Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Prezentare fonduri 2014 2020 completata v2
1. Enhancing the Romanian - Dutch Cooperation in
the Water Sector
Financing Opportunities
for
future projects in the water sector
2014-2020
Bianca Pricope
Bucharest, 6 October 2014
2. Content
I. National Programmes
i. National Rural Development Programme (PNDR)
ii. Operational Programme for Large Infrastructure (POIM)
II. European Programmes
i. Horizon 2020 - EU
ii. LIFE 2014-2020 - EU
iii. Eurostars Programme - EU & EUREKA
iv. START Danube Region Project Fund - EU
v. Know-how Exchange Programme - AU&IT
vi. Sustainable Water Fund - NL
5. Introduction
Objectives:
1. restructuring and increasing farm viability;
2. sustainable management of natural resources and tackling
climate change;
3. diversification of economic activities, creation of jobs, improvement
of infrastructure and services for improving the quality of life in rural
areas.
— 14 rural development measures with a total budget of 9,363
billion €
6. Sustainable management of natural
resources and tackling climate change
— Aims:
◦ high natural value and the good condition of natural resources
◦ resilience towards more frequent occurrence of extreme weather
events
◦ low level of pollution (GHG emissions)
— Essential actions for the cross-cutting objectives related to:
◦ environment protection
◦ mitigation and adaptation to climate change
7. Increasing efficiency in water use
by agriculture sector
Choice of rural development measures:
◦ M04 - Investments in physical assets: establishment, expansion
and/or modernization of irrigation installations - 2,071 billion €
◦ M10 - Agri-environment-climate: promotion of technology and new
agricultural management practices - 999,9 million €
8. Cross cutting objectives
Measure 1 (Knowledge transfer and information actions)
— developing the environmental management skills and knowledge of farmers
and foresters - 55,9 million €
Measure 2 (Advisory services)
— elaborating the business plans, including for farm manure management and
the use of environmentally-friendly methods and technologies - 59,3 million €
Measure 16 (Co-operation)
— potential support for EIP-AGRI Operational Groups to develop pilot projects,
new and innovative technologies and practices which address specific issues
related to environmental management - 14,5 million €
10. Introduction
Financial allocation (including the performance reserve): € 9.4 billion
Thematic objectives:
— TO 4: Supporting the transition towards economic sectors with low
carbon emissions
— TO 5: Promoting the adaption to climate change, preventing and
managing risks
— TO 6: Environmental protection and promotion of efficient use
of resources
— TO 7: Promoting sustainable transport systems and eliminating
blockages in the infrastructure of major networks
11. Priority Axes (PA)
Transport
◦ PA 1 ‐ Developing the TEN‐T network in Romania
◦ PA 2 ‐ Increasing the regional accessibility by connecting to the TEN‐T
◦ PA 3 ‐ Developing a transport system that is safe and friendly towards the environment
Environment and climate change
◦ PA 4 ‐ Environmental protection and promotion of the efficient use of resources
◦ PA 5 ‐ Biodiversity protection and conservation, polluted site decontamination, air
quality monitoring
◦ PA 6 ‐ Promoting the adaption to climate change, preveting and managing risks
Clean energy and energy efficiency
◦ PA 7 ‐ Safe and clean energy for a low carbon emission economy
◦ PA 8 - Intelligent and suistainable transport systems for electricity and natural gases
Infrastructure in Bucharest-Ilfov region
◦ PA 9 - Developing urban infrastructure in Bucharest-Ilfov
12. Environment & climate change
PA 4 ‐ Environmental protection and promotion of the efficient use of resources
— Investments in the water and waste water sector
— Investments in the waste sector
PA 5 ‐ Biodiversity protection and conservation, polluted site decontamination,
air quality monitoring
PA 6 ‐ Promoting the adaption to climate change, preventing and managing risks
— Non-structural measures, orientated towards mitigating risks generated by climate
change, especially floods and droughts complemented through infrastructure projects
(river course planning, enbankments etc.)
