SlideShare a Scribd company logo
1 of 49
Download to read offline
Safe harbor 
RRFF OOppttiimmiissaattiioonn 
• Neither the information nor any opinion expressed in this presentation constitutes an offer, or invitation to make an offer, or to buy any security issued by the company. This presentation contains 
predictions, estimates or other information regarding the Company's operations which are forward looking in nature. While these forward looking statements represent our best current judgment on what the 
future holds, they are subject to risks and uncertainties that could cause actual results to differ materially and may involve risk and uncertainty. This presentation is prepared for general purposes only and 
does not have any regard to the specific investment objectives, financial situation and particular needs of any specific person. No liability for any loss will arise with the company as a result of the action 
taken on the basis of information contained herein. 
•For a discussion of the risks and uncertainties that may cause results to differ, you should review GTL’s filings with stock exchanges, including the annual report and quarterly disclosures.
Network Planning, Design & Optimisation 
Core Offerings 
2
Imperatives for Optimisation 
3 
RF optimisation remains one of the key challenges in any network. 
Identifying potential faults in the network and resolving them before 
they affect network performance. 
Rectifying causes of faults affecting network performance. 
Leads to efficient use of the spectrum.
Optimisation Overview 
4
Need for optimisation 
Network issues that may generate a requirement 
Perceived reduction in network quality. 
Indications from network performance monitoring. 
Subscriber's experience of using the network. 
Maximising the use of existing infrastructure. 
Operators wants to ensure the best returns on investment. 
Introduction of new services. 
Maximise existing resources to accommodate new services such as GPRS. 
Change in original design parameters. 
 Flawed original design in format. 
 Original design information has changed. 
5
Network Lifecycle 
Network 
Planning 
Network 
Rollout 
Licence 
Award 
Continuous 
Optimisation 
Network Lifecycle 
Pre Launch 
Optimisation 
Swap 
Management 
(If required) 
6
RF Optimisation 
7 
Swap 
Management 
Virtual Optimisation Centre 
- BTS upgrade 
- BTS re-homing 
- BSC re-parenting 
(If required) 
- Transmission Re-engineering 
Pre Launch 
Optimisation 
Continuous 
Optimisation 
Virtual Optimisation Centre
Pre Launch Optimisation 
8 
Objectives 
High rate of integrations 
Low traffic (Pre-launch or launch) 
Predominantly drive data dependant 
Pre Launch 
Optimisation 
Continuous 
Optimisation 
Swap 
Management
Optimisation Process – Single site verification 
9 
RF Site 
Audit 
Coverage 
Verification 
Parameter 
verification 
Reconfiguration 
Problem 
Analysis 
Fail 
Pass Site 
Acceptance 
Site 
Pre Launch Identification 
Optimisation 
Continuous 
Optimisation 
Swap 
Management
Optimisation Process – Drive Test Based 
10 
Cluster 
Stimulation 
Site 
Identification 
Cluster 
Preparation 
Drive Test 
Data Analysis Reconfiguration 
Problem 
Analysis 
Site 
Acceptance 
Fail 
Pass Cluster 
Analysis 
Cluster 
Pre Launch Identification 
Optimisation 
Continuous 
Optimisation 
Swap 
Management
Cluster Analysis 
OMC 
Data 
Drive Test 
Results 
Simulation 
Data 
Determine clusters for acceptance 
Characterise performance 
Ensure correct site configuration 
Drive tests 
Process data 
Analysis 
Remodelling 
• Parameter Setting 
• Neighbors 
• Powered 
• Stable 
•Call statistics 
•Key measurement events 
• Neighbor analysis 
•Key measurement data 
Reconfiguration 
• Parameters 
• Neighbors 
• Report Hardware 
Requirements 
11
Cluster Reconfiguration 
12 
HHaarrddwwaarree 
OOppttiimmiissaattiioonn 
Antenna Reorientation 
Antenna Down tilt 
Antenna Relocation 
Antenna Height adjustment 
Masthead Amplifiers 
CCeellll ppaarraammeetteerr 
ooppttiimmiissaattiioonn 
Handover parameters 
Power planning 
Neighbour list reconfiguration 
Frequency planning 
Performance Monitoring 
Pre Launch 
Optimisation 
Continuous 
Optimisation 
Swap 
Management
Pre Launch Optimization 
On Site 
Identification 
Network 
Reconfigure 
13 
Parameter 
Analysis 
Process Creation 
KPI Definition 
KPI Reporting 
Functionality 
Asses 
Training 
Config Management 
Cluster 
Cluster 
Preparation 
Drive Testing 
Drive Analysis 
Modelling 
Cluster Monitoring 
Model Calibration 
Off Site 
What GTL can do for 
you 
Pre Launch 
Optimisation 
Continuous 
Optimisation 
Swap 
Management
KPI’s to be Monitored 
Based on performance of a Network  Cell 
Network KPI Target Type 
KPI Deciding 
Factor 
Network / 
Town Level 
CSR (%) 
CSSR (%) 
DCR (%) 
TCH Blocking 
SDCCH 
Blocking 
93% 
95% 
5% 
2% 
3% 
Performance 
Performance 
Performance 
Performance 
Performance 
TBD upon 
checking trend 
to maintain the 
performance of 
the network 
and to improve 
CSR (%) 
CSSR (%) 
DCR (%) 
TCH Blocking 
SDCCH Blocking 
90% 
92% 
10% 
4% 
6% 
Performance 
Performance 
Performance 
Performance 
Performance 
TBD upon 
checking trend 
to maintain the 
performance of 
the network 
and to improve 
Cell Level 
(TBD : To Be Decided) 
14
KPI’s to be Monitored 
Based on performance of a Network  Cell 
Network KPI Target Type 
KPI Deciding 
Factor 
Network / 
Town Level 
Downlink Rx Qual 
Uplink Rx Qual 
FER 
Data Through 
output 
Data 
Accessibility 
TBA 
TBA 
TBA 
TBA 
TBA 
Performance 
Performance 
Performance 
Performance 
Performance 
TBD upon 
checking trend 
to maintain the 
performance of 
the network 
and to improve 
Downlink Rx Qual 
Uplink Rx Qual 
FER 
Data Through 
output 
Data Accessibility 
Performance 
Performance 
Performance 
Performance 
Performance 
TBD upon 
checking trend 
to maintain the 
performance of 
the network 
and to improve 
Cell Level 
(TBA : To Be Accepted) 
15 
TBA 
TBA 
TBA 
TBA 
TBA
Reports 
Deliverables 
Pre Launch Optimization 
Cell / Cluster Drive Test and Analysis Report. 
Quality issues identification and RX lev, RX Qual, TCH Blocking, 
SDCCH Drop,HO Issues, Call drop problems, and call set up 
issues analysis. 
Cell / Cluster Optimisation Report. 
RF parameters audit and tuning : neighbour site list, power 
parameters, HO parameters, etc. 
Antenna engineering tuning. 
Cell / cluster Optimisation and tuning to reach acceptance criteria. 
Pre Launch 
Optimisation 
Continuous 
Optimisation 
Swap 
Management 
16
Reports 
Traffic Statistics Analysis Report. 
Network Analysis and Optimisation Report. 
Cell, cluster, Network drive test reports from post processing tool. 
RF coverage and quality assessment report. 
Radio and system Parameters audit and tuning report. 
Optimisation Report. 
Acceptance Report. 
Interference Measurement. 
Updated network site database. 
Pre Launch 
Optimisation 
Continuous 
Optimisation 
Swap 
Management 
17
Continuous Optimisation 
18 
Objectives 
Maintaining the traffic rate within medium to low 
To achieve more stability in neighbour/ pilot 
Minimisation of integration Issues 
Reducing operational cost 
Predominantly OMC R Stats and Counters 
Pre Launch 
Optimisation 
Continuous 
Optimisation 
Swap 
Management
Continuous Optimisation 
19 
Network 
Performance 
Targets 
Performance 
Customer Faults Trouble Tickets 
CM Data Call Trace 
Drive Test Results Alarms 
Service Level 
OMC 
Status 
Fault 
Resolution 
Cell 
Prioritisation 
Fault Reports 
Pre Launch 
Optimisation 
Continuous 
Optimisation 
Swap 
Management
Optimisation Process – Drive Test Based 
20 
Pre Launch 
Optimisation 
Continuous 
Optimisation 
Swap 
Management 
Determine clusters for acceptance 
Characterise performance 
Ensure correct site configuration 
Drive tests 
Process data 
