SlideShare a Scribd company logo
1 of 14
CPCCBC5018A Apply Structural Principles To The Construction Of Medium
Rise Buildings
Answer:
Part One
1) What is the difference between dead loads and live loads? Give at least five (5) examples
of each.
Dead Load: The dead load includes loads that are relatively constant over time, including
the weight of the structure itself, and immovable fixtures such as walls, plasterboard or
carpet. The roof is also a dead load. Dead loads are also known as permanent or static loads.
E.g.: wall loads, Roof loads, Window loads, floor load, and tiles load.
Live Load: Live loads are the weights of people, furniture, supplies, machines, stores, and so
on, borne by the building during its use and occupancy. The loads of small or movable
pieces of equipment are considered as live loads, but equipment that belongs to the building
and is fixed and heavy is regarded as dead load. E.g.: furniture, air conditioner, movement of
people, people, supplies, machines and etc.
The major difference between live loads and dead loads is: Dead loads can be calculated
accurately as they are constant but the live loads cannot be calculated exactly.
2) Calculate the dead load exerted by a 13mm Gypsum plaster board sheets that are fixed to
a wall which is 5m wide and 3m in height.
Show your working.
Total sqm = (5 x 3) =15sqm
Weight / unit area N/m2 = 15 x 220 = 3300 N/M2
= 3.3 KN
3) Calculate the expected live load on a column which supports 15sqm of floor in a retail
shop.
Show your working.
Live load for Retail shop = 5.0 Kn/m2
Expected live load on a column of 15sqm = 15 x 5.0 = 75Kn/M2
4) Give three (3) examples during mixing and pouring of concrete which can decrease the
strength properties of concrete.
Cement and water ratio can decrease the strength of concrete
Compaction of concrete
Temperature and weather when concreate is poured.
5) It is proposed that a medium masonry residential building of 15m in height will be
demolished on a small site. The building is suspected of containing asbestos and lead paint.
Consider each point below and explain the main requirements and considerations to be
followed for each area:
Who you will engage to undertake the work and why? Consider nsw licensing requirements.
What should be the sequencing of works?
How will the presence of hazardous materials be addressed?
What is the requirement for hoardings?
What services are required on site?
What other aspects relevant to the demolition work must be complied with before
proceeding with the work?
Prepare Your Response In A Word Document
Demolition will be done by engaging Licensed demolisher. And require license person who
can handle asbestos. Qualified person who can handle lead paint.
Sequence of work:
Obtain Construction certificate for Demolition
· Get the building vacated
· Disconnect Power & Gas
· Site Establishment by putting temporary fence, Shade cloth over fence,
Sediment fence
· Remove any existing lead and asbestos.
· Get demolition started as per approved conditions.
Hazardous Material will be isolated and separated during demolition work. Asbestos will be
packed in bags and disposed at asbestos centres
Put up the board showing the work timings, Safety instruction board outside fence, SWMS
to be maintained onsite.
Water, temporary toilet facility and power is the most important service to be required
onsite during demolition.
Before proceeding to demolition services like gas and electricity should be disconnected.
Construction certificate for demolition should be obtained. If any trees need to be protected
than they should be covered or make safe by temporary fence.
Demolition plan
6) Pick a retaining wall system from the list below and identify, via a diagram, all the forces
exerted on the wall and the resisting forces of the wall.
Gravity Retaining Wall
Cantilever Retaining Wall
Piling Retaining Wall
Anchored Wall
Draw the wall on a blank piece of paper, identify all of the forces exerted on the wall and
upload a scanned copy of your drawing below.
7) In accordance with Australian Standards, provide a methodology for a concrete slump
test.
What constitutes a pass or a fail and what rectification steps must be taken in the event of a
test fail?
Give a brief of slump test
8) Explain how excessive water in a concrete mix can compromise the structural integrity of
concrete.
In your response, provide two (2) examples of how the risks of excess water in concrete can
be avoided on site.
Monitor the pour & don’t allow concrete truck or pump guy to put water
9) Explain why it is important that concrete cures correctly.
How can you ensure a concrete slab is allowed to cure appropriately?
In your response, refer to relevant standards.
It will get right strength quicker, avoid shrinkage cracks.
10) What is “consolidation” in a concrete pour?
Explain its importance and methods for how the concrete should be consolidated.
It doesn’t allow segregation of material and mixes thoroughly and avoids air pockets
11) Explain the purpose and required positioning of joints in masonry construction.
Allows for movement, avoids cracking, expansion and contractions. Change of material, long
distance
12) How should a tilt up concrete panel be supported immediately after it is erected?
Diagonally bracing it at 45deg. At minimum two bracing per panel and can’t be out 90deg
Part Two
1)
The factors to consider when planning the forming and storing of concrete tilt up panels are
location, site limitations, schedule, budget, structure, building size, and construction
sequencing.
2)
Structural Integrity of Footings
Action I Take
NCC/BCA Code
Accepted Principles
Construction
Slab and footing construction
AS 2870
Concrete slabs
Retaining walls
Positioning of steel reinforcement
Footing widths and depths
Stiffening beams
3
Damp Coursing and Termite Barriers
Action I Take
NCC/BCA Code
Accepted Principles
Construction
Concrete slabbing and damp proofing
AS/NZS 2904: 1995
AS 3660.1: 2014
Concrete slabs
Damp proof course
Construction of concrete slabs to prevent termites and dap proof courses to prevent
damping
4)
Structural Integrity of Slabs, Bearers and Joists
Action I Take
NCC/BCA Code
Accepted Principles
Construction
Concrete
AS 1684
Shear wall
Wind bracing
Columns
Beams
Concrete slabs
Construction of beams, columns, wind bracing, shear wall and slabs to bear weight of dead
and live loads
5)
Structural Integrity of Floor Systems
Action I Take
NCC/BCA Code
Accepted Principles
Construction
Concrete and damping compound
AS 2870
Retaining walls
Concrete slabs
Damp proofing
Construction of retaining walls to prevent lateral pressure from soil and, damp proofing to
prevent damping.
6)
Structural Materials
Term
Definition
Accommodating Behaviours
Stress
Refers to force per unit area within a material that comes from external forces
Use of composites with good tensile and compressional strengths
