SlideShare a Scribd company logo
1 of 49
Download to read offline
Safe harbor
• Neither the information nor any opinion expressed in this presentation constitutes an offer, or invitation to make an offer, or to buy any security issued by the company. This presentation contains
predictions, estimates or other information regarding the Company's operations which are forward looking in nature. While these forward looking statements represent our best current judgment on what the
future holds, they are subject to risks and uncertainties that could cause actual results to differ materially and may involve risk and uncertainty. This presentation is prepared for general purposes only and
does not have any regard to the specific investment objectives, financial situation and particular needs of any specific person. No liability for any loss will arise with the company as a result of the action
taken on the basis of information contained herein.
•For a discussion of the risks and uncertainties that may cause results to differ, you should review GTL’s filings with stock exchanges, including the annual report and quarterly disclosures.
RFRF OptimisationOptimisation
Network Planning, Design & Optimisation
Core Offerings
2
Imperatives for Optimisation
3
RF optimisation remains one of the key challenges in any network.
Identifying potential faults in the network and resolving them before
they affect network performance.
Rectifying causes of faults affecting network performance.
Leads to efficient use of the spectrum.
Optimisation Overview
4
Need for optimisation
Perceived reduction in network quality.
Maximising the use of existing infrastructure.
Introduction of new services.
Indications from network performance monitoring.
Subscriber's experience of using the network.
Operators wants to ensure the best returns on investment.
Maximise existing resources to accommodate new services such as GPRS.
▪ Flawed original design in format.
▪ Original design information has changed.
Change in original design parameters.
Network issues that may generate a requirement
5
Network Lifecycle
Network
Rollout
Network
Planning
Licence
Award
Continuous
Optimisation
Pre Launch
Optimisation
Network Lifecycle
Swap
Management
(If required)
6
RF Optimisation
7
Swap
Management
- BTS upgrade
- BTS re-homing
- BSC re-parenting
- Transmission Re-engineering
(If required)
Pre Launch
Optimisation
Continuous
Optimisation
Virtual Optimisation Centre
Virtual Optimisation Centre
Pre Launch Optimisation
8
Objectives
High rate of integrations
Low traffic (Pre-launch or launch)
Predominantly drive data dependant
Pre Launch
Optimisation
Continuous
Optimisation
Swap
Management
Optimisation Process – Single site verification
9
RF Site
Audit
Coverage
Verification
Parameter
verification
Reconfiguration
Problem
Analysis
Fail
PassSite
Acceptance
Site
IdentificationPre Launch
Optimisation
Continuous
Optimisation
Swap
Management
Optimisation Process – Drive Test Based
10
Cluster
Stimulation
Site
Identification
Cluster
Preparation
Drive Test
Data Analysis Reconfiguration
Problem
Analysis
Site
Acceptance
Fail
PassCluster
Analysis
Cluster
IdentificationPre Launch
Optimisation
Continuous
Optimisation
Swap
Management
Cluster Analysis
OMC
Data
Drive Test
Results
Simulation
Data
Determine clusters for acceptance
Characterise performance
Ensure correct site configuration
Drive tests
Process data
Analysis
Remodelling
Reconfiguration
• Parameter Setting
• Neighbors
• Powered
• Stable
•Call statistics
•Key measurement events
• Neighbor analysis
•Key measurement data
• Parameters
• Neighbors
• Report Hardware
Requirements
11
Cluster Reconfiguration
12
HardwareHardware
OptimisationOptimisation
Antenna Reorientation
Antenna Down tilt
Antenna Relocation
Antenna Height adjustment
Masthead Amplifiers
Cell parameterCell parameter
optimisationoptimisation
Handover parameters
Power planning
Neighbour list reconfiguration
Frequency planning
Performance Monitoring
Pre Launch
Optimisation
Swap
Management
Continuous
Optimisation
Pre Launch Optimization
13
Parameter
Analysis
Process Creation
KPI Definition
KPI Reporting
Training
Functionality
Asses
Config Management
Cluster
Preparation
Drive Testing
Drive Analysis
Modelling
Cluster Monitoring
Model Calibration
Cluster
Identification
Network
Reconfigure
On Site
Off Site
What GTL can do for
you
Pre Launch
Optimisation
Continuous
Optimisation
Swap
Management
KPI’s to be Monitored
Based on performance of a Network & Cell
Network KPI Target Type
KPI Deciding
Factor
Network /
Town Level
CSR (%)
CSSR (%)
DCR (%)
TCH Blocking
SDCCH
Blocking
93%
95%
5%
2%
3%
Performance
Performance
Performance
Performance
Performance
TBD upon
checking trend
to maintain the
performance of
the network
and to improve
CSR (%)
CSSR (%)
DCR (%)
TCH Blocking
SDCCH Blocking
90%
92%
10%
4%
6%
Performance
Performance
Performance
Performance
Performance
TBD upon
checking trend
to maintain the
performance of
the network
and to improve
Cell Level
(TBD : To Be Decided)
14
KPI’s to be Monitored
Based on performance of a Network & Cell
Network KPI Target Type
KPI Deciding
Factor
Network /
Town Level
Downlink Rx Qual
Uplink Rx Qual
FER
Data Through
output
Data
Accessibility
TBA
TBA
TBA
TBA
TBA
Performance
Performance
Performance
Performance
Performance
TBD upon
checking trend
to maintain the
performance of
the network
and to improve
Downlink Rx Qual
Uplink Rx Qual
FER
Data Through
output
Data Accessibility
Performance
Performance
Performance
Performance
Performance
TBD upon
checking trend
to maintain the
performance of
the network
and to improve
Cell Level
(TBA : To Be Accepted)
15
TBA
TBA
TBA
TBA
TBA
Reports
Pre Launch Optimization
Cell / Cluster Drive Test and Analysis Report.
Quality issues identification and RX lev, RX Qual, TCH Blocking,
SDCCH Drop,HO Issues, Call drop problems, and call set up
issues analysis.
RF parameters audit and tuning : neighbour site list, power
parameters, HO parameters, etc.
Cell / Cluster Optimisation Report.
Antenna engineering tuning.
Deliverables
Cell / cluster Optimisation and tuning to reach acceptance criteria.
Pre Launch
Optimisation
Continuous
Optimisation
Swap
Management
16
Reports
Network Analysis and Optimisation Report.
Cell, cluster, Network drive test reports from post processing tool.
RF coverage and quality assessment report.
Radio and system Parameters audit and tuning report.
Optimisation Report.
Acceptance Report.
Interference Measurement.
Updated network site database.
Traffic Statistics Analysis Report.
Pre Launch
Optimisation
Continuous
Optimisation
Swap
Management
17
Continuous Optimisation
18
Objectives
Minimisation of integration Issues
Maintaining the traffic rate within medium to low
To achieve more stability in neighbour/ pilot
Reducing operational cost
Predominantly OMC R Stats and Counters
Pre Launch
Optimisation
Continuous
Optimisation
Swap
Management
Continuous Optimisation
19
Network
Performance
Targets
Performance
Customer Faults Trouble Tickets
CM Data Call Trace
Drive Test Results Alarms
Service Level
OMC
Status
Fault
Resolution
Cell
Prioritisation
ReportsFault
Pre Launch
Optimisation
Continuous
Optimisation
Swap
Management
Optimisation Process – Drive Test Based
20
Pre Launch
Optimisation
Continuous
Optimisation
Swap
Management
Characterise performance
Ensure correct site configuration
Drive tests
Process data
Analysis
Remodelling
Reconfiguration
• Parameter Setting