Analysis 
Remodelling 
Reconfiguration 
• Parameter Setting 
• Neighbors 
• Powered 
• Stable 
•Call statistics 
•Key measurement events 
• Neighbor analysis 
•Key measurement data 
• Parameters 
• Neighbors 
• Report Hardware 
Requirements
Cluster Reconfiguration 
21 
HHaarrddwwaarree 
OOppttiimmiissaattiioonn 
Antenna Reorientation 
Antenna Down tilt 
Antenna Relocation 
Antenna Height adjustment 
Masthead Amplifiers 
CCeellll ppaarraammeetteerr 
ooppttiimmiissaattiioonn 
Handover parameters 
Power planning 
Neighbour list reconfiguration 
Frequency planning 
Performance Monitoring 
Pre Launch 
Optimisation 
Continuous 
Optimisation 
Swap 
Management
Continuous Optimization 
22 
Audit 
Benchmarking 
Process Control 
Config 
Management 
KPI Definition 
KPI Reporting 
Training 
OMC Reporting 
Cell Prioritisation 
Fault Resolution 
Drive testing 
Change 
recommend 
Network 
Reconfigure 
Functionality 
Asses 
What GTL can do 
for you 
On Site 
Pre Launch Off site 
Optimisation 
Continuous 
Optimisation 
Swap 
Management
KPI’s to be Monitored 
Based on performance of a Network  Cell 
Network KPI Target Type 
KPI Deciding 
Factor 
Network / 
Town Level 
CSR (%) 
CSSR (%) 
DCR (%) 
TCH Blocking 
SDCCH 
Blocking 
93% 
95% 
5% 
2% 
3% 
Performance 
Performance 
Performance 
Performance 
Performance 
TBD upon 
checking trend 
to maintain the 
performance of 
the network 
and to improve 
CSR (%) 
CSSR (%) 
DCR (%) 
TCH Blocking 
SDCCH Blocking 
90% 
92% 
10% 
4% 
6% 
Performance 
Performance 
Performance 
Performance 
Performance 
TBD upon 
checking trend 
to maintain the 
performance of 
the network 
and to improve 
Cell Level 
(TBD : To Be Decided) 
23
KPI’s to be Monitored 
Based on performance of a Network  Cell 
Network KPI Target Type 
KPI Deciding 
Factor 
Network / 
Town Level 
Downlink Rx Qual 
Uplink Rx Qual 
FER 
Data Through 
output 
Data 
Accessibility 
TBA 
TBA 
TBA 
TBA 
TBA 
Performance 
Performance 
Performance 
Performance 
Performance 
TBD upon 
checking trend 
to maintain the 
performance of 
the network 
and to improve 
Downlink Rx Qual 
Uplink Rx Qual 
FER 
Data Through 
output 
Data Accessibility 
Performance 
Performance 
Performance 
Performance 
Performance 
TBD upon 
checking trend 
to maintain the 
performance of 
the network 
and to improve 
Cell Level 
(TBA : To Be Accepted) 
24 
TBA 
TBA 
TBA 
TBA 
TBA
Reports 
Deliverables 
Continuous Optimisation 
Radio network measurement and analysis report 
Containing signal strength, Quality, Time advance,Path loss, 
Frequency distribution, Neighbour selection. 
BSS/ RAN parameter adjustment report 
Neighbour optimisation parameter, BTS/ MS power control, 
Intracell handover, Hierarchy cell structure  cell load sharing. 
Pre Launch 
Optimisation 
Continuous 
Optimisation 
Swap 
Management 
25
Reports 
Worst cell optimization report 
TCH Blocking, SDCCH Blocking, Signal Strength, Bad Quality, 
Timing Advance, Sudden Loss, Other Reasons. 
Coverage Analysis report 
Drive test, Worst cell, site survey,Antenna rigging. 
Capacity Analysis  Recommendation Report 
Dynamic full and half rate, Cell load sharing,Hierarchy cell structure, 
Dynamic allocation of SDCCH. 
Pre Launch 
Optimisation 
Continuous 
Optimisation 
Swap 
Management 
26
Swap Management 
27 
Objectives 
High rate of integrations 
High traffic (Pre-Cut and Post Cut) 
Predominantly drive data dependant 
Pre Launch 
Optimisation 
Continuous 
Optimisation 
Swap 
Management
Swap Management 
28 
Swap Planning 
Default Parameter 
Parameter Mapping 
Validation of Neighbour, BSIC and MAIO 
Pre Launch 
Optimisation 
Continuous 
Optimisation 
Swap 
Management
Swap Process – Pre / Post verification 
29 
RF Site 
Audit 
Coverage 
Verification 
Parameter 
verification 
Reconfiguration 
Problem 
Analysis 
Fail 
Pass Site 
Acceptance 
Site 
Pre Launch Identification 
Optimisation 
Continuous 
Optimisation 
Swap 
Management
Swap Process – Cluster Based 
30 
Cluster 
Stimulation 
Site 
Identification 
Cluster 
Preparation 
Drive Test 
Data Analysis Reconfiguration 
Problem 
Analysis 
Site 
Acceptance 
Fail 
Pass Cluster 
Analysis 
Cluster 
Pre Launch Identification 
Optimisation 
Continuous 
Optimisation 
Swap 
Management
Cluster Analysis 
31 
OMC 
Data 
Drive Test 
Results 
Simulation 
Data 
Determine clusters for acceptance 
Characterise performance 
Ensure correct site configuration 
• Parameters 
• Neighbors 
• Report Hardware 
Requirements 
Drive tests 
Process data 
Analysis 
Remodelling 
• Parameter Setting 
• Neighbors 
• Powered 
• Stable 
•Call statistics 
•Key measurement events 
• Neighbor analysis 
•Key measurement data 
Reconfiguration
Cluster Reconfiguration 
32 
HHaarrddwwaarree 
OOppttiimmiissaattiioonn 
Antenna Reorientation 
Antenna Down tilt 
Antenna Relocation 
Antenna Height adjustment 
Masthead Amplifiers 
CCeellll ppaarraammeetteerr 
ooppttiimmiissaattiioonn 
Handover parameters 
Power planning 
Neighbour list reconfiguration 
Performance Monitoring 
Pre Launch 
Optimisation 
Continuous 
Optimisation 
Swap 
Management
Swap Optimization 
On Site 
Identification 
Network 
Reconfigure 
33 
Parameter 
Analysis 
Process Creation 
KPI Definition 
KPI Reporting 
Functionality 
Asses 
Training 
Config Management 
Cluster 
Cluster 
Preparation 
Drive Testing 
Drive Analysis 
Modelling 
Cluster Monitoring 
Off Site 
What GTL can do for 
you 
Pre Launch 
Optimisation 
Continuous 
Optimisation 
Swap 
Management 
Model Calibration
KPI’s to be Monitored 
Based on performance of a Network  Cell 
Network KPI Target Type 
KPI Deciding 
Factor 
Network / 
Town Level 
CSR (%) 
CSSR (%) 
DCR (%) 
TCH Blocking 
SDCCH 
Blocking 
Improve 
Improve 
Improve 
Improve 
Improve 
Performance 
Performance 
Performance 
Performance 
Performance 
TBD upon 
checking trend 
to maintain the 
performance of 
the network 
and to improve 
CSR (%) 
CSSR (%) 
DCR (%) 
TCH Blocking 
SDCCH Blocking 
Performance 
Performance 
Performance 
Performance 
Performance 
TBD upon 
checking trend 
to maintain the 
performance of 
the network 
and to improve 
Cell Level 
(TBA : To Be Accepted) 
34 
Improve 
Improve 
Improve 
Improve 
Improve
KPI’s to be Monitored 
Based on performance of a Network  Cell 
Network KPI Target Type 
KPI Deciding 
Factor 
Network / 
Town Level 
Downlink Rx Qual 
Uplink Rx Qual 
FER 
Data Through 
output 
Data 
Accessibility 
Performance 
Performance 
Performance 
Performance 
Performance 
TBD upon 
checking trend 
to maintain the 
performance of 
the network 
and to improve 
Downlink Rx Qual 
Uplink Rx Qual 
FER 
Data Through 
output 
Data Accessibility 
Performance 
Performance 
Performance 
Performance 
Performance 
TBD upon 
checking trend 
to maintain the 
performance of 
the network 
and to improve 
Cell Level 
Improve 
Improve 
Improve 
Improve 
Improve 
35 
Improve 
Improve 
Improve 
Improve 
Improve
Reports 
Deliverables 
Swap Management 
Swap Planning Report. 
Parameter mapping report 
Pre Drive Test Report 
Verification of RF Coverage, parameters audit and tuning : neighbour site list, 
Power parameters, HO parameters, etc. 
Cutover Drive Test Report 
Validation of RF Coverage, parameters audit and tuning : neighbour 
site list, power parameters, HO parameters, etc. 
Post Drive Test Report. 
Improvement of RF Coverage, parameters audit and tuning : neighbour 
site list, power parameters, HO parameters, etc. 
Pre Launch 
Optimisation 
Continuous 
Optimisation 
Swap 
Management 
36
Subjects to Investigate 
37 
Non-Working sites/sectors or TRX’s 
In-active Radio network features like frequency hopping 
•Disabled GPRS 
Overshooting sites – coverage overlaps 
•Coverage holes 
C/I, C/A analysis 
High Interference Spots 
Drop Calls 
Capacity Problems 
Pre Launch 
Optimisation 
Continuous 
Optimisation 
Swap 
