SlideShare a Scribd company logo
1 of 8
RAHUL KUMAR
Mobile: +917838624144
Email: kumar.rahhul@gmail.com
Career Level: Experienced
Experience: 8.9 Year
Area of Expertise
Experience in Technology
GSM
(months)
UMTS
(months)
LTE
(months)
CDMA2000
(months)
CDMA EVDO
(months)
RF Optimization and Tuning 65 30 2 0 0
KPI Monitoring 65 30 2 0 0
Drive Test 10 0 0 0
0
Current Organization – Ericsson India Global Pvt Ltd
Designation –Senior engineer
Technical Competencies/skills
Drive Test & Analysis Tool Tems Investigation, Actix Analyzer, Mapinfo, MCOM, MIPT
Planning Tool ASSET
Optimization Tool
MAPINFO, MCOM, Optimizer
Performance Analysis Tool ENIQ, BO, ITK, RNO (MRR, NCS), WINFIOL, NETACT Tools (Reporting Suite, Report Builder
Content Browser), CRTPA Tool, Citrix / ICA client. Netnuman, ISMG
RAN Equipment vendors NSN, Ericsson , ZTE
Current Project
Project Name
 ERICSSON_ Tim Brazil WCDMA Optimization
Technology UMTS
Ericsson Confidential Page 1 of 8
Location Remote
Duration 07-July 2015 to Till Date
Project
Highlights  Daily working on challenging KPI’s such as Accessibility, Retain ability,
Throughput, Mobility with worst offender cells.
 Parameter and neighbor audit on regular basis removing parameter
inconsistencies IRAT parameter ( 2D & 2F) tuning to improve CS /PS Retainabilty
call Drops.
 Suggesting actions for congested cells having Power congestion, Code
Congestion CE & Iub congestion and suggest best action after complete analysis
and resource availability either to expand resources/new site or through
parameter tuning to relief congestion
 Enabling various measurements such as WNCS, WMRR to reduce Missing
Neighbor & Overshooting problem.
 Scrambling Code and Neighbor Plan Audit and optimize 3G-3G, 3G-2G, 2G-3G
Neighbor list where required
 IRAT Optimization and optimize the 2G-3G interworking strategy according to
operators requirement
 Proposing of capacity and coverage Sites to Overcome Coverage Patches & filling
Capacity areas. Auditing of New Sites and Verifying Hardware, Tilt, Antenna
height and Orientation, according to the Planning Database.
 Regularly endorse critical alarms to Operations and Maintenance group for
proper handling/ troubleshooting.
Previous Project
Project Name
 ERICSSON_ Telcel_Mexico WCDMA Optimization
Technology UMTS
Location On Site
Duration 20-Jan-15 to 06 July 2015
Project
Highlights  Daily working on challenging KPI’s such as Accessibility, Retain ability, Throughput,
Mobility with worst offender cells.
 Parameter and neighbor audit on regular basis removing parameter inconsistencies IRAT
Ericsson Confidential Page 2 of 8
parameter ( 2D & 2F) tuning to improve CS /PS Retainabilty call Drops.
 Suggesting actions for congested cells having Power congestion, Code Congestion CE &
Iub congestion and suggest best action after complete analysis and resource availability
either to expand resources/new site or through parameter tuning to relief congestion
 Enabling various measurements such as WNCS, WMRR to reduce Missing Neighbor &
Overshooting problem.
 Scrambling Code and Neighbor Plan Audit and optimize 3G-3G, 3G-2G, 2G-3G Neighbor
list where required
 Proposing of capacity and coverage Sites to Overcome Coverage Patches & filling
Capacity areas. Auditing of New Sites and Verifying Hardware, Tilt, Antenna height and
Orientation, according to the Planning Database.
 Regularly endorse critical alarms to Operations and Maintenance group for proper
handling/ troubleshooting.
 Customer Complaint Handling.
Project Name
 ERICSSON_ Vivo Brazil WCDMA Optimization
Technology UMTS
Location Remote
Duration 20-Jan-14 to 18 Jan 2015
Project
Highlights  Daily working on challenging KPI’s such as Accessibility, Retain ability, Throughput,