Strain
Refers to the ratio of elongation to the original length as a result of an external force
Introduction of movement joints at the design stage.
Elasticity
The property of material to return to its original shape and size when strain/force is
removed.
Use of materials with big elastic limits
7)
Prestressing refers to the process of compressing concrete prior to application of external
load.
8)
The procedure for ensuring the quality of structural frames is as follows:
Check for the fabricator’s qualification and experience
Check the material being used
The equipment used in the fabrication process must meet the required standards
Finally, take the measurements of the steel parts to see if they meet the measurements in
the design
9)
The following procedure helps in ensuring quality of roof trusses
Check the truss layout plan
Cross-check the manufacturer’s specifications for lateral stability, tie-downs, and bracings
Check the roof truss certification
Assess whether the supporting structure is adequate
Check if the overall length and width of wall as well as dimension of wall fit the roof truss
Check for the availability of girder trusses support
Check for spacings and plumb
Check for all fixings and tie-downs
Check for location of specialized trusses
Ensure trusses have not been modified or adjusted on-site
Check for eave overhangs
Check for trimming to manhole
10)
Structural Integrity of Cladding
Action I Take
NCC/BCA Code
Accepted Principles
Construction
Cladding
BCGBC4010A
Structural bracing
External walls are clad so that the cladding material acting in tension connects the bottom
and top plates to provide tie-down.
11)
Standard Controls
Hazards
Standard Control Measures
Work at Heights
All activities involving heights of 2 m and higher must be performed using fall protection
equipment in accordance with workplace safety standards Act 2005.
Working with Asbestos
All activities related to asbestos exposure must be conducted in strict compliance with the
code of practice for safe removal of asbestos [NOHSC:2005] and WHS regulation 419
Working with scaffolding
All activities involving use of scaffolding must be conducted with aid of fall protection
equipment in accordance with work safety standards Act 2005
Workplace Project
1)
The site is in the shape of a rectangle measuring 135 m * 40 m. It is enclosed by roads on the
south-west and northwest sides. On the remaining sides are multistorey residential
apartments. Currently, the site has four 3-stoeyr unoccupied residential buildings. In front
of the buildings is a large open parking lot.
According to Sydney 1:100000 Geological Series Sheet, the soil underlying the site is the
dark grey Ashfield Shale. However, the site is nearby a geological boundary with
Hawkesbury Sandstone, comprising a medium grained quartz with minor layers of laminite
and shale.
The excavations will be supported due to the low strength of the sandstone until
construction of permanent basement walls is complete. Shoring support will be used from
the surface of ground to the consistent high strength rock. However, in some locations like
the south western side of the site where the high strength rock is shallow, temporary
batters OF 1.5H: 1V may be adopted instead of shoring.
In addition, soldier piles with in-fills of reinforced shotcrete panels would be used at 2 m
centres and be socketed into the sandstone.
2)
A damp proof course is a system that helps prevent a building from dampness and its
related effects. A damp proof course is laid on top of the ground adjoining the building’s
plinth level in the wall’s entire width. The thickness of the medium rose building visited was
20 mm.
Prior to installing a damp proof course, the brick work must reach the plinth level. The
damp proof is prepared by mixing a damp proofing compound with sand and cement (2:1)
with sufficient amount of water. Once the mixture is ready, it is laid in the full breadth of the
brick underneath it. The thickness of the damp proof layer was kept at 2.5 cm, which is the
recommended thickness. After installation, the course is cured for 7 days, dried, and then
coated with a layer of coal tar.
The damp proof course for the medium rise building showed robustness since there were
no potential weak spots where penetration could occur later. This robustness was
attributed to the strict adherence of Australian standards for laying of a damp proof course.
3)
The type of services assessed in the medium rise building under review include energy
distribution system, lighting, control systems of the building, alarm and security systems,
ICT networks, energy supply, plumbing, drainage and water systems, and fire safety system.
Building services perform an integral role in a building’s design, not only in terms of
strategies to be achieved, but also in standards to be met. Thus, the design of the building
services will be integrated into the building’s overall design at an early stage.
To protect the building’s services from clashing with other components of the building, such
software and techniques as 3D CAD and BIM will be used. These clashes if not prevented
can lead to variations and delays on site. In addition, these building services will be
necessary for fulfilment of various Australian Standards and building codes such as AS 2436
for noise control.
Construction Portfolio Of Evidence
The building is a two-storey class 2 building that would be erected in accordance with all
the relevant Australian Standards and Building Codes.
In addition a cantilever retaining wall will be built to hold back soil. The wall will rest on the
foundation slab. The foundation slab being loaded by backfill, it will stabilize the wall and
prevent it from sliding and overturning.
1 Demolition Portfolio Of Evidence
a)
Prior to commencement of demolition works, legislative requirements must be fulfilled.
First, the AS 2601 demolition of structures act must be complied with. Secondly, the
building regulations applicable to the Australian Codes of practice and Standards must be
met. These regulations include OH&S code of demolition practice, OH&S code of
construction and building workplaces practice, OH&S Asbestos regulations, and AS 2436 for
noise control guide.
b)
The three provisions for safety are:
OH&S Asbestos regulations
AS 2436 for noise control guide
OH&S Asbestos regulations
c)
The structural design and structural principles of buildings are integral factors to consider
during demolition. For instance, removal of prestressed concrete can be done manually or
by mechanical demolition. Similarly, non-load bearing walls can be removed manually or by
mechanical means. Also, adjoining walls are only demolished by hand and not by any other
means to protect the immediate environment and the adjoining buildings.
d)
The building being under demolition was a low-rise building of 30 metres in height.

More Related Content

Similar to CPCCBC5018A Apply Structural Principles To The Construction Of Medium Rise.docx

SEISMIC DESIGN STEPS.ppt
SEISMIC DESIGN STEPS.pptSEISMIC DESIGN STEPS.ppt
SEISMIC DESIGN STEPS.pptAteeqRahman26
 
the kajima cut and take down method
the kajima cut and take down methodthe kajima cut and take down method
the kajima cut and take down methodDarshan Parakhiya
 
Re development works at east kidwai nagar, New Delhi
Re development works at east kidwai nagar, New DelhiRe development works at east kidwai nagar, New Delhi
Re development works at east kidwai nagar, New DelhiJaspreet singh
 
Aerocon Panels: An Alternative Building Walling Solution for the Modern Age
Aerocon Panels: An Alternative Building Walling Solution for the Modern AgeAerocon Panels: An Alternative Building Walling Solution for the Modern Age
Aerocon Panels: An Alternative Building Walling Solution for the Modern AgeIRJET Journal
 
Reinforced concrete masonry cantilever reaining walls
Reinforced concrete masonry cantilever reaining wallsReinforced concrete masonry cantilever reaining walls
Reinforced concrete masonry cantilever reaining wallsTimóteo Rocha
 
“COMPARATIVE STUDY ANALYSIS OF MULTI STOREYED RC FRAMED BUILDINGS WITH AAC BL...
“COMPARATIVE STUDY ANALYSIS OF MULTI STOREYED RC FRAMED BUILDINGS WITH AAC BL...“COMPARATIVE STUDY ANALYSIS OF MULTI STOREYED RC FRAMED BUILDINGS WITH AAC BL...
“COMPARATIVE STUDY ANALYSIS OF MULTI STOREYED RC FRAMED BUILDINGS WITH AAC BL...IRJET Journal
 
Seismic analysis of base isolated building in rc framed structures 1868
Seismic analysis of base isolated building in rc framed structures 1868Seismic analysis of base isolated building in rc framed structures 1868
Seismic analysis of base isolated building in rc framed structures 1868Anusha Reddy
 
national building code
national building codenational building code
national building codeRuhiya Garg
 
Building construction mini project
Building construction mini projectBuilding construction mini project
Building construction mini projectZarnoshKtk
 
Task 1 Structural Design Principles Question For.pdf
Task 1 Structural Design Principles Question For.pdfTask 1 Structural Design Principles Question For.pdf
Task 1 Structural Design Principles Question For.pdfsdfghj21
 
Condition Assessment and Evaluation of Concrete Structures by Advanced Non-de...
Condition Assessment and Evaluation of Concrete Structures by Advanced Non-de...Condition Assessment and Evaluation of Concrete Structures by Advanced Non-de...
Condition Assessment and Evaluation of Concrete Structures by Advanced Non-de...IRJET Journal
 
