SlideShare a Scribd company logo
1 of 15
FINAL PROJECT:
DEVELOPMENT PROPOSAL:
INTRODUCTION TO
CONSTRUCTION INDUSTRY (ICI)
(QSB 30105)
FNBE MARCH 2015
WONG MEI XIN (0323824)
WONG YUN TENG (0323454)
TUTOR: PN HAS
INDEX
INDEX …1
INTRODUCTION …2
OBJECTIVE & PROJECT BENEFITS …3
INTRODUCTION TO SITE …4
SITE CONTEXT …5-8
MICRO CLIMATE …9
TOPOGRAPHY …10
TRAFFIC CONDITION …11
AMBIENCE&PROS AND CONS …12
SITE PLAN & LOCATION PLAN …13
ADVANTAGES &DISADVANTAGES …14
OF THE SITE
Introduction
We are required to find a specific empty land to initiate a small
construction project. The size of the land shall between 50m x 50m (2500m2)
– 50m x 70m (3500m2).
Individually, we have to propose one project that serves on any one or
combination of two or more of the following purposes: Recreation area,
Commercial area, Industrial area, Agricultural area, Tourism area, Residential
area. Subsequently, we are required to identify the professions required in our
development. Besides that, we need to list down the tasks each profession
needs to do.
This project enabled us to develop an understanding of the building
team, its organization, duties and inter-relations. In addition, it also enabled
us to develop an awareness of their professional responsibilities and to
appreciate their profession in the construction industry.
2
Objective
The objective of this project is to provide convenience to residents living
around the site. Residents do not need to go a commercial shop or a place to
do recreational activities by car. They just need to go to the spot by walking
within 4 minutes.
Project Benefits
Commercial areas enabled people to reduce stress and relax. Positive
and enjoyable recreation experiences can decrease stress and psychological
tensions. Leisure activities provide people with the opportunity to expel
energy and emotion not being released in other aspects of their lives.
Recreation area creates an opportunity to people to control weight,
look better, and build strong bodies. Sports participants had significantly
lower body mass index values, lower blood pressures, and lower resting pulse
rates. In addition, people who exercised regularly were happier than people
who didn’t exercise at all. Besides that, family bonds are improved by the
sharing of leisure time. Families that recreate together tend to be closer, more
cohesive and improve their chances of staying together. This is true with both
parent-child relationships and married couples. One can meet friends and
create memories too. People can develop social skills, problem solving and
creativity. The best opportunities are those that are planned and supervised.
For children, physical activity is intellectually stimulating and enhances the
learning process and the development of cognitive skills.
3
Introduction to Site
The undeveloped empty land that we have looked upon is located at
Jalan Kemajuan Subang. It is approximately 26,896 Sq.Ft. There are greenery
and woody trees on the empty land.
In addition, there are several residential areas located near to our site
and there are two apartments which is Subang Soho and Olives residence are
just opposite to our site. Besides that, there is one primary school, Sekolah
Kebangsaan Perdana Jaya near to the site as well. It is a great area to be
developed since it is near to residential areas and school.
Some commercial shops such as 7-Eleven, stationary stores as well as
food court and recreation area such as sports complex should be built within
this area in order to bring convenience to people. Hence, this empty land has
high potential to become a successful recreation and commercial spot in the
future.
4
Site context
-Apartments opposite to the site-
-Residential area nearby-
5
-Residential area nearby-
-Primary school nearby-
6
-Shops nearby-
-ShellStation nearby- -Shopsnearby-
7
-Fastfood shop nearby- -Shopping mallnearby-
As the pictures shown above, these are the places that near to the site. There
are two apartments opposite of the site. Furthermore, there are many
residential areas and a primary school nearby as well. Some shops can be
found too.
8
Micro Climate
The sun rises from the east to west, there are little obstructions around so
people can enjoy the view of the sunrise and sunset. The wind direction is
from west to east, thus the land is cooling throughout the day.
9
Topography
There is a slope from the main road to the site. The land has an uneven
surface as it is a grassy land.
10
Traffic Condition
There is little trafficcongestionmostof the time of the day.
11
Ambience
There is little to none traffic noises as there is only a highway located quite a
distance away.
Pros and Cons
The land is surrounded by residential area and industrial area. Furthermore, it
is lacking of commercial and recreation area. Hence, this empty land has high
potential to become a successful recreation and commercial spot. Residents
can walk or go by bicycle to the spot.
12
Site plan
Location plan
13
Advantages of the site
The site is easily reachable from many directions. It can be reached using Jalan
SS16/1 and then turn onto Jalan Kemajuan Subang Highway. The site has a low
pollution rating because of the residential areas surrounding it. This allows the
people that stay nearby the ability to excess it easily. Other than that, this site
has great facilities. As examples, there are religious buildings there like some
churches and a surau nearby. Educational areas such as SK Perdana Jaya are
also available there. There are also a music centers, a golf center and more.
The site has a lack of proper waste management as seen by garbage being
seen around the site. There are also no office and commercial blocks built
around the area. This causes the need to drive out of the area for work. Lastly,
the air quality is also not very good on site due to the amount of traffic on the
road.
Disadvantages of the site
The site is easily reachable from many directions. It can be reached using Jalan
SS16/1 and then turn onto Jalan Kemajuan Subang Highway. The site has a low
pollution rating becasue of the residential areas surrounding it. This allows the
people that stay nearby the ability to excess it easily. Other than that, this site
has great facilities. As examples, there are religious buildings there like some
churches and a surau nearby. Educational areas such as SK Perdana Jaya are
also avalible there. There are also a music centers, a golf center and more. The
site has a lack of proper waste management as seen by garbage being seen
around the site. There are also no office and commercial blocks built around
the area. This causes the need to drive out of the area for work. Lastly, the air
quality is also not very good on site due to the amount of traffic on the road.
14