• Neighbors
• Powered
• Stable
•Call statistics
•Key measurement events
• Neighbor analysis
•Key measurement data
Determine clusters for acceptance
• Parameters
• Neighbors
• Report Hardware
Requirements
Cluster Reconfiguration
21
HardwareHardware
OptimisationOptimisation
Antenna Reorientation
Antenna Down tilt
Antenna Relocation
Antenna Height adjustment
Masthead Amplifiers
Cell parameterCell parameter
optimisationoptimisation
Handover parameters
Power planning
Neighbour list reconfiguration
Frequency planning
Performance Monitoring
Pre Launch
Optimisation
Continuous
Optimisation
Swap
Management
Continuous Optimization
22
Benchmarking
Process Control
KPI Definition
KPI Reporting
Training
OMC Reporting
Cell Prioritisation
Fault Resolution
Change
recommend
Network
Reconfigure
Drive testing
Functionality
Asses
Audit
Config
Management
What GTL can do
for you
On Site
Off sitePre Launch
Optimisation
Continuous
Optimisation
Swap
Management
KPI’s to be Monitored
Based on performance of a Network & Cell
Network KPI Target Type
KPI Deciding
Factor
Network /
Town Level
CSR (%)
CSSR (%)
DCR (%)
TCH Blocking
SDCCH
Blocking
93%
95%
5%
2%
3%
Performance
Performance
Performance
Performance
Performance
TBD upon
checking trend
to maintain the
performance of
the network
and to improve
CSR (%)
CSSR (%)
DCR (%)
TCH Blocking
SDCCH Blocking
90%
92%
10%
4%
6%
Performance
Performance
Performance
Performance
Performance
TBD upon
checking trend
to maintain the
performance of
the network
and to improve
Cell Level
(TBD : To Be Decided)
23
KPI’s to be Monitored
Based on performance of a Network & Cell
Network KPI Target Type
KPI Deciding
Factor
Network /
Town Level
Downlink Rx Qual
Uplink Rx Qual
FER
Data Through
output
Data
Accessibility
TBA
TBA
TBA
TBA
TBA
Performance
Performance
Performance
Performance
Performance
TBD upon
checking trend
to maintain the
performance of
the network
and to improve
Downlink Rx Qual
Uplink Rx Qual
FER
Data Through
output
Data Accessibility
Performance
Performance
Performance
Performance
Performance
TBD upon
checking trend
to maintain the
performance of
the network
and to improve
Cell Level
(TBA : To Be Accepted)
24
TBA
TBA
TBA
TBA
TBA
Reports
Continuous Optimisation
Radio network measurement and analysis report
Containing signal strength, Quality, Time advance,Path loss,
Frequency distribution, Neighbour selection.
Deliverables
BSS/ RAN parameter adjustment report
Neighbour optimisation parameter, BTS/ MS power control,
Intracell handover, Hierarchy cell structure & cell load sharing.
Pre Launch
Optimisation
Continuous
Optimisation
Swap
Management
25
Reports
Worst cell optimization report
TCH Blocking, SDCCH Blocking, Signal Strength, Bad Quality,
Timing Advance, Sudden Loss, Other Reasons.
Drive test, Worst cell, site survey,Antenna rigging.
Coverage Analysis report
Capacity Analysis & Recommendation Report
Dynamic full and half rate, Cell load sharing,Hierarchy cell structure,
Dynamic allocation of SDCCH.
Pre Launch
Optimisation
Continuous
Optimisation
Swap
Management
26
Swap Management
27
Objectives
High rate of integrations
High traffic (Pre-Cut and Post Cut)
Predominantly drive data dependant
Pre Launch
Optimisation
Continuous
Optimisation
Swap
Management
Swap Management
28
Swap Planning
Default Parameter
Parameter Mapping
Validation of Neighbour, BSIC and MAIO
Pre Launch
Optimisation
Continuous
Optimisation
Swap
Management
Swap Process – Pre / Post verification
29
RF Site
Audit
Coverage
Verification
Parameter
verification
Reconfiguration
Problem
Analysis
Fail
PassSite
Acceptance
Site
IdentificationPre Launch
Optimisation
Continuous
Optimisation
Swap
Management
Swap Process – Cluster Based
30
Cluster
Stimulation
Site
Identification
Cluster
Preparation
Drive Test
Data Analysis Reconfiguration
Problem
Analysis
Site
Acceptance
Fail
PassCluster
Analysis
Cluster
IdentificationPre Launch
Optimisation
Continuous
Optimisation
Swap
Management
Cluster Analysis
31
OMC
Data
Drive Test
Results
Simulation
Data
• Parameters
• Neighbors
• Report Hardware
Requirements
Determine clusters for acceptance
Characterise performance
Ensure correct site configuration
Drive tests
Process data
Analysis
Remodelling
• Parameter Setting
• Neighbors
• Powered
• Stable
•Call statistics
•Key measurement events
• Neighbor analysis
•Key measurement data
Reconfiguration
Cluster Reconfiguration
32
HardwareHardware
OptimisationOptimisation
Antenna Reorientation
Antenna Down tilt
Antenna Relocation
Antenna Height adjustment
Masthead Amplifiers
Cell parameterCell parameter
optimisationoptimisation
Handover parameters
Power planning
Neighbour list reconfiguration
Performance Monitoring
Pre Launch
Optimisation
Continuous
Optimisation
Swap
Management
Swap Optimization
33
Parameter
Analysis
Process Creation
KPI Definition
KPI Reporting
Training
Functionality
Asses
Config Management
Cluster
Preparation
Drive Testing
Drive Analysis
Modelling
Cluster Monitoring
Cluster
Identification
Network
Reconfigure
On Site
Off Site
What GTL can do for
you
Pre Launch
Optimisation
Continuous
Optimisation
Swap
Management
Model Calibration
KPI’s to be Monitored
Based on performance of a Network & Cell
Network KPI Target Type
KPI Deciding
Factor
Network /
Town Level
CSR (%)
CSSR (%)
DCR (%)
TCH Blocking
SDCCH
Blocking
Improve
Improve
Improve
Improve
Improve
Performance
Performance
Performance
Performance
Performance
TBD upon
checking trend
to maintain the
performance of
the network
and to improve
CSR (%)
CSSR (%)
DCR (%)
TCH Blocking
SDCCH Blocking
Performance
Performance
Performance
Performance
Performance
TBD upon
checking trend
to maintain the
performance of
the network
and to improve
Cell Level
(TBA : To Be Accepted)
34
Improve
Improve
Improve
Improve
Improve
KPI’s to be Monitored
Based on performance of a Network & Cell
Network KPI Target Type
KPI Deciding
Factor
Network /
Town Level
Downlink Rx Qual
Uplink Rx Qual
FER
Data Through
output
Data
Accessibility
Performance
Performance
Performance
Performance
Performance
TBD upon
checking trend
to maintain the
performance of
the network
and to improve
Downlink Rx Qual
Uplink Rx Qual
FER
Data Through
output
Data Accessibility
Performance
Performance
Performance
Performance
Performance
TBD upon
checking trend
to maintain the
performance of
the network
and to improve
Cell Level
Improve
Improve
Improve
Improve
Improve
35
Improve
Improve
Improve
Improve
Improve
Reports
Swap Management
Swap Planning Report.
Parameter mapping report
Verification of RF Coverage, parameters audit and tuning : neighbour site list,
Power parameters, HO parameters, etc.
Pre Drive Test Report
Deliverables
Post Drive Test Report.
Improvement of RF Coverage, parameters audit and tuning : neighbour
site list, power parameters, HO parameters, etc.
Cutover Drive Test Report
Validation of RF Coverage, parameters audit and tuning : neighbour
site list, power parameters, HO parameters, etc.
Pre Launch
Optimisation
Continuous
Optimisation
Swap
Management
36
Subjects to Investigate
37
Non-Working sites/sectors or TRX’s
In-active Radio network features like frequency hopping
Overshooting sites – coverage overlaps
•Disabled GPRS
•Coverage holes
C/I, C/A analysis
High Interference Spots
Drop Calls
Capacity Problems
Pre Launch
Optimisation
Continuous
Optimisation
Swap
Management
Other Interference Sources
Missing Neighbors
Subjects to Investigate
38
One-way neighbors
Not happening handovers