— Investments for the reduction in coastal erosion on the Black Sea shore
— Developing the capacity for emergency response of the professional and voluntary
services
13. Environment & climate change
Eligible beneficiaries:
— Local public authorities
◦ Developing the waste integrated management systems ‐ PA 4
◦ Decontaminating polluted sites, where the polluter cannot be identified and there is a
negative impact on human health ‐ PA 5
◦ Biodiversity protection measures where the LPAs or the subordinate structures have in
custody or are administrating protected areas / Natura 2000 sites ‐ PA 5
— Other beneficiaries at the local level / NGOs
◦ Regional water operators - PA 4
◦ Biodiversity protection measures where the NGOs or the subordinate structures have in
custody or are administrating protected areas / Natura 2000 sites ‐ PA 5
— Central public administration
◦ Romanian Waters National Administration, authorities responsible for the monitoring and
warning systems of meteorological events and for the management of emergency
situations
15. HORIZON 2020
WORK PROGRAMME 2014 – 2015
Societal Challenges - Climate action, environment, resource
efficiency and raw materials
Source: European Commission
16. Water Innovation: Boosting its value for Europe
— Activities in this call address:
◦ integrated approaches to water and climate change adaptation and mitigation;
◦ bringing innovative water solutions to the market;
◦ harnessing water research and innovation results for the benefit of industry, policy
makers and citizens in Europe and globally.
— This call is expected to contribute to several policy objectives:
◦ impacts of droughts and floods should be minimised;
◦ alternative water supply options are only relied upon when all water saving and
water efficiency measure are taken and other options exhausted;
◦ water extraction should remain below 20% of available renewable water
resources.
17. Water Innovation: Boosting its value for
Europe - project calls
Opening date for 2015 topics: 10/12/2014
Eligible consortium: partners from minimum 3 countries
Overall indicative budget for 2015 topics: EUR 96 million
Calls:
WATER-1-2014/2015: Bridging the gap: from innovative water solutions to
market replication
— [2015] Demonstration/pilot activities of new or improved innovative water solutions in a real
environment, with a focus on the cross cutting priorities identified in the EIP on Water, while addressing
the thematic priorities (EUR 45 million)
WATER-2-2014/2015: Integrated approaches to water and climate change
— [2015] Integrated approaches to food security, low-carbon energy, sustainable water management and
climate change mitigation (EUR 15 million)
18. Water Innovation: Boosting its value for
Europe - project calls
WATER-3-2014/2015: Stepping up EU research and innovation cooperation in
the water area
• [2015] Proposals should pool the necessary financial resources from the participating national (or
regional) research programmes with a view to implementing a joint call for proposals resulting in grants
to third parties with EU co-funding to support the priorities identified in the Strategic Research Agenda
of the Water JPI (EUR 15 million)
WATER-4-2014/2015: Harnessing EU water research and innovation results for
industry, agriculture, policy makers and citizens
— [2015] Proposals (around EUR 3 million) should aim to:
◦ implement measures to showcase, exchange, test and transfer water management solutions to
end-users in the agricultural sector in view of improving water use efficiency and quality in
agricultural practices
◦ contribute to a 'thematic network'34 on water in agriculture with broad involvement of practitioners
and other stakeholders throughout Europe to compile, disseminate and further develop solutions;
and
◦ support the integration of water relevant issues in the EIP on 'Agricultural Productivity and
Sustainability', including linking up with EIP operational groups and related actions of the
EIP on 'Water'.
