hereof. > COPYRIGHT © Passing of this document to a third party, duplication or re-use of this document, in whole or part, electronically or otherwise, is not permitted without the expressed written consent of Mineral Engineering Technical Services Pty Ltd. > ACKNOWLEDGEMENTS This document is a dynamic record of the knowledge and experience of personnel at Mineral Engineering Technical Services. As such it has been built upon over the years and is a collaborative effort by all those involved. We are thankful for the material supplied by and referenced from various equipment manufacturers, vendors, industry research and project partners.
  • 3. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Key Attributes > Working globally since 1988 > Dynamic and innovative niche consultancy > Dedicated team providing customised service > Specialist in Mineral Processing & Engineering Projects > Unique solution finder Pragmatic, efficient, complete engineering through quality, personalised & exceptional service delivery
  • 4. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services The Group
  • 5. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services > Water is critical for ore processing and in short supply > Three magnetite projects - 3 different solutions > Balmoral Magnetite Project > Karara Magnetite Project > Southdown Magnetite Project > Common themes and differences with each project > Specific issues to magnetite processing - new industry for WA > Summary & findings Introduction
  • 6. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Water Scarcity in Australia new magnetite projects
  • 7. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Water Use In Australia 70% 8% 8% 6% 3% 3% 2% Agriculture Households Water servcies Electricity and gas Manufacturing Mining Other Agriculture Households Water services Electricity and gas Manufacturing Mining Other
  • 8. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Total Water Use In WA 1999-2000 > Total: 1790 GL/ yr > Mining: 430 GL/yr Irrigated agriculture, 40% Mining, 24% Industry, 4% Services, 7% Parks and Gardens, 4% Households, 13% Garden bores, 5% Stock water, 3% Mining % is growing - 2007 it was 72% of all water used in Pilbara
  • 9. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Water Licence Allocation By Minerals in WA 1999-2000 Gold, 50% Iron, 16% Nickel, 12% Manganese, 8% Heavy Mineral Sands, 6% Alumina, 2% Coal, 2% Base metals, 2% Others, 1% Diamonds, 1% GOLD, IRON, MANGANESE and NICKEL account for 86% of total water allocation Competing uses for water
  • 10. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Important Aspects Water > Australia is one of the driest continents > No large rivers > Murray-Darling is in trouble > Significant rainfall in the tropical north - short duration, rapid run off, no storage > Many competing uses for water - mining has no special privilege > Attitudes to water use are changing > Roxby- Great Artesian Basin - mound springs > Millstream - water millions of years old - drawdown > National policies are being formulated- COAG Water Reforms – Water trading – Ground water management plans – Equitable allocations – Charging for extraction – Economically sustainable – Environmental acceptance
  • 11. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Just As Important As The Ore > Transport of ores and waste > Grinding and separation-critical-must have > Mineral separation > Cooling > Dust suppression > Washing equipment > Human consumption > Manage mine dewatering
  • 12. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Magnetite Advantages > Previously based on DSO hematite ores > New projects for Western Australia > Exothermic in processing > Easily upgraded to high grade concentrates (68-71% Fe) > Low in deleterious elements (silica only issue) > Suitable for high quality pellets
  • 13. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Balmoral South Project > Large open cut 80 Mtpa magnetite ore - massive projects > 24 Mtpa magnetite concentrate > 40 GLpa desalination plant > 600 MW combined cycle power station > Filtration of tailings and dry stacking 80 km South West of Karratha
  • 14. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Water Loss For Balmoral Project Area of Use Annual Activity Water Usage Rate Water Consumption (GLpa) Mining Dust Suppression 160Mtpa total movement in the mine 3% of material moved 4.8 Water in concentrate exiting the filter plant 24Mtpa produced 9% 2.2 Water in screened and filtered coarse tailings leaving the plant 56Mtpa 15% 8.4 Additional water for discharge of fine tailing 56Mtpa 28% 15.7 Evaporation in the plant 10% of water used in plant 2.0 Pellet Plant 14Mtpa 8% of pellets produced 1.1 Port Stockyard 24Mtpa 3% of material handled 0.7 Power Station 450MW for 7800 hrs 1.28m3/MWh, mostly evaporated in cooling tower 4.5 Camp 4000 people 0.4m3/day 0.6 Total 40.0
  • 15. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Reverse Osmosis Supply & Water Balance > Sea water feed-little choice > Energy recovery by recuperators > Producing 40 GLpa > (GL=1X109 and ML=1X106) Area of Use Annual Activity Water Usage Rate Water Consumption (GLpa) Mining Dust Supression 160Mtpa total movement in the mine 3% of material moved 4.8 Water in concentrate exiting the filter plant 24Mtpa produced 9% 2.2 Water in screened and filtered coarse tailings leaving the plant 56Mtpa 15% 8.4 Additional water for discharge of fine tailing 56Mtpa 28% 15.7 Evaporation in the plant 10% of water used in plant 2.0 Pellet Plant 14Mtpa 8% of pellets produced 1.1 Port Stockyard 24Mtpa 3% of material handled 0.7 Power Station 450MW for 7800 hrs 1.28m3 /MWh, mostly evaporated in cooling tower 4.5 Camp 4000 people 0.4m3 /day 0.6 Total 40.0