Ping-Pong Handovers
Footprint and performance of the site as per design
criteria
Sites not operational
Faulty Installations
•Faulty TRX
BA list error
Pre Launch
Optimisation
Continuous
Optimisation
Swap
Management
•BSIC, HSN, MAIO Plan
Hopping ON or OFF
Recommendations
Defining missing neighbor relations
Proposing new sites or sector additions
Proposing antenna azimuth changes
Proposing antenna tilt changes
Proposing antenna type changes
BTS Equipment/Filter change
Re-tuning of interfered frequencies
Adjusting HO Margins
Adjusting accessibility parameters
Changing power parameters
MHA/TMA adds
Pre Launch
Optimisation
Continuous
Optimisation
Swap
Management
39
Virtual Optimisation Centre
Pre Launch
Optimisation
Continuous
Optimisation
Swap
Management
40
Remote Analytics for Design, Planning & Optimisation
to achieve minimal startup time, consistent use of
process and tools and concentrated expertise in one
location
State of the art VPO Centre vital stats:
Floor space: 2000 Sq. Ft.
Seating capacity: 50
Internet speed: 2 Mbps
No. of RF engineers: 50
Total man years experience: 10 Years
Tools used for VPO: Asset
Connect
PL4 & MIPT
Virtual Optimisation Centre
Activities Off shore On shore
Benchmarking
Data Collection
RF and Transmission Planning
Transmission Network Verification
RF / Line of Sight Surveys
CW Testing and Model Tuning
Nominal Cell Planning
Frequency Scanning
Optimisation
Pre Launch
Optimisation
Continuous
Optimisation
Swap
Management
41
Low fixed Cost regardless of the project location.
Fast Delivery Cycle and Quick deployment of project.
Cost effective especially for high cost areas.
Flexible service packages to meet unique customer needs.
Ideal solution for high-risk or hard to access areas.
Expertise availability guaranteed.
Core expertise group available to service multiple project.
Quick take off without tine lag to mobilize.
Uniform applications on tolls through standard processes.
Virtual Optimisation Centre
Benefits
Pre Launch
Optimisation
Continuous
Optimisation
Swap
Management
42
Value Proposition
43
Risk Sharing - KPI & SLA Based Commitments
End to End RF solution provider
RF Planning, Design and Optimisation done for
31 networks
– Experience across 15 geographies
– Covering 2G, 2.5G, 3G technologies
– Across standards such as GSM, Edge/GPRS,
CDMA, UMTS and WiMAX
Long Standing relations With OEMs At Global
Level
Unique combination of tasks carried out Offshore
and Onshore that give cost efficiencies
Technology and vendor agnostic skill set
Case Studies & Capabilities
44
Case Study 1
About the Client :
Hutchison Essar (Hutch), is a leading GSM network
operator in India having GSM wireless operations with
a pan Indian footage. The network has been growing
at a very high pace to address competition with more
coverage and capacity. This entails Hutch to roll out
new sites in remote areas of UP. While expanding,
Hutch wanted to have their network optimised
Business Challenge :
Hutch found RF Group of GTL a competent partner to
perform on their behalf optimization activities with
quality deliverables. In the process GTL got the
responsibility of around 240 sites (170 existing & 70
new sites) to be completed during October 2005 to
March 2006.
Project Scope :
GTL was to optimize new roll out cell sites in the
network to achieve desired results viz. call origination,
call termination, intra-cell handover, and coverage.
On many occasions, it has been found that improper RF
cabling gave rise to wrong BCCH - Sector combination.
Corrections were initiated and post correction verifications have
been performed.
To find coverage footprint and associated quality plt, drive
tests were executed with two MS (MS 1-Hutch Idle mode &
MS 2 – Hutch Dedicated mode) simultaneously.
This were done in and around 6km radius centering the site as
per Hutch specification.
From this drive-test data, GTL prepared coverage and quality
plot for newly commissioned site. Results were submitted to
Hutch. After achieving required results, sites were put on air
for commercial purposes.
Value Delivered :
GTL successfully completed the optimisation activity for
the project covered 170 existing sites and 70 new sites during
Oct’05 to Mar’06.
All sites were either in Highways or in remote locations of
eastern part of UP covering Kanpur, Lucknow, Varanasi,
Allahabad and Gorakhpur.
45
Case Study 2
About the Client :
Hutch is one of the leading gsm operator in India
having licenses spanning all over India. Hutch is
working with gsm 900 band and wants to expand their
network as the demand grow. So to meet quality and
coverage there is need to swap old ZTE system with
some new updated system, which can support the
gsm, gprs, edge and easily upgraded to 3G.
Hutch selected Nokia as OEM for the core part of their
network.
Business Challenge :
Nokia wanted to have resources in the outsourcing
domain increase their strength. As GTL had done lots
of work with Nokia in India so GTL seems to be
perfectly poised to rise to the need. We became
partner of choicer for Nokia to perform RF tasks in the
swap roll out process. From March 2005 to Till Date
for performed allocated tasks creditably. A few points
of project:
GSM 900 Networks.
45 sites to be swap from ZTE to Nokia.
342 New Nokia Ultra BTS
Coverage includes cities and boundaries.
Network with 19 BSC’s and two switch AXE 10 from
Nokia.-
CSSR ≥94%, SDCCH Drop ≥2%, Handover success
rate ≥ 94%, Call drop rate ≤ 2.5%.
Project Scope :
SoW conferred and accepted by GTL have been as follows:
Perform pre swap drive test for all 41 sites.
Prepared proficient database for Nokia
Add and delete Neighbor list.
Verification of antenna locations and azimuth.
Verifies existing Frequency Plan, recommend the changes
required.
Download the database to OMC and verify the dump.
Perform Drive Tests for sites verification on Swap night.
Perform the post swap drive test for all 45 sites.
Conduct Acceptance Test Procedure (ATP) with end customer.
Nominal Cell Planning for New 417 sites
RF survey, LOS survey and Drive Test for New Sites.
MW radio link planning for MW transmission links.
Provide a solution for the Hutch subscriber’s complaints.
Preparation of 2 Mbit/s transmission plan including link capacity
calculations, timeslot allocation and ET planning
Maintain the Network quality by daily monitoring KPI.
Value Delivered :
All swaps are mostly conducted at night there is around 6 sites
swap per day. As soon as swap sites bring on air our drive test
is ask to conduct the site verification drive test at each cell the
test includes database verification, sector swapping, handover
testing, neighbor list verification, call termination. After
finishing the swap now optimization is started on network level,
to meet the KPI daily statistic report are generated with the
help of Business object and results are discussed with the
customer and also suggest the necessary changes.
46
GTL's Network Customer Engagement
Government Of
Maharashtra
Power Grid
Corp
47
© Copy right GTL Limited 2008
International Presence
Americas:
US
Asia–Pacific:
Malaysia
Thailand
China
Taiwan
Indonesia
Australia
Singapore
Philippines
New Zealand
Europe:
UK
France
Ireland
Sweden
Switzerland
Middle East:
UAE
KSA
Oman
Qatar
Kuwait
South Asia
India
Nepal
Bhutan
Maldives
Sri Lanka
Bangladesh
Africa:
Nigeria
South Africa
Guinea Conakry
Mauritius
International Office
Projects Undertaken
48
Thank you

