2. What is Kneat Gx
Kneat Gx creates and maintains sets of product,
process or equipment lifecycle documents with
less effort and higher quality
Kneat can be applied to any process where
compliance and data integrity is business critical
and information is shared across a set of
documents
For example
– Large project execution
– Manufacturing facility validation documentation
2
3. Some Large Project Execution Concerns…..
Right First Time translation of requirements
Collaboration across multiple stakeholders
Engineering data management
– Data flow between different stakeholders
– Data integrity
– Management of change
C&Q process
– Test plans need to be appropriate and optimised
– Test documents need to be aligned with latest design
– Management of deviations and re-work process
Timely handover of accurate and complete data /
information to operations
3
4. Typical Project Execution Outcomes
Corrupt, inaccurate, missing data
Test documents not aligned with design
C&Q process delayed and over budget
As-building exercise is a headache
Handover to operations is problematic
Non-optimal start up impacts company goals
4
5. Kneat Gx Paperless Approach
Document content is dynamically linked to a
database which provides structure and context
Automated assessment of the impact of change
across all documents
Streamlined execution of changes to documents
Downstream life cycle documents/ test reports are
auto-generated
Online test execution and deviation processing
Cloning of suites of documents for new projects
maintaining embedded relationships
Efficiency, Quality and Compliance built in
5
7. Kneat’s Powerful Leveraging of Work
RE204 bioreactor cloned documents are at
development closed status and are waiting for a
document number to be assigned.
These are new units created by simply cloning RE201
including all of its associated documentation,
embedded relationships and model objects.
7
8. Document Change Execution Process
Affected
Documents
Approved Auto Generate re- Re-test
Document Auto Impact Documents
B1.0 test Documents
Assessment
Change
A1.0
Initiation C1.0
A1.1 D1.0
B1.1 Change Change Pre-
Change Post- Approval
Completed Approval
C1.1 All docs Change
automatically Execution and
updated re-test
D1.1
Approved
Documents
8
9. Kneat Fit in Large Project Execution
All lifecycle documents are generated, approved and executed within
Kneat
Global collaboration
Automated and streamlined change execution
Just in Time release of test documents
Online testing and deviation management
Auto-generation of test and acceptance reports
9
10. Kneat Fit in Large Project Execution
Note: A/E can own the
MPD for smaller projects • User/functional requirements
Requirements • Risk assessment
Management
• Requirements traceability
Process
A/E Data • Design verification
Master Project Import*
Automation Kneat Document
Database (MPD)
Integrator Owned by
Database Change Operations
Data Execution
Construction Mgr
• Auto-impact assessment
• Auto-retest scripts
• Auto doc updating
Equipment • FAT/SAT
Vendor
Receipt C&Q • IV/FV
Data
Verification Process • Online testing / Deviation Mgt
Process • Acceptance Reports
Construction Mgt Kneat Gx application (Owned by Operator)
* Import on demand,
periodically or at milestone
10
11. Kneat Benefits for Project Execution
Engineering specifications and verification process
can be standardised
Global project execution through collaboration
and live management oversight
Design and test documents always aligned
– On-line document change execution
– Auto impact assessment
– Auto updating of affected life cycle documents
– Just in Time release of test protocols
Right first time project deliverables translates to
reduced Business Risk - Quality, Safety, Financial,
and Operational
11
12. Kneat Opportunity for Operations
Kneat can continue to provide value to operations
in a new facility
Instant access to original requirements, design
basis and associated risk assessments
Retention of project knowledge, practices and
templates for future projects
Ongoing document change execution related to
facility modifications and additions
Documentation relating to new equipment can be
cloned from similar existing equipment
12
13. Kneat Supporting Ongoing Operations
Enterprise Document Management System
Approved documents
published from Kneat
Kneat Database
Initiation Closeout
Facility
Design Verify
Modifications /
Upgrades
Construct
Facility Lifecycle (20 – 30 years) Retirement
Change execution based on robust impact assessment
Lifecycle documentation is always audit ready and
easily accessed
13
14. Kneat Fit in Site Infrastructure
Management of all
site documents
Publishing of EDMS
approved Kneat
documents
Kneat CAPA
Generation/ Site Change Control
Management of the System
content of lifecycle*
documents
Doc status and
change details
* Lifecycle documents describe a regulated process, where info is shared across
documents and compliance and data integrity are business critical. eg Facility
Qualification
14
15. Kneat Benefits for Operations
Ability to copy/clone work done on previous
projects provides significant efficiencies
Reduced time to market for new product launches
Optimal plant performance is achieved sooner
Lifecycle documents are audit-ready and
maintained in a state of compliance at all times
Lower risk of citations and warning letters
Lower cost of compliance
15
16. Kneat Gx Infrastructure
Web application based on Microsoft’s .NET
platform
Browser based access to secure optimized
database
Controlled login over Secure Sockets Layer (SSL)
Full enterprise level scalability
Fully validated to GAMP 5 ISPE guidelines and
21CFR Part 11 regulations
System architecture facilitates integration with
other IT applications
16