More Related Content

Viewers also liked

Viewers also liked (6)

Hercules Daliani
Hercules DalianiHercules Daliani
Hercules Daliani
 
Khóa Đào Tạo Lái Xe Ô Tô Tại Các Quận TPHCM
Khóa Đào Tạo Lái Xe Ô Tô Tại Các Quận TPHCMKhóa Đào Tạo Lái Xe Ô Tô Tại Các Quận TPHCM
Khóa Đào Tạo Lái Xe Ô Tô Tại Các Quận TPHCM
 
LIÇÃO 09 - A NOVA VIDA EM CRISTO
LIÇÃO 09 - A NOVA VIDA EM CRISTOLIÇÃO 09 - A NOVA VIDA EM CRISTO
LIÇÃO 09 - A NOVA VIDA EM CRISTO
 
Resume_Gurjeet
Resume_GurjeetResume_Gurjeet
Resume_Gurjeet
 
Resume-Michael Turner
Resume-Michael TurnerResume-Michael Turner
Resume-Michael Turner
 
DE0118_Impairment_Reporting_Jan10_revised
DE0118_Impairment_Reporting_Jan10_revisedDE0118_Impairment_Reporting_Jan10_revised
DE0118_Impairment_Reporting_Jan10_revised
 

Similar to Ici group

ICI Final Project 03/15
ICI Final Project 03/15ICI Final Project 03/15
ICI Final Project 03/15lohwenjun
 
Ici final project
Ici final projectIci final project
Ici final projectAdeleLu
 
Ici final-project proposal
Ici final-project proposalIci final-project proposal
Ici final-project proposalDana Kan
 
ICI final
ICI finalICI final
ICI finalLam Yu
 
Ici final project
Ici final projectIci final project
Ici final projectAdeleLu
 
ICI - The project proposal
ICI - The project proposalICI - The project proposal
ICI - The project proposal_NabilaHanim
 
ICI FINAL PROJECT
ICI FINAL PROJECT ICI FINAL PROJECT
ICI FINAL PROJECT shensin1015
 
Subdivision presentation.pdf
Subdivision presentation.pdfSubdivision presentation.pdf
Subdivision presentation.pdfSkFoishalAhmed
 
Ici final project
Ici final projectIci final project
Ici final projectDaniel Tan
 
Open house_October_Slideshow
Open house_October_SlideshowOpen house_October_Slideshow
Open house_October_SlideshowJamie Granger
 
Ici- final project
Ici- final projectIci- final project
Ici- final projectdinnahanny
 

Similar to Ici group (20)

ICI
ICIICI
ICI
 
Ici
IciIci
Ici
 
Ici final assignment
Ici final assignment Ici final assignment
Ici final assignment
 
Icip3 project brief
Icip3 project briefIcip3 project brief
Icip3 project brief
 
Ici final project
Ici final projectIci final project
Ici final project
 
Ici final project
Ici final projectIci final project
Ici final project
 
ICI Final Project 03/15
ICI Final Project 03/15ICI Final Project 03/15
ICI Final Project 03/15
 
Ici final project
Ici final projectIci final project
Ici final project
 
Ici final-project proposal
Ici final-project proposalIci final-project proposal
Ici final-project proposal
 
Doc12
Doc12Doc12
Doc12
 
ICI final
ICI finalICI final
ICI final
 
Ici final project
Ici final projectIci final project
Ici final project
 
ICI - The project proposal
ICI - The project proposalICI - The project proposal
ICI - The project proposal
 
Assignment 2
Assignment 2Assignment 2
Assignment 2
 
ICI FINAL PROJECT
ICI FINAL PROJECT ICI FINAL PROJECT
ICI FINAL PROJECT
 
Subdivision presentation.pdf
Subdivision presentation.pdfSubdivision presentation.pdf
Subdivision presentation.pdf
 