Mobility with worst offender cells.
 Parameter and neighbor audit on regular basis removing parameter inconsistencies IRAT
parameter ( 2D & 2F) tuning to improve CS /PS Retainabilty call Drops.
 Suggesting actions for congested cells having Power congestion, Code Congestion CE &
Iub congestion and suggest best action after complete analysis and resource availability
either to expand resources/new site or through parameter tuning to relief congestion
 Enabling various measurements such as WNCS, WMRR to reduce Missing Neighbor &
Overshooting problem.
 Scrambling Code and Neighbor Plan Audit and optimize 3G-3G, 3G-2G, 2G-3G Neighbor
list where required
 Proposing of capacity and coverage Sites to Overcome Coverage Patches & filling
Capacity areas. Auditing of New Sites and Verifying Hardware, Tilt, Antenna height and
Orientation, according to the Planning Database.
 Regularly endorse critical alarms to Operations and Maintenance group for proper
handling/ troubleshooting.
Ericsson Confidential Page 3 of 8
Project Name  NSN_ Aircel Delhi Optimization
Technology GSM
Location Delhi Circle
Duration Dec-11 to Jan-14
Project
Highlights  Analyzing the Daily Reports like ND111, 208, 232, 196,
153,163 for frequency & TRX Configuration, Path Balance Problem,
Hardware Problem, Handover Problem, TCH Drop, SDCCH Drop,
TCH Blocking SDCCH Blocking
 Processing ZEOL Report for Alarm and Analyzing ZEAT Report
 Identify and regularize performance trends of Voice and Data i.e. to
keep a constant check over network performance indicators (KPI’s) viz.
(TCH call drop rate), (SDCCH Drop rate), Handover success rate, TCH
blocking , SDCCH blocking DL and UL Quality TBF Success rate , TBF
Drop rate, DLMS Improve , RLC Downlink throughput , RLC Uplink throughput,
Expansion of GPRS/EDGE territory, Reducing Soft and Hard Blocking , EDAP
Expansion, PCU expansion, Handling of customer complaint and Escalations
for EDGE & GPRS
 NSEI and BCSU rebalancing
 NNPO Parameter Audit
 Database Parameters fine-tuning like Power Control, Handover control, as per the
Network requirements and performance to improve the Network KPI’s. Daily
monitoring of OMCR reports to analyze the Radio network performance as Utilization,
congestion & Blocking (TCH/SDCCH), Assign failures etc. & take corrective steps to
achieve the optimum KPI.
 Capacity planning of a rapidly growing network for expansions and new sites based
upon current Traffic Behavior. Analysis of radio utilization to identify blocking, and its
minimization by parameter changes, implementing dynamic half rate.
Recommendation of RF Specifications of the Tower height to meet the coverage
Objective with minimum acceptable interference level to deploy the max capacity of
sites.
 .Frequency planning for new sites and expansions in the Network. This included
allocation of BCCH & TCH frequencies, BSIC, Neighbour lists, etc for non-uniform
SFH. HSN and MAIO allocation with step Size for Nokia System. Generation of
Performance and Statistical Reports viz. Assignment Failure Ratio, Handover
Statistics and Drop Statistics of the network SDCCH and TCH Assignment success
and failure ratio and maintaining the all KPI has given threshold level.
 Included new site planning as part of the yearly roll-out, Optimization of the existing
sites.
 RSRAN report analysis & provide the solution for impacted cells KPI’s and betterment
of the QoS & NW KPI.
 Analyzing site performance after integration through drive-test measurement
Ericsson Confidential Page 4 of 8
 3G Drive-Test for data-collection and post-processing for Network Optimization.
Generating RAN tuning report and analysis through MapInfo.