More Related Content

What's hot

04. lte kpi in lte radio network
04. lte   kpi in lte radio network04. lte   kpi in lte radio network
04. lte kpi in lte radio networkDani Indra Kumara
 
GPRS KPIs based on network performance
GPRS KPIs based on network performance GPRS KPIs based on network performance
GPRS KPIs based on network performance Mehmet Beyaz
 
Vikrant Tiwari Resume(RNO)
Vikrant Tiwari Resume(RNO)Vikrant Tiwari Resume(RNO)
Vikrant Tiwari Resume(RNO)vikrant tiwari
 
Network optimization presentation generic dec18
Network optimization presentation generic dec18Network optimization presentation generic dec18
Network optimization presentation generic dec18frankjoh
 
Gsm bss kpi analysis
Gsm bss kpi analysisGsm bss kpi analysis
Gsm bss kpi analysisHassan Imam
 
Lakshman Resume 3 years experience
Lakshman Resume 3 years experienceLakshman Resume 3 years experience
Lakshman Resume 3 years experiencelakshman vatada
 
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...Jean de la Sagesse
 
Gsm rf-optimization
Gsm rf-optimizationGsm rf-optimization
Gsm rf-optimizationkarimfeel
 
Basics of performance measurement in umts
Basics of performance measurement in umtsBasics of performance measurement in umts
Basics of performance measurement in umtsEkwere Udoh
 
CV_RF_NEETIN CHANDRA VIDYARTHY_RF110116
CV_RF_NEETIN CHANDRA VIDYARTHY_RF110116CV_RF_NEETIN CHANDRA VIDYARTHY_RF110116
CV_RF_NEETIN CHANDRA VIDYARTHY_RF110116Neetin vidyarthy
 
53 gsm bss network ps kpi (success rate of uplink tbf establishments) optimiz...
53 gsm bss network ps kpi (success rate of uplink tbf establishments) optimiz...53 gsm bss network ps kpi (success rate of uplink tbf establishments) optimiz...
53 gsm bss network ps kpi (success rate of uplink tbf establishments) optimiz...tharinduwije
 
3 gpp key performance indicators (kpi) for umts and gsm release 9
3 gpp key performance indicators (kpi) for umts and gsm release 93 gpp key performance indicators (kpi) for umts and gsm release 9
3 gpp key performance indicators (kpi) for umts and gsm release 9Telecom Consultant
 
NTADOM TONY C RF DT
NTADOM TONY C  RF DTNTADOM TONY C  RF DT
NTADOM TONY C RF DTTony Ntadom
 
49823859 gsm-gprs-evaluatioin-and-optimization
49823859 gsm-gprs-evaluatioin-and-optimization49823859 gsm-gprs-evaluatioin-and-optimization
49823859 gsm-gprs-evaluatioin-and-optimizationMery Koto
 
3 g second carrier optimization report – cluster2_
3 g second carrier optimization report – cluster2_3 g second carrier optimization report – cluster2_
3 g second carrier optimization report – cluster2_Ridwan Syarif Siregar
 
52 gsm bss network performance ps kpi (downlink tbf establishment success rat...
52 gsm bss network performance ps kpi (downlink tbf establishment success rat...52 gsm bss network performance ps kpi (downlink tbf establishment success rat...
52 gsm bss network performance ps kpi (downlink tbf establishment success rat...tharinduwije
 
16 gsm bss network kpi (inter rat handover success rate) optimization manual[...
16 gsm bss network kpi (inter rat handover success rate) optimization manual[...16 gsm bss network kpi (inter rat handover success rate) optimization manual[...
16 gsm bss network kpi (inter rat handover success rate) optimization manual[...tharinduwije
 

What's hot (20)

04. lte kpi in lte radio network
04. lte   kpi in lte radio network04. lte   kpi in lte radio network
04. lte kpi in lte radio network
 
GPRS KPIs based on network performance
GPRS KPIs based on network performance GPRS KPIs based on network performance
GPRS KPIs based on network performance
 
Vikrant Tiwari Resume(RNO)
Vikrant Tiwari Resume(RNO)Vikrant Tiwari Resume(RNO)
Vikrant Tiwari Resume(RNO)
 
Kpi info
Kpi info Kpi info
Kpi info
 
Network optimization presentation generic dec18
Network optimization presentation generic dec18Network optimization presentation generic dec18
Network optimization presentation generic dec18
 
Gsm bss kpi analysis
Gsm bss kpi analysisGsm bss kpi analysis
Gsm bss kpi analysis
 
Lakshman Resume 3 years experience
Lakshman Resume 3 years experienceLakshman Resume 3 years experience
Lakshman Resume 3 years experience
 
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
 
Gsm rf-optimization
Gsm rf-optimizationGsm rf-optimization
Gsm rf-optimization
 
Basics of performance measurement in umts
Basics of performance measurement in umtsBasics of performance measurement in umts
Basics of performance measurement in umts
 
CV_Satbir
CV_SatbirCV_Satbir
CV_Satbir
 
CV_RF_NEETIN CHANDRA VIDYARTHY_RF110116
CV_RF_NEETIN CHANDRA VIDYARTHY_RF110116CV_RF_NEETIN CHANDRA VIDYARTHY_RF110116
CV_RF_NEETIN CHANDRA VIDYARTHY_RF110116
 
53 gsm bss network ps kpi (success rate of uplink tbf establishments) optimiz...
53 gsm bss network ps kpi (success rate of uplink tbf establishments) optimiz...53 gsm bss network ps kpi (success rate of uplink tbf establishments) optimiz...
53 gsm bss network ps kpi (success rate of uplink tbf establishments) optimiz...
 