http://www.eip-water.eu/
19. Water Innovation: Boosting its value for
Europe - project calls
WATER-5-2014/2015: Strengthening international R&I cooperation in the field of
water
1. [2015] A coordination platform for scientists, decision makers, practitioners and other key stakeholders
representing a number of African countries throughout the duration of Horizon 2020 to identify
opportunities and constraints for the sustainable management of water and other natural resources
and ecosystems and for the development of cost-effective climate change adaptation and mitigation
measures in Africa (around EUR 3 million)
2. [2015] Development of water supply and sanitation technology, systems and tools, and/or
methodologies to manage risks associated with water supply and sanitation and/or cross-boundary
water management issues, or integrated water resources management systems for sustainable
agriculture and food security, sustainable environment protection and economic growth, focused on
the non-EU Mediterranean countries and/or Africa (EUR 15 million)
25. Introduction
— INTERREG EUROPE budget allocation is EUR 359 million
financed by the European Regional Development Fund (ERDF)
— INTERREG EUROPE will finance two actions:
◦ Interregional Cooperation projects
◦ Policy Learning Platforms
— Eligible countries:
◦ 28 EU member states
◦ Norway
◦ Switzerland
26. Eligible beneficiaries
INTERREG EUROPE is designed to support policy learning
among public authorities to improve the performance of
policies and programmes for regional development
Eligible beneficiaries:
— National, regional or local public authorities
— Other institutions governed by public law:
◦ universities
◦ regional development agencies
◦ business support actors, etc.
— Private non-profit bodies
27. Priority axes
1. Research, Technological Development and Innovation
2. Competitiveness of Small and Medium-Sized Enterprises
3. Low Carbon Economy
4. Environment and Resource Efficiency
5. Technical Assistance
28. Budget breakdown by priority axis
Priority axis Union support National counterpart Total funding
1. Research, Technological
Development and Innovation
€ 84,441,610 € 14,903,007.28 € 99,344.617.28
2. Competitiveness of Small
and Medium-Sized
Enterprises
€ 84,441,610 € 14,903,007.28 € 99,344.617.28
3. Low Carbon Economy € 84,441,610 € 14,903,007.28 € 99,344.617.28
4. Environment and Resource
Efficiency
€ 84,441,610 € 14,903,007.28 € 99,344.617.28
5. Technical Assistance € 21,559,560 € 7,371,520.00 € 28,931,080.00
TOTAL € 359,326,000 6 € 66,983,549.12 € 426,309,549.12
29. Timeline
July 2014 (provisional) Cooperation programme and SEA submitted to EC
15-16 October 2014
On communication strategy; programme manual; terms
of reference for the first call for project proposals;
application form; financial arrangements and subsidy
contract
2-3 December 2014
Interregional cooperation forum/ Launch of INTERREG
EUROPE
4 December 2014
On rules of procedure and further elaboration of the
programme documents
10-11 February 2015
First Monitoring Committee of INTERREG EUROPE
programme
mid-February 2015 First call for proposals
31. Introduction
— The Eurostars programme is publicly financed with a total budget of 1.14 billion euro and
is currently supported by 33 EUREKA countries and the European Union and available
for the following countries:
— Eurostars provides funding and support to research-performing companies, especially
SMEs
— The next deadlines for submitting an application are March 5th & September 17th 2015
32. Project eligibility criteria
— The project leader is an R&D-performing SME from a Eurostars Country
— The project contains at least two legal entities that are independent of one another
— The consortium is a partnership hosted by at least two different Eurostars
countries
— Market introduction of the major project result is planned to occur within 24.0
months of the completion of the project
— Each of the participating organisations in the consortium is a legal entity in the
host country
— The project duration < 3 years
33. Financial aspects (RO)
Type of organisation
Funding % of
eligible costs
Maximum Financial
Support
Additional Information
SME
With respect of the
state aid scheme
notified N542/2007
C2007(6545)
Whole project will not exceed
700000 RON/Year
LARGE COMPANY
With respect of the
state aid scheme
notified N542/2007
C2007(6545)
Whole project will not exceed
700000 RON/Year
UNIVERSITY 100%
Whole project will not exceed
700000 RON/Year
The Romanian EUREKA Office
recommends universities to apply
together with a Romanian
SME/company
RESEARCH
ORGANISATION
100%
Whole project will not exceed
700000 RON/Year
The Romanian EUREKA Office
recommends research
organisations to apply together
with a Romanian SME/company
OTHER 100%
Whole project will not exceed
700000 RON/Year
The Romanian EUREKA Office
recommends applicants to apply
together with a Romanian
SME/company
Eligible costs: Direct costs - Human resources costs, logistic costs as materials, components, equipment (only the amortization rate for
the project duration, maximum 40% of the project cost), subcontracting of services and consultancy (maximum 20% of grant amount),
travel costs (max. 5% of grant amount), IPR costs, Feasibility studies costs; Indirect costs – maximum 12% of direct costs.