Management 
Other Interference Sources 
Missing Neighbors
Subjects to Investigate 
38 
One-way neighbors 
Ping-Pong Handovers 
Not happening handovers 
Footprint and performance of the site as per design 
criteria 
Faulty Installations 
Sites not operational 
•Faulty TRX 
BA list error 
Pre Launch 
Optimisation 
Continuous 
Optimisation 
Swap 
Management 
•BSIC, HSN, MAIO Plan 
Hopping ON or OFF
Recommendations 
Defining missing neighbor relations 
Proposing new sites or sector additions 
Proposing antenna azimuth changes 
Proposing antenna tilt changes 
Proposing antenna type changes 
BTS Equipment/Filter change 
Re-tuning of interfered frequencies 
Adjusting HO Margins 
Adjusting accessibility parameters 
Changing power parameters 
MHA/TMA adds 
Pre Launch 
Optimisation 
Continuous 
Optimisation 
Swap 
Management 
39
Virtual Optimisation Centre 
Pre Launch 
Optimisation 
Continuous 
Optimisation 
Swap 
Management 
40 
Remote Analytics for Design, Planning  Optimisation 
to achieve minimal startup time, consistent use of 
process and tools and concentrated expertise in one 
location 
State of the art VPO Centre vital stats: 
Floor space: 2000 Sq. Ft. 
Seating capacity: 50 
Internet speed: 2 Mbps 
No. of RF engineers: 50 
Total man years experience: 10 Years 
Tools used for VPO: Asset 
Connect 
PL4  MIPT
Virtual Optimisation Centre 
Activities Off shore On shore 
Benchmarking 
Data Collection 
RF and Transmission Planning 
Transmission Network Verification 
RF / Line of Sight Surveys 
CW Testing and Model Tuning 
Nominal Cell Planning 
Frequency Scanning 
Optimisation 
Pre Launch 
Optimisation 
Continuous 
Optimisation 
Swap 
Management 
41
Low fixed Cost regardless of the project location. 
Fast Delivery Cycle and Quick deployment of project. 
Cost effective especially for high cost areas. 
Flexible service packages to meet unique customer needs. 
Ideal solution for high-risk or hard to access areas. 
Expertise availability guaranteed. 
Core expertise group available to service multiple project. 
Quick take off without tine lag to mobilize. 
Uniform applications on tolls through standard processes. 
Virtual Optimisation Centre 
Benefits 
Pre Launch 
Optimisation 
Continuous 
Optimisation 
Swap 
Management 
42
Value Proposition 
43 
Risk Sharing - KPI  SLA Based Commitments 
End to End RF solution provider 
RF Planning, Design and Optimisation done for 
31 networks 
– Experience across 15 geographies 
– Covering 2G, 2.5G, 3G technologies 
– Across standards such as GSM, Edge/GPRS, 
CDMA, UMTS and WiMAX 
Long Standing relations With OEMs At Global 
Level 
Unique combination of tasks carried out Offshore 
and Onshore that give cost efficiencies 
Technology and vendor agnostic skill set
Case Studies  Capabilities 
44
Case Study 1 
About the Client : 
Hutchison Essar (Hutch), is a leading GSM network 
operator in India having GSM wireless operations with 
a pan Indian footage. The network has been growing 
at a very high pace to address competition with more 
coverage and capacity. This entails Hutch to roll out 
new sites in remote areas of UP. While expanding, 
Hutch wanted to have their network optimised 
Business Challenge : 
Hutch found RF Group of GTL a competent partner to 
perform on their behalf optimization activities with 
quality deliverables. In the process GTL got the 
responsibility of around 240 sites (170 existing  70 
new sites) to be completed during October 2005 to 
March 2006. 
Project Scope : 
GTL was to optimize new roll out cell sites in the 
network to achieve desired results viz. call origination, 
call termination, intra-cell handover, and coverage. 
On many occasions, it has been found that improper RF 
cabling gave rise to wrong BCCH - Sector combination. 
Corrections were initiated and post correction verifications have 
been performed. 
To find coverage footprint and associated quality plt, drive 
tests were executed with two MS (MS 1-Hutch Idle mode  
MS 2 – Hutch Dedicated mode) simultaneously. 
This were done in and around 6km radius centering the site as 
per Hutch specification. 
From this drive-test data, GTL prepared coverage and quality 
plot for newly commissioned site. Results were submitted to 
Hutch. After achieving required results, sites were put on air 
for commercial purposes. 
Value Delivered : 
GTL successfully completed the optimisation activity for 
the project covered 170 existing sites and 70 new sites during 
Oct’05 to Mar’06. 
All sites were either in Highways or in remote locations of 
eastern part of UP covering Kanpur, Lucknow, Varanasi, 
Allahabad and Gorakhpur. 
45
Case Study 2 
About the Client : 
Hutch is one of the leading gsm operator in India 
having licenses spanning all over India. Hutch is 
working with gsm 900 band and wants to expand their 
network as the demand grow. So to meet quality and 
coverage there is need to swap old ZTE system with 
some new updated system, which can support the 
gsm, gprs, edge and easily upgraded to 3G. 
Hutch selected Nokia as OEM for the core part of their 
network. 
Business Challenge : 
Nokia wanted to have resources in the outsourcing 
domain increase their strength. As GTL had done lots 
of work with Nokia in India so GTL seems to be 
perfectly poised to rise to the need. We became 
partner of choicer for Nokia to perform RF tasks in the 
swap roll out process. From March 2005 to Till Date 
for performed allocated tasks creditably. A few points 
of project: 
GSM 900 Networks. 
45 sites to be swap from ZTE to Nokia. 
342 New Nokia Ultra BTS 
Coverage includes cities and boundaries. 
Network with 19 BSC’s and two switch AXE 10 from 
Nokia.- 
CSSR 94%, SDCCH Drop 2%, Handover success 
rate  94%, Call drop rate  2.5%. 
Project Scope : 
SoW conferred and accepted by GTL have been as follows: 
Perform pre swap drive test for all 41 sites. 
Prepared proficient database for Nokia 
Add and delete Neighbor list. 
Verification of antenna locations and azimuth. 
Verifies existing Frequency Plan, recommend the changes 
required. 
Download the database to OMC and verify the dump. 
Perform Drive Tests for sites verification on Swap night. 
Perform the post swap drive test for all 45 sites. 
Conduct Acceptance Test Procedure (ATP) with end customer. 
Nominal Cell Planning for New 417 sites 
RF survey, LOS survey and Drive Test for New Sites. 
MW radio link planning for MW transmission links. 
Provide a solution for the Hutch subscriber’s complaints. 
Preparation of 2 Mbit/s transmission plan including link capacity 
calculations, timeslot allocation and ET planning 
Maintain the Network quality by daily monitoring KPI. 
Value Delivered : 
All swaps are mostly conducted at night there is around 6 sites 
swap per day. As soon as swap sites bring on air our drive test 
is ask to conduct the site verification drive test at each cell the 
test includes database verification, sector swapping, handover 
testing, neighbor list verification, call termination. After 
finishing the swap now optimization is started on network level, 
to meet the KPI daily statistic report are generated with the 
help of Business object and results are discussed with the 
customer and also suggest the necessary changes. 
46
GTL's Network Customer Engagement 
Government Of 
Maharashtra 
Power Grid 
Corp 
47
© Copy right GTL Limited 2008 
International Presence 
Americas: 
US 
Asia–Pacific: 
Malaysia 
Thailand 
China 
Taiwan 
Indonesia 
Australia 
Singapore 
Philippines 
New Zealand 
Europe: 
UK 
France 
Ireland 
Sweden 
Switzerland 
Middle East: 
UAE 
KSA 
Oman 
Qatar 
Kuwait 
South Asia 
India 
Nepal 
Bhutan 
Maldives 
Sri Lanka 
Bangladesh 
Africa: 
Nigeria 
South Africa 
Guinea Conakry 
Mauritius 
International Office 
Projects Undertaken 
48
Thank you