3 gpp key performance indicators (kpi) for umts and gsm release 9
3 gpp key performance indicators (kpi) for umts and gsm release 93 gpp key performance indicators (kpi) for umts and gsm release 9
3 gpp key performance indicators (kpi) for umts and gsm release 9
 
Gsm kpi
Gsm kpiGsm kpi
Gsm kpi
 
NTADOM TONY C RF DT
NTADOM TONY C  RF DTNTADOM TONY C  RF DT
NTADOM TONY C RF DT
 
49823859 gsm-gprs-evaluatioin-and-optimization
49823859 gsm-gprs-evaluatioin-and-optimization49823859 gsm-gprs-evaluatioin-and-optimization
49823859 gsm-gprs-evaluatioin-and-optimization
 
3 g second carrier optimization report – cluster2_
3 g second carrier optimization report – cluster2_3 g second carrier optimization report – cluster2_
3 g second carrier optimization report – cluster2_
 
52 gsm bss network performance ps kpi (downlink tbf establishment success rat...
52 gsm bss network performance ps kpi (downlink tbf establishment success rat...52 gsm bss network performance ps kpi (downlink tbf establishment success rat...
52 gsm bss network performance ps kpi (downlink tbf establishment success rat...
 
16 gsm bss network kpi (inter rat handover success rate) optimization manual[...
16 gsm bss network kpi (inter rat handover success rate) optimization manual[...16 gsm bss network kpi (inter rat handover success rate) optimization manual[...
16 gsm bss network kpi (inter rat handover success rate) optimization manual[...
 

Similar to Rf optimisation

Профессиональные сервисы для Центров Обработки Данных
Профессиональные сервисы для Центров Обработки Данных Профессиональные сервисы для Центров Обработки Данных
Профессиональные сервисы для Центров Обработки Данных TERMILAB. Интернет - лаборатория
 
Brightcomms Company Profile
Brightcomms Company ProfileBrightcomms Company Profile
Brightcomms Company Profiledennygraph
 
ROI Example
ROI ExampleROI Example
ROI ExamplePhilbo58
 
360 cellutions casestudy
360 cellutions casestudy360 cellutions casestudy
360 cellutions casestudy360cell
 
Baker Charlie
Baker CharlieBaker Charlie
Baker CharlieCarl Ford
 
Project Plan_v1.2.pptx
Project Plan_v1.2.pptxProject Plan_v1.2.pptx
Project Plan_v1.2.pptxTech King
 
Project presentation
Project presentationProject presentation
Project presentationNiraj Bhujel
 
Lemuelle L. Labadan_CV_2015
Lemuelle L. Labadan_CV_2015Lemuelle L. Labadan_CV_2015
Lemuelle L. Labadan_CV_2015Lemuelle Labadan
 
Case Study: How Cisco Gained Visibility into Network Utilization and Proacti...
Case Study:  How Cisco Gained Visibility into Network Utilization and Proacti...Case Study:  How Cisco Gained Visibility into Network Utilization and Proacti...
Case Study: How Cisco Gained Visibility into Network Utilization and Proacti...CA Technologies
 
Rahul kumar_2016
Rahul kumar_2016Rahul kumar_2016
Rahul kumar_2016Rahul Kumar
 

Similar to Rf optimisation (20)

Rf optimisation
Rf optimisationRf optimisation
Rf optimisation
 
CV_MALIK MD NURANI.pdf
CV_MALIK MD NURANI.pdfCV_MALIK MD NURANI.pdf
CV_MALIK MD NURANI.pdf
 
Mobile radio network_RAN Optimization
Mobile radio network_RAN Optimization Mobile radio network_RAN Optimization
Mobile radio network_RAN Optimization
 
Профессиональные сервисы для Центров Обработки Данных
Профессиональные сервисы для Центров Обработки Данных Профессиональные сервисы для Центров Обработки Данных
Профессиональные сервисы для Центров Обработки Данных
 
Ijett v4 i10p113
Ijett v4 i10p113Ijett v4 i10p113
Ijett v4 i10p113
 
Job Description
Job DescriptionJob Description
Job Description
 
Brightcomms Company Profile
Brightcomms Company ProfileBrightcomms Company Profile
Brightcomms Company Profile
 
Umts Kpi
Umts KpiUmts Kpi
Umts Kpi
 
ROI Example
ROI ExampleROI Example
ROI Example
 
360 cellutions casestudy
360 cellutions casestudy360 cellutions casestudy
360 cellutions casestudy
 
Satisha Kumar_RF Engg(3G)_3.6 year
Satisha Kumar_RF Engg(3G)_3.6 yearSatisha Kumar_RF Engg(3G)_3.6 year
Satisha Kumar_RF Engg(3G)_3.6 year
 
soc
socsoc
soc
 
Baker Charlie
Baker CharlieBaker Charlie
Baker Charlie
 
Project Plan_v1.2.pptx
Project Plan_v1.2.pptxProject Plan_v1.2.pptx
Project Plan_v1.2.pptx
 
Project presentation
Project presentationProject presentation
Project presentation
 
Lemuelle L. Labadan_CV_2015
Lemuelle L. Labadan_CV_2015Lemuelle L. Labadan_CV_2015
Lemuelle L. Labadan_CV_2015
 
Resume_Ajith
Resume_AjithResume_Ajith
Resume_Ajith
 
Case Study: How Cisco Gained Visibility into Network Utilization and Proacti...
Case Study:  How Cisco Gained Visibility into Network Utilization and Proacti...Case Study:  How Cisco Gained Visibility into Network Utilization and Proacti...
Case Study: How Cisco Gained Visibility into Network Utilization and Proacti...
 
