SCHEDULE OF
DIMENSIONS
PRESENTED BY
N.R.KALE/Lecturer (works)
What is SOD ?
 Schedule of dimension is nothing but a
schedule, which lays down :-
 Limiting values, recommended values,
and infringement to limiting values,
which can be continued over entire
Indian railways system for various track
parameters.
 Goods wagon and coaching stock
parameters.
 Horizontal and vertical clearances to be
followed on Indian railways.
Necessity of S O D
 It is absolutely essential to ensure safety of
traveling public as well as goods over entire
Indian railways system.
 To adopt uniform system of track tolerances,
location of structures and construction
standard all over the Indian railways.
 To permit different types of coaching and
goods stock owned by different railways to
ply on entire railway system with same level
of degree of safety.
Brief Introduction
 1913 - First schedule of maxm & minm
dimension.
 1922 – SOD with Maxm. Minm & recommended
dimension was published.
 1929 – Amendment in order to introduce some
improvement and additions of clearances
required for electric traction.
 1936 – Financial stringency on railway therefore
amendment to restrict capital expenditure to
minimum.
Contd. ….
 1939 & 1958 reprinted with some modifications.
 1973 – Reprinted with conversion to metric
system, introduction of dimensions for 25KV AC
traction.
 1990 – Recommendations of 64th Track
Standard Committee for revision of SOD of
1939 reprinted in 1973.
 2004 – Revised version published with some
modifications.
MAIN FEATURES OF SOD-2004
 Dimensions are given only for 1676 mm
gauge.
 Consists of only metric units.
 Only two schedules – schedule I & schedule II
 Extra clearances required for curves are
modified to suit speed of 160 kmph and SE of 165
mm
 Additional appendix for extra clearances required
for 200 kmph is also given with 185 mm SE
SCHEDULE - I
 Schedule I of SOD-2004 consists of those
items which are mandatory and have to be
observed on all 1676 mm gauge Railways in
India.
 Contains the items of Schedule- I and certain
selected items of Schedule- II of 1973 Version
Contd. …
DIMENSIONS given in Schedule-I are classified
under two heads :-
‘Existing works’ – The works which were
existing before issue of SOD ( 2004 ).
‘New works’ – Include new constructions,
additions of new lines/structure, gauge
conversion and doubling
Contd. …
However following works will not be included in
‘New works’-
Shifting of Points & Crossings.
Extension of siding.
Extension of building, etc.
SCHEDULE - II
 Schedule – II contains the existing
infringements of Schedule – I.
 These are items, which were included in
Schedule – III of 1973 version.
CONTENT OF S.O.D.
SCHEDULE I :-i) ESSENTIAL FOR SAFETY
ii) PRIOR SANCTION FOR
DEVIATION
CHAPTER DETAILS
I GENERAL Spacing, ,Curves, Br.Bldg Structure,
Tunnel, Sig Gear, locking etc.
II. STN YARD Pts.& Crossing, P/F, Bldg/St,
Tr.Spacing etc.
Contd. …
III –W/Shop &
Sheds
Tr,Spacing, O/Head
Girder Structure.
IV –(A) Rolling
stock (C&W)
Wheels /Axles, Wheelbase,
Buffers / Couplings,Floor
height Max.moving
dimensions
IV-(B)- Rolling
Stock (3660 mm) -
Max. future moving
dimensions.
Contd. …
IV-©-Rolling Stock
(Loco)
Wheels & Axles,Buffers/
Couplings,Max. moving
Dimensions.
V-ELECT.TR.(D.C.) Elect.Equipment Clearances .
V-(A)----------(A.C.) -------DO-----------
SCHEDULE I CHAPTER I
 MIN. DIST. C/C OF TRACK .
As per CS No.9 dated.16.10.2012
i) For existing works 4265 mm
ii) For new works/additions
to existing works 5300 mm
Note: OHE mast and Signal post shall not
preferably be provided in between tracks.
However, under unavoidable circumstances, the
clearance shall be increased by equal to width
of such structure/foundation.
SCHEDULE I CHAPTER I
 MIN. DIST. C/C OF TRACK
(Tunnel, Semi-through/Through girder bridges)
As per CS No.9 dated.16.10.2012
i) For existing works 4495 mm
ii) For new works/additions
to existing works 4725 mm
Contd. …
 Minimum Radius of curves -175 m (10 degree)
Note: Check rails to be provided in curves having
radius 218 meters(8 degree) and sharper.
Check rails may also be provided in flatter
curves, if high speed is contemplated.
Contd. …
A) Maximum clear distance bet. two sleepers on
bridge:-
i) on existing Bridges 510 mm
ii) New construction & on existing bridges
during regirdering /TSR
450 mm
B) Maximum distance between Joint
sleepers on Bridges.
200 mm
Contd. …
Minimum thickness
of Bridge timber,
exclusive of
notching.
150 mm
Minimum length of
bridge sleeper.
305 mm +
dist. from out
side to
outside of
girder flange
(subject to
min.2440
mm)
SCHEDULE I CHAPTER I
CONTD…
 Minimum clearance of
check rail on curve. 44 mm.
 Minimum clearance of
check rail on level crossing. 51 mm.
 Maximum clearance of check
rail on level crossing. 57 mm
 Minimum depth for wheel flange. 38 mm
Schedule I chapter I contd. …
BULDING AND STRUCTURE
Minimum horizontal distance from center
of track to any structure from RL to
305 mm above RL
i) For existing works 1675 mm
ii) For new works or alterations
to existing works 1905 mm
Minimum horizontal distance from C/L of track to
any structure except a platform.
i)For existing works.
From 305 mm to 4420 mm
above RL.
2135 mm
ii) For new works or alterations
to new works
From 305 mm to1065 mm
above R L
1905 mm
increasing to
2360 mm
From 1065 mm to 3355 mm 2360 mm
Contd. …
From 3355 to 4420 mm
above rail level
2360 mm
decreasing to
2135 mm
From 4420 to 5870 mm
above rail level
2135 mm
decreasing to 915
mm
Contd. …
Below the rail level up to the
formation level on the straight
track and curve up to 875 m
2575 mm
Below the rail level up to the
formation level on the curve
Radius< 875 m
2725 mm
Schedule I Chapter I contd. …
Minimum horizontal distance of any telegraph
post from C/L of nearest track
i) For existing works - Ht of the post +
2135 mm.
ii) For new works - Ht of the post +
2360 mm.
Height of ROB & FOB (C.S.No.7/13)
 Min. ht. above rail level for a dist. Of 1600
mm on either side of the centre of track.
Where 25 K.V. A.C. traction is likely to be
used.
 F.O.B. 6250 mm (5270 mm)*
 R.O.B./ Fly over 5870 mm (5070 mm)*
* For 4.80 M height of contact wire
C.S.No.10 Dated 08.11.12
Note for overhead structure-
 For existing overhead structures, wherever
feasible, the ht. of contact wire shall be as high as
possible to allow passage of ODC of 4.8 m height.
 If any T/out or X/over is within 40m or any LC is
within 520m, the ht. shall be 6250m
 On lines proposed for electrified, provision shall be
made in OHE structure to permit an allowance of
275mm for raising of track
Contd. …(CS No.13 dt. 21.10.13 )
Minimum height above rail level for
telegraph, telephone and other such
low tension wires crossing a railway
6100 mm
The minimum horizontal distance from
centre of nearest track to structure
carrying electrical conductors crossing
a railway (For existing work)
Height of
structure +
2.135M
----------do------------(For new work) Height of
structure + 6
meters
Schedule I chapter I contd. …
Safety Refuges :-
Max. distance in tunnels 100 m
On bridges with
a)span less than 100 m 100 m
b)spans of 100 m or more - On each pier
Provision of Trolley refuse as per CS No 116
of IRPWM
Location Distance
Maximum distance should not be more than 1Km subject to
following
Cutting in straight 200M
Cutting in curve 100M
High Embankment 200M
Tunnel 100M
Bridges with span less than 100 m 100M
Bridges with spans of 100 m or more On each pier
On Ballasted deck bridges 50M
Interlocking and signal gear
Description Dimension
Maximum height above rail level of any part of
inter locking or signal gear for a width of 1600 mm
or 1830 mm in case of tunnels, through and semi-
through girders on either side of centre of track
64 mm
Note: 1. For a distance of 229 mm outside and 140mm inside
the gauge faces of the rail, no gear or track fitting must project
above rail level
2. Metal covers with ramps on both sides must be provided
over interlocking gear to prevent hanging coupling from
damaging the gear.
Schedule I chapter I contd. …
Formation width :- (Considering formation slope of
1 in 30 and track distance 5300mm and straight track)
For single line straight track –
Min. width in embankment 6850 mm
Min. width in cutting 6250 mm
For Double line straight track –
Min. width in embankment 12150 mm
Min. width in cutting 11550 mm
Formation width as per CS No.16 of
LWRM and CS No.135 of IRPWM
For Single Line Formation Width
For Embankment 7850 mm
For cutting 7850 mm
For Double Line
For Embankment 13160 mm
For cutting 13160 mm
Gauge on straight and curves
Alignment Gauge tolerance
Straight including curves of
350 M
-5 mm to +3 mm
(1671 to 1679mm)
Curves less than 350 M Up to +10 mm
(Up to 1686 mm)
Schedule I chapter II
(Station yard)
Min. dist. Centre to centre of track :-
(i) For existing works 4265 mm
(ii) For new works / Alt. 5300 mm
Max. gradient in Station yard :-
(i) For existing works 1 in 400
(ii) For new works / Alt. 1 in 1200
Note: There must be no change of grades
within 30 meters of any points & crossings.
The power of condonation for gradient
steeper than 1 in 1200 in case of new work
(As per Corrigendum to C.S. No.12)
Gradient Authority
Steeper than 1 in 1200 and
up to 1 in 400
Personal approval of G. M.
through COM of the zonal
Railway after making efforts for
providing grade as flatter as
possible
Steeper than 1 in 400 and
up to 1 in 260
C.R.S.
Steeper than 1in 260 Railway Board through C.C.R.S.
Chapter ii contd. …
Horizontal dist. From C/L of track to
Face of platform
coping
Max.
1680 mm
Min.
1670mm
Face of goods
platform coping
1680 mm 1670 mm
Face of any platform
wall
1905 mm 1675 mm
New platform wall should be built to maximum
dimensions and the coping corbelled out to 1675mm.
Platform on curved track
 No passenger platform in case of new line,
would be constructed on a curve having
radius less than 875 M
 Extra allowance to be reduced by 51mm for
platform, inside of curve.
 Extra allowance to be reduced by 25mm for
platform, outside of curve.
Chapter ii contd. …
Height above rail level –
For high level
passenger platform
Max.
840 mm
Min.
760 mm
For medium level
passenger platform
455 mm -
For goods platform 1065 mm -
Railway Board’s directives for
Mumbai suburban section
 Vide letter No.2007/CEDO/SD/O dated
19.02.14, Railway Board has conveyed Board’s
approval to change the height range of platform
in Mumbai suburban section from 760-840mm
to 840-920mm.
 RDSO has been asked to submit draft
correction slip for Board’s approval which is yet
to be issued.
Chapter II Contd. (Buildings and structures)
 Minimum Horizontal distance of any building on
a passenger platform from center of track.
Height of the structure Distance
From P/F level to 305 mm above P/F level 5180mm
5330mm
From 305mm above P/F level to 3430mm
above RL
5330mm
From 3430 to 4115mm above RL for existing
work and
5330mm
3810mm
From 3430 to 4610mm above RL for new work
Contd. ….. (CS No. 11)
 Min. horizontal distance of any bldg. or
longitudinal boundary fence from centre line
of track of passenger platform which is not
an island (For New works)
Minimum 6830mm
Recommended 12130mm
Note: Recommended dimension is for setting back
the platform to make room for an additional track
in future, without infringing minimum distance.
Chapter No. 2 contd. ….
 Minimum horizontal distance from center line of
track to a pillar, column, lamp of similar isolated
structure on a passenger platform.
Height Distance
From platform level to
305mm above platform level
4570mm increasing
uniformly to 4720mm
From 305mm above
platform level to 3705mm
above rail level
4720mm
CHAPTER II CONTD…
POINTS & CROSSINGS :- Clearance of
Check rail opposite nose of
crossing
Max.
48 mm
Min.
44 mm
----------------Do------------------
(In case of PRC T/O )
45 mm 41 mm
Wing rail at nose of crossing 48 mm 44 mm
------------------Do---------------
(In case of PRC T/O )
45 mm 41 mm
Chapter ii contd. …
Points & Crossings :-
Clearance bet. Toe of open switch and
stock rail.
(i) For Existing work 95 mm
(ii) For new work or alteration to existing
work
115 mm
Minimum Radius of curvature for Slip
points, Turn outs, Cross over.
218 m
Chapter ii contd. …
Points & Crossings :-
Minimum angle of crossing. (ordinary) 1 in 16
Crossing as flat as 1 in 20 will usually be sanctioned
if recommended by CRS.
Minimum length of Tongue Rail. 3660 mm
Diamond crossing not to be flatter than 1 in 8 1/2
Diamond crossing as flat as 1 in 10 will usually be
sanctioned if recommended by CRS.
Length of siding for New work (C.S. No.8)
Condition Length of siding
Where the ruling gradient is
1in 100 and flatter
750 Meters
Steeper than 1 in 100 Length of longest train permitted
in the section + 35 M
Clear available length denotes :
1. Distance between foot of signal and FM in rear on the same
line in case of main line and Directional loop at station yard
2. In case of common loop, distance between two starter
signals of opposite direction on the same line.
Maximum Moving Dimensions
Description 3250mm
wide stock
3660mm
Wide stock
Max. width over all projections, at
305mm above RL, when fully
loaded
3135mm 3505mm
Max. width over all projections
from 305mm to 1082/1145mm
above RL when fully loaded
3250mm
3135mm
3660mm
3505mm
Max. width with over open doors,
including all projections for goods
vehicle
4265mm 4725mm
Max. height above RL for a width
of 760mm on either side of the
centre of unloaded vehicle
4265mm 4725mm
SCHEDULE I CHAPTER IV (A)
 Wheel Gauge 1599mm-1602mm.
 Tread Dia of new wheel 914mm-1092mm.
 Flange Projection 28.5mm-35.0 mm
 Flange Thickness 16 mm- 29.4 mm*
* As per CS No.14
Contd. …
 Tyre width 127mm minimum.
Floor height above RL
 Passenger 1345mm-1220mm.
 Goods 1345mm-1145mm.
 Buffer height above RL 1030mm-1105mm
 Maxim Wheel Base for 4-Wheeler - 6100mm
SCHEDULE I CHAPTERIV(A) CONTD…
Min.Wheel base for bogie truck 1830mm.
Min. Wheel base for pass. Bogie 2440mm.
Min. Dist. Bet bogie centres 2/3 vehicle
length
Max. Dist bet. Bogie centres: 14.900m.*
* CS No.14
Max. Lenth of body or roof:
4-Wheeler (3200mm wide )
Bogie vehicles (3250mm. Wide)
8540mm.
21340mm
SCHEDULE V (A) A.C.
 MIN. HT. OF UNDERSIDE OF LIVE WIRE:
BRIDGES & TUNNELS 4800mm
IN OPEN 5500mm
SHEDS 5800mm
LEVEL CROSSINGS 5500mm
 MAX. VARIATION OF LIVE WIRE EITHER SIDE :
STRAGIHT 200mm
CURVES 300mm
 MAX. WITDTH OF PENTOGRAPH 1800mm
SCHEDULE-II
 Min. dist C/L to C/L of track
i)for 3250mm wide stock 3660 mm
ii) for 3660mm wide stock 4040 mm
 Min. clear dist. From C/L
of Track to any fixed structure
From RL to 1065 mm above
Rail level 1675/1905mm
Contd. …
 From 1065mm to 3505mm
above R/L 1980/2135mm
 4265 mm above R/L 2055 mm
( with SR 16 kmph ) 1980 mm
 Min. clear height above R/L
for a dist. of 305 mm/915 mm on either
of centre of track 4420 mm / 5030 mm
Over-dimensioned consignment
 When a consignment whose length,width and
height are such that one or more of them
infringe the standard moving dimension at any
point during the run from start to destination,
then the consignment is called O.D.C.
Class ‘A’ O.D.C.
(Permitted out of gauge loads)
Which exceed the maximum moving
dimensions but do not infringe any fixed
structure on the route by a net clearance of 150
mm and above and gross clearance 225 mm
and above.
Contd. …
Class ‘B’ O.D.C.(Exceptional out of gauge load)
– Net clearance not less than 75 mm but less
than 150 mm, gross clearance 150 mm to 225
mm.
Class ‘C’ O.D.C.-(Extraordinary out of gauge
loads) Net clearance are less than 75 mm and
gross clearance less than 150 mm
Speed Restrictions for ‘A’ Class
O.D.C.
Gauge Speed Restriction Escort Sanctionin
g authority
B.G Sectional speed of
four wheeler
30 kmph where gross
clearances is less
than 380 mm.
Movement by
day/night
Not
required
COPS
Speed Restrictions for ‘B’
Class O.D.C.
Gauge Speed Restriction Escort Sanctionin
g authority
B.G. 40 kmph by day and
night During night stop
dead and proceed
slowly at approach of
structure having gross
clearance less than 225
mm.
SSE
(C&W)
T.I.
CE
Speed Restrictions for ‘C’
Class O.D.C.
Gauge
Speed
Restriction
Escort Sanctioning
authority
B.G. 25 kmph
Movement
by day
only
SSE/SE
(C&W)
T.I.
SSE/SE
(P.Way)
TRD staff
CRS
THANKS
SCHEDULE OF DIMENSIONS.ppt
SCHEDULE OF DIMENSIONS.ppt
SCHEDULE OF DIMENSIONS.ppt
SCHEDULE OF DIMENSIONS.ppt
SCHEDULE OF DIMENSIONS.ppt
SCHEDULE OF DIMENSIONS.ppt
SCHEDULE OF DIMENSIONS.ppt

More Related Content

What's hot

Different Cross sections of Rail Tracks and Railway Station Layout
Different Cross sections of Rail Tracks and Railway Station LayoutDifferent Cross sections of Rail Tracks and Railway Station Layout
Different Cross sections of Rail Tracks and Railway Station LayoutSunil Kumar Meena
 
Railway Engineering: signaling, interlocking, train control system
Railway Engineering: signaling, interlocking, train control systemRailway Engineering: signaling, interlocking, train control system
Railway Engineering: signaling, interlocking, train control systemBathla Tuition Centre
 
RAILWAYS,HARBOR, TUNNEL ENGINEERING
RAILWAYS,HARBOR, TUNNEL ENGINEERINGRAILWAYS,HARBOR, TUNNEL ENGINEERING
RAILWAYS,HARBOR, TUNNEL ENGINEERINGbhavin_pindoriya
 
Introduction to urban transportation
Introduction to urban transportationIntroduction to urban transportation
Introduction to urban transportationAli Alraouf
 
Signalling and Interlocking
Signalling and InterlockingSignalling and Interlocking
Signalling and Interlockingsrinivas2036
 
Basics of Metro Railway Signalling system
Basics of Metro Railway Signalling systemBasics of Metro Railway Signalling system
Basics of Metro Railway Signalling systemBhaskar Kumar Dan
 
modern methods of railway track maintanence
modern methods of railway track maintanencemodern methods of railway track maintanence
modern methods of railway track maintanencekrishnacp
 
Geometric design of railway track
Geometric design of railway  trackGeometric design of railway  track
Geometric design of railway trackMOHIT DUREJA
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossingshiranrathva
 
Geometric design of track
Geometric design of trackGeometric design of track
Geometric design of trackJOYCHENKENGLANG
 
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationLarsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationShuBham RaNa
 
Track work presentation
Track work presentationTrack work presentation
Track work presentationKumar M.
 
Railway engg geometric design
Railway engg geometric designRailway engg geometric design
Railway engg geometric designVijai Krishnan V
 
Railway signalling
Railway signallingRailway signalling
Railway signallingkarthikdishu
 
Chapter 5 Introduction to railway
Chapter 5 Introduction to railwayChapter 5 Introduction to railway
Chapter 5 Introduction to railwayKHUSHBU SHAH
 
Depots presentation
Depots presentationDepots presentation
Depots presentationKumar M.
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossingssrinivas2036
 

What's hot (20)

turnouts in railways
 turnouts in railways turnouts in railways
turnouts in railways
 
Different Cross sections of Rail Tracks and Railway Station Layout
Different Cross sections of Rail Tracks and Railway Station LayoutDifferent Cross sections of Rail Tracks and Railway Station Layout
Different Cross sections of Rail Tracks and Railway Station Layout
 
Railway Engineering: signaling, interlocking, train control system
Railway Engineering: signaling, interlocking, train control systemRailway Engineering: signaling, interlocking, train control system
Railway Engineering: signaling, interlocking, train control system
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Signals on Railway
Signals on RailwaySignals on Railway
Signals on Railway
 
RAILWAYS,HARBOR, TUNNEL ENGINEERING
RAILWAYS,HARBOR, TUNNEL ENGINEERINGRAILWAYS,HARBOR, TUNNEL ENGINEERING
RAILWAYS,HARBOR, TUNNEL ENGINEERING
 
Introduction to urban transportation
Introduction to urban transportationIntroduction to urban transportation
Introduction to urban transportation
 
Signalling and Interlocking
Signalling and InterlockingSignalling and Interlocking
Signalling and Interlocking
 
Basics of Metro Railway Signalling system
Basics of Metro Railway Signalling systemBasics of Metro Railway Signalling system
Basics of Metro Railway Signalling system
 
modern methods of railway track maintanence
modern methods of railway track maintanencemodern methods of railway track maintanence
modern methods of railway track maintanence
 
Geometric design of railway track
Geometric design of railway  trackGeometric design of railway  track
Geometric design of railway track
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
Geometric design of track
Geometric design of trackGeometric design of track
Geometric design of track
 
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationLarsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
 
Track work presentation
Track work presentationTrack work presentation
Track work presentation
 
Railway engg geometric design
Railway engg geometric designRailway engg geometric design
Railway engg geometric design
 
Railway signalling
Railway signallingRailway signalling
Railway signalling
 
Chapter 5 Introduction to railway
Chapter 5 Introduction to railwayChapter 5 Introduction to railway
Chapter 5 Introduction to railway
 
Depots presentation
Depots presentationDepots presentation
Depots presentation
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 

Similar to SCHEDULE OF DIMENSIONS.ppt

IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET Journal
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18Rajesh Prasad
 
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
Cable stay bridge  05.01.16-IPWE seminar NewDelhiCable stay bridge  05.01.16-IPWE seminar NewDelhi
Cable stay bridge 05.01.16-IPWE seminar NewDelhiRajesh Prasad
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18Rajesh Prasad
 
2x25 KV OHE system in DFCCIL in Western corridor.ppsx
2x25 KV OHE system in DFCCIL in Western corridor.ppsx2x25 KV OHE system in DFCCIL in Western corridor.ppsx
2x25 KV OHE system in DFCCIL in Western corridor.ppsxMohd. Aslam Siddiqui
 
Transmission Line Towers and details
Transmission Line Towers and detailsTransmission Line Towers and details
Transmission Line Towers and detailsMahesh Sontyal
 
Revised ppt High rise OHE (1).pptx
Revised ppt High rise OHE (1).pptxRevised ppt High rise OHE (1).pptx
Revised ppt High rise OHE (1).pptxHimanshuTekwani1
 
Comparative study of Conventional Bridge with Innovative Bridge for Optimization
Comparative study of Conventional Bridge with Innovative Bridge for OptimizationComparative study of Conventional Bridge with Innovative Bridge for Optimization
Comparative study of Conventional Bridge with Innovative Bridge for OptimizationIJERA Editor
 
Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Pratap Bhunia
 
IRJET- Finite Element Analysis of Slabs, Cross Girders and Main Girders in RC...
IRJET- Finite Element Analysis of Slabs, Cross Girders and Main Girders in RC...IRJET- Finite Element Analysis of Slabs, Cross Girders and Main Girders in RC...
IRJET- Finite Element Analysis of Slabs, Cross Girders and Main Girders in RC...IRJET Journal
 
458531017-Slipform-technology-ppt.ppt
458531017-Slipform-technology-ppt.ppt458531017-Slipform-technology-ppt.ppt
458531017-Slipform-technology-ppt.pptJerryMah1
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Rajesh Prasad
 
ENG1002 Design project - Client Brief Version 2.0 1 © .docx
ENG1002 Design project - Client Brief Version 2.0 1 © .docxENG1002 Design project - Client Brief Version 2.0 1 © .docx
ENG1002 Design project - Client Brief Version 2.0 1 © .docxYASHU40
 
089 CC2011 Crete (2011) Rail Straightness Control in Service
089 CC2011 Crete (2011) Rail Straightness Control in Service089 CC2011 Crete (2011) Rail Straightness Control in Service
089 CC2011 Crete (2011) Rail Straightness Control in ServiceAndrea Bracciali
 
Pt slab design philosophy with slides and pictures showing benefit
Pt slab design philosophy  with slides and pictures showing benefitPt slab design philosophy  with slides and pictures showing benefit
Pt slab design philosophy with slides and pictures showing benefitPerwez Ahmad
 

Similar to SCHEDULE OF DIMENSIONS.ppt (20)

IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
Cable stay bridge  05.01.16-IPWE seminar NewDelhiCable stay bridge  05.01.16-IPWE seminar NewDelhi
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
Closure Report
Closure ReportClosure Report
Closure Report
 
2x25 KV OHE system in DFCCIL in Western corridor.ppsx
2x25 KV OHE system in DFCCIL in Western corridor.ppsx2x25 KV OHE system in DFCCIL in Western corridor.ppsx
2x25 KV OHE system in DFCCIL in Western corridor.ppsx
 
Transmission Line Towers and details
Transmission Line Towers and detailsTransmission Line Towers and details
Transmission Line Towers and details
 
Rail track geometry
Rail track geometryRail track geometry
Rail track geometry
 
Revised ppt High rise OHE (1).pptx
Revised ppt High rise OHE (1).pptxRevised ppt High rise OHE (1).pptx
Revised ppt High rise OHE (1).pptx
 
BMRCL.ppt
 BMRCL.ppt BMRCL.ppt
BMRCL.ppt
 
Comparative study of Conventional Bridge with Innovative Bridge for Optimization
Comparative study of Conventional Bridge with Innovative Bridge for OptimizationComparative study of Conventional Bridge with Innovative Bridge for Optimization
Comparative study of Conventional Bridge with Innovative Bridge for Optimization
 
2581
25812581
2581
 
Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...
 
IRJET- Finite Element Analysis of Slabs, Cross Girders and Main Girders in RC...
IRJET- Finite Element Analysis of Slabs, Cross Girders and Main Girders in RC...IRJET- Finite Element Analysis of Slabs, Cross Girders and Main Girders in RC...
IRJET- Finite Element Analysis of Slabs, Cross Girders and Main Girders in RC...
 
458531017-Slipform-technology-ppt.ppt
458531017-Slipform-technology-ppt.ppt458531017-Slipform-technology-ppt.ppt
458531017-Slipform-technology-ppt.ppt
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...
 