More Related Content

What's hot

Network optimization presentation generic dec18
Network optimization presentation generic dec18Network optimization presentation generic dec18
Network optimization presentation generic dec18frankjoh
 
Radio network optimization flow 20090429-a-4.0
Radio network optimization flow 20090429-a-4.0Radio network optimization flow 20090429-a-4.0
Radio network optimization flow 20090429-a-4.0Mashaal322
 
Curriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham ZahoorCurriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham ZahoorHisham Zahoor
 
GPRS KPIs based on network performance
GPRS KPIs based on network performance GPRS KPIs based on network performance
GPRS KPIs based on network performance Mehmet Beyaz
 
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...Jean de la Sagesse
 
51 gsm bss network performance ps kpi (upload rate) optimization manual[1].doc
51 gsm bss network performance ps kpi (upload rate) optimization manual[1].doc51 gsm bss network performance ps kpi (upload rate) optimization manual[1].doc
51 gsm bss network performance ps kpi (upload rate) optimization manual[1].doctharinduwije
 
Inop presentation dec sgb 2017
Inop presentation dec sgb 2017Inop presentation dec sgb 2017
Inop presentation dec sgb 2017frankjoh
 
3 gpp key performance indicators (kpi) for umts and gsm release 9
3 gpp key performance indicators (kpi) for umts and gsm release 93 gpp key performance indicators (kpi) for umts and gsm release 9
3 gpp key performance indicators (kpi) for umts and gsm release 9Telecom Consultant
 
Gsm bss-network-kpi-call-setup-success-rate-optimization-manual(cssr)
Gsm bss-network-kpi-call-setup-success-rate-optimization-manual(cssr)Gsm bss-network-kpi-call-setup-success-rate-optimization-manual(cssr)
Gsm bss-network-kpi-call-setup-success-rate-optimization-manual(cssr)Ayann Khan
 
Basics of performance measurement in umts
Basics of performance measurement in umtsBasics of performance measurement in umts
Basics of performance measurement in umtsEkwere Udoh
 
Introduction to Genex Assistance
Introduction to  Genex AssistanceIntroduction to  Genex Assistance
Introduction to Genex AssistanceTempus Telcosys
 
3 g second carrier optimization report – cluster2_
3 g second carrier optimization report – cluster2_3 g second carrier optimization report – cluster2_
3 g second carrier optimization report – cluster2_Ridwan Syarif Siregar
 
Gsm bss kpi analysis
Gsm bss kpi analysisGsm bss kpi analysis
Gsm bss kpi analysisHassan Imam
 
Hussams Cv October 21 2008
Hussams Cv October 21 2008Hussams Cv October 21 2008
Hussams Cv October 21 2008husjam
 
Fawad Tanveer Butt CV
Fawad Tanveer Butt CVFawad Tanveer Butt CV
Fawad Tanveer Butt CVFawad Butt
 

What's hot (20)

Network optimization presentation generic dec18
Network optimization presentation generic dec18Network optimization presentation generic dec18
Network optimization presentation generic dec18
 
Kpi info
Kpi info Kpi info
Kpi info
 
Ijett v4 i10p113
Ijett v4 i10p113Ijett v4 i10p113
Ijett v4 i10p113
 
CV_Satbir
CV_SatbirCV_Satbir
CV_Satbir
 
Radio network optimization flow 20090429-a-4.0
Radio network optimization flow 20090429-a-4.0Radio network optimization flow 20090429-a-4.0
Radio network optimization flow 20090429-a-4.0
 
Curriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham ZahoorCurriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham Zahoor
 
GPRS KPIs based on network performance
GPRS KPIs based on network performance GPRS KPIs based on network performance
GPRS KPIs based on network performance
 
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
 
Resume_Sushil Kumar Kushwaha
Resume_Sushil Kumar KushwahaResume_Sushil Kumar Kushwaha
Resume_Sushil Kumar Kushwaha
 
51 gsm bss network performance ps kpi (upload rate) optimization manual[1].doc
51 gsm bss network performance ps kpi (upload rate) optimization manual[1].doc51 gsm bss network performance ps kpi (upload rate) optimization manual[1].doc
51 gsm bss network performance ps kpi (upload rate) optimization manual[1].doc
 
Inop presentation dec sgb 2017
Inop presentation dec sgb 2017Inop presentation dec sgb 2017
Inop presentation dec sgb 2017
 
3 gpp key performance indicators (kpi) for umts and gsm release 9
3 gpp key performance indicators (kpi) for umts and gsm release 93 gpp key performance indicators (kpi) for umts and gsm release 9
3 gpp key performance indicators (kpi) for umts and gsm release 9
 