 Recommendation of Neighbor optimization and Physical Optimization to achieve
desired Pilot Coverage, Coverage Probability, Ec/No by varying pilot power, azimuth,
tilt resources etc.
 Working on neighbor, Call-Drop optimization for improving the network quality and
KPI’s improvement.
Project Name  ETISALAT DB TELECOM PVT LTD
Technology GSM
Ericsson Confidential Page 5 of 8
Location Delhi Circle
Duration Jan-11 to Dec-11
Project
Highlights Site planning based on capacity and coverage as per business strategies
 Monitoring radio performance of All BSC’s of delhi circle .
 Identify and regularize performance trends i.e. to keep a constant check
over network performance indicators (KPI’s) viz. (TCH call drop rate),
(SDCCH Drop rate), Handover success rate, TCH blocking , SDCCH
blocking DL and UL Quality etc.
 Optimization and Audit of BSS Cell database Parameters/ BSS
Configuration etc to improve the Quality of Service of the Network. .
 Network traffic analysis to provide a congestion free network
 Identify fault like VSWR, Diversity, and CFR Alarm etc and follow up
with BSS team for rectification.
 Handling the team of Drive testers for new site integration and Auditing
Sites and Verifying Hardware, Tilt, Antenna height and Orientation,
according to the Planning Database and for for day to day optimization
activities like inconsistency checks, physical site optimization, parameter tuning,
improving top worst contributory cells.
 Verification/Audit of Parameter DUMP, Analysis of Network Reports
.
Project Name
 ZTE TELECOM PVT LTD
Technology GSM
Location Bihar Circle
Duration June 2009 to Jan-2011
Ericsson Confidential Page 6 of 8
Project
Highlights
 Performance optimization includes Accessibility, Retainability
KPIs, with Quality optimization, Capacity optimization, Coverage
optimization, Roll out support.
 Responsible for Data KPI’s TBF Drop, TBF congestion, DL
Throughput per TSL/TBF, and tuning the data parameter’s cell
level, BSC level which gives optimal throughput, also analysis the
Abis_EDAP, Gb link Congestion, DSP Reshuffling and UPPB
congestion.
 Analysis cell traffic, Utilization, Blocking on network level and give
plan for TRX addition, FR HR change, cell load sharing biweekly.
 Responsible for coverage optimization –Level and quality optimization
to ensure satisfaction of customer with coordinate drive test engineer.
 Analyzed Drive Test Log files for taking care of Internal Interference
in the Network and Network performance statistics
(KPI’s).Responsible for Identification of BSS hardware problems from
statistics.
 Troubleshooting hardware failure and Alarm analysis.
 Minimization of Adjacent Channel and Co-channel interface.
 Neighbor, BCCH, BASIC, HSN, MAIO Plan of site and get
implement in OMCR using NetNuman and ISMG Tools.
 Creating the Voice & Data reports for the final submission using
TEMS report Generator and MapInfo 8.5 version.
.
Project Name  CELL PLAN TECNOLOGY PVT LTD
Technology GSM
Location Delhi Circle
Duration 13 Sept 2007 to June-09
Trainings done:
Technology UMTS,LTE
Ericsson Confidential Page 7 of 8
Training
Highlights
 WCDMA Air interface training on Ericsson system
 WCDMA Functionality training on Ericsson system
 WCDMA PMO training on Ericsson system
 LTE Air interface training on Ericsson system
 LTE Functionality training on Ericsson system
PROFESSIONAL
QUALIFICATION
B. Tech. (Electronics & Communication Engineering) from Radha Govind College of
Engineering, Meerut in 2007.
CERTICICATION
DONE BUGS Global Individual Assessment Program
PERSONAL
SYNOPSIS
 Name: Rahul Kumar.
 Father-s Name: Shiv vijay singh.
 Date of Birth: 04th Nov 1983.
 Passport: P0826179
Ericsson Confidential Page 8 of 8