Glen-Gery’s Brickwork Techniques Seminar Series : The Basics of Brickwork Det...
Glen-Gery’s Brickwork Techniques Seminar Series : The Basics of Brickwork Det...Glen-Gery’s Brickwork Techniques Seminar Series : The Basics of Brickwork Det...
Glen-Gery’s Brickwork Techniques Seminar Series : The Basics of Brickwork Det...Anupama Krishnan
 
Concrete technology by nihar.pptx
Concrete technology by nihar.pptxConcrete technology by nihar.pptx
Concrete technology by nihar.pptxNiharranjanmohanta2
 
Introduction To Structures.docx
Introduction To Structures.docxIntroduction To Structures.docx
Introduction To Structures.docxwrite22
 
Introduction To Structures.docx
Introduction To Structures.docxIntroduction To Structures.docx
Introduction To Structures.docxstirlingvwriters
 
Quantity and Cost Calculations for Several Reinforced Earth Wall Types using ...
Quantity and Cost Calculations for Several Reinforced Earth Wall Types using ...Quantity and Cost Calculations for Several Reinforced Earth Wall Types using ...
Quantity and Cost Calculations for Several Reinforced Earth Wall Types using ...ijtsrd
 

Similar to CPCCBC5018A Apply Structural Principles To The Construction Of Medium Rise.docx (20)

SEISMIC DESIGN STEPS.ppt
SEISMIC DESIGN STEPS.pptSEISMIC DESIGN STEPS.ppt
SEISMIC DESIGN STEPS.ppt
 
Seismic design steps
Seismic design stepsSeismic design steps
Seismic design steps
 
the kajima cut and take down method
the kajima cut and take down methodthe kajima cut and take down method
the kajima cut and take down method
 
Final Document
Final DocumentFinal Document
Final Document
 
Re development works at east kidwai nagar, New Delhi
Re development works at east kidwai nagar, New DelhiRe development works at east kidwai nagar, New Delhi
Re development works at east kidwai nagar, New Delhi
 
Aerocon Panels: An Alternative Building Walling Solution for the Modern Age
Aerocon Panels: An Alternative Building Walling Solution for the Modern AgeAerocon Panels: An Alternative Building Walling Solution for the Modern Age
Aerocon Panels: An Alternative Building Walling Solution for the Modern Age
 
Reinforced concrete masonry cantilever reaining walls
Reinforced concrete masonry cantilever reaining wallsReinforced concrete masonry cantilever reaining walls
Reinforced concrete masonry cantilever reaining walls
 
“COMPARATIVE STUDY ANALYSIS OF MULTI STOREYED RC FRAMED BUILDINGS WITH AAC BL...
“COMPARATIVE STUDY ANALYSIS OF MULTI STOREYED RC FRAMED BUILDINGS WITH AAC BL...“COMPARATIVE STUDY ANALYSIS OF MULTI STOREYED RC FRAMED BUILDINGS WITH AAC BL...
“COMPARATIVE STUDY ANALYSIS OF MULTI STOREYED RC FRAMED BUILDINGS WITH AAC BL...
 
Seismic analysis of base isolated building in rc framed structures 1868
Seismic analysis of base isolated building in rc framed structures 1868Seismic analysis of base isolated building in rc framed structures 1868
Seismic analysis of base isolated building in rc framed structures 1868
 
national building code
national building codenational building code
national building code
 
Building construction mini project
Building construction mini projectBuilding construction mini project
Building construction mini project
 
Task 1 Structural Design Principles Question For.pdf
Task 1 Structural Design Principles Question For.pdfTask 1 Structural Design Principles Question For.pdf
Task 1 Structural Design Principles Question For.pdf
 
Condition Assessment and Evaluation of Concrete Structures by Advanced Non-de...
Condition Assessment and Evaluation of Concrete Structures by Advanced Non-de...Condition Assessment and Evaluation of Concrete Structures by Advanced Non-de...
Condition Assessment and Evaluation of Concrete Structures by Advanced Non-de...
 
Glen-Gery’s Brickwork Techniques Seminar Series : The Basics of Brickwork Det...
Glen-Gery’s Brickwork Techniques Seminar Series : The Basics of Brickwork Det...Glen-Gery’s Brickwork Techniques Seminar Series : The Basics of Brickwork Det...
Glen-Gery’s Brickwork Techniques Seminar Series : The Basics of Brickwork Det...
 
Mortarless system
Mortarless systemMortarless system
Mortarless system
 
Final thesis presentation.
Final thesis presentation.Final thesis presentation.
Final thesis presentation.
 
Concrete technology by nihar.pptx
Concrete technology by nihar.pptxConcrete technology by nihar.pptx
Concrete technology by nihar.pptx
 
Introduction To Structures.docx
Introduction To Structures.docxIntroduction To Structures.docx
Introduction To Structures.docx
 
Introduction To Structures.docx
Introduction To Structures.docxIntroduction To Structures.docx
Introduction To Structures.docx
 
Quantity and Cost Calculations for Several Reinforced Earth Wall Types using ...
Quantity and Cost Calculations for Several Reinforced Earth Wall Types using ...Quantity and Cost Calculations for Several Reinforced Earth Wall Types using ...
Quantity and Cost Calculations for Several Reinforced Earth Wall Types using ...
 

More from write31

The candidates will develop a substantive understanding of six components.docx
The candidates will develop a substantive understanding of six components.docxThe candidates will develop a substantive understanding of six components.docx
The candidates will develop a substantive understanding of six components.docxwrite31
 
Women in The Testament of the Bible shows.docx
Women in The Testament of the Bible shows.docxWomen in The Testament of the Bible shows.docx
Women in The Testament of the Bible shows.docxwrite31
 
Write a article more than 2 pages in.docx
Write a article more than 2 pages in.docxWrite a article more than 2 pages in.docx
Write a article more than 2 pages in.docxwrite31
 
Write a memo to the CIO that describes how to.docx
Write a memo to the CIO that describes how to.docxWrite a memo to the CIO that describes how to.docx
Write a memo to the CIO that describes how to.docxwrite31
 
The topic is In the Western Catholic The.docx
The topic is In the Western Catholic The.docxThe topic is In the Western Catholic The.docx
The topic is In the Western Catholic The.docxwrite31
 
Video if makes the speech compelling.docx
Video if makes the speech compelling.docxVideo if makes the speech compelling.docx
Video if makes the speech compelling.docxwrite31
 
watch the video on The Role of HR Has.docx
watch the video on The Role of HR Has.docxwatch the video on The Role of HR Has.docx
watch the video on The Role of HR Has.docxwrite31
 
There is a relationship between an emotionality and their.docx
There is a relationship between an emotionality and their.docxThere is a relationship between an emotionality and their.docx
There is a relationship between an emotionality and their.docxwrite31
 
What is required to petition is a formal letter the.docx
What is required to petition is a formal letter the.docxWhat is required to petition is a formal letter the.docx
What is required to petition is a formal letter the.docxwrite31
 
what is mental illness as an officially recognized.docx
what is mental illness as an officially recognized.docxwhat is mental illness as an officially recognized.docx
what is mental illness as an officially recognized.docxwrite31
 
With you have learned about the cell DNA.docx
With you have learned about the cell DNA.docxWith you have learned about the cell DNA.docx
With you have learned about the cell DNA.docxwrite31
 
TO EACH POST 100 WORDS MIN This.docx
TO EACH POST 100 WORDS MIN This.docxTO EACH POST 100 WORDS MIN This.docx
TO EACH POST 100 WORDS MIN This.docxwrite31
 
TO EACH POST MIN 100 WORDS In.docx
TO EACH POST MIN 100 WORDS In.docxTO EACH POST MIN 100 WORDS In.docx
TO EACH POST MIN 100 WORDS In.docxwrite31
 
Take a look back at your DPP and the Belmont.docx
Take a look back at your DPP and the Belmont.docxTake a look back at your DPP and the Belmont.docx
Take a look back at your DPP and the Belmont.docxwrite31
 
Stakeholder support is necessary for successful project Consider your.docx
Stakeholder support is necessary for successful project Consider your.docxStakeholder support is necessary for successful project Consider your.docx
Stakeholder support is necessary for successful project Consider your.docxwrite31
 
The OSI data link layer is responsible for physical.docx
The OSI data link layer is responsible for physical.docxThe OSI data link layer is responsible for physical.docx
The OSI data link layer is responsible for physical.docxwrite31
 
This assignment is intended to help you use leadership skills.docx
This assignment is intended to help you use leadership skills.docxThis assignment is intended to help you use leadership skills.docx
This assignment is intended to help you use leadership skills.docxwrite31
 
What are the different portals of entry for a pathogen.docx
What are the different portals of entry for a pathogen.docxWhat are the different portals of entry for a pathogen.docx
What are the different portals of entry for a pathogen.docxwrite31
 
You are the Social Media Manager for Savannah Technical.docx
You are the Social Media Manager for Savannah Technical.docxYou are the Social Media Manager for Savannah Technical.docx
You are the Social Media Manager for Savannah Technical.docxwrite31
 
When you are engaging it is important to understand.docx
When you are engaging it is important to understand.docxWhen you are engaging it is important to understand.docx
When you are engaging it is important to understand.docxwrite31
 

More from write31 (20)

The candidates will develop a substantive understanding of six components.docx
The candidates will develop a substantive understanding of six components.docxThe candidates will develop a substantive understanding of six components.docx
The candidates will develop a substantive understanding of six components.docx
 
Women in The Testament of the Bible shows.docx
Women in The Testament of the Bible shows.docxWomen in The Testament of the Bible shows.docx
Women in The Testament of the Bible shows.docx
 
Write a article more than 2 pages in.docx
Write a article more than 2 pages in.docxWrite a article more than 2 pages in.docx
Write a article more than 2 pages in.docx
 
Write a memo to the CIO that describes how to.docx
Write a memo to the CIO that describes how to.docxWrite a memo to the CIO that describes how to.docx
Write a memo to the CIO that describes how to.docx
 