36. Introduction
— START – Danube Region Project Fund is a new pilot initiative of the EUSDR
— Seed Money for the development and implementation of Danube Region projects
— The total allocation to START amounts to € 900.000 (95% European Commission,
5% City of Vienna)
— The START initiative is running until the end of 2016
— 2 calls for project proposals (1 left)
— START EU grants between € 10.000 to € 40.000 per project
— Project partners must co‐finance at least 10% of the total project costs, from their
own resources or other (non‐EU) sources
37. Eligibility criteria
— Applicants: public or private organisations with legal personality (no individuals), especially
small institutions, non‐governmental and civil society organisations
— Location: the entire Danube Region:
◦ EU Member States: Germany (Baden‐Württemberg and Bavaria), Austria, Hungary, Czech Republic,
Slovak Republic, Slovenia, Bulgaria, Romania and Croatia;
◦ EU Accession Countries: Serbia, Bosnia and Herzegovina and Montenegro and
◦ Non‐EU Countries: Moldova and Ukraine
— Duration: 6-12 months
— Projects must:
◦ involve at least two partners from two EUSDR countries
◦ be of public interest and have a macro‐regional impact
◦ be either a specific part of a larger project or a small project
◦ address at least one of the Priority Areas (PA) of the EUSDR:
39. Introduction
— The Central European Initiative (CEI) - 18 Member States:
Albania, Austria, Belarus, Bosnia and Herzegovina, Bulgaria,
Croatia, the Czech Republic, Hungary, Italy, Macedonia, Moldova,
Montenegro, Poland, Romania, Serbia, Slovakia, Slovenia and
Ukraine
— The Know-how Exchange Programme (KEP) - an instrument
supporting projects and programmes focused on the transfer of
know-how and best practices from EU to non-EU CEI Member
States
— KEP priorities:
1. European Integration, Capacity Building and Market Economy
2. Infrastructure Planning and Development
3. Agriculture, Energy, and Environment (protection of the natural
environment, waste management, water management and water
resource development)
40. KEP Austria & Italy
— It operates through calls for proposals:
I. KEP Austria
II. KEP Italy
— The KEP Austria grant:
◦ < EUR 50.000 for each individual project
◦ < 50% of the total amount of a project
— The KEP Italy grant:
◦ < EUR 40.000 for each individual project
◦ < 50% of the total amount of a project
42. Introduction
Aim
Public/Private Partnership for water safety and water security in developing
countries through collective initiatives between governmental bodies, private
sector and Non-Governmental Organisations (NGOs) and possibly knowledge
institutions
Themes
◦ Improved access to drinking water and sanitation;
◦ Efficient and sustainable water use, particularly within agriculture;
◦ Safe deltas and improved basin management.
43. Eligibility criteria
— The partnership consists of at least one public institute, one company and one NGO & at least
one Dutch and one local partner.
— An own contribution of at least 40% of the project budget.
— Minimum grant application is €500,000 and the maximum is €4,000,000.
— The maximum project duration: 7 years.
— The project activities take place in minimal one of the countries mentioned on the country list:
44. Ciprian Nanu
T: +40-744 298 803
E: ciprian.nanu@bdgind.ro
Bianca Pricope
T: +40-744 272 914
E: bianca.pricope@bdgind.ro
THANK YOU FOR YOUR ATTENTION!
For further questions please don’t hesitate to contact us:
RNWP Local Coordinators: