Total loss of economic value – Case of DC Mill
Followings are some simplified details obtained from records of a Cleaner
Production assessment conducted at a Desiccated Coconut (DC) mill by National
Cleaner Production Centre, Sri Lanka in year 2004.
Process
Dehusked nuts purchased in the field are transported to the mill. One lorry load
contains 15,000 nuts and the transportation cost is Rs.25/- per km. The nuts are
deshelled and pared by workers in the mill at a rate of Rs.60/- per 100 nuts for
both operations. The kernel (pared coconut) is processed in to Desiccated
Coconut (DC) in its production line at a cost of Rs.2/- per kg of kernel. Finally
the product is packed in to air tight bags for export.
Weight of DC produced by 100 kg of kernel is 10 kg.
Material balance
Following data were obtained in a material balance conducted for a sample of
1000 nuts purchased in the field.
Purchasing cost of nuts in the field – Rs.18/- per kg.
Distance of transportation - 50Km
Weight of 1000 nuts – 650 kg
No.of spoilt nuts found in inspection after unloading – 25 nuts
No.of broken nuts during loading & unloading – 20 nuts
No.of spoilt nuts found in de shelling & paring – 15 nuts
Weight of the shells – 180 kg
Coconut water – 66 litres
Weight of paring – 50 kg
Spillages in the final packing operation-0.5 Kg
Questions
1. Calculate the total loss of economic value of the material (coconut) during
the process.
2. Suggest at least five low cost options to reduce the economical losses
encountered in the entire operation
Purchasing cost of 1000 nuts = 650 x 18/=
= Rs 11700/=
Transportation cost of 1000 nuts = 50 x 25/= x1000/15000
= Rs 83.33
Economic value of 1000 nuts @ the mill = 11700 + 83.33
= Rs 11783.33/=
Loss of economic value of spoilt nuts found in inspection
= 25 x 11783.33/1000
= Rs. 294.58
Loss of economic value of broken nuts
during loading & unloading = 20 x 11783.33/1000
= Rs. 235.67
Economic value of balance 955 nuts
= 11783.33 – (294.58 + 235.67)
= Rs. 11253.08
Value of 955 nuts after deshelling
& pairing = 11253.08 + 955x60/100
= Rs. 11826.08
Loss of economic value due to spoilt nuts
found in de shelling & paring = 15 x 11826.08/955
= Rs. 185.75
Economic value of kernel of
balance 940 nuts = 11826.08 – 185.75
= Rs. 11640.33
Weight of kernel = (940 x 650/1000) – (180 + 66+ 50)
= 315 kg
Processing cost of kernel = 315 x2
= Rs 630.00
Economic value of DC produced = 11640.33 + 630
= Rs. 12270.33
Weight of DC output = 315 x10/100
= 31.5 Kg
Loss of economic value of
spilled out DC = (12270.33/31.5) x 0.5
= Rs. 194.77
Economic value of final output of DC = 12270.33 – 194.77
= Rs. 12075.56
Total loss of economic value
= 294.58 + 235.67 + 185.75 + 194.77
= Rs. 910.77

More Related Content

More from zubeditufail

More from zubeditufail (20)

International Environmental Impact Assessment - Atkins.pdf
International Environmental Impact Assessment - Atkins.pdfInternational Environmental Impact Assessment - Atkins.pdf
International Environmental Impact Assessment - Atkins.pdf
 
The Holy Quran with Easy Word Meaning
The Holy Quran with Easy Word MeaningThe Holy Quran with Easy Word Meaning
The Holy Quran with Easy Word Meaning
 
Use of fungus bricks in construction sector
Use of fungus bricks in construction sectorUse of fungus bricks in construction sector
Use of fungus bricks in construction sector
 
SPMC training iso 45001 awareness
SPMC training iso 45001 awarenessSPMC training iso 45001 awareness
SPMC training iso 45001 awareness
 
SPMC - Pakistan training iso 14001 EMS awareness
SPMC - Pakistan training iso 14001 EMS awarenessSPMC - Pakistan training iso 14001 EMS awareness
SPMC - Pakistan training iso 14001 EMS awareness
 
SPMC - Pakistan training iso 9001 QMS awareness
SPMC - Pakistan training iso 9001 QMS awarenessSPMC - Pakistan training iso 9001 QMS awareness
SPMC - Pakistan training iso 9001 QMS awareness
 
SPMC - Pakistan Training Calendar 2020
SPMC - Pakistan Training Calendar 2020SPMC - Pakistan Training Calendar 2020
SPMC - Pakistan Training Calendar 2020
 
ISO 9001:2015 Life Cycle
ISO 9001:2015 Life Cycle ISO 9001:2015 Life Cycle
ISO 9001:2015 Life Cycle
 
CODEX HACCP Short Introduction
CODEX HACCP Short Introduction CODEX HACCP Short Introduction
CODEX HACCP Short Introduction
 
Pakistan Income Tax Ordinance amendment 2016
Pakistan Income Tax Ordinance amendment 2016Pakistan Income Tax Ordinance amendment 2016
Pakistan Income Tax Ordinance amendment 2016
 
Heat stroke by SPMCpk.com
Heat stroke by SPMCpk.comHeat stroke by SPMCpk.com
Heat stroke by SPMCpk.com
 
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCE
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCEAPPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCE
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCE
 
Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)
Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)
Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)
 
Environmental and Social Management Framework (ESMF) - Karachi Neighborhood I...
Environmental and Social Management Framework (ESMF) - Karachi Neighborhood I...Environmental and Social Management Framework (ESMF) - Karachi Neighborhood I...
Environmental and Social Management Framework (ESMF) - Karachi Neighborhood I...
 