ENG1002 Design project - Client Brief Version 2.0 1 © .docx
ENG1002 Design project - Client Brief Version 2.0 1 © .docxENG1002 Design project - Client Brief Version 2.0 1 © .docx
ENG1002 Design project - Client Brief Version 2.0 1 © .docx
 
089 CC2011 Crete (2011) Rail Straightness Control in Service
089 CC2011 Crete (2011) Rail Straightness Control in Service089 CC2011 Crete (2011) Rail Straightness Control in Service
089 CC2011 Crete (2011) Rail Straightness Control in Service
 
Track Performance
Track PerformanceTrack Performance
Track Performance
 
Pt slab design philosophy with slides and pictures showing benefit
Pt slab design philosophy  with slides and pictures showing benefitPt slab design philosophy  with slides and pictures showing benefit
Pt slab design philosophy with slides and pictures showing benefit
 

Recently uploaded

Sales & Marketing Alignment_ How to Synergize for Success.pptx.pdf
Sales & Marketing Alignment_ How to Synergize for Success.pptx.pdfSales & Marketing Alignment_ How to Synergize for Success.pptx.pdf
Sales & Marketing Alignment_ How to Synergize for Success.pptx.pdfAggregage
 
audience feedback draft 3.pptxxxxxxxxxxx
audience feedback draft 3.pptxxxxxxxxxxxaudience feedback draft 3.pptxxxxxxxxxxx
audience feedback draft 3.pptxxxxxxxxxxxMollyBrown86
 
John Deere Tractors 6130M 6140M Diagnostic Manual
John Deere Tractors  6130M 6140M Diagnostic ManualJohn Deere Tractors  6130M 6140M Diagnostic Manual
John Deere Tractors 6130M 6140M Diagnostic ManualExcavator
 
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...shivangimorya083
 
John deere 425 445 455 Maitenance Manual
John deere 425 445 455 Maitenance ManualJohn deere 425 445 455 Maitenance Manual
John deere 425 445 455 Maitenance ManualExcavator
 
如何办理美国西雅图大学毕业证(Seattle毕业证书)成绩单(学位证)原版一比一
如何办理美国西雅图大学毕业证(Seattle毕业证书)成绩单(学位证)原版一比一如何办理美国西雅图大学毕业证(Seattle毕业证书)成绩单(学位证)原版一比一
如何办理美国西雅图大学毕业证(Seattle毕业证书)成绩单(学位证)原版一比一meq5nzfnk
 
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls  Size E6 (O525547819) Call Girls In DubaiDubai Call Girls  Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubaikojalkojal131
 
꧁ ୨⎯Call Girls In Ashok Vihar, New Delhi **✿❀7042364481❀✿**Escorts ServiCes C...
꧁ ୨⎯Call Girls In Ashok Vihar, New Delhi **✿❀7042364481❀✿**Escorts ServiCes C...꧁ ୨⎯Call Girls In Ashok Vihar, New Delhi **✿❀7042364481❀✿**Escorts ServiCes C...
꧁ ୨⎯Call Girls In Ashok Vihar, New Delhi **✿❀7042364481❀✿**Escorts ServiCes C...Hot Call Girls In Sector 58 (Noida)
 
Delhi Call Girls Safdarjung 9711199171 ☎✔👌✔Body to body massage with sex
Delhi Call Girls Safdarjung 9711199171 ☎✔👌✔Body to body massage with sexDelhi Call Girls Safdarjung 9711199171 ☎✔👌✔Body to body massage with sex
Delhi Call Girls Safdarjung 9711199171 ☎✔👌✔Body to body massage with sexshivangimorya083
 
Vip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile Girls
Vip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile GirlsVip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile Girls
Vip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile Girlsshivangimorya083
 
Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...
Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...
Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...shivangimorya083
 
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...Delhi Call girls
 
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂Hot Call Girls In Sector 58 (Noida)
 
83778-77756 ( HER.SELF ) Brings Call Girls In Laxmi Nagar
83778-77756 ( HER.SELF ) Brings Call Girls In Laxmi Nagar83778-77756 ( HER.SELF ) Brings Call Girls In Laxmi Nagar
83778-77756 ( HER.SELF ) Brings Call Girls In Laxmi Nagardollysharma2066
 
Hot Modals Call Girls (Delhi) Dwarka9711199171✔️ High Class Service 100% Saf...
Hot Modals Call Girls (Delhi) Dwarka9711199171✔️ High Class  Service 100% Saf...Hot Modals Call Girls (Delhi) Dwarka9711199171✔️ High Class  Service 100% Saf...
Hot Modals Call Girls (Delhi) Dwarka9711199171✔️ High Class Service 100% Saf...shivangimorya083
 
定制多伦多大学毕业证(UofT毕业证)成绩单(学位证)原版一比一
定制多伦多大学毕业证(UofT毕业证)成绩单(学位证)原版一比一定制多伦多大学毕业证(UofT毕业证)成绩单(学位证)原版一比一
定制多伦多大学毕业证(UofT毕业证)成绩单(学位证)原版一比一meq5nzfnk
 
What Could Cause Your Subaru's Touch Screen To Stop Working
What Could Cause Your Subaru's Touch Screen To Stop WorkingWhat Could Cause Your Subaru's Touch Screen To Stop Working
What Could Cause Your Subaru's Touch Screen To Stop WorkingBruce Cox Imports
 
Delhi Call Girls Mayur Vihar 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Mayur Vihar 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls Mayur Vihar 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Mayur Vihar 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Callshivangimorya083
 
Delhi Call Girls Saket 9711199171 ☎✔👌✔ Full night Service for more than 1 person
Delhi Call Girls Saket 9711199171 ☎✔👌✔ Full night Service for more than 1 personDelhi Call Girls Saket 9711199171 ☎✔👌✔ Full night Service for more than 1 person
Delhi Call Girls Saket 9711199171 ☎✔👌✔ Full night Service for more than 1 personshivangimorya083
 

Recently uploaded (20)

Sales & Marketing Alignment_ How to Synergize for Success.pptx.pdf
Sales & Marketing Alignment_ How to Synergize for Success.pptx.pdfSales & Marketing Alignment_ How to Synergize for Success.pptx.pdf
Sales & Marketing Alignment_ How to Synergize for Success.pptx.pdf
 
audience feedback draft 3.pptxxxxxxxxxxx
audience feedback draft 3.pptxxxxxxxxxxxaudience feedback draft 3.pptxxxxxxxxxxx
audience feedback draft 3.pptxxxxxxxxxxx
 
John Deere Tractors 6130M 6140M Diagnostic Manual
John Deere Tractors  6130M 6140M Diagnostic ManualJohn Deere Tractors  6130M 6140M Diagnostic Manual
John Deere Tractors 6130M 6140M Diagnostic Manual
 
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
 
Call Girls In Greater Noida 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Greater Noida 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICECall Girls In Greater Noida 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Greater Noida 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
 
John deere 425 445 455 Maitenance Manual
John deere 425 445 455 Maitenance ManualJohn deere 425 445 455 Maitenance Manual
John deere 425 445 455 Maitenance Manual
 
如何办理美国西雅图大学毕业证(Seattle毕业证书)成绩单(学位证)原版一比一
如何办理美国西雅图大学毕业证(Seattle毕业证书)成绩单(学位证)原版一比一如何办理美国西雅图大学毕业证(Seattle毕业证书)成绩单(学位证)原版一比一
如何办理美国西雅图大学毕业证(Seattle毕业证书)成绩单(学位证)原版一比一
 
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls  Size E6 (O525547819) Call Girls In DubaiDubai Call Girls  Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubai
 
꧁ ୨⎯Call Girls In Ashok Vihar, New Delhi **✿❀7042364481❀✿**Escorts ServiCes C...
꧁ ୨⎯Call Girls In Ashok Vihar, New Delhi **✿❀7042364481❀✿**Escorts ServiCes C...꧁ ୨⎯Call Girls In Ashok Vihar, New Delhi **✿❀7042364481❀✿**Escorts ServiCes C...
꧁ ୨⎯Call Girls In Ashok Vihar, New Delhi **✿❀7042364481❀✿**Escorts ServiCes C...
 