More Related Content

What's hot

Og 002 service flow of radio network planning issue1.1
Og 002 service flow of radio network planning issue1.1Og 002 service flow of radio network planning issue1.1
Og 002 service flow of radio network planning issue1.1Ketut Widya
 
Vikrant Tiwari Resume(RNO)
Vikrant Tiwari Resume(RNO)Vikrant Tiwari Resume(RNO)
Vikrant Tiwari Resume(RNO)vikrant tiwari
 
Basics of performance measurement in umts
Basics of performance measurement in umtsBasics of performance measurement in umts
Basics of performance measurement in umtsEkwere Udoh
 
Muhammad Jebran_RF Consultant_2G_3G_LTE
Muhammad Jebran_RF Consultant_2G_3G_LTEMuhammad Jebran_RF Consultant_2G_3G_LTE
Muhammad Jebran_RF Consultant_2G_3G_LTEMuhammad Jibran
 
Finding the best Radio Network Planning and Radio Network Optimization software
Finding the best Radio Network Planning and Radio Network Optimization softwareFinding the best Radio Network Planning and Radio Network Optimization software
Finding the best Radio Network Planning and Radio Network Optimization softwareMuhammad Waqas Akram
 
Fawad Tanveer Butt CV
Fawad Tanveer Butt CVFawad Tanveer Butt CV
Fawad Tanveer Butt CVFawad Butt
 
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...Jean de la Sagesse
 
Harshit Sengar Resume
Harshit Sengar Resume Harshit Sengar Resume
Harshit Sengar Resume Harshit Sengar
 
T sel3 g optimization process and guideline ver01
T sel3 g optimization process and guideline ver01T sel3 g optimization process and guideline ver01
T sel3 g optimization process and guideline ver01Eko Priyanto
 
Radio network optimization flow 20090429-a-4.0
Radio network optimization flow 20090429-a-4.0Radio network optimization flow 20090429-a-4.0
Radio network optimization flow 20090429-a-4.0Mashaal322
 
AJAY VERMA Resume(RNO)
AJAY VERMA Resume(RNO)AJAY VERMA Resume(RNO)
AJAY VERMA Resume(RNO)ajay Verma
 
Hussams Cv October 21 2008
Hussams Cv October 21 2008Hussams Cv October 21 2008
Hussams Cv October 21 2008husjam
 
3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?TTI Telecom
 
Rf Optimization Tools Development111
Rf Optimization Tools Development111Rf Optimization Tools Development111
Rf Optimization Tools Development111Zk87
 

What's hot (20)

RF Planning Training
RF Planning TrainingRF Planning Training
RF Planning Training
 
Sandeep Sharma_CV
Sandeep Sharma_CVSandeep Sharma_CV
Sandeep Sharma_CV
 
Og 002 service flow of radio network planning issue1.1
Og 002 service flow of radio network planning issue1.1Og 002 service flow of radio network planning issue1.1
Og 002 service flow of radio network planning issue1.1
 
Vikrant Tiwari Resume(RNO)
Vikrant Tiwari Resume(RNO)Vikrant Tiwari Resume(RNO)
Vikrant Tiwari Resume(RNO)
 
Basics of performance measurement in umts
Basics of performance measurement in umtsBasics of performance measurement in umts
Basics of performance measurement in umts
 
Muhammad Jebran_RF Consultant_2G_3G_LTE
Muhammad Jebran_RF Consultant_2G_3G_LTEMuhammad Jebran_RF Consultant_2G_3G_LTE
Muhammad Jebran_RF Consultant_2G_3G_LTE
 
Finding the best Radio Network Planning and Radio Network Optimization software
Finding the best Radio Network Planning and Radio Network Optimization softwareFinding the best Radio Network Planning and Radio Network Optimization software
Finding the best Radio Network Planning and Radio Network Optimization software
 
rf planning
rf planningrf planning
rf planning
 
shajeer cv
shajeer cvshajeer cv
shajeer cv
 
Fawad Tanveer Butt CV
Fawad Tanveer Butt CVFawad Tanveer Butt CV
Fawad Tanveer Butt CV
 
AMIT MODI
AMIT MODIAMIT MODI
AMIT MODI
 
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
 
Harshit Sengar Resume
Harshit Sengar Resume Harshit Sengar Resume
Harshit Sengar Resume
 
T sel3 g optimization process and guideline ver01
T sel3 g optimization process and guideline ver01T sel3 g optimization process and guideline ver01
T sel3 g optimization process and guideline ver01
 
Radio network optimization flow 20090429-a-4.0
Radio network optimization flow 20090429-a-4.0Radio network optimization flow 20090429-a-4.0
Radio network optimization flow 20090429-a-4.0
 
AJAY VERMA Resume(RNO)
AJAY VERMA Resume(RNO)AJAY VERMA Resume(RNO)
AJAY VERMA Resume(RNO)
 
Hussams Cv October 21 2008
Hussams Cv October 21 2008Hussams Cv October 21 2008
Hussams Cv October 21 2008
 
Mobile CDS LTE Simulation Demo
Mobile CDS LTE Simulation Demo Mobile CDS LTE Simulation Demo
Mobile CDS LTE Simulation Demo
 
3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?
 