Gsm bss-network-kpi-call-setup-success-rate-optimization-manual(cssr)
Gsm bss-network-kpi-call-setup-success-rate-optimization-manual(cssr)Gsm bss-network-kpi-call-setup-success-rate-optimization-manual(cssr)
Gsm bss-network-kpi-call-setup-success-rate-optimization-manual(cssr)
 
Basics of performance measurement in umts
Basics of performance measurement in umtsBasics of performance measurement in umts
Basics of performance measurement in umts
 
Introduction to Genex Assistance
Introduction to  Genex AssistanceIntroduction to  Genex Assistance
Introduction to Genex Assistance
 
3 g second carrier optimization report – cluster2_
3 g second carrier optimization report – cluster2_3 g second carrier optimization report – cluster2_
3 g second carrier optimization report – cluster2_
 
Gsm bss kpi analysis
Gsm bss kpi analysisGsm bss kpi analysis
Gsm bss kpi analysis
 
Satisha Kumar_RF Engg(3G)_3.6 year
Satisha Kumar_RF Engg(3G)_3.6 yearSatisha Kumar_RF Engg(3G)_3.6 year
Satisha Kumar_RF Engg(3G)_3.6 year
 
Hussams Cv October 21 2008
Hussams Cv October 21 2008Hussams Cv October 21 2008
Hussams Cv October 21 2008
 
Fawad Tanveer Butt CV
Fawad Tanveer Butt CVFawad Tanveer Butt CV
Fawad Tanveer Butt CV
 

Viewers also liked

Drupal Site Audit - SFDUG
Drupal Site Audit - SFDUGDrupal Site Audit - SFDUG
Drupal Site Audit - SFDUGJon Peck
 
Doing an awesome site audit
Doing an awesome site auditDoing an awesome site audit
Doing an awesome site auditJono Alderson
 
Og 102 site survey and layout of bts issue1.5
Og 102 site survey and layout of bts issue1.5Og 102 site survey and layout of bts issue1.5
Og 102 site survey and layout of bts issue1.5Ketut Widya
 
3 g huawei-wcdma-rno-parameters-optimization
3 g huawei-wcdma-rno-parameters-optimization3 g huawei-wcdma-rno-parameters-optimization
3 g huawei-wcdma-rno-parameters-optimizationshagahod
 

Viewers also liked (6)

Drupal Site Audit - SFDUG
Drupal Site Audit - SFDUGDrupal Site Audit - SFDUG
Drupal Site Audit - SFDUG
 
Antenna alignment tool
Antenna alignment toolAntenna alignment tool
Antenna alignment tool
 
Doing an awesome site audit
Doing an awesome site auditDoing an awesome site audit
Doing an awesome site audit
 
Og 102 site survey and layout of bts issue1.5
Og 102 site survey and layout of bts issue1.5Og 102 site survey and layout of bts issue1.5
Og 102 site survey and layout of bts issue1.5
 
BTS SITE VISIT
BTS SITE VISITBTS SITE VISIT
BTS SITE VISIT
 
3 g huawei-wcdma-rno-parameters-optimization
3 g huawei-wcdma-rno-parameters-optimization3 g huawei-wcdma-rno-parameters-optimization
3 g huawei-wcdma-rno-parameters-optimization
 

Similar to Rf optimisation

Rf optimisation
Rf optimisationRf optimisation
Rf optimisationUma Mahesh
 
Akhilesh Pandey_RF Optimization Eng
Akhilesh Pandey_RF Optimization EngAkhilesh Pandey_RF Optimization Eng
Akhilesh Pandey_RF Optimization EngAkhilesh Pandey
 
Lakshman Resume 3 years experience
Lakshman Resume 3 years experienceLakshman Resume 3 years experience
Lakshman Resume 3 years experiencelakshman vatada
 
NTADOM TONY C RF DT
NTADOM TONY C  RF DTNTADOM TONY C  RF DT
NTADOM TONY C RF DTTony Ntadom
 
Rahul kumar_2016
Rahul kumar_2016Rahul kumar_2016
Rahul kumar_2016Rahul Kumar
 
CV_RF_NEETIN CHANDRA VIDYARTHY_RF110116
CV_RF_NEETIN CHANDRA VIDYARTHY_RF110116CV_RF_NEETIN CHANDRA VIDYARTHY_RF110116
CV_RF_NEETIN CHANDRA VIDYARTHY_RF110116Neetin vidyarthy
 
15 - Introduction to Optimization Tools Rev A.ppt
15 - Introduction to Optimization Tools Rev A.ppt15 - Introduction to Optimization Tools Rev A.ppt
15 - Introduction to Optimization Tools Rev A.pptMohamedShabana37
 
360 cellutions casestudy
360 cellutions casestudy360 cellutions casestudy
360 cellutions casestudy360cell
 
3-DRIVE TEST Introduction ENGENHEIRO SENIOR EMERSON EDUARDO RODRIGUES.pptx
3-DRIVE TEST  Introduction ENGENHEIRO SENIOR EMERSON EDUARDO RODRIGUES.pptx3-DRIVE TEST  Introduction ENGENHEIRO SENIOR EMERSON EDUARDO RODRIGUES.pptx
3-DRIVE TEST Introduction ENGENHEIRO SENIOR EMERSON EDUARDO RODRIGUES.pptxEMERSON EDUARDO RODRIGUES
 
3-DRIVE TEST Introduction ENGENHEIRO SENIOR EMERSON EDUARDO RODRIGUES.pptx
3-DRIVE TEST  Introduction ENGENHEIRO SENIOR EMERSON EDUARDO RODRIGUES.pptx3-DRIVE TEST  Introduction ENGENHEIRO SENIOR EMERSON EDUARDO RODRIGUES.pptx
3-DRIVE TEST Introduction ENGENHEIRO SENIOR EMERSON EDUARDO RODRIGUES.pptxEMERSON EDUARDO RODRIGUES
 
Lemuelle L. Labadan_CV_2015
Lemuelle L. Labadan_CV_2015Lemuelle L. Labadan_CV_2015
Lemuelle L. Labadan_CV_2015Lemuelle Labadan
 

Similar to Rf optimisation (20)

Rf optimisation
Rf optimisationRf optimisation
Rf optimisation
 
CV_MALIK MD NURANI.pdf
CV_MALIK MD NURANI.pdfCV_MALIK MD NURANI.pdf
CV_MALIK MD NURANI.pdf
 
Akhilesh Pandey_RF Optimization Eng
Akhilesh Pandey_RF Optimization EngAkhilesh Pandey_RF Optimization Eng
Akhilesh Pandey_RF Optimization Eng
 
Mobile radio network_RAN Optimization
Mobile radio network_RAN Optimization Mobile radio network_RAN Optimization
Mobile radio network_RAN Optimization
 
Lakshman Resume 3 years experience
Lakshman Resume 3 years experienceLakshman Resume 3 years experience
Lakshman Resume 3 years experience
 
Job Description
Job DescriptionJob Description
Job Description
 
New project 18
New project 18New project 18
New project 18
 
NTADOM TONY C RF DT
NTADOM TONY C  RF DTNTADOM TONY C  RF DT
NTADOM TONY C RF DT
 
Rahul kumar_2016
Rahul kumar_2016Rahul kumar_2016
Rahul kumar_2016
 
Resume_Ajith
Resume_AjithResume_Ajith
Resume_Ajith
 
Umts Kpi
Umts KpiUmts Kpi
Umts Kpi
 
CV_RF_NEETIN CHANDRA VIDYARTHY_RF110116
CV_RF_NEETIN CHANDRA VIDYARTHY_RF110116CV_RF_NEETIN CHANDRA VIDYARTHY_RF110116
CV_RF_NEETIN CHANDRA VIDYARTHY_RF110116
 