Delhi Call Girls Safdarjung 9711199171 ☎✔👌✔Body to body massage with sex
Delhi Call Girls Safdarjung 9711199171 ☎✔👌✔Body to body massage with sexDelhi Call Girls Safdarjung 9711199171 ☎✔👌✔Body to body massage with sex
Delhi Call Girls Safdarjung 9711199171 ☎✔👌✔Body to body massage with sex
 
Vip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile Girls
Vip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile GirlsVip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile Girls
Vip Hot🥵 Call Girls Delhi Delhi {9711199012} Avni Thakur 🧡😘 High Profile Girls
 
Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...
Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...
Hot And Sexy 🥵 Call Girls Delhi Daryaganj {9711199171} Ira Malik High class G...
 
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
Call Girls in Malviya Nagar Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escorts Ser...
 
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
 
83778-77756 ( HER.SELF ) Brings Call Girls In Laxmi Nagar
83778-77756 ( HER.SELF ) Brings Call Girls In Laxmi Nagar83778-77756 ( HER.SELF ) Brings Call Girls In Laxmi Nagar
83778-77756 ( HER.SELF ) Brings Call Girls In Laxmi Nagar
 
Hot Modals Call Girls (Delhi) Dwarka9711199171✔️ High Class Service 100% Saf...
Hot Modals Call Girls (Delhi) Dwarka9711199171✔️ High Class  Service 100% Saf...Hot Modals Call Girls (Delhi) Dwarka9711199171✔️ High Class  Service 100% Saf...
Hot Modals Call Girls (Delhi) Dwarka9711199171✔️ High Class Service 100% Saf...
 
定制多伦多大学毕业证(UofT毕业证)成绩单(学位证)原版一比一
定制多伦多大学毕业证(UofT毕业证)成绩单(学位证)原版一比一定制多伦多大学毕业证(UofT毕业证)成绩单(学位证)原版一比一
定制多伦多大学毕业证(UofT毕业证)成绩单(学位证)原版一比一
 
What Could Cause Your Subaru's Touch Screen To Stop Working
What Could Cause Your Subaru's Touch Screen To Stop WorkingWhat Could Cause Your Subaru's Touch Screen To Stop Working
What Could Cause Your Subaru's Touch Screen To Stop Working
 
Delhi Call Girls Mayur Vihar 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Mayur Vihar 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip CallDelhi Call Girls Mayur Vihar 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
Delhi Call Girls Mayur Vihar 9711199171 ☎✔👌✔ Whatsapp Hard And Sexy Vip Call
 
Delhi Call Girls Saket 9711199171 ☎✔👌✔ Full night Service for more than 1 person
Delhi Call Girls Saket 9711199171 ☎✔👌✔ Full night Service for more than 1 personDelhi Call Girls Saket 9711199171 ☎✔👌✔ Full night Service for more than 1 person
Delhi Call Girls Saket 9711199171 ☎✔👌✔ Full night Service for more than 1 person
 