Rf Optimization Tools Development111
Rf Optimization Tools Development111Rf Optimization Tools Development111
Rf Optimization Tools Development111
 

Viewers also liked

алимова мадина+приложение конкурентности+предприниматели
алимова мадина+приложение конкурентности+предпринимателиалимова мадина+приложение конкурентности+предприниматели
алимова мадина+приложение конкурентности+предпринимателиAlimovaMadina
 
Mejoramiento de las matemáticas
Mejoramiento de las matemáticasMejoramiento de las matemáticas
Mejoramiento de las matemáticasJenny Ojeda
 
Week8MATLAB
Week8MATLABWeek8MATLAB
Week8MATLABpapopang
 
алимова мадина+ресторан альянс+предприниматели
алимова мадина+ресторан альянс+предпринимателиалимова мадина+ресторан альянс+предприниматели
алимова мадина+ресторан альянс+предпринимателиAlimovaMadina
 
When a child speaks
When a child speaksWhen a child speaks
When a child speaksJean Guittap
 
Cv 2016 operations
Cv 2016 operationsCv 2016 operations
Cv 2016 operationsMITHUN MOHAN
 
алимова мадина+ресторан альянс+предприниматели
алимова мадина+ресторан альянс+предпринимателиалимова мадина+ресторан альянс+предприниматели
алимова мадина+ресторан альянс+предпринимателиAlimovaMadina
 

Viewers also liked (12)

алимова мадина+приложение конкурентности+предприниматели
алимова мадина+приложение конкурентности+предпринимателиалимова мадина+приложение конкурентности+предприниматели
алимова мадина+приложение конкурентности+предприниматели
 
Week10
Week10Week10
Week10
 
Mejoramiento de las matemáticas
Mejoramiento de las matemáticasMejoramiento de las matemáticas
Mejoramiento de las matemáticas
 
Week8MATLAB
Week8MATLABWeek8MATLAB
Week8MATLAB
 
Week 10
Week 10Week 10
Week 10
 
RESUME (1)
RESUME (1)RESUME (1)
RESUME (1)
 
алимова мадина+ресторан альянс+предприниматели
алимова мадина+ресторан альянс+предпринимателиалимова мадина+ресторан альянс+предприниматели
алимова мадина+ресторан альянс+предприниматели
 
When a child speaks
When a child speaksWhen a child speaks
When a child speaks
 
Week 12
Week 12Week 12
Week 12
 
Cv 2016 operations
Cv 2016 operationsCv 2016 operations
Cv 2016 operations
 
Week12
Week12Week12
Week12
 
алимова мадина+ресторан альянс+предприниматели
алимова мадина+ресторан альянс+предпринимателиалимова мадина+ресторан альянс+предприниматели
алимова мадина+ресторан альянс+предприниматели
 

Similar to Rahul kumar_2016

Similar to Rahul kumar_2016 (20)

CV_MALIK MD NURANI.pdf
CV_MALIK MD NURANI.pdfCV_MALIK MD NURANI.pdf
CV_MALIK MD NURANI.pdf
 
Resume_Srinivas
Resume_SrinivasResume_Srinivas
Resume_Srinivas
 
Pankaj Patel Resume
Pankaj Patel  ResumePankaj Patel  Resume
Pankaj Patel Resume
 
Sunil saini rf engineer updated resume
Sunil saini rf engineer updated resumeSunil saini rf engineer updated resume
Sunil saini rf engineer updated resume
 
Munendra Singh Jadon LTE Optimization (1)
Munendra Singh Jadon LTE Optimization (1)Munendra Singh Jadon LTE Optimization (1)
Munendra Singh Jadon LTE Optimization (1)
 
AMIT MODI
AMIT MODIAMIT MODI
AMIT MODI
 
Mohit Kapoor resume March 2016
Mohit Kapoor resume March 2016Mohit Kapoor resume March 2016
Mohit Kapoor resume March 2016
 
Resume
ResumeResume
Resume
 
RF Engineer
RF EngineerRF Engineer
RF Engineer
 
irshadali_CV
irshadali_CVirshadali_CV
irshadali_CV
 
Call setup success_rate
Call setup success_rateCall setup success_rate
Call setup success_rate
 