Ici final project
Ici final projectIci final project
Ici final project
 
Design Studio 6 report
Design Studio 6 reportDesign Studio 6 report
Design Studio 6 report
 
Open house_October_Slideshow
Open house_October_SlideshowOpen house_October_Slideshow
Open house_October_Slideshow
 
Ici- final project
Ici- final projectIci- final project
Ici- final project
 

Recently uploaded

Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 

Recently uploaded (20)

Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 

Ici group

  • 1. FINAL PROJECT: DEVELOPMENT PROPOSAL: INTRODUCTION TO CONSTRUCTION INDUSTRY (ICI) (QSB 30105) FNBE MARCH 2015 WONG MEI XIN (0323824) WONG YUN TENG (0323454) TUTOR: PN HAS
  • 2. INDEX INDEX …1 INTRODUCTION …2 OBJECTIVE & PROJECT BENEFITS …3 INTRODUCTION TO SITE …4 SITE CONTEXT …5-8 MICRO CLIMATE …9 TOPOGRAPHY …10 TRAFFIC CONDITION …11 AMBIENCE&PROS AND CONS …12 SITE PLAN & LOCATION PLAN …13 ADVANTAGES &DISADVANTAGES …14 OF THE SITE
  • 3. Introduction We are required to find a specific empty land to initiate a small construction project. The size of the land shall between 50m x 50m (2500m2) – 50m x 70m (3500m2). Individually, we have to propose one project that serves on any one or combination of two or more of the following purposes: Recreation area, Commercial area, Industrial area, Agricultural area, Tourism area, Residential area. Subsequently, we are required to identify the professions required in our development. Besides that, we need to list down the tasks each profession needs to do. This project enabled us to develop an understanding of the building team, its organization, duties and inter-relations. In addition, it also enabled us to develop an awareness of their professional responsibilities and to appreciate their profession in the construction industry. 2
  • 4. Objective The objective of this project is to provide convenience to residents living around the site. Residents do not need to go a commercial shop or a place to do recreational activities by car. They just need to go to the spot by walking within 4 minutes. Project Benefits Commercial areas enabled people to reduce stress and relax. Positive and enjoyable recreation experiences can decrease stress and psychological tensions. Leisure activities provide people with the opportunity to expel energy and emotion not being released in other aspects of their lives. Recreation area creates an opportunity to people to control weight, look better, and build strong bodies. Sports participants had significantly lower body mass index values, lower blood pressures, and lower resting pulse rates. In addition, people who exercised regularly were happier than people who didn’t exercise at all. Besides that, family bonds are improved by the sharing of leisure time. Families that recreate together tend to be closer, more cohesive and improve their chances of staying together. This is true with both parent-child relationships and married couples. One can meet friends and create memories too. People can develop social skills, problem solving and creativity. The best opportunities are those that are planned and supervised. For children, physical activity is intellectually stimulating and enhances the learning process and the development of cognitive skills. 3
  • 5. Introduction to Site The undeveloped empty land that we have looked upon is located at Jalan Kemajuan Subang. It is approximately 26,896 Sq.Ft. There are greenery and woody trees on the empty land. In addition, there are several residential areas located near to our site and there are two apartments which is Subang Soho and Olives residence are just opposite to our site. Besides that, there is one primary school, Sekolah Kebangsaan Perdana Jaya near to the site as well. It is a great area to be developed since it is near to residential areas and school. Some commercial shops such as 7-Eleven, stationary stores as well as food court and recreation area such as sports complex should be built within this area in order to bring convenience to people. Hence, this empty land has high potential to become a successful recreation and commercial spot in the future. 4
  • 6. Site context -Apartments opposite to the site- -Residential area nearby- 5
  • 9. -Fastfood shop nearby- -Shopping mallnearby- As the pictures shown above, these are the places that near to the site. There are two apartments opposite of the site. Furthermore, there are many residential areas and a primary school nearby as well. Some shops can be found too. 8
  • 10. Micro Climate The sun rises from the east to west, there are little obstructions around so people can enjoy the view of the sunrise and sunset. The wind direction is from west to east, thus the land is cooling throughout the day. 9
  • 11. Topography There is a slope from the main road to the site. The land has an uneven surface as it is a grassy land. 10
  • 12. Traffic Condition There is little trafficcongestionmostof the time of the day. 11
  • 13. Ambience There is little to none traffic noises as there is only a highway located quite a distance away. Pros and Cons The land is surrounded by residential area and industrial area. Furthermore, it is lacking of commercial and recreation area. Hence, this empty land has high potential to become a successful recreation and commercial spot. Residents can walk or go by bicycle to the spot. 12
  • 15. Advantages of the site The site is easily reachable from many directions. It can be reached using Jalan SS16/1 and then turn onto Jalan Kemajuan Subang Highway. The site has a low pollution rating because of the residential areas