SCHEDULE OF DIMENSIONS.ppt

  • 2. What is SOD ?  Schedule of dimension is nothing but a schedule, which lays down :-  Limiting values, recommended values, and infringement to limiting values, which can be continued over entire Indian railways system for various track parameters.  Goods wagon and coaching stock parameters.  Horizontal and vertical clearances to be followed on Indian railways.
  • 3. Necessity of S O D  It is absolutely essential to ensure safety of traveling public as well as goods over entire Indian railways system.  To adopt uniform system of track tolerances, location of structures and construction standard all over the Indian railways.  To permit different types of coaching and goods stock owned by different railways to ply on entire railway system with same level of degree of safety.
  • 4. Brief Introduction  1913 - First schedule of maxm & minm dimension.  1922 – SOD with Maxm. Minm & recommended dimension was published.  1929 – Amendment in order to introduce some improvement and additions of clearances required for electric traction.  1936 – Financial stringency on railway therefore amendment to restrict capital expenditure to minimum.
  • 5. Contd. ….  1939 & 1958 reprinted with some modifications.  1973 – Reprinted with conversion to metric system, introduction of dimensions for 25KV AC traction.  1990 – Recommendations of 64th Track Standard Committee for revision of SOD of 1939 reprinted in 1973.  2004 – Revised version published with some modifications.
  • 6. MAIN FEATURES OF SOD-2004  Dimensions are given only for 1676 mm gauge.  Consists of only metric units.  Only two schedules – schedule I & schedule II  Extra clearances required for curves are modified to suit speed of 160 kmph and SE of 165 mm  Additional appendix for extra clearances required for 200 kmph is also given with 185 mm SE
  • 7. SCHEDULE - I  Schedule I of SOD-2004 consists of those items which are mandatory and have to be observed on all 1676 mm gauge Railways in India.  Contains the items of Schedule- I and certain selected items of Schedule- II of 1973 Version
  • 8. Contd. … DIMENSIONS given in Schedule-I are classified under two heads :- ‘Existing works’ – The works which were existing before issue of SOD ( 2004 ). ‘New works’ – Include new constructions, additions of new lines/structure, gauge conversion and doubling
  • 9. Contd. … However following works will not be included in ‘New works’- Shifting of Points & Crossings. Extension of siding. Extension of building, etc.
  • 10. SCHEDULE - II  Schedule – II contains the existing infringements of Schedule – I.  These are items, which were included in Schedule – III of 1973 version.
  • 11. CONTENT OF S.O.D. SCHEDULE I :-i) ESSENTIAL FOR SAFETY ii) PRIOR SANCTION FOR DEVIATION CHAPTER DETAILS I GENERAL Spacing, ,Curves, Br.Bldg Structure, Tunnel, Sig Gear, locking etc. II. STN YARD Pts.& Crossing, P/F, Bldg/St, Tr.Spacing etc.
  • 12. Contd. … III –W/Shop & Sheds Tr,Spacing, O/Head Girder Structure. IV –(A) Rolling stock (C&W) Wheels /Axles, Wheelbase, Buffers / Couplings,Floor height Max.moving dimensions IV-(B)- Rolling Stock (3660 mm) - Max. future moving dimensions.
  • 13. Contd. … IV-©-Rolling Stock (Loco) Wheels & Axles,Buffers/ Couplings,Max. moving Dimensions. V-ELECT.TR.(D.C.) Elect.Equipment Clearances . V-(A)----------(A.C.) -------DO-----------
  • 14. SCHEDULE I CHAPTER I  MIN. DIST. C/C OF TRACK . As per CS No.9 dated.16.10.2012 i) For existing works 4265 mm ii) For new works/additions to existing works 5300 mm Note: OHE mast and Signal post shall not preferably be provided in between tracks. However, under unavoidable circumstances, the clearance shall be increased by equal to width of such structure/foundation.
  • 15. SCHEDULE I CHAPTER I  MIN. DIST. C/C OF TRACK (Tunnel, Semi-through/Through girder bridges) As per CS No.9 dated.16.10.2012 i) For existing works 4495 mm ii) For new works/additions to existing works 4725 mm
  • 16. Contd. …  Minimum Radius of curves -175 m (10 degree) Note: Check rails to be provided in curves having radius 218 meters(8 degree) and sharper. Check rails may also be provided in flatter curves, if high speed is contemplated.
  • 17. Contd. … A) Maximum clear distance bet. two sleepers on bridge:- i) on existing Bridges 510 mm ii) New construction & on existing bridges during regirdering /TSR 450 mm B) Maximum distance between Joint sleepers on Bridges. 200 mm
  • 18. Contd. … Minimum thickness of Bridge timber, exclusive of notching. 150 mm Minimum length of bridge sleeper. 305 mm + dist. from out side to outside of girder flange (subject to min.2440 mm)
  • 19. SCHEDULE I CHAPTER I CONTD…  Minimum clearance of check rail on curve. 44 mm.  Minimum clearance of check rail on level crossing. 51 mm.  Maximum clearance of check rail on level crossing. 57 mm  Minimum depth for wheel flange. 38 mm
  • 20. Schedule I chapter I contd. … BULDING AND STRUCTURE Minimum horizontal distance from center of track to any structure from RL to 305 mm above RL i) For existing works 1675 mm ii) For new works or alterations to existing works 1905 mm
  • 21. Minimum horizontal distance from C/L of track to any structure except a platform. i)For existing works. From 305 mm to 4420 mm above RL. 2135 mm ii) For new works or alterations to new works From 305 mm to1065 mm above R L 1905 mm increasing to 2360 mm From 1065 mm to 3355 mm 2360 mm
  • 22. Contd. … From 3355 to 4420 mm above rail level 2360 mm decreasing to 2135 mm From 4420 to 5870 mm above rail level 2135 mm decreasing to 915 mm
  • 23. Contd. … Below the rail level up to the formation level on the straight track and curve up to 875 m 2575 mm Below the rail level up to the formation level on the curve Radius< 875 m 2725 mm
  • 24. Schedule I Chapter I contd. … Minimum horizontal distance of any telegraph post from C/L of nearest track i) For existing works - Ht of the post + 2135 mm. ii) For new works - Ht of the post + 2360 mm.
  • 25. Height of ROB & FOB (C.S.No.7/13)  Min. ht. above rail level for a dist. Of 1600 mm on either side of the centre of track. Where 25 K.V. A.C. traction is likely to be used.  F.O.B. 6250 mm (5270 mm)*  R.O.B./ Fly over 5870 mm (5070 mm)* * For 4.80 M height of contact wire
  • 26. C.S.No.10 Dated 08.11.12 Note for overhead structure-  For existing overhead structures, wherever feasible, the ht. of contact wire shall be as high as possible to allow passage of ODC of 4.8 m height.  If any T/out or X/over is within 40m or any LC is within 520m, the ht. shall be 6250m  On lines proposed for electrified, provision shall be made in OHE structure to permit an allowance of 275mm for raising of track
  • 27. Contd. …(CS No.13 dt. 21.10.13 ) Minimum height above rail level for telegraph, telephone and other such low tension wires crossing a railway 6100 mm The minimum horizontal distance from centre of nearest track to structure carrying electrical conductors crossing a railway (For existing work) Height of structure + 2.135M ----------do------------(For new work) Height of structure + 6 meters
  • 28. Schedule I chapter I contd. … Safety Refuges :- Max. distance in tunnels 100 m On bridges with a)span less than 100 m 100 m b)spans of 100 m or more - On each pier
  • 29. Provision of Trolley refuse as per CS No 116 of IRPWM Location Distance Maximum distance should not be more than 1Km subject to following Cutting in straight 200M Cutting in curve 100M High Embankment 200M Tunnel 100M Bridges with span less than 100 m 100M Bridges with spans of 100 m or more On each pier On Ballasted deck bridges 50M
  • 30. Interlocking and signal gear Description Dimension Maximum height above rail level of any part of inter locking or signal gear for a width of 1600 mm or 1830 mm in case of tunnels, through and semi- through girders on either side of centre of track 64 mm Note: 1. For a distance of 229 mm outside and 140mm inside the gauge faces of the rail, no gear or track fitting must project above rail level 2. Metal covers with ramps on both sides must be provided over interlocking gear to prevent hanging coupling from damaging the gear.