Deepk Resume Updated
Deepk Resume UpdatedDeepk Resume Updated
Deepk Resume Updated
 
Hadi Tohidlou-CV
Hadi Tohidlou-CVHadi Tohidlou-CV
Hadi Tohidlou-CV
 
Satisha Kumar_RF Engg(3G)_3.6 year
Satisha Kumar_RF Engg(3G)_3.6 yearSatisha Kumar_RF Engg(3G)_3.6 year
Satisha Kumar_RF Engg(3G)_3.6 year
 
CV_Satbir
CV_SatbirCV_Satbir
CV_Satbir
 
Devender Kumar_CV
Devender Kumar_CVDevender Kumar_CV
Devender Kumar_CV
 
U04505107111
U04505107111U04505107111
U04505107111
 
Akhilesh Pandey_RF Optimization Eng
Akhilesh Pandey_RF Optimization EngAkhilesh Pandey_RF Optimization Eng
Akhilesh Pandey_RF Optimization Eng
 
Ankit Tomar_Resume
Ankit Tomar_ResumeAnkit Tomar_Resume
Ankit Tomar_Resume
 
Arshad Masih -Resume
Arshad Masih -ResumeArshad Masih -Resume
Arshad Masih -Resume
 

Rahul kumar_2016

  • 1. RAHUL KUMAR Mobile: +917838624144 Email: kumar.rahhul@gmail.com Career Level: Experienced Experience: 8.9 Year Area of Expertise Experience in Technology GSM (months) UMTS (months) LTE (months) CDMA2000 (months) CDMA EVDO (months) RF Optimization and Tuning 65 30 2 0 0 KPI Monitoring 65 30 2 0 0 Drive Test 10 0 0 0 0 Current Organization – Ericsson India Global Pvt Ltd Designation –Senior engineer Technical Competencies/skills Drive Test & Analysis Tool Tems Investigation, Actix Analyzer, Mapinfo, MCOM, MIPT Planning Tool ASSET Optimization Tool MAPINFO, MCOM, Optimizer Performance Analysis Tool ENIQ, BO, ITK, RNO (MRR, NCS), WINFIOL, NETACT Tools (Reporting Suite, Report Builder Content Browser), CRTPA Tool, Citrix / ICA client. Netnuman, ISMG RAN Equipment vendors NSN, Ericsson , ZTE Current Project Project Name  ERICSSON_ Tim Brazil WCDMA Optimization Technology UMTS Ericsson Confidential Page 1 of 8
  • 2. Location Remote Duration 07-July 2015 to Till Date Project Highlights  Daily working on challenging KPI’s such as Accessibility, Retain ability, Throughput, Mobility with worst offender cells.  Parameter and neighbor audit on regular basis removing parameter inconsistencies IRAT parameter ( 2D & 2F) tuning to improve CS /PS Retainabilty call Drops.  Suggesting actions for congested cells having Power congestion, Code Congestion CE & Iub congestion and suggest best action after complete analysis and resource availability either to expand resources/new site or through parameter tuning to relief congestion  Enabling various measurements such as WNCS, WMRR to reduce Missing Neighbor & Overshooting problem.  Scrambling Code and Neighbor Plan Audit and optimize 3G-3G, 3G-2G, 2G-3G Neighbor list where required  IRAT Optimization and optimize the 2G-3G interworking strategy according to operators requirement  Proposing of capacity and coverage Sites to Overcome Coverage Patches & filling Capacity areas. Auditing of New Sites and Verifying Hardware, Tilt, Antenna height and Orientation, according to the Planning Database.  Regularly endorse critical alarms to Operations and Maintenance group for proper handling/ troubleshooting. Previous Project Project Name  ERICSSON_ Telcel_Mexico WCDMA Optimization Technology UMTS Location On Site Duration 20-Jan-15 to 06 July 2015 Project Highlights  Daily working on challenging KPI’s such as Accessibility, Retain ability, Throughput, Mobility with worst offender cells.  Parameter and neighbor audit on regular basis removing parameter inconsistencies IRAT Ericsson Confidential Page 2 of 8
  • 3. parameter ( 2D & 2F) tuning to improve CS /PS Retainabilty call Drops.  Suggesting actions for congested cells having Power congestion, Code Congestion CE & Iub congestion and suggest best action after complete analysis and resource availability either to expand resources/new site or through parameter tuning to relief congestion  Enabling various measurements such as WNCS, WMRR to reduce Missing Neighbor & Overshooting problem.  Scrambling Code and Neighbor Plan Audit and optimize 3G-3G, 3G-2G, 2G-3G Neighbor list where required  Proposing of capacity and coverage Sites to Overcome Coverage Patches & filling Capacity areas. Auditing of New Sites and Verifying Hardware, Tilt, Antenna height and Orientation, according to the Planning Database.  Regularly endorse critical alarms to Operations and Maintenance group for proper handling/ troubleshooting.  Customer Complaint Handling. Project Name  ERICSSON_ Vivo Brazil WCDMA Optimization Technology UMTS Location Remote Duration 20-Jan-14 to 18 Jan 2015 Project Highlights  Daily working on challenging KPI’s such as Accessibility, Retain ability, Throughput, Mobility with worst offender cells.  Parameter and neighbor audit on regular basis removing parameter inconsistencies IRAT parameter ( 2D & 2F) tuning to improve CS /PS Retainabilty call Drops.  Suggesting actions for congested cells having Power congestion, Code Congestion CE & Iub congestion and suggest best action after complete analysis and resource availability either to expand resources/new site or through parameter tuning to relief congestion  Enabling various measurements such as WNCS, WMRR to reduce Missing Neighbor & Overshooting problem.  Scrambling Code and Neighbor Plan Audit and optimize 3G-3G, 3G-2G, 2G-3G Neighbor list where required  Proposing of capacity and coverage Sites to Overcome Coverage Patches & filling Capacity areas. Auditing of New Sites and Verifying Hardware, Tilt, Antenna height and Orientation, according to the Planning Database.  Regularly endorse critical alarms to Operations and Maintenance group for proper handling/ troubleshooting. Ericsson Confidential Page 3 of 8
  • 4. Project Name  NSN_ Aircel Delhi Optimization Technology GSM Location Delhi Circle Duration Dec-11 to Jan-14 Project Highlights  Analyzing the Daily Reports like ND111, 208, 232, 196, 153,163 for frequency & TRX Configuration, Path Balance Problem, Hardware Problem, Handover Problem, TCH Drop, SDCCH Drop, TCH Blocking SDCCH Blocking  Processing ZEOL Report for Alarm and Analyzing ZEAT Report  Identify and regularize performance trends of Voice and Data i.e. to keep a constant check over network performance indicators (KPI’s) viz. (TCH call drop rate), (SDCCH Drop rate), Handover success rate, TCH blocking , SDCCH blocking DL and UL Quality TBF Success rate , TBF Drop rate, DLMS Improve , RLC Downlink throughput , RLC Uplink throughput, Expansion of GPRS/EDGE territory, Reducing Soft and Hard Blocking , EDAP Expansion, PCU expansion, Handling of customer complaint and Escalations for EDGE & GPRS  NSEI and BCSU rebalancing  NNPO Parameter Audit  Database Parameters fine-tuning like Power Control, Handover control, as per the Network requirements and performance to improve the Network KPI’s. Daily monitoring of OMCR reports to analyze the Radio network performance as Utilization, congestion & Blocking (TCH/SDCCH), Assign failures etc. & take corrective steps to achieve the optimum KPI.  Capacity planning of a rapidly growing network for expansions and new sites based upon current Traffic Behavior. Analysis of radio utilization to identify blocking, and its minimization by parameter changes, implementing dynamic half rate. Recommendation of RF Specifications of the Tower height to meet the coverage Objective with minimum acceptable interference level to deploy the max capacity of sites.  .Frequency planning for new sites and expansions in the Network. This included allocation of BCCH & TCH frequencies, BSIC, Neighbour lists, etc for non-uniform SFH. HSN and MAIO allocation with step Size for Nokia System. Generation of Performance and Statistical Reports viz. Assignment Failure Ratio, Handover Statistics and Drop Statistics of the network SDCCH and TCH Assignment success and failure ratio and maintaining the all KPI has given threshold level.  Included new site planning as part of the yearly roll-out, Optimization of the existing sites.  RSRAN report analysis & provide the solution for impacted cells KPI’s and betterment of the QoS & NW KPI.  Analyzing site performance after integration through drive-test measurement Ericsson Confidential Page 4 of 8
  • 5.  3G Drive-Test for data-collection and post-processing for Network Optimization. Generating RAN tuning report and analysis through MapInfo.  Recommendation of Neighbor optimization and Physical Optimization to achieve desired Pilot Coverage, Coverage Probability, Ec/No by varying pilot power, azimuth, tilt resources etc.  Working on neighbor, Call-Drop optimization for improving the network quality and KPI’s improvement. Project Name  ETISALAT DB TELECOM PVT LTD Technology GSM Ericsson Confidential Page 5 of 8
  • 6. Location Delhi Circle Duration Jan-11 to Dec-11 Project Highlights Site planning based on capacity and coverage as per business strategies  Monitoring radio performance of All BSC’s of delhi circle .  Identify and regularize performance trends i.e. to keep a constant check over network performance indicators (KPI’s) viz. (TCH call drop rate), (SDCCH Drop rate), Handover success rate, TCH blocking , SDCCH blocking DL and UL Quality etc.  Optimization and Audit of BSS Cell database Parameters/ BSS Configuration etc to improve the Quality of Service of the Network. .  Network traffic analysis to provide a congestion free network  Identify fault like VSWR, Diversity, and CFR Alarm etc and follow up with BSS team for rectification.  Handling the team of Drive testers for new site integration and Auditing Sites and Verifying Hardware, Tilt, Antenna height and Orientation, according to the Planning Database and for for day to day optimization activities like inconsistency checks, physical site optimization, parameter tuning, improving top worst contributory cells.  Verification/Audit of Parameter DUMP, Analysis of Network Reports . Project Name  ZTE TELECOM PVT LTD Technology GSM Location Bihar Circle Duration June 2009 to Jan-2011 Ericsson Confidential Page 6 of 8
  • 7. Project Highlights  Performance optimization includes Accessibility, Retainability KPIs, with Quality optimization, Capacity optimization, Coverage optimization, Roll out support.  Responsible for Data KPI’s TBF Drop, TBF congestion, DL Throughput per TSL/TBF, and tuning the data parameter’s cell level, BSC level which gives optimal throughput, also analysis the Abis_EDAP, Gb link Congestion, DSP Reshuffling and UPPB congestion.  Analysis cell traffic, Utilization, Blocking on network level and give plan for TRX addition, FR HR change, cell load sharing biweekly.  Responsible for coverage optimization –Level and quality optimization to ensure satisfaction of customer with coordinate drive test engineer.  Analyzed Drive Test Log files for taking care of Internal Interference in the Network and Network performance statistics (KPI’s).Responsible for Identification of BSS hardware problems from statistics.  Troubleshooting hardware failure and Alarm analysis.  Minimization of Adjacent Channel and Co-channel interface.  Neighbor, BCCH, BASIC, HSN, MAIO Plan of site and get implement in OMCR using NetNuman and ISMG Tools.  Creating the Voice & Data reports for the final submission using TEMS report Generator and MapInfo 8.5 version. . Project Name  CELL PLAN TECNOLOGY PVT LTD Technology GSM Location Delhi Circle Duration 13 Sept 2007 to June-09 Trainings done: Technology UMTS,LTE Ericsson Confidential Page 7 of 8
  • 8. Training Highlights  WCDMA Air interface training on Ericsson system  WCDMA Functionality training on Ericsson system  WCDMA PMO training on Ericsson system  LTE Air interface training on Ericsson system  LTE Functionality training on Ericsson system PROFESSIONAL QUALIFICATION B. Tech. (Electronics & Communication Engineering) from Radha Govind College of Engineering, Meerut in 2007. CERTICICATION DONE BUGS Global Individual Assessment Program PERSONAL SYNOPSIS  Name: Rahul Kumar.  Father-s Name: Shiv vijay singh.  Date of Birth: 04th Nov 1983.  Passport: P0826179 Ericsson Confidential Page 8 of 8