15 - Introduction to Optimization Tools Rev A.ppt
15 - Introduction to Optimization Tools Rev A.ppt15 - Introduction to Optimization Tools Rev A.ppt
15 - Introduction to Optimization Tools Rev A.ppt
 
360 cellutions casestudy
360 cellutions casestudy360 cellutions casestudy
360 cellutions casestudy
 
sahil_resume
sahil_resumesahil_resume
sahil_resume
 
3-DRIVE TEST Introduction ENGENHEIRO SENIOR EMERSON EDUARDO RODRIGUES.pptx
3-DRIVE TEST  Introduction ENGENHEIRO SENIOR EMERSON EDUARDO RODRIGUES.pptx3-DRIVE TEST  Introduction ENGENHEIRO SENIOR EMERSON EDUARDO RODRIGUES.pptx
3-DRIVE TEST Introduction ENGENHEIRO SENIOR EMERSON EDUARDO RODRIGUES.pptx
 
3-DRIVE TEST Introduction ENGENHEIRO SENIOR EMERSON EDUARDO RODRIGUES.pptx
3-DRIVE TEST  Introduction ENGENHEIRO SENIOR EMERSON EDUARDO RODRIGUES.pptx3-DRIVE TEST  Introduction ENGENHEIRO SENIOR EMERSON EDUARDO RODRIGUES.pptx
3-DRIVE TEST Introduction ENGENHEIRO SENIOR EMERSON EDUARDO RODRIGUES.pptx
 
Sandeep Sharma_CV
Sandeep Sharma_CVSandeep Sharma_CV
Sandeep Sharma_CV
 
Lemuelle L. Labadan_CV_2015
Lemuelle L. Labadan_CV_2015Lemuelle L. Labadan_CV_2015
Lemuelle L. Labadan_CV_2015
 
Drive testing in mobile networks
Drive testing in mobile networksDrive testing in mobile networks
Drive testing in mobile networks
 

Recently uploaded

Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Recently uploaded (20)

Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 

Rf optimisation

  • 1. Safe harbor RRFF OOppttiimmiissaattiioonn • Neither the information nor any opinion expressed in this presentation constitutes an offer, or invitation to make an offer, or to buy any security issued by the company. This presentation contains predictions, estimates or other information regarding the Company's operations which are forward looking in nature. While these forward looking statements represent our best current judgment on what the future holds, they are subject to risks and uncertainties that could cause actual results to differ materially and may involve risk and uncertainty. This presentation is prepared for general purposes only and does not have any regard to the specific investment objectives, financial situation and particular needs of any specific person. No liability for any loss will arise with the company as a result of the action taken on the basis of information contained herein. •For a discussion of the risks and uncertainties that may cause results to differ, you should review GTL’s filings with stock exchanges, including the annual report and quarterly disclosures.
  • 2. Network Planning, Design & Optimisation Core Offerings 2
  • 3. Imperatives for Optimisation 3 RF optimisation remains one of the key challenges in any network. Identifying potential faults in the network and resolving them before they affect network performance. Rectifying causes of faults affecting network performance. Leads to efficient use of the spectrum.
  • 5. Need for optimisation Network issues that may generate a requirement Perceived reduction in network quality. Indications from network performance monitoring. Subscriber's experience of using the network. Maximising the use of existing infrastructure. Operators wants to ensure the best returns on investment. Introduction of new services. Maximise existing resources to accommodate new services such as GPRS. Change in original design parameters. Flawed original design in format. Original design information has changed. 5
  • 6. Network Lifecycle Network Planning Network Rollout Licence Award Continuous Optimisation Network Lifecycle Pre Launch Optimisation Swap Management (If required) 6
  • 7. RF Optimisation 7 Swap Management Virtual Optimisation Centre - BTS upgrade - BTS re-homing - BSC re-parenting (If required) - Transmission Re-engineering Pre Launch Optimisation Continuous Optimisation Virtual Optimisation Centre
  • 8. Pre Launch Optimisation 8 Objectives High rate of integrations Low traffic (Pre-launch or launch) Predominantly drive data dependant Pre Launch Optimisation Continuous Optimisation Swap Management
  • 9. Optimisation Process – Single site verification 9 RF Site Audit Coverage Verification Parameter verification Reconfiguration Problem Analysis Fail Pass Site Acceptance Site Pre Launch Identification Optimisation Continuous Optimisation Swap Management
  • 10. Optimisation Process – Drive Test Based 10 Cluster Stimulation Site Identification Cluster Preparation Drive Test Data Analysis Reconfiguration Problem Analysis Site Acceptance Fail Pass Cluster Analysis Cluster Pre Launch Identification Optimisation Continuous Optimisation Swap Management
  • 11. Cluster Analysis OMC Data Drive Test Results Simulation Data Determine clusters for acceptance Characterise performance Ensure correct site configuration Drive tests Process data Analysis Remodelling • Parameter Setting • Neighbors • Powered • Stable •Call statistics •Key measurement events • Neighbor analysis •Key measurement data Reconfiguration • Parameters • Neighbors • Report Hardware Requirements 11
  • 12. Cluster Reconfiguration 12 HHaarrddwwaarree OOppttiimmiissaattiioonn Antenna Reorientation Antenna Down tilt Antenna Relocation Antenna Height adjustment Masthead Amplifiers CCeellll ppaarraammeetteerr ooppttiimmiissaattiioonn Handover parameters Power planning Neighbour list reconfiguration Frequency planning Performance Monitoring Pre Launch Optimisation Continuous Optimisation Swap Management
  • 13. Pre Launch Optimization On Site Identification Network Reconfigure 13 Parameter Analysis Process Creation KPI Definition KPI Reporting Functionality Asses Training Config Management Cluster Cluster Preparation Drive Testing Drive Analysis Modelling Cluster Monitoring Model Calibration Off Site What GTL can do for you Pre Launch Optimisation Continuous Optimisation Swap Management
  • 14. KPI’s to be Monitored Based on performance of a Network Cell Network KPI Target Type KPI Deciding Factor Network / Town Level CSR (%) CSSR (%) DCR (%) TCH Blocking SDCCH Blocking 93% 95% 5% 2% 3% Performance Performance Performance Performance Performance TBD upon checking trend to maintain the performance of the network and to improve CSR (%) CSSR (%) DCR (%) TCH Blocking SDCCH Blocking 90% 92% 10% 4% 6% Performance Performance Performance Performance Performance TBD upon checking trend to maintain the performance of the network and to improve Cell Level (TBD : To Be Decided) 14
  • 15. KPI’s to be Monitored Based on performance of a Network Cell Network KPI Target Type KPI Deciding Factor Network / Town Level Downlink Rx Qual Uplink Rx Qual FER Data Through output Data Accessibility TBA TBA TBA TBA TBA Performance Performance Performance Performance Performance TBD upon checking trend to maintain the performance of the network and to improve Downlink Rx Qual Uplink Rx Qual FER Data Through output Data Accessibility Performance Performance Performance Performance Performance TBD upon checking trend to maintain the performance of the network and to improve Cell Level (TBA : To Be Accepted) 15 TBA TBA TBA TBA TBA
  • 16. Reports Deliverables Pre Launch Optimization Cell / Cluster Drive Test and Analysis Report. Quality issues identification and RX lev, RX Qual, TCH Blocking, SDCCH Drop,HO Issues, Call drop problems, and call set up issues analysis. Cell / Cluster Optimisation Report. RF parameters audit and tuning : neighbour site list, power parameters, HO parameters, etc. Antenna engineering tuning. Cell / cluster Optimisation and tuning to reach acceptance criteria. Pre Launch Optimisation Continuous Optimisation Swap Management 16
  • 17. Reports Traffic Statistics Analysis Report. Network Analysis and Optimisation Report. Cell, cluster, Network drive test reports from post processing tool. RF coverage and quality assessment report. Radio and system Parameters audit and tuning report. Optimisation Report. Acceptance Report. Interference Measurement. Updated network site database. Pre Launch Optimisation Continuous Optimisation Swap Management 17
  • 18. Continuous Optimisation 18 Objectives Maintaining the traffic rate within medium to low To achieve more stability in neighbour/ pilot Minimisation of integration Issues Reducing operational cost Predominantly OMC R Stats and Counters Pre Launch Optimisation Continuous Optimisation Swap Management
  • 19. Continuous Optimisation 19 Network Performance Targets Performance Customer Faults Trouble Tickets CM Data Call Trace Drive Test Results Alarms Service Level OMC Status Fault Resolution Cell Prioritisation Fault Reports Pre Launch Optimisation Continuous Optimisation Swap Management
  • 20. Optimisation Process – Drive Test Based 20 Pre Launch Optimisation Continuous Optimisation Swap Management Determine clusters for acceptance Characterise performance Ensure correct site configuration Drive tests Process data Analysis Remodelling Reconfiguration • Parameter Setting • Neighbors • Powered • Stable •Call statistics •Key measurement events • Neighbor analysis •Key measurement data • Parameters • Neighbors • Report Hardware Requirements
  • 21. Cluster Reconfiguration 21 HHaarrddwwaarree OOppttiimmiissaattiioonn Antenna Reorientation Antenna Down tilt Antenna Relocation Antenna Height adjustment Masthead Amplifiers CCeellll ppaarraammeetteerr ooppttiimmiissaattiioonn Handover parameters Power planning Neighbour list reconfiguration Frequency planning Performance Monitoring Pre Launch Optimisation Continuous Optimisation Swap Management
  • 22. Continuous Optimization 22 Audit Benchmarking Process Control Config Management KPI Definition KPI Reporting Training OMC Reporting Cell Prioritisation Fault Resolution Drive testing Change recommend Network Reconfigure Functionality Asses What GTL can do for you On Site Pre Launch Off site Optimisation Continuous Optimisation Swap Management
  • 23. KPI’s to be Monitored Based on performance of a Network Cell Network KPI Target Type KPI Deciding Factor Network / Town Level CSR (%) CSSR (%) DCR (%) TCH Blocking SDCCH Blocking 93% 95% 5% 2% 3% Performance Performance Performance Performance Performance TBD upon checking trend to maintain the performance of the network and to improve CSR (%) CSSR (%) DCR (%) TCH Blocking SDCCH Blocking 90% 92% 10% 4% 6% Performance Performance Performance Performance Performance TBD upon checking trend to maintain the performance of the network and to improve Cell Level (TBD : To Be Decided) 23
  • 24. KPI’s to be Monitored Based on performance of a Network Cell Network KPI Target Type KPI Deciding Factor Network / Town Level Downlink Rx Qual Uplink Rx Qual FER Data Through output Data Accessibility TBA TBA TBA TBA TBA Performance Performance Performance Performance Performance TBD upon checking trend to maintain the performance of the network and to improve Downlink Rx Qual Uplink Rx Qual FER Data Through output Data Accessibility Performance Performance Performance Performance Performance TBD upon checking trend to maintain the performance of the network and to improve Cell Level (TBA : To Be Accepted) 24 TBA TBA TBA TBA TBA
  • 25. Reports Deliverables Continuous Optimisation Radio network measurement and analysis report Containing signal strength, Quality, Time advance,Path loss, Frequency distribution, Neighbour selection. BSS/ RAN parameter adjustment report Neighbour optimisation parameter, BTS/ MS power control, Intracell handover, Hierarchy cell structure cell load sharing. Pre Launch Optimisation Continuous Optimisation Swap Management 25
  • 26. Reports Worst cell optimization report TCH Blocking, SDCCH Blocking, Signal Strength, Bad Quality, Timing Advance, Sudden Loss, Other Reasons. Coverage Analysis report Drive test, Worst cell, site survey,Antenna rigging. Capacity Analysis Recommendation Report Dynamic full and half rate, Cell load sharing,Hierarchy cell structure, Dynamic allocation of SDCCH. Pre Launch Optimisation Continuous Optimisation Swap Management 26
  • 27. Swap Management 27 Objectives High rate of integrations High traffic (Pre-Cut and Post Cut) Predominantly drive data dependant Pre Launch Optimisation Continuous Optimisation Swap Management
  • 28. Swap Management 28 Swap Planning Default Parameter Parameter Mapping Validation of Neighbour, BSIC and MAIO Pre Launch Optimisation Continuous Optimisation Swap Management
  • 29. Swap Process – Pre / Post verification 29 RF Site Audit Coverage Verification Parameter verification Reconfiguration Problem Analysis Fail Pass Site Acceptance Site Pre Launch Identification Optimisation Continuous Optimisation Swap Management