The topic is In the Western Catholic The.docx
The topic is In the Western Catholic The.docxThe topic is In the Western Catholic The.docx
The topic is In the Western Catholic The.docx
 
Video if makes the speech compelling.docx
Video if makes the speech compelling.docxVideo if makes the speech compelling.docx
Video if makes the speech compelling.docx
 
watch the video on The Role of HR Has.docx
watch the video on The Role of HR Has.docxwatch the video on The Role of HR Has.docx
watch the video on The Role of HR Has.docx
 
There is a relationship between an emotionality and their.docx
There is a relationship between an emotionality and their.docxThere is a relationship between an emotionality and their.docx
There is a relationship between an emotionality and their.docx
 
What is required to petition is a formal letter the.docx
What is required to petition is a formal letter the.docxWhat is required to petition is a formal letter the.docx
What is required to petition is a formal letter the.docx
 
what is mental illness as an officially recognized.docx
what is mental illness as an officially recognized.docxwhat is mental illness as an officially recognized.docx
what is mental illness as an officially recognized.docx
 
With you have learned about the cell DNA.docx
With you have learned about the cell DNA.docxWith you have learned about the cell DNA.docx
With you have learned about the cell DNA.docx
 
TO EACH POST 100 WORDS MIN This.docx
TO EACH POST 100 WORDS MIN This.docxTO EACH POST 100 WORDS MIN This.docx
TO EACH POST 100 WORDS MIN This.docx
 
TO EACH POST MIN 100 WORDS In.docx
TO EACH POST MIN 100 WORDS In.docxTO EACH POST MIN 100 WORDS In.docx
TO EACH POST MIN 100 WORDS In.docx
 
Take a look back at your DPP and the Belmont.docx
Take a look back at your DPP and the Belmont.docxTake a look back at your DPP and the Belmont.docx
Take a look back at your DPP and the Belmont.docx
 
Stakeholder support is necessary for successful project Consider your.docx
Stakeholder support is necessary for successful project Consider your.docxStakeholder support is necessary for successful project Consider your.docx
Stakeholder support is necessary for successful project Consider your.docx
 
The OSI data link layer is responsible for physical.docx
The OSI data link layer is responsible for physical.docxThe OSI data link layer is responsible for physical.docx
The OSI data link layer is responsible for physical.docx
 
This assignment is intended to help you use leadership skills.docx
This assignment is intended to help you use leadership skills.docxThis assignment is intended to help you use leadership skills.docx
This assignment is intended to help you use leadership skills.docx
 
What are the different portals of entry for a pathogen.docx
What are the different portals of entry for a pathogen.docxWhat are the different portals of entry for a pathogen.docx
What are the different portals of entry for a pathogen.docx
 
You are the Social Media Manager for Savannah Technical.docx
You are the Social Media Manager for Savannah Technical.docxYou are the Social Media Manager for Savannah Technical.docx
You are the Social Media Manager for Savannah Technical.docx
 
When you are engaging it is important to understand.docx
When you are engaging it is important to understand.docxWhen you are engaging it is important to understand.docx
When you are engaging it is important to understand.docx
 

Recently uploaded

BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxUnboundStockton
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfadityarao40181
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxAnaBeatriceAblay2
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxsocialsciencegdgrohi
 

Recently uploaded (20)

9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docx
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdf
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
 