Sandeep Sharma_CV
Sandeep Sharma_CVSandeep Sharma_CV
Sandeep Sharma_CV
 
Rahul kumar_2016
Rahul kumar_2016Rahul kumar_2016
Rahul kumar_2016
 

Recently uploaded

Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
Unlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsUnlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsPrecisely
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentationphoebematthew05
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraDeakin University
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsHyundai Motor Group
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxnull - The Open Security Community
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 

Recently uploaded (20)

Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
Unlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsUnlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power Systems
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
The transition to renewables in India.pdf
The transition to renewables in India.pdfThe transition to renewables in India.pdf
The transition to renewables in India.pdf
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentation
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning era
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 

Rf optimisation

  • 1. Safe harbor • Neither the information nor any opinion expressed in this presentation constitutes an offer, or invitation to make an offer, or to buy any security issued by the company. This presentation contains predictions, estimates or other information regarding the Company's operations which are forward looking in nature. While these forward looking statements represent our best current judgment on what the future holds, they are subject to risks and uncertainties that could cause actual results to differ materially and may involve risk and uncertainty. This presentation is prepared for general purposes only and does not have any regard to the specific investment objectives, financial situation and particular needs of any specific person. No liability for any loss will arise with the company as a result of the action taken on the basis of information contained herein. •For a discussion of the risks and uncertainties that may cause results to differ, you should review GTL’s filings with stock exchanges, including the annual report and quarterly disclosures. RFRF OptimisationOptimisation
  • 2. Network Planning, Design & Optimisation Core Offerings 2
  • 3. Imperatives for Optimisation 3 RF optimisation remains one of the key challenges in any network. Identifying potential faults in the network and resolving them before they affect network performance. Rectifying causes of faults affecting network performance. Leads to efficient use of the spectrum.
  • 5. Need for optimisation Perceived reduction in network quality. Maximising the use of existing infrastructure. Introduction of new services. Indications from network performance monitoring. Subscriber's experience of using the network. Operators wants to ensure the best returns on investment. Maximise existing resources to accommodate new services such as GPRS. ▪ Flawed original design in format. ▪ Original design information has changed. Change in original design parameters. Network issues that may generate a requirement 5
  • 7. RF Optimisation 7 Swap Management - BTS upgrade - BTS re-homing - BSC re-parenting - Transmission Re-engineering (If required) Pre Launch Optimisation Continuous Optimisation Virtual Optimisation Centre Virtual Optimisation Centre
  • 8. Pre Launch Optimisation 8 Objectives High rate of integrations Low traffic (Pre-launch or launch) Predominantly drive data dependant Pre Launch Optimisation Continuous Optimisation Swap Management
  • 9. Optimisation Process – Single site verification 9 RF Site Audit Coverage Verification Parameter verification Reconfiguration Problem Analysis Fail PassSite Acceptance Site IdentificationPre Launch Optimisation Continuous Optimisation Swap Management
  • 10. Optimisation Process – Drive Test Based 10 Cluster Stimulation Site Identification Cluster Preparation Drive Test Data Analysis Reconfiguration Problem Analysis Site Acceptance Fail PassCluster Analysis Cluster IdentificationPre Launch Optimisation Continuous Optimisation Swap Management
  • 11. Cluster Analysis OMC Data Drive Test Results Simulation Data Determine clusters for acceptance Characterise performance Ensure correct site configuration Drive tests Process data Analysis Remodelling Reconfiguration • Parameter Setting • Neighbors • Powered • Stable •Call statistics •Key measurement events • Neighbor analysis •Key measurement data • Parameters • Neighbors • Report Hardware Requirements 11
  • 12. Cluster Reconfiguration 12 HardwareHardware OptimisationOptimisation Antenna Reorientation Antenna Down tilt Antenna Relocation Antenna Height adjustment Masthead Amplifiers Cell parameterCell parameter optimisationoptimisation Handover parameters Power planning Neighbour list reconfiguration Frequency planning Performance Monitoring Pre Launch Optimisation Swap Management Continuous Optimisation
  • 13. Pre Launch Optimization 13 Parameter Analysis Process Creation KPI Definition KPI Reporting Training Functionality Asses Config Management Cluster Preparation Drive Testing Drive Analysis Modelling Cluster Monitoring Model Calibration Cluster Identification Network Reconfigure On Site Off Site What GTL can do for you Pre Launch Optimisation Continuous Optimisation Swap Management
  • 14. KPI’s to be Monitored Based on performance of a Network & Cell Network KPI Target Type KPI Deciding Factor Network / Town Level CSR (%) CSSR (%) DCR (%) TCH Blocking SDCCH Blocking 93% 95% 5% 2% 3% Performance Performance Performance Performance Performance TBD upon checking trend to maintain the performance of the network and to improve CSR (%) CSSR (%) DCR (%) TCH Blocking SDCCH Blocking 90% 92% 10% 4% 6% Performance Performance Performance Performance Performance TBD upon checking trend to maintain the performance of the network and to improve Cell Level (TBD : To Be Decided) 14
  • 15. KPI’s to be Monitored Based on performance of a Network & Cell Network KPI Target Type KPI Deciding Factor Network / Town Level Downlink Rx Qual Uplink Rx Qual FER Data Through output Data Accessibility TBA TBA TBA TBA TBA Performance Performance Performance Performance Performance TBD upon checking trend to maintain the performance of the network and to improve Downlink Rx Qual Uplink Rx Qual FER Data Through output Data Accessibility Performance Performance Performance Performance Performance TBD upon checking trend to maintain the performance of the network and to improve Cell Level (TBA : To Be Accepted) 15 TBA TBA TBA TBA TBA
  • 16. Reports Pre Launch Optimization Cell / Cluster Drive Test and Analysis Report. Quality issues identification and RX lev, RX Qual, TCH Blocking, SDCCH Drop,HO Issues, Call drop problems, and call set up issues analysis. RF parameters audit and tuning : neighbour site list, power parameters, HO parameters, etc. Cell / Cluster Optimisation Report. Antenna engineering tuning. Deliverables Cell / cluster Optimisation and tuning to reach acceptance criteria. Pre Launch Optimisation Continuous Optimisation Swap Management 16
  • 17. Reports Network Analysis and Optimisation Report. Cell, cluster, Network drive test reports from post processing tool. RF coverage and quality assessment report. Radio and system Parameters audit and tuning report. Optimisation Report. Acceptance Report. Interference Measurement. Updated network site database. Traffic Statistics Analysis Report. Pre Launch Optimisation Continuous Optimisation Swap Management 17