  • 31. Schedule I chapter I contd. … Formation width :- (Considering formation slope of 1 in 30 and track distance 5300mm and straight track) For single line straight track – Min. width in embankment 6850 mm Min. width in cutting 6250 mm For Double line straight track – Min. width in embankment 12150 mm Min. width in cutting 11550 mm
  • 32. Formation width as per CS No.16 of LWRM and CS No.135 of IRPWM For Single Line Formation Width For Embankment 7850 mm For cutting 7850 mm For Double Line For Embankment 13160 mm For cutting 13160 mm
  • 33. Gauge on straight and curves Alignment Gauge tolerance Straight including curves of 350 M -5 mm to +3 mm (1671 to 1679mm) Curves less than 350 M Up to +10 mm (Up to 1686 mm)
  • 34. Schedule I chapter II (Station yard) Min. dist. Centre to centre of track :- (i) For existing works 4265 mm (ii) For new works / Alt. 5300 mm Max. gradient in Station yard :- (i) For existing works 1 in 400 (ii) For new works / Alt. 1 in 1200 Note: There must be no change of grades within 30 meters of any points & crossings.
  • 35. The power of condonation for gradient steeper than 1 in 1200 in case of new work (As per Corrigendum to C.S. No.12) Gradient Authority Steeper than 1 in 1200 and up to 1 in 400 Personal approval of G. M. through COM of the zonal Railway after making efforts for providing grade as flatter as possible Steeper than 1 in 400 and up to 1 in 260 C.R.S. Steeper than 1in 260 Railway Board through C.C.R.S.
  • 36. Chapter ii contd. … Horizontal dist. From C/L of track to Face of platform coping Max. 1680 mm Min. 1670mm Face of goods platform coping 1680 mm 1670 mm Face of any platform wall 1905 mm 1675 mm New platform wall should be built to maximum dimensions and the coping corbelled out to 1675mm.
  • 37. Platform on curved track  No passenger platform in case of new line, would be constructed on a curve having radius less than 875 M  Extra allowance to be reduced by 51mm for platform, inside of curve.  Extra allowance to be reduced by 25mm for platform, outside of curve.
  • 38. Chapter ii contd. … Height above rail level – For high level passenger platform Max. 840 mm Min. 760 mm For medium level passenger platform 455 mm - For goods platform 1065 mm -
  • 39. Railway Board’s directives for Mumbai suburban section  Vide letter No.2007/CEDO/SD/O dated 19.02.14, Railway Board has conveyed Board’s approval to change the height range of platform in Mumbai suburban section from 760-840mm to 840-920mm.  RDSO has been asked to submit draft correction slip for Board’s approval which is yet to be issued.
  • 40. Chapter II Contd. (Buildings and structures)  Minimum Horizontal distance of any building on a passenger platform from center of track. Height of the structure Distance From P/F level to 305 mm above P/F level 5180mm 5330mm From 305mm above P/F level to 3430mm above RL 5330mm From 3430 to 4115mm above RL for existing work and 5330mm 3810mm From 3430 to 4610mm above RL for new work
  • 41. Contd. ….. (CS No. 11)  Min. horizontal distance of any bldg. or longitudinal boundary fence from centre line of track of passenger platform which is not an island (For New works) Minimum 6830mm Recommended 12130mm Note: Recommended dimension is for setting back the platform to make room for an additional track in future, without infringing minimum distance.
  • 42. Chapter No. 2 contd. ….  Minimum horizontal distance from center line of track to a pillar, column, lamp of similar isolated structure on a passenger platform. Height Distance From platform level to 305mm above platform level 4570mm increasing uniformly to 4720mm From 305mm above platform level to 3705mm above rail level 4720mm
  • 43. CHAPTER II CONTD… POINTS & CROSSINGS :- Clearance of Check rail opposite nose of crossing Max. 48 mm Min. 44 mm ----------------Do------------------ (In case of PRC T/O ) 45 mm 41 mm Wing rail at nose of crossing 48 mm 44 mm ------------------Do--------------- (In case of PRC T/O ) 45 mm 41 mm
  • 44. Chapter ii contd. … Points & Crossings :- Clearance bet. Toe of open switch and stock rail. (i) For Existing work 95 mm (ii) For new work or alteration to existing work 115 mm Minimum Radius of curvature for Slip points, Turn outs, Cross over. 218 m
  • 45. Chapter ii contd. … Points & Crossings :- Minimum angle of crossing. (ordinary) 1 in 16 Crossing as flat as 1 in 20 will usually be sanctioned if recommended by CRS. Minimum length of Tongue Rail. 3660 mm Diamond crossing not to be flatter than 1 in 8 1/2 Diamond crossing as flat as 1 in 10 will usually be sanctioned if recommended by CRS.
  • 46. Length of siding for New work (C.S. No.8) Condition Length of siding Where the ruling gradient is 1in 100 and flatter 750 Meters Steeper than 1 in 100 Length of longest train permitted in the section + 35 M Clear available length denotes : 1. Distance between foot of signal and FM in rear on the same line in case of main line and Directional loop at station yard 2. In case of common loop, distance between two starter signals of opposite direction on the same line.
  • 47. Maximum Moving Dimensions Description 3250mm wide stock 3660mm Wide stock Max. width over all projections, at 305mm above RL, when fully loaded 3135mm 3505mm Max. width over all projections from 305mm to 1082/1145mm above RL when fully loaded 3250mm 3135mm 3660mm 3505mm Max. width with over open doors, including all projections for goods vehicle 4265mm 4725mm Max. height above RL for a width of 760mm on either side of the centre of unloaded vehicle 4265mm 4725mm
  • 48. SCHEDULE I CHAPTER IV (A)  Wheel Gauge 1599mm-1602mm.  Tread Dia of new wheel 914mm-1092mm.  Flange Projection 28.5mm-35.0 mm  Flange Thickness 16 mm- 29.4 mm* * As per CS No.14
  • 49. Contd. …  Tyre width 127mm minimum. Floor height above RL  Passenger 1345mm-1220mm.  Goods 1345mm-1145mm.  Buffer height above RL 1030mm-1105mm  Maxim Wheel Base for 4-Wheeler - 6100mm
  • 50. SCHEDULE I CHAPTERIV(A) CONTD… Min.Wheel base for bogie truck 1830mm. Min. Wheel base for pass. Bogie 2440mm. Min. Dist. Bet bogie centres 2/3 vehicle length Max. Dist bet. Bogie centres: 14.900m.* * CS No.14 Max. Lenth of body or roof: 4-Wheeler (3200mm wide ) Bogie vehicles (3250mm. Wide) 8540mm. 21340mm
  • 51. SCHEDULE V (A) A.C.  MIN. HT. OF UNDERSIDE OF LIVE WIRE: BRIDGES & TUNNELS 4800mm IN OPEN 5500mm SHEDS 5800mm LEVEL CROSSINGS 5500mm  MAX. VARIATION OF LIVE WIRE EITHER SIDE : STRAGIHT 200mm CURVES 300mm  MAX. WITDTH OF PENTOGRAPH 1800mm
  • 52. SCHEDULE-II  Min. dist C/L to C/L of track i)for 3250mm wide stock 3660 mm ii) for 3660mm wide stock 4040 mm  Min. clear dist. From C/L of Track to any fixed structure From RL to 1065 mm above Rail level 1675/1905mm
  • 53. Contd. …  From 1065mm to 3505mm above R/L 1980/2135mm  4265 mm above R/L 2055 mm ( with SR 16 kmph ) 1980 mm  Min. clear height above R/L for a dist. of 305 mm/915 mm on either of centre of track 4420 mm / 5030 mm
  • 54. Over-dimensioned consignment  When a consignment whose length,width and height are such that one or more of them infringe the standard moving dimension at any point during the run from start to destination, then the consignment is called O.D.C.
  • 55. Class ‘A’ O.D.C. (Permitted out of gauge loads) Which exceed the maximum moving dimensions but do not infringe any fixed structure on the route by a net clearance of 150 mm and above and gross clearance 225 mm and above.
  • 56. Contd. … Class ‘B’ O.D.C.(Exceptional out of gauge load) – Net clearance not less than 75 mm but less than 150 mm, gross clearance 150 mm to 225 mm. Class ‘C’ O.D.C.-(Extraordinary out of gauge loads) Net clearance are less than 75 mm and gross clearance less than 150 mm
  • 57. Speed Restrictions for ‘A’ Class O.D.C. Gauge Speed Restriction Escort Sanctionin g authority B.G Sectional speed of four wheeler 30 kmph where gross clearances is less than 380 mm. Movement by day/night Not required COPS
  • 58. Speed Restrictions for ‘B’ Class O.D.C. Gauge Speed Restriction Escort Sanctionin g authority B.G. 40 kmph by day and night During night stop dead and proceed slowly at approach of structure having gross clearance less than 225 mm. SSE (C&W) T.I. CE
  • 59. Speed Restrictions for ‘C’ Class O.D.C. Gauge Speed Restriction Escort Sanctioning authority B.G. 25 kmph Movement by day only SSE/SE (C&W) T.I. SSE/SE (P.Way) TRD staff CRS