Ohsas 18001 self assessment checklist
Ohsas 18001 self assessment checklistOhsas 18001 self assessment checklist
Ohsas 18001 self assessment checklist
 
Draft2 guiding principles_and_recommendations_for_businesses_in_and_around_kb...
Draft2 guiding principles_and_recommendations_for_businesses_in_and_around_kb...Draft2 guiding principles_and_recommendations_for_businesses_in_and_around_kb...
Draft2 guiding principles_and_recommendations_for_businesses_in_and_around_kb...
 
A global standard_for_the_identification_of_key_biodiversity_areas_final_web
A global standard_for_the_identification_of_key_biodiversity_areas_final_webA global standard_for_the_identification_of_key_biodiversity_areas_final_web
A global standard_for_the_identification_of_key_biodiversity_areas_final_web
 
The Daily Dawn newspaper - millineium development goals report - Pakistan
The Daily Dawn newspaper - millineium development goals report - PakistanThe Daily Dawn newspaper - millineium development goals report - Pakistan
The Daily Dawn newspaper - millineium development goals report - Pakistan
 
shehri Letter to sepa
shehri Letter to sepashehri Letter to sepa
shehri Letter to sepa
 
EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...
EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...
EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...
 

Recently uploaded

LaPlace Transforms 2 with use of Matlab.pptx
LaPlace Transforms 2 with use of Matlab.pptxLaPlace Transforms 2 with use of Matlab.pptx
LaPlace Transforms 2 with use of Matlab.pptx
joshuaclack73
 
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
The Hebrew University of Jerusalem
 

Recently uploaded (20)

VIP ℂall Girls Chennai 8250077686 WhatsApp: Me All Time Serviℂe Available Day...
VIP ℂall Girls Chennai 8250077686 WhatsApp: Me All Time Serviℂe Available Day...VIP ℂall Girls Chennai 8250077686 WhatsApp: Me All Time Serviℂe Available Day...
VIP ℂall Girls Chennai 8250077686 WhatsApp: Me All Time Serviℂe Available Day...
 
Elemental Analysis of Plants using ICP-OES(2023)
Elemental Analysis of Plants using ICP-OES(2023)Elemental Analysis of Plants using ICP-OES(2023)
Elemental Analysis of Plants using ICP-OES(2023)
 
BIG DEVELOPMENT SHAPING' LESOTHO FUTURE.
BIG DEVELOPMENT SHAPING' LESOTHO FUTURE.BIG DEVELOPMENT SHAPING' LESOTHO FUTURE.
BIG DEVELOPMENT SHAPING' LESOTHO FUTURE.
 
Introducing Blue Carbon Deck seeking for actionable partnerships
Introducing Blue Carbon Deck seeking for actionable partnershipsIntroducing Blue Carbon Deck seeking for actionable partnerships
Introducing Blue Carbon Deck seeking for actionable partnerships
 
LaPlace Transforms 2 with use of Matlab.pptx
LaPlace Transforms 2 with use of Matlab.pptxLaPlace Transforms 2 with use of Matlab.pptx
LaPlace Transforms 2 with use of Matlab.pptx
 
Up to 40% of food crops are lost to plant pests and diseases annually.
Up to 40% of food crops are lost to plant pests and diseases annually.Up to 40% of food crops are lost to plant pests and diseases annually.
Up to 40% of food crops are lost to plant pests and diseases annually.
 
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
 
Peat land Restoration Project in HLG Londerang
Peat land Restoration Project in HLG LonderangPeat land Restoration Project in HLG Londerang
Peat land Restoration Project in HLG Londerang
 
Global warming, Types, Causes and Effects.
Global warming, Types, Causes and Effects.Global warming, Types, Causes and Effects.
Global warming, Types, Causes and Effects.
 
TEST BANK For Geosystems An Introduction to Physical Geography, 5th Canadian ...
TEST BANK For Geosystems An Introduction to Physical Geography, 5th Canadian ...TEST BANK For Geosystems An Introduction to Physical Geography, 5th Canadian ...
TEST BANK For Geosystems An Introduction to Physical Geography, 5th Canadian ...
 
A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...
 
slidesgo-maximizing-sustainability-the-case-for-plastic-reuse
slidesgo-maximizing-sustainability-the-case-for-plastic-reuseslidesgo-maximizing-sustainability-the-case-for-plastic-reuse
slidesgo-maximizing-sustainability-the-case-for-plastic-reuse
 
Rising temperatures also mean that more plant pests are appearing earlier and...
Rising temperatures also mean that more plant pests are appearing earlier and...Rising temperatures also mean that more plant pests are appearing earlier and...
Rising temperatures also mean that more plant pests are appearing earlier and...
 