  • 18. Continuous Optimisation 18 Objectives Minimisation of integration Issues Maintaining the traffic rate within medium to low To achieve more stability in neighbour/ pilot Reducing operational cost Predominantly OMC R Stats and Counters Pre Launch Optimisation Continuous Optimisation Swap Management
  • 19. Continuous Optimisation 19 Network Performance Targets Performance Customer Faults Trouble Tickets CM Data Call Trace Drive Test Results Alarms Service Level OMC Status Fault Resolution Cell Prioritisation ReportsFault Pre Launch Optimisation Continuous Optimisation Swap Management
  • 20. Optimisation Process – Drive Test Based 20 Pre Launch Optimisation Continuous Optimisation Swap Management Characterise performance Ensure correct site configuration Drive tests Process data Analysis Remodelling Reconfiguration • Parameter Setting • Neighbors • Powered • Stable •Call statistics •Key measurement events • Neighbor analysis •Key measurement data Determine clusters for acceptance • Parameters • Neighbors • Report Hardware Requirements
  • 21. Cluster Reconfiguration 21 HardwareHardware OptimisationOptimisation Antenna Reorientation Antenna Down tilt Antenna Relocation Antenna Height adjustment Masthead Amplifiers Cell parameterCell parameter optimisationoptimisation Handover parameters Power planning Neighbour list reconfiguration Frequency planning Performance Monitoring Pre Launch Optimisation Continuous Optimisation Swap Management
  • 22. Continuous Optimization 22 Benchmarking Process Control KPI Definition KPI Reporting Training OMC Reporting Cell Prioritisation Fault Resolution Change recommend Network Reconfigure Drive testing Functionality Asses Audit Config Management What GTL can do for you On Site Off sitePre Launch Optimisation Continuous Optimisation Swap Management
  • 23. KPI’s to be Monitored Based on performance of a Network & Cell Network KPI Target Type KPI Deciding Factor Network / Town Level CSR (%) CSSR (%) DCR (%) TCH Blocking SDCCH Blocking 93% 95% 5% 2% 3% Performance Performance Performance Performance Performance TBD upon checking trend to maintain the performance of the network and to improve CSR (%) CSSR (%) DCR (%) TCH Blocking SDCCH Blocking 90% 92% 10% 4% 6% Performance Performance Performance Performance Performance TBD upon checking trend to maintain the performance of the network and to improve Cell Level (TBD : To Be Decided) 23
  • 24. KPI’s to be Monitored Based on performance of a Network & Cell Network KPI Target Type KPI Deciding Factor Network / Town Level Downlink Rx Qual Uplink Rx Qual FER Data Through output Data Accessibility TBA TBA TBA TBA TBA Performance Performance Performance Performance Performance TBD upon checking trend to maintain the performance of the network and to improve Downlink Rx Qual Uplink Rx Qual FER Data Through output Data Accessibility Performance Performance Performance Performance Performance TBD upon checking trend to maintain the performance of the network and to improve Cell Level (TBA : To Be Accepted) 24 TBA TBA TBA TBA TBA
  • 25. Reports Continuous Optimisation Radio network measurement and analysis report Containing signal strength, Quality, Time advance,Path loss, Frequency distribution, Neighbour selection. Deliverables BSS/ RAN parameter adjustment report Neighbour optimisation parameter, BTS/ MS power control, Intracell handover, Hierarchy cell structure & cell load sharing. Pre Launch Optimisation Continuous Optimisation Swap Management 25
  • 26. Reports Worst cell optimization report TCH Blocking, SDCCH Blocking, Signal Strength, Bad Quality, Timing Advance, Sudden Loss, Other Reasons. Drive test, Worst cell, site survey,Antenna rigging. Coverage Analysis report Capacity Analysis & Recommendation Report Dynamic full and half rate, Cell load sharing,Hierarchy cell structure, Dynamic allocation of SDCCH. Pre Launch Optimisation Continuous Optimisation Swap Management 26
  • 27. Swap Management 27 Objectives High rate of integrations High traffic (Pre-Cut and Post Cut) Predominantly drive data dependant Pre Launch Optimisation Continuous Optimisation Swap Management
  • 28. Swap Management 28 Swap Planning Default Parameter Parameter Mapping Validation of Neighbour, BSIC and MAIO Pre Launch Optimisation Continuous Optimisation Swap Management
  • 29. Swap Process – Pre / Post verification 29 RF Site Audit Coverage Verification Parameter verification Reconfiguration Problem Analysis Fail PassSite Acceptance Site IdentificationPre Launch Optimisation Continuous Optimisation Swap Management
  • 30. Swap Process – Cluster Based 30 Cluster Stimulation Site Identification Cluster Preparation Drive Test Data Analysis Reconfiguration Problem Analysis Site Acceptance Fail PassCluster Analysis Cluster IdentificationPre Launch Optimisation Continuous Optimisation Swap Management
  • 31. Cluster Analysis 31 OMC Data Drive Test Results Simulation Data • Parameters • Neighbors • Report Hardware Requirements Determine clusters for acceptance Characterise performance Ensure correct site configuration Drive tests Process data Analysis Remodelling • Parameter Setting • Neighbors • Powered • Stable •Call statistics •Key measurement events • Neighbor analysis •Key measurement data Reconfiguration
  • 32. Cluster Reconfiguration 32 HardwareHardware OptimisationOptimisation Antenna Reorientation Antenna Down tilt Antenna Relocation Antenna Height adjustment Masthead Amplifiers Cell parameterCell parameter optimisationoptimisation Handover parameters Power planning Neighbour list reconfiguration Performance Monitoring Pre Launch Optimisation Continuous Optimisation Swap Management
  • 33. Swap Optimization 33 Parameter Analysis Process Creation KPI Definition KPI Reporting Training Functionality Asses Config Management Cluster Preparation Drive Testing Drive Analysis Modelling Cluster Monitoring Cluster Identification Network Reconfigure On Site Off Site What GTL can do for you Pre Launch Optimisation Continuous Optimisation Swap Management Model Calibration
  • 34. KPI’s to be Monitored Based on performance of a Network & Cell Network KPI Target Type KPI Deciding Factor Network / Town Level CSR (%) CSSR (%) DCR (%) TCH Blocking SDCCH Blocking Improve Improve Improve Improve Improve Performance Performance Performance Performance Performance TBD upon checking trend to maintain the performance of the network and to improve CSR (%) CSSR (%) DCR (%) TCH Blocking SDCCH Blocking Performance Performance Performance Performance Performance TBD upon checking trend to maintain the performance of the network and to improve Cell Level (TBA : To Be Accepted) 34 Improve Improve Improve Improve Improve
  • 35. KPI’s to be Monitored Based on performance of a Network & Cell Network KPI Target Type KPI Deciding Factor Network / Town Level Downlink Rx Qual Uplink Rx Qual FER Data Through output Data Accessibility Performance Performance Performance Performance Performance TBD upon checking trend to maintain the performance of the network and to improve Downlink Rx Qual Uplink Rx Qual FER Data Through output Data Accessibility Performance Performance Performance Performance Performance TBD upon checking trend to maintain the performance of the network and to improve Cell Level Improve Improve Improve Improve Improve 35 Improve Improve Improve Improve Improve
  • 36. Reports Swap Management Swap Planning Report. Parameter mapping report Verification of RF Coverage, parameters audit and tuning : neighbour site list, Power parameters, HO parameters, etc. Pre Drive Test Report Deliverables Post Drive Test Report. Improvement of RF Coverage, parameters audit and tuning : neighbour site list, power parameters, HO parameters, etc. Cutover Drive Test Report Validation of RF Coverage, parameters audit and tuning : neighbour site list, power parameters, HO parameters, etc. Pre Launch Optimisation Continuous Optimisation Swap Management 36