CPCCBC5018A Apply Structural Principles To The Construction Of Medium Rise.docx

  • 1. CPCCBC5018A Apply Structural Principles To The Construction Of Medium Rise Buildings Answer: Part One 1) What is the difference between dead loads and live loads? Give at least five (5) examples of each. Dead Load: The dead load includes loads that are relatively constant over time, including the weight of the structure itself, and immovable fixtures such as walls, plasterboard or carpet. The roof is also a dead load. Dead loads are also known as permanent or static loads. E.g.: wall loads, Roof loads, Window loads, floor load, and tiles load. Live Load: Live loads are the weights of people, furniture, supplies, machines, stores, and so on, borne by the building during its use and occupancy. The loads of small or movable pieces of equipment are considered as live loads, but equipment that belongs to the building and is fixed and heavy is regarded as dead load. E.g.: furniture, air conditioner, movement of people, people, supplies, machines and etc. The major difference between live loads and dead loads is: Dead loads can be calculated accurately as they are constant but the live loads cannot be calculated exactly. 2) Calculate the dead load exerted by a 13mm Gypsum plaster board sheets that are fixed to a wall which is 5m wide and 3m in height. Show your working. Total sqm = (5 x 3) =15sqm Weight / unit area N/m2 = 15 x 220 = 3300 N/M2 = 3.3 KN 3) Calculate the expected live load on a column which supports 15sqm of floor in a retail shop. Show your working.
  • 2. Live load for Retail shop = 5.0 Kn/m2 Expected live load on a column of 15sqm = 15 x 5.0 = 75Kn/M2 4) Give three (3) examples during mixing and pouring of concrete which can decrease the strength properties of concrete. Cement and water ratio can decrease the strength of concrete Compaction of concrete Temperature and weather when concreate is poured. 5) It is proposed that a medium masonry residential building of 15m in height will be demolished on a small site. The building is suspected of containing asbestos and lead paint. Consider each point below and explain the main requirements and considerations to be followed for each area: Who you will engage to undertake the work and why? Consider nsw licensing requirements. What should be the sequencing of works? How will the presence of hazardous materials be addressed? What is the requirement for hoardings? What services are required on site? What other aspects relevant to the demolition work must be complied with before proceeding with the work? Prepare Your Response In A Word Document Demolition will be done by engaging Licensed demolisher. And require license person who can handle asbestos. Qualified person who can handle lead paint. Sequence of work: Obtain Construction certificate for Demolition · Get the building vacated · Disconnect Power & Gas · Site Establishment by putting temporary fence, Shade cloth over fence, Sediment fence · Remove any existing lead and asbestos. · Get demolition started as per approved conditions. Hazardous Material will be isolated and separated during demolition work. Asbestos will be packed in bags and disposed at asbestos centres Put up the board showing the work timings, Safety instruction board outside fence, SWMS to be maintained onsite. Water, temporary toilet facility and power is the most important service to be required onsite during demolition.
  • 3. Before proceeding to demolition services like gas and electricity should be disconnected. Construction certificate for demolition should be obtained. If any trees need to be protected than they should be covered or make safe by temporary fence. Demolition plan 6) Pick a retaining wall system from the list below and identify, via a diagram, all the forces exerted on the wall and the resisting forces of the wall. Gravity Retaining Wall Cantilever Retaining Wall Piling Retaining Wall Anchored Wall Draw the wall on a blank piece of paper, identify all of the forces exerted on the wall and upload a scanned copy of your drawing below. 7) In accordance with Australian Standards, provide a methodology for a concrete slump test. What constitutes a pass or a fail and what rectification steps must be taken in the event of a test fail? Give a brief of slump test 8) Explain how excessive water in a concrete mix can compromise the structural integrity of concrete. In your response, provide two (2) examples of how the risks of excess water in concrete can be avoided on site. Monitor the pour & don’t allow concrete truck or pump guy to put water 9) Explain why it is important that concrete cures correctly. How can you ensure a concrete slab is allowed to cure appropriately? In your response, refer to relevant standards. It will get right strength quicker, avoid shrinkage cracks. 10) What is “consolidation” in a concrete pour? Explain its importance and methods for how the concrete should be consolidated.
  • 4. It doesn’t allow segregation of material and mixes thoroughly and avoids air pockets 11) Explain the purpose and required positioning of joints in masonry construction. Allows for movement, avoids cracking, expansion and contractions. Change of material, long distance 12) How should a tilt up concrete panel be supported immediately after it is erected? Diagonally bracing it at 45deg. At minimum two bracing per panel and can’t be out 90deg Part Two 1) The factors to consider when planning the forming and storing of concrete tilt up panels are location, site limitations, schedule, budget, structure, building size, and construction sequencing. 2) Structural Integrity of Footings Action I Take NCC/BCA Code Accepted Principles Construction
  • 5. Slab and footing construction AS 2870 Concrete slabs Retaining walls Positioning of steel reinforcement Footing widths and depths Stiffening beams 3 Damp Coursing and Termite Barriers Action I Take NCC/BCA Code Accepted Principles Construction
  • 6. Concrete slabbing and damp proofing AS/NZS 2904: 1995 AS 3660.1: 2014 Concrete slabs Damp proof course Construction of concrete slabs to prevent termites and dap proof courses to prevent damping 4) Structural Integrity of Slabs, Bearers and Joists Action I Take NCC/BCA Code Accepted Principles Construction
  • 7. Concrete AS 1684 Shear wall Wind bracing Columns Beams Concrete slabs Construction of beams, columns, wind bracing, shear wall and slabs to bear weight of dead and live loads 5) Structural Integrity of Floor Systems Action I Take NCC/BCA Code Accepted Principles
  • 8. Construction Concrete and damping compound AS 2870 Retaining walls Concrete slabs Damp proofing Construction of retaining walls to prevent lateral pressure from soil and, damp proofing to prevent damping. 6) Structural Materials Term Definition Accommodating Behaviours