NO1 Pakistan Black magic In Pakistan Kala Ilam Expert Specialist In UK Kala I...
NO1 Pakistan Black magic In Pakistan Kala Ilam Expert Specialist In UK Kala I...NO1 Pakistan Black magic In Pakistan Kala Ilam Expert Specialist In UK Kala I...
NO1 Pakistan Black magic In Pakistan Kala Ilam Expert Specialist In UK Kala I...
 
A Wide Range of Eco System Services with Mangroves
A Wide Range of Eco System Services with MangrovesA Wide Range of Eco System Services with Mangroves
A Wide Range of Eco System Services with Mangroves
 
Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...
Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...
Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...
 
Impacts of agriculture on the environment.
Impacts of agriculture on the environment.Impacts of agriculture on the environment.
Impacts of agriculture on the environment.
 
Coastal and mangrove vulnerability assessment In the Northern Coast of Java, ...
Coastal and mangrove vulnerability assessment In the Northern Coast of Java, ...Coastal and mangrove vulnerability assessment In the Northern Coast of Java, ...
Coastal and mangrove vulnerability assessment In the Northern Coast of Java, ...
 
2024-05-16 Composting at Home 101 without link to voucher
2024-05-16 Composting at Home 101 without link to voucher2024-05-16 Composting at Home 101 without link to voucher
2024-05-16 Composting at Home 101 without link to voucher
 
NO1 Best Amil Baba In Pakistan Authentic Amil In pakistan Best Amil In Pakist...
NO1 Best Amil Baba In Pakistan Authentic Amil In pakistan Best Amil In Pakist...NO1 Best Amil Baba In Pakistan Authentic Amil In pakistan Best Amil In Pakist...
NO1 Best Amil Baba In Pakistan Authentic Amil In pakistan Best Amil In Pakist...
 

Cpgp day02 7- total loss of economic value

  • 1. National Cleaner Production Centre, Sri Lanka Total loss of economic value – Case of DC Mill Followings are some simplified details obtained from records of a Cleaner Production assessment conducted at a Desiccated Coconut (DC) mill by National Cleaner Production Centre, Sri Lanka in year 2004. Process Dehusked nuts purchased in the field are transported to the mill. One lorry load contains 15,000 nuts and the transportation cost is Rs.25/- per km. The nuts are deshelled and pared by workers in the mill at a rate of Rs.60/- per 100 nuts for both operations. The kernel (pared coconut) is processed in to Desiccated Coconut (DC) in its production line at a cost of Rs.2/- per kg of kernel. Finally the product is packed in to air tight bags for export. Weight of DC produced by 100 kg of kernel is 10 kg. Material balance Following data were obtained in a material balance conducted for a sample of 1000 nuts purchased in the field. Purchasing cost of nuts in the field – Rs.18/- per kg. Distance of transportation - 50Km Weight of 1000 nuts – 650 kg No.of spoilt nuts found in inspection after unloading – 25 nuts No.of broken nuts during loading & unloading – 20 nuts No.of spoilt nuts found in de shelling & paring – 15 nuts Weight of the shells – 180 kg Coconut water – 66 litres Weight of paring – 50 kg Spillages in the final packing operation-0.5 Kg Questions 1. Calculate the total loss of economic value of the material (coconut) during the process. 2. Suggest at least five low cost options to reduce the economical losses encountered in the entire operation
  • 2. Purchasing cost of 1000 nuts = 650 x 18/= = Rs 11700/= Transportation cost of 1000 nuts = 50 x 25/= x1000/15000 = Rs 83.33 Economic value of 1000 nuts @ the mill = 11700 + 83.33 = Rs 11783.33/= Loss of economic value of spoilt nuts found in inspection = 25 x 11783.33/1000 = Rs. 294.58 Loss of economic value of broken nuts during loading & unloading = 20 x 11783.33/1000 = Rs. 235.67 Economic value of balance 955 nuts = 11783.33 – (294.58 + 235.67) = Rs. 11253.08 Value of 955 nuts after deshelling & pairing = 11253.08 + 955x60/100 = Rs. 11826.08 Loss of economic value due to spoilt nuts found in de shelling & paring = 15 x 11826.08/955 = Rs. 185.75 Economic value of kernel of balance 940 nuts = 11826.08 – 185.75 = Rs. 11640.33 Weight of kernel = (940 x 650/1000) – (180 + 66+ 50) = 315 kg
  • 3. Processing cost of kernel = 315 x2 = Rs 630.00 Economic value of DC produced = 11640.33 + 630 = Rs. 12270.33 Weight of DC output = 315 x10/100 = 31.5 Kg Loss of economic value of spilled out DC = (12270.33/31.5) x 0.5 = Rs. 194.77 Economic value of final output of DC = 12270.33 – 194.77 = Rs. 12075.56 Total loss of economic value = 294.58 + 235.67 + 185.75 + 194.77 = Rs. 910.77