26/10/12   Firstly, I started the 1 I feel that I progressed through these without difficulty and I feel
           that I gained enough knowledge of buttons and flash for the future tasks.
           I started on task 2 by creating a project schedule; I had a little bit of difficulty with this
           being the first project schedule I have created. This task took a while to create. I then
           started on my product log which I updated throughout the Assignment.

           I Then started my mood board, I found this as an easy task to do and felt it went quite
           well, the mood board contained images of 2D & 3D characters to give me ideas for my
           character. I feel that that the task was completed on time.
31/26/12   I Created my task by compiling my 10 favourite 2D Characters into a document each
           with a small paragraph explaining who they are & What they do as well as why they are
           my in my top 10 favourite. This task was Simple and was created very quickly and easily.
           This task was not completed on time as it was set for non-school periods and I created it
           in class time.
           After this was completed I started to generate ideas for my character by using my mood
           board and task 3 for reference.
2/11/12    I Continued generating ideas for my Character.
5/11/12    I started Task 4 with creating a storyboard with my planned Idea and produced it on the
           template which I was given. I found this task very simple and quick to complete. I
           completed this task within my allocated time.
7/11/12    I Produced my Product Charter I found this slightly difficult with wording but after a
           short amount of thought I produced it fairly quickly.
           I then Updated my Schedule with my completed work.

14/11/20   I started on Task 5 where I created a presentation/Profile of my character including
12         Biography, Personality, Powers and Backround.
           I then started starting to create my character in illustrator for task 6. Ifound a reference
           image which I thenvector drew around an image with the pen tool.
16/11/12   I Created a Presentation of my character including name, backstory, physical description
           and the game genre with the template given, I felt that I did very well with the this task
           I was then Recorded given my presentation to the class, I felt that the Presentation
           Went well, I spoke Confidently and too the class. I also feel that I stuttered my words a
           few times.
           I also updated my Project schedule accordingly.
21/11/12   I continued on with task 5, creating the character, I added colour via the eye-dropper
           tool using the reference image.
           I Updated the Project Schedule.
           I started to create the backround for my Character using a reference image taken from
           the internet and then I Vector drew around it with the pen tool.
23/11/12   I Finished the backround and My character, I now started on Task 6, I started with the
           Animation Plan. I felt that I didn’t need the animation plan, but I created one anyway.
           I completed the Plan quickly and started on the animation work.
23/11/12   I Continued on with the animations, I now started putting the artwork onto the scenes
           and creating a logo for the Title Scene. I created the logo from a reference Image.
           When adding the Artwork to flash I realised that it would not animate as a group so I
           had to take it back into illustrator and break it up for me to animate it in flash.
28/11/12   I added the broken up parts of the vector images into flash scenes appropriately. I then
           animated it. I Found creating and setting up the scenes easy.
30/11/12   I updated my project Schedule accordingly.
           I took my Character back into illustrator and tweaked it’s colours design because I felt it
           needed a more realistic feel to it.
5/12/12    I tweeked my animation because some of the scenes were out of place.
7/12/12    I updated my project schedule accordiangly.
           I tweeked my flash project more because I felt it was needed.
13/12/12   I went over all the tasks and tweeked & Fixed anything that was needed. No tasks
           needed anymore tweeking so I got everything ready to upload them on the deadline.
14/12/12   The Deadline is today, I uploaded my Tasks to slideshare and then embedded them to
           slideshare.

More Related Content

What's hot

Production Process of Front Cover
Production Process of Front CoverProduction Process of Front Cover
Production Process of Front Coverchantaldavies
 
Production log 140512
Production log 140512Production log 140512
Production log 140512SamHill129
 
Production log
Production logProduction log
Production logeduriez
 
Production log 210512
Production log 210512Production log 210512
Production log 210512SamHill129
 
Production log 150512
Production log 150512Production log 150512
Production log 150512SamHill129
 
Calendar evaluation
Calendar evaluationCalendar evaluation
Calendar evaluationThatMediaGuy
 
Production log 080512
Production log 080512Production log 080512
Production log 080512SamHill129
 
13 a jacobvreekenc
13 a jacobvreekenc13 a jacobvreekenc
13 a jacobvreekencJavreeken
 
As production schedule hannah chyriwsky - daily schedule
As production schedule   hannah chyriwsky - daily scheduleAs production schedule   hannah chyriwsky - daily schedule
As production schedule hannah chyriwsky - daily scheduleHannah Chyriwsky
 
Creating My Contents Page
Creating My Contents PageCreating My Contents Page
Creating My Contents PageTerri1611
 
Evaluation of my recreation
Evaluation of my recreationEvaluation of my recreation
Evaluation of my recreationmw4684
 
Comm tech powerpoint
Comm tech powerpointComm tech powerpoint
Comm tech powerpointjburke1084
 
7. evaluation(1)
7. evaluation(1)7. evaluation(1)
7. evaluation(1)Jack-Lowes
 

What's hot (19)

Production Process of Front Cover
Production Process of Front CoverProduction Process of Front Cover
Production Process of Front Cover
 
Portfolio
PortfolioPortfolio
Portfolio
 
Production log 140512
Production log 140512Production log 140512
Production log 140512
 
Portfolio
PortfolioPortfolio
Portfolio
 
Production log
Production logProduction log
Production log
 
Production log 210512
Production log 210512Production log 210512
Production log 210512
 
Production log 150512
Production log 150512Production log 150512
Production log 150512
 
Calendar evaluation
Calendar evaluationCalendar evaluation
Calendar evaluation
 
Production log 080512
Production log 080512Production log 080512
Production log 080512
 
13 a jacobvreekenc
13 a jacobvreekenc13 a jacobvreekenc
13 a jacobvreekenc
 
As production schedule hannah chyriwsky - daily schedule
As production schedule   hannah chyriwsky - daily scheduleAs production schedule   hannah chyriwsky - daily schedule
As production schedule hannah chyriwsky - daily schedule
 
Photoshop
Photoshop Photoshop
Photoshop
 
Production log
Production logProduction log
Production log
 
Creating My Contents Page
Creating My Contents PageCreating My Contents Page
Creating My Contents Page
 
Evaluation of my recreation
Evaluation of my recreationEvaluation of my recreation
Evaluation of my recreation
 
Magazine development
Magazine developmentMagazine development
Magazine development
 
Comm tech powerpoint
Comm tech powerpointComm tech powerpoint
Comm tech powerpoint
 
Q7
Q7Q7
Q7
 
7. evaluation(1)
7. evaluation(1)7. evaluation(1)
7. evaluation(1)
 

Similar to Production log

Ha2 productionlogdiary
Ha2 productionlogdiaryHa2 productionlogdiary
Ha2 productionlogdiaryChloeKyri
 
Ha2 production log
Ha2 production logHa2 production log
Ha2 production logsoulsama
 
Production log
Production logProduction log
Production logeduriez
 
Unit78 production log_191113
Unit78 production log_191113Unit78 production log_191113
Unit78 production log_191113Deightonater
 
Production log
Production logProduction log
Production logeduriez
 
Production log
Production logProduction log
Production logeduriez
 
Evaluation
EvaluationEvaluation
EvaluationxChiip
 
Ha2 production log_template_141014
Ha2 production log_template_141014Ha2 production log_template_141014
Ha2 production log_template_141014crisgalliano
 

Similar to Production log (20)

Production log
Production logProduction log
Production log
 
Ha2 productionlogdiary
Ha2 productionlogdiaryHa2 productionlogdiary
Ha2 productionlogdiary
 
Ha2 production log
Ha2 production logHa2 production log
Ha2 production log
 
Production log
Production logProduction log
Production log
 
13A celenarousculp
13A celenarousculp13A celenarousculp
13A celenarousculp
 
Unit78 production log_191113
Unit78 production log_191113Unit78 production log_191113
Unit78 production log_191113
 
Fmp production log_050514
Fmp production log_050514Fmp production log_050514
Fmp production log_050514
 
Production log
Production logProduction log
Production log
 
Production log
Production logProduction log
Production log
 
Fmp production log_280414
Fmp production log_280414Fmp production log_280414
Fmp production log_280414
 
A2 Production log
A2 Production logA2 Production log
A2 Production log
 
13AJennaJesperson
13AJennaJesperson13AJennaJesperson
13AJennaJesperson
 
Production diary
Production diaryProduction diary
Production diary
 
Unit 67 Production Log
Unit 67 Production LogUnit 67 Production Log
Unit 67 Production Log
 
Production t5
Production t5Production t5
Production t5
 
13A Michael Mann
13A Michael Mann13A Michael Mann
13A Michael Mann
 
Evaluation
EvaluationEvaluation
Evaluation
 
Production reflection
Production reflectionProduction reflection
Production reflection
 
Task 8 evaluating your own work
Task 8 evaluating your own workTask 8 evaluating your own work
Task 8 evaluating your own work
 
Ha2 production log_template_141014
Ha2 production log_template_141014Ha2 production log_template_141014
Ha2 production log_template_141014
 

More from xChiip

Schedule 5
Schedule 5Schedule 5
Schedule 5xChiip
 
Schedule 4
Schedule 4Schedule 4
Schedule 4xChiip
 
Schedule 3
Schedule 3Schedule 3
Schedule 3xChiip
 
Schedule 2
Schedule 2Schedule 2
Schedule 2xChiip
 
Schedule 1
Schedule 1Schedule 1
Schedule 1xChiip
 
Product log asif
Product log asifProduct log asif
Product log asifxChiip
 
Dev plan
Dev planDev plan
Dev planxChiip
 
Stufffs
StufffsStufffs
StufffsxChiip
 
Flythrough
FlythroughFlythrough
FlythroughxChiip
 
Evaluation
EvaluationEvaluation
EvaluationxChiip
 
3d model
3d model3d model
3d modelxChiip
 
Techincal glossery
Techincal glosseryTechincal glossery
Techincal glosseryxChiip
 
Graphic styles
Graphic stylesGraphic styles
Graphic stylesxChiip
 
Artistic styles
Artistic stylesArtistic styles
Artistic stylesxChiip
 
Artistic styles
Artistic stylesArtistic styles
Artistic stylesxChiip
 
Graphic styles
Graphic stylesGraphic styles
Graphic stylesxChiip
 
Schedule 7.03.13
Schedule 7.03.13Schedule 7.03.13
Schedule 7.03.13xChiip
 
Schedule 10.03.13
Schedule 10.03.13Schedule 10.03.13
Schedule 10.03.13xChiip
 
Schedule 21.03.13
Schedule 21.03.13Schedule 21.03.13
Schedule 21.03.13xChiip
 
Schedule 20.03.13
Schedule 20.03.13Schedule 20.03.13
Schedule 20.03.13xChiip
 

More from xChiip (20)

Schedule 5
Schedule 5Schedule 5
Schedule 5
 
Schedule 4
Schedule 4Schedule 4
Schedule 4
 
Schedule 3
Schedule 3Schedule 3
Schedule 3
 
Schedule 2
Schedule 2Schedule 2
Schedule 2
 
Schedule 1
Schedule 1Schedule 1
Schedule 1
 
Product log asif
Product log asifProduct log asif
Product log asif
 
Dev plan
Dev planDev plan
Dev plan
 
Stufffs
StufffsStufffs
Stufffs
 
Flythrough
FlythroughFlythrough
Flythrough
 
Evaluation
EvaluationEvaluation
Evaluation
 
3d model
3d model3d model
3d model
 
Techincal glossery
Techincal glosseryTechincal glossery
Techincal glossery
 
Graphic styles
Graphic stylesGraphic styles
Graphic styles
 
Artistic styles
Artistic stylesArtistic styles
Artistic styles
 
Artistic styles
Artistic stylesArtistic styles
Artistic styles
 
Graphic styles
Graphic stylesGraphic styles
Graphic styles
 
Schedule 7.03.13
Schedule 7.03.13Schedule 7.03.13
Schedule 7.03.13
 
Schedule 10.03.13
Schedule 10.03.13Schedule 10.03.13
Schedule 10.03.13
 
Schedule 21.03.13
Schedule 21.03.13Schedule 21.03.13
Schedule 21.03.13
 
Schedule 20.03.13
Schedule 20.03.13Schedule 20.03.13
Schedule 20.03.13
 

Production log

  • 1. Date Comment 26/10/12 Firstly, I started the 1 I feel that I progressed through these without difficulty and I feel that I gained enough knowledge of buttons and flash for the future tasks. I started on task 2 by creating a project schedule; I had a little bit of difficulty with this being the first project schedule I have created. This task took a while to create. I then started on my product log which I updated throughout the Assignment. I Then started my mood board, I found this as an easy task to do and felt it went quite well, the mood board contained images of 2D & 3D characters to give me ideas for my character. I feel that that the task was completed on time. 31/26/12 I Created my task by compiling my 10 favourite 2D Characters into a document each with a small paragraph explaining who they are & What they do as well as why they are my in my top 10 favourite. This task was Simple and was created very quickly and easily. This task was not completed on time as it was set for non-school periods and I created it in class time. After this was completed I started to generate ideas for my character by using my mood board and task 3 for reference. 2/11/12 I Continued generating ideas for my Character. 5/11/12 I started Task 4 with creating a storyboard with my planned Idea and produced it on the template which I was given. I found this task very simple and quick to complete. I completed this task within my allocated time. 7/11/12 I Produced my Product Charter I found this slightly difficult with wording but after a short amount of thought I produced it fairly quickly. I then Updated my Schedule with my completed work. 14/11/20 I started on Task 5 where I created a presentation/Profile of my character including 12 Biography, Personality, Powers and Backround. I then started starting to create my character in illustrator for task 6. Ifound a reference image which I thenvector drew around an image with the pen tool.
  • 2. 16/11/12 I Created a Presentation of my character including name, backstory, physical description and the game genre with the template given, I felt that I did very well with the this task I was then Recorded given my presentation to the class, I felt that the Presentation Went well, I spoke Confidently and too the class. I also feel that I stuttered my words a few times. I also updated my Project schedule accordingly. 21/11/12 I continued on with task 5, creating the character, I added colour via the eye-dropper tool using the reference image. I Updated the Project Schedule. I started to create the backround for my Character using a reference image taken from the internet and then I Vector drew around it with the pen tool.
  • 3. 23/11/12 I Finished the backround and My character, I now started on Task 6, I started with the Animation Plan. I felt that I didn’t need the animation plan, but I created one anyway. I completed the Plan quickly and started on the animation work.
  • 4. 23/11/12 I Continued on with the animations, I now started putting the artwork onto the scenes and creating a logo for the Title Scene. I created the logo from a reference Image. When adding the Artwork to flash I realised that it would not animate as a group so I had to take it back into illustrator and break it up for me to animate it in flash.
  • 5. 28/11/12 I added the broken up parts of the vector images into flash scenes appropriately. I then animated it. I Found creating and setting up the scenes easy.
  • 6. 30/11/12 I updated my project Schedule accordingly. I took my Character back into illustrator and tweaked it’s colours design because I felt it needed a more realistic feel to it. 5/12/12 I tweeked my animation because some of the scenes were out of place. 7/12/12 I updated my project schedule accordiangly. I tweeked my flash project more because I felt it was needed. 13/12/12 I went over all the tasks and tweeked & Fixed anything that was needed. No tasks needed anymore tweeking so I got everything ready to upload them on the deadline. 14/12/12 The Deadline is today, I uploaded my Tasks to slideshare and then embedded them to slideshare.