  • 30. Swap Process – Cluster Based 30 Cluster Stimulation Site Identification Cluster Preparation Drive Test Data Analysis Reconfiguration Problem Analysis Site Acceptance Fail Pass Cluster Analysis Cluster Pre Launch Identification Optimisation Continuous Optimisation Swap Management
  • 31. Cluster Analysis 31 OMC Data Drive Test Results Simulation Data Determine clusters for acceptance Characterise performance Ensure correct site configuration • Parameters • Neighbors • Report Hardware Requirements Drive tests Process data Analysis Remodelling • Parameter Setting • Neighbors • Powered • Stable •Call statistics •Key measurement events • Neighbor analysis •Key measurement data Reconfiguration
  • 32. Cluster Reconfiguration 32 HHaarrddwwaarree OOppttiimmiissaattiioonn Antenna Reorientation Antenna Down tilt Antenna Relocation Antenna Height adjustment Masthead Amplifiers CCeellll ppaarraammeetteerr ooppttiimmiissaattiioonn Handover parameters Power planning Neighbour list reconfiguration Performance Monitoring Pre Launch Optimisation Continuous Optimisation Swap Management
  • 33. Swap Optimization On Site Identification Network Reconfigure 33 Parameter Analysis Process Creation KPI Definition KPI Reporting Functionality Asses Training Config Management Cluster Cluster Preparation Drive Testing Drive Analysis Modelling Cluster Monitoring Off Site What GTL can do for you Pre Launch Optimisation Continuous Optimisation Swap Management Model Calibration
  • 34. KPI’s to be Monitored Based on performance of a Network Cell Network KPI Target Type KPI Deciding Factor Network / Town Level CSR (%) CSSR (%) DCR (%) TCH Blocking SDCCH Blocking Improve Improve Improve Improve Improve Performance Performance Performance Performance Performance TBD upon checking trend to maintain the performance of the network and to improve CSR (%) CSSR (%) DCR (%) TCH Blocking SDCCH Blocking Performance Performance Performance Performance Performance TBD upon checking trend to maintain the performance of the network and to improve Cell Level (TBA : To Be Accepted) 34 Improve Improve Improve Improve Improve
  • 35. KPI’s to be Monitored Based on performance of a Network Cell Network KPI Target Type KPI Deciding Factor Network / Town Level Downlink Rx Qual Uplink Rx Qual FER Data Through output Data Accessibility Performance Performance Performance Performance Performance TBD upon checking trend to maintain the performance of the network and to improve Downlink Rx Qual Uplink Rx Qual FER Data Through output Data Accessibility Performance Performance Performance Performance Performance TBD upon checking trend to maintain the performance of the network and to improve Cell Level Improve Improve Improve Improve Improve 35 Improve Improve Improve Improve Improve
  • 36. Reports Deliverables Swap Management Swap Planning Report. Parameter mapping report Pre Drive Test Report Verification of RF Coverage, parameters audit and tuning : neighbour site list, Power parameters, HO parameters, etc. Cutover Drive Test Report Validation of RF Coverage, parameters audit and tuning : neighbour site list, power parameters, HO parameters, etc. Post Drive Test Report. Improvement of RF Coverage, parameters audit and tuning : neighbour site list, power parameters, HO parameters, etc. Pre Launch Optimisation Continuous Optimisation Swap Management 36
  • 37. Subjects to Investigate 37 Non-Working sites/sectors or TRX’s In-active Radio network features like frequency hopping •Disabled GPRS Overshooting sites – coverage overlaps •Coverage holes C/I, C/A analysis High Interference Spots Drop Calls Capacity Problems Pre Launch Optimisation Continuous Optimisation Swap Management Other Interference Sources Missing Neighbors
  • 38. Subjects to Investigate 38 One-way neighbors Ping-Pong Handovers Not happening handovers Footprint and performance of the site as per design criteria Faulty Installations Sites not operational •Faulty TRX BA list error Pre Launch Optimisation Continuous Optimisation Swap Management •BSIC, HSN, MAIO Plan Hopping ON or OFF
  • 39. Recommendations Defining missing neighbor relations Proposing new sites or sector additions Proposing antenna azimuth changes Proposing antenna tilt changes Proposing antenna type changes BTS Equipment/Filter change Re-tuning of interfered frequencies Adjusting HO Margins Adjusting accessibility parameters Changing power parameters MHA/TMA adds Pre Launch Optimisation Continuous Optimisation Swap Management 39
  • 40. Virtual Optimisation Centre Pre Launch Optimisation Continuous Optimisation Swap Management 40 Remote Analytics for Design, Planning Optimisation to achieve minimal startup time, consistent use of process and tools and concentrated expertise in one location State of the art VPO Centre vital stats: Floor space: 2000 Sq. Ft. Seating capacity: 50 Internet speed: 2 Mbps No. of RF engineers: 50 Total man years experience: 10 Years Tools used for VPO: Asset Connect PL4 MIPT
  • 41. Virtual Optimisation Centre Activities Off shore On shore Benchmarking Data Collection RF and Transmission Planning Transmission Network Verification RF / Line of Sight Surveys CW Testing and Model Tuning Nominal Cell Planning Frequency Scanning Optimisation Pre Launch Optimisation Continuous Optimisation Swap Management 41
  • 42. Low fixed Cost regardless of the project location. Fast Delivery Cycle and Quick deployment of project. Cost effective especially for high cost areas. Flexible service packages to meet unique customer needs. Ideal solution for high-risk or hard to access areas. Expertise availability guaranteed. Core expertise group available to service multiple project. Quick take off without tine lag to mobilize. Uniform applications on tolls through standard processes. Virtual Optimisation Centre Benefits Pre Launch Optimisation Continuous Optimisation Swap Management 42
  • 43. Value Proposition 43 Risk Sharing - KPI SLA Based Commitments End to End RF solution provider RF Planning, Design and Optimisation done for 31 networks – Experience across 15 geographies – Covering 2G, 2.5G, 3G technologies – Across standards such as GSM, Edge/GPRS, CDMA, UMTS and WiMAX Long Standing relations With OEMs At Global Level Unique combination of tasks carried out Offshore and Onshore that give cost efficiencies Technology and vendor agnostic skill set
  • 44. Case Studies Capabilities 44
  • 45. Case Study 1 About the Client : Hutchison Essar (Hutch), is a leading GSM network operator in India having GSM wireless operations with a pan Indian footage. The network has been growing at a very high pace to address competition with more coverage and capacity. This entails Hutch to roll out new sites in remote areas of UP. While expanding, Hutch wanted to have their network optimised Business Challenge : Hutch found RF Group of GTL a competent partner to perform on their behalf optimization activities with quality deliverables. In the process GTL got the responsibility of around 240 sites (170 existing 70 new sites) to be completed during October 2005 to March 2006. Project Scope : GTL was to optimize new roll out cell sites in the network to achieve desired results viz. call origination, call termination, intra-cell handover, and coverage. On many occasions, it has been found that improper RF cabling gave rise to wrong BCCH - Sector combination. Corrections were initiated and post correction verifications have been performed. To find coverage footprint and associated quality plt, drive tests were executed with two MS (MS 1-Hutch Idle mode MS 2 – Hutch Dedicated mode) simultaneously. This were done in and around 6km radius centering the site as per Hutch specification. From this drive-test data, GTL prepared coverage and quality plot for newly commissioned site. Results were submitted to Hutch. After achieving required results, sites were put on air for commercial purposes. Value Delivered : GTL successfully completed the optimisation activity for the project covered 170 existing sites and 70 new sites during Oct’05 to Mar’06. All sites were either in Highways or in remote locations of eastern part of UP covering Kanpur, Lucknow, Varanasi, Allahabad and Gorakhpur. 45
  • 46. Case Study 2 About the Client : Hutch is one of the leading gsm operator in India having licenses spanning all over India. Hutch is working with gsm 900 band and wants to expand their network as the demand grow. So to meet quality and coverage there is need to swap old ZTE system with some new updated system, which can support the gsm, gprs, edge and easily upgraded to 3G. Hutch selected Nokia as OEM for the core part of their network. Business Challenge : Nokia wanted to have resources in the outsourcing domain increase their strength. As GTL had done lots of work with Nokia in India so GTL seems to be perfectly poised to rise to the need. We became partner of choicer for Nokia to perform RF tasks in the swap roll out process. From March 2005 to Till Date for performed allocated tasks creditably. A few points of project: GSM 900 Networks. 45 sites to be swap from ZTE to Nokia. 342 New Nokia Ultra BTS Coverage includes cities and boundaries. Network with 19 BSC’s and two switch AXE 10 from Nokia.- CSSR 94%, SDCCH Drop 2%, Handover success rate 94%, Call drop rate 2.5%. Project Scope : SoW conferred and accepted by GTL have been as follows: Perform pre swap drive test for all 41 sites. Prepared proficient database for Nokia Add and delete Neighbor list. Verification of antenna locations and azimuth. Verifies existing Frequency Plan, recommend the changes required. Download the database to OMC and verify the dump. Perform Drive Tests for sites verification on Swap night. Perform the post swap drive test for all 45 sites. Conduct Acceptance Test Procedure (ATP) with end customer. Nominal Cell Planning for New 417 sites RF survey, LOS survey and Drive Test for New Sites. MW radio link planning for MW transmission links. Provide a solution for the Hutch subscriber’s complaints. Preparation of 2 Mbit/s transmission plan including link capacity calculations, timeslot allocation and ET planning Maintain the Network quality by daily monitoring KPI. Value Delivered : All swaps are mostly conducted at night there is around 6 sites swap per day. As soon as swap sites bring on air our drive test is ask to conduct the site verification drive test at each cell the test includes database verification, sector swapping, handover testing, neighbor list verification, call termination. After finishing the swap now optimization is started on network level, to meet the KPI daily statistic report are generated with the help of Business object and results are discussed with the customer and also suggest the necessary changes. 46
  • 47. GTL's Network Customer Engagement Government Of Maharashtra Power Grid Corp 47
  • 48. © Copy right GTL Limited 2008 International Presence Americas: US Asia–Pacific: Malaysia Thailand China Taiwan Indonesia Australia Singapore Philippines New Zealand Europe: UK France Ireland Sweden Switzerland Middle East: UAE KSA Oman Qatar Kuwait South Asia India Nepal Bhutan Maldives Sri Lanka Bangladesh Africa: Nigeria South Africa Guinea Conakry Mauritius International Office Projects Undertaken 48