  • 37. Subjects to Investigate 37 Non-Working sites/sectors or TRX’s In-active Radio network features like frequency hopping Overshooting sites – coverage overlaps •Disabled GPRS •Coverage holes C/I, C/A analysis High Interference Spots Drop Calls Capacity Problems Pre Launch Optimisation Continuous Optimisation Swap Management Other Interference Sources Missing Neighbors
  • 38. Subjects to Investigate 38 One-way neighbors Not happening handovers Ping-Pong Handovers Footprint and performance of the site as per design criteria Sites not operational Faulty Installations •Faulty TRX BA list error Pre Launch Optimisation Continuous Optimisation Swap Management •BSIC, HSN, MAIO Plan Hopping ON or OFF
  • 39. Recommendations Defining missing neighbor relations Proposing new sites or sector additions Proposing antenna azimuth changes Proposing antenna tilt changes Proposing antenna type changes BTS Equipment/Filter change Re-tuning of interfered frequencies Adjusting HO Margins Adjusting accessibility parameters Changing power parameters MHA/TMA adds Pre Launch Optimisation Continuous Optimisation Swap Management 39
  • 40. Virtual Optimisation Centre Pre Launch Optimisation Continuous Optimisation Swap Management 40 Remote Analytics for Design, Planning & Optimisation to achieve minimal startup time, consistent use of process and tools and concentrated expertise in one location State of the art VPO Centre vital stats: Floor space: 2000 Sq. Ft. Seating capacity: 50 Internet speed: 2 Mbps No. of RF engineers: 50 Total man years experience: 10 Years Tools used for VPO: Asset Connect PL4 & MIPT
  • 41. Virtual Optimisation Centre Activities Off shore On shore Benchmarking Data Collection RF and Transmission Planning Transmission Network Verification RF / Line of Sight Surveys CW Testing and Model Tuning Nominal Cell Planning Frequency Scanning Optimisation Pre Launch Optimisation Continuous Optimisation Swap Management 41
  • 42. Low fixed Cost regardless of the project location. Fast Delivery Cycle and Quick deployment of project. Cost effective especially for high cost areas. Flexible service packages to meet unique customer needs. Ideal solution for high-risk or hard to access areas. Expertise availability guaranteed. Core expertise group available to service multiple project. Quick take off without tine lag to mobilize. Uniform applications on tolls through standard processes. Virtual Optimisation Centre Benefits Pre Launch Optimisation Continuous Optimisation Swap Management 42
  • 43. Value Proposition 43 Risk Sharing - KPI & SLA Based Commitments End to End RF solution provider RF Planning, Design and Optimisation done for 31 networks – Experience across 15 geographies – Covering 2G, 2.5G, 3G technologies – Across standards such as GSM, Edge/GPRS, CDMA, UMTS and WiMAX Long Standing relations With OEMs At Global Level Unique combination of tasks carried out Offshore and Onshore that give cost efficiencies Technology and vendor agnostic skill set
  • 44. Case Studies & Capabilities 44
  • 45. Case Study 1 About the Client : Hutchison Essar (Hutch), is a leading GSM network operator in India having GSM wireless operations with a pan Indian footage. The network has been growing at a very high pace to address competition with more coverage and capacity. This entails Hutch to roll out new sites in remote areas of UP. While expanding, Hutch wanted to have their network optimised Business Challenge : Hutch found RF Group of GTL a competent partner to perform on their behalf optimization activities with quality deliverables. In the process GTL got the responsibility of around 240 sites (170 existing & 70 new sites) to be completed during October 2005 to March 2006. Project Scope : GTL was to optimize new roll out cell sites in the network to achieve desired results viz. call origination, call termination, intra-cell handover, and coverage. On many occasions, it has been found that improper RF cabling gave rise to wrong BCCH - Sector combination. Corrections were initiated and post correction verifications have been performed. To find coverage footprint and associated quality plt, drive tests were executed with two MS (MS 1-Hutch Idle mode & MS 2 – Hutch Dedicated mode) simultaneously. This were done in and around 6km radius centering the site as per Hutch specification. From this drive-test data, GTL prepared coverage and quality plot for newly commissioned site. Results were submitted to Hutch. After achieving required results, sites were put on air for commercial purposes. Value Delivered : GTL successfully completed the optimisation activity for the project covered 170 existing sites and 70 new sites during Oct’05 to Mar’06. All sites were either in Highways or in remote locations of eastern part of UP covering Kanpur, Lucknow, Varanasi, Allahabad and Gorakhpur. 45
  • 46. Case Study 2 About the Client : Hutch is one of the leading gsm operator in India having licenses spanning all over India. Hutch is working with gsm 900 band and wants to expand their network as the demand grow. So to meet quality and coverage there is need to swap old ZTE system with some new updated system, which can support the gsm, gprs, edge and easily upgraded to 3G. Hutch selected Nokia as OEM for the core part of their network. Business Challenge : Nokia wanted to have resources in the outsourcing domain increase their strength. As GTL had done lots of work with Nokia in India so GTL seems to be perfectly poised to rise to the need. We became partner of choicer for Nokia to perform RF tasks in the swap roll out process. From March 2005 to Till Date for performed allocated tasks creditably. A few points of project: GSM 900 Networks. 45 sites to be swap from ZTE to Nokia. 342 New Nokia Ultra BTS Coverage includes cities and boundaries. Network with 19 BSC’s and two switch AXE 10 from Nokia.- CSSR ≥94%, SDCCH Drop ≥2%, Handover success rate ≥ 94%, Call drop rate ≤ 2.5%. Project Scope : SoW conferred and accepted by GTL have been as follows: Perform pre swap drive test for all 41 sites. Prepared proficient database for Nokia Add and delete Neighbor list. Verification of antenna locations and azimuth. Verifies existing Frequency Plan, recommend the changes required. Download the database to OMC and verify the dump. Perform Drive Tests for sites verification on Swap night. Perform the post swap drive test for all 45 sites. Conduct Acceptance Test Procedure (ATP) with end customer. Nominal Cell Planning for New 417 sites RF survey, LOS survey and Drive Test for New Sites. MW radio link planning for MW transmission links. Provide a solution for the Hutch subscriber’s complaints. Preparation of 2 Mbit/s transmission plan including link capacity calculations, timeslot allocation and ET planning Maintain the Network quality by daily monitoring KPI. Value Delivered : All swaps are mostly conducted at night there is around 6 sites swap per day. As soon as swap sites bring on air our drive test is ask to conduct the site verification drive test at each cell the test includes database verification, sector swapping, handover testing, neighbor list verification, call termination. After finishing the swap now optimization is started on network level, to meet the KPI daily statistic report are generated with the help of Business object and results are discussed with the customer and also suggest the necessary changes. 46
  • 47. GTL's Network Customer Engagement Government Of Maharashtra Power Grid Corp 47
  • 48. © Copy right GTL Limited 2008 International Presence Americas: US Asia–Pacific: Malaysia Thailand China Taiwan Indonesia Australia Singapore Philippines New Zealand Europe: UK France Ireland Sweden Switzerland Middle East: UAE KSA Oman Qatar Kuwait South Asia India Nepal Bhutan Maldives Sri Lanka Bangladesh Africa: Nigeria South Africa Guinea Conakry Mauritius International Office Projects Undertaken 48