  • 9. Stress Refers to force per unit area within a material that comes from external forces Use of composites with good tensile and compressional strengths Strain Refers to the ratio of elongation to the original length as a result of an external force Introduction of movement joints at the design stage. Elasticity The property of material to return to its original shape and size when strain/force is removed. Use of materials with big elastic limits 7) Prestressing refers to the process of compressing concrete prior to application of external load.
  • 10. 8) The procedure for ensuring the quality of structural frames is as follows: Check for the fabricator’s qualification and experience Check the material being used The equipment used in the fabrication process must meet the required standards Finally, take the measurements of the steel parts to see if they meet the measurements in the design 9) The following procedure helps in ensuring quality of roof trusses Check the truss layout plan Cross-check the manufacturer’s specifications for lateral stability, tie-downs, and bracings Check the roof truss certification Assess whether the supporting structure is adequate Check if the overall length and width of wall as well as dimension of wall fit the roof truss Check for the availability of girder trusses support Check for spacings and plumb Check for all fixings and tie-downs Check for location of specialized trusses Ensure trusses have not been modified or adjusted on-site Check for eave overhangs Check for trimming to manhole 10) Structural Integrity of Cladding Action I Take NCC/BCA Code
  • 11. Accepted Principles Construction Cladding BCGBC4010A Structural bracing External walls are clad so that the cladding material acting in tension connects the bottom and top plates to provide tie-down. 11) Standard Controls Hazards Standard Control Measures Work at Heights
  • 12. All activities involving heights of 2 m and higher must be performed using fall protection equipment in accordance with workplace safety standards Act 2005. Working with Asbestos All activities related to asbestos exposure must be conducted in strict compliance with the code of practice for safe removal of asbestos [NOHSC:2005] and WHS regulation 419 Working with scaffolding All activities involving use of scaffolding must be conducted with aid of fall protection equipment in accordance with work safety standards Act 2005 Workplace Project 1) The site is in the shape of a rectangle measuring 135 m * 40 m. It is enclosed by roads on the south-west and northwest sides. On the remaining sides are multistorey residential apartments. Currently, the site has four 3-stoeyr unoccupied residential buildings. In front of the buildings is a large open parking lot. According to Sydney 1:100000 Geological Series Sheet, the soil underlying the site is the dark grey Ashfield Shale. However, the site is nearby a geological boundary with Hawkesbury Sandstone, comprising a medium grained quartz with minor layers of laminite and shale. The excavations will be supported due to the low strength of the sandstone until construction of permanent basement walls is complete. Shoring support will be used from the surface of ground to the consistent high strength rock. However, in some locations like the south western side of the site where the high strength rock is shallow, temporary batters OF 1.5H: 1V may be adopted instead of shoring.
  • 13. In addition, soldier piles with in-fills of reinforced shotcrete panels would be used at 2 m centres and be socketed into the sandstone. 2) A damp proof course is a system that helps prevent a building from dampness and its related effects. A damp proof course is laid on top of the ground adjoining the building’s plinth level in the wall’s entire width. The thickness of the medium rose building visited was 20 mm. Prior to installing a damp proof course, the brick work must reach the plinth level. The damp proof is prepared by mixing a damp proofing compound with sand and cement (2:1) with sufficient amount of water. Once the mixture is ready, it is laid in the full breadth of the brick underneath it. The thickness of the damp proof layer was kept at 2.5 cm, which is the recommended thickness. After installation, the course is cured for 7 days, dried, and then coated with a layer of coal tar. The damp proof course for the medium rise building showed robustness since there were no potential weak spots where penetration could occur later. This robustness was attributed to the strict adherence of Australian standards for laying of a damp proof course. 3) The type of services assessed in the medium rise building under review include energy distribution system, lighting, control systems of the building, alarm and security systems, ICT networks, energy supply, plumbing, drainage and water systems, and fire safety system. Building services perform an integral role in a building’s design, not only in terms of strategies to be achieved, but also in standards to be met. Thus, the design of the building services will be integrated into the building’s overall design at an early stage. To protect the building’s services from clashing with other components of the building, such software and techniques as 3D CAD and BIM will be used. These clashes if not prevented can lead to variations and delays on site. In addition, these building services will be necessary for fulfilment of various Australian Standards and building codes such as AS 2436 for noise control. Construction Portfolio Of Evidence The building is a two-storey class 2 building that would be erected in accordance with all the relevant Australian Standards and Building Codes.
  • 14. In addition a cantilever retaining wall will be built to hold back soil. The wall will rest on the foundation slab. The foundation slab being loaded by backfill, it will stabilize the wall and prevent it from sliding and overturning. 1 Demolition Portfolio Of Evidence a) Prior to commencement of demolition works, legislative requirements must be fulfilled. First, the AS 2601 demolition of structures act must be complied with. Secondly, the building regulations applicable to the Australian Codes of practice and Standards must be met. These regulations include OH&S code of demolition practice, OH&S code of construction and building workplaces practice, OH&S Asbestos regulations, and AS 2436 for noise control guide. b) The three provisions for safety are: OH&S Asbestos regulations AS 2436 for noise control guide OH&S Asbestos regulations c) The structural design and structural principles of buildings are integral factors to consider during demolition. For instance, removal of prestressed concrete can be done manually or by mechanical demolition. Similarly, non-load bearing walls can be removed manually or by mechanical means. Also, adjoining walls are only demolished by hand and not by any other means to protect the immediate environment and the adjoining buildings. d) The building being under demolition was a low-rise building of 30 metres in height.