  • 16. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Reverse Osmosis (RO) > Separates dissolved solids > Membrane technology getting better - cost/life > Yield of product depends on feed quality > Energy biggest cost $$$- recuperators > Scaling, fouling, chemical cleaning > Some opposition from Green groups re brine outfall
  • 17. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Reverse Osmosis – 1 (Including Ultrafiltration & Nanofiltration) > Reverse Osmosis (RO) - Non-selective soluble salts removal > Ultrafiltration (UF) / Nanofiltration (NF) - Selective soluble salts removal > Desalination / Demineralisation - multi-stage / two pass > Water Recovery - 50 to 95% vol., limited by SiO2 and gypsum, etc. > Salt Rejection - generally 95-99.8% > 50% waste stream from seawater
  • 18. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Chemicals Used in Water Treatment Dosing chemical Purpose Dosing concentrat’n ppm Discharge concentration ppm Modelled Mixing- zone boundary concentration ppm (refer Appendix F) Sodium Hypochlorite NaOCl Intake. Intermittent oxidiser 5 nil nil Sulphuric Acid H2SO4 Pre-treatment. Continuous 29 nil nil Ferric Sulphate Fe2(SO4)3 Pre-treatment. Continuous 12 8.0 – discharged as Ferrous Hydroxide 0.3 0.2 Polymer (anionic polyacrilic such as Nalco 8103 Plus or equivalent) Flocculant. Continuous 0.3 0.5 Nil SBS (Sodium Bisulphite) Pre-treat intermittent oxidiser 10 nil nil Anti-scalant (Permatreat PC 191 or equivalent) RO. Continuous 1.5 2.2 0.05 Lime Pre-treatment. Continuous 46 2 – discharged as silicate impurities 0.05
  • 19. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services > Selective Separation - based on ionic radius and molecular charge - eg. sulphate (multivalent) / chloride (monovalent) > Capital Cost (1-5 ML/day plant size): (reducing yr on yr) - Brackish: $600/ML/day product water - Seawater: $1,200/ML/day product water > Operating cost: > (reducing yr on yr) -Brackish: $0.40/kL produced -Seawater: $0.70 to 1.40/kL produced Reverse Osmosis CAPEX OPEX
  • 20. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Process Flowsheet > HPGR to 3mm > Coarse cobbing > Primary grind P80 55 µm > Intermediate magnetic separation > Final magnetic separation > Reverse flotation reduce silica<5% > Filtration concentrate to 9% moisture > Dry stacked tailings
  • 21. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Karara Magnetite Project > 225 km east of Geraldton > JV Gindalbie Metals Ltd & Anshan Iron & Steel Group > 20 Mtpa raw feed to produce 8 Mtpa concentrate 68% Fe > Water supply from bore-field > Dry stacked tailings > Slurry pipeline concentrates to Geraldton
  • 22. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Ground Water Analysis Groundwater Sub Area and Aquifer Twin Hills GWSA (Yarragadee aquifer) Available for allocation (GL/a) 48 Allocation being sought (GL/a) 6.6 pH - 6.6 TDS mg/l 780 (grav) Silica mg/l 23 Sulphate mg/l 110 Iron mg/l 0.58 Manganese mg/l 0.08 Nitrate mg/l <0.02
  • 23. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Karara Process Flowsheet
  • 24. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Southdown Magnetite Project > 90 km northeast of Albany > 6.6 Mtpa concentrate -120 km concentrate pipeline > Water supply from pit dewatering and precipitation run off > Conventional tailings dam and tailings return water > Low evaporation rates
  • 25. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Thickener Components - Water Recovery FEED OVERFLOW UNDERFLOW Sludge Rake Feed Well Overflow Launder
  • 26. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Filter Presses - Final Water Recovery > Set of vertical, recessed plates > Plates – Covered with filter medium – Central feed port – Ports at corners to collect filtrate > Plates are pressed together to form series of chambers Typical Filter Press
  • 27. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Filter Press Operation Cycle > Chamber filling > Slurry pumped into feed port > Chambers fill with slurry > Pressing > Uses hydraulic or mechanical system > Applies pressure to plates ~6 bar > Liquor squeezed into filter media > Wash water may be added and sequence repeats > Cake collection > Plates separate and cake falls free > Plates return to original position
  • 28. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Filter Press Sequence CHAMBER FILLING PRESSING CAKE COLLECTION
  • 29. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Southdown Magnetite Process Flowsheet
  • 30. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Magnetite Processing Common Themes & Differences > Availability of water, water conservation and high cost of water are common themes > Water is scarce and the cost of acquiring process water is increasing > Water quality is important with chloride limits in the product & processing issues > Balmoral use sea water, Karara use bore water and Southdown use pit dewatering and run off water > Water is a sensitive environmental issue
  • 31. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Water Quality For Processing > Salinity - Fresh water - Less than 1,000 ppm - Slightly saline water - From 1,000 ppm to 3,000 ppm - Moderately saline water - From 3,000 ppm to 10,000 ppm - Highly saline water - From 10,000 ppm to 35,000 ppm - Ocean water contains about 35,000 ppm of salt - Hypersaline - >35,000 ppm TDS > Acidity alkalinity > Chemical analysis > Pollutants > Hardness
  • 32. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Water Quality For Processing > Water quality is an important issue in mineral processing operations such as flotation, flocculation, gravity & magnetic separation, grinding, thickening and filtration > Approximately 80% of water utilised by the mineral industry is sourced from underground- bore fields- desalination is a relatively new source > Water strategy in terms of quality: “fit for purpose” > Examples: - Mt Keith Nickel Project: uses 15,000 – 20,000 mg/L TDS - Some gold projects in WA: use 300,000 mg/L TDS with pH 3-3.5 for CIP/CIL - Plutonic good quality water- SRB’s (sulphate reducing bacteria) - Paddington- HCN gas levels
  • 33. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Water Quality Issues > Accumulation of chemical species in recycled water > Climate impacts on recycled water - build up of salts > Use of ground water impacts on quality > Increased cost of water > Increased maintenance - corrosion issues
  • 34. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Conduct A Water Audit & Analysis > The water quality circuit constitutes a complex system > System analysis - absolutely necessary > Three main levels at which a system can be identified Level 1 – Unit Operations Level 2 – Processing Plant Level 3 – Site Water Tasks
  • 35. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Possible Outcomes from Circuit Analysis > Model water circuit - scenarios > Classify water qualities > Highlight areas of water loss > Possibilities for re-use > Economics of water sourcing & re-use > Conclusions & recommendations from above
  • 36. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Licences & Regulations > Water licence quota – Department of Water (DoW- Western Australia) > Bore-field Monitoring and reporting of draw down, volume and analysis of water quality > Seepage monitoring bores adjacent to tailings dams and heavy metal maximum levels in the groundwater allowable > Annual reporting requirement > Draft Pilbara Water In Mining Guideline, DoW, Feb 2009 > Final Pre-Feasibility Study Report On Pilbara Integrated Water Supply, DoW, May 2009.
  • 37. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Methodology for Appraising a Waste Water Re-use Project > Internal recycling - Low tech, low risk - Fast track, greatest impact - Lowest capital and operating cost > Holistic Approach – Consider - Total capital and operating cost (life cost) - Mineral processing plus waste management - Various waste treatment options - Various water quality requirements - Minimise processing of water
  • 38. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Classify Water Types & Quality > Start paying attention to types, use and quality > Raw water (bore water, sea water, stream) > Tailings return water > Process water (worked water) > Potable water (drinking)
  • 39. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Water Balance > Water In= Water out but can you account for it ? > Seasonal changes upset the balance - tropical vs. dry climate > Ore type can change the balance - clays > Cant manage what you don’t measure > High evaporation rates
  • 40. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Specific Magnetite Issues > Water quality important for reverse flotation (no slimes) > Product has limits with respect to salt content > Balmoral/Karara/Southdown different approaches - location > Filtration of large volumes of tailings is mandatory and has not been done before > Desalination has environmental issues with respect to reject stream dispersion > Bores can only be used on a sustainable basis - reporting, license, no drawdown, black art
  • 41. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Specific Magnetite Issues > Mineral processing can improve its management of water quality > Mineral processing plants can improve recycling > Auditing and system analysis will assist and is the most appropriate > Water circuits are complex > Industry will face a number of challenges with water > Desalination is only a part of the solution
  • 42. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Summary > Water has to be managed as a precious resource > Quantity & quality > Cost likely to increase - fees for extraction? > Recycling should be a high priority > Carry out a risk assessment > Assess effect of water on process > Management based on measurement - Risk Analysis > Water Issues are complex and cannot be considered in isolation - many impacting factors > Mining companies must win the environmental hearts and minds of people in the cities
  • 43. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services What did you get out of this presentation? Please share your thoughts in an informal discussion Questions ? Attendee Outcomes
  • 44. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services Acknowledgement > Thanks to SME for the opportunity to present > Thanks to various companies, colleagues, engineers > METS staff and consultants > Thanks to laboratory staff
  • 45. > RESOURCE PROJECTS > TECHNOLOGY > INTEGRATED SERVICES> Mineral Processing > Engineering Design > Training > Specialist Services THANK YOU www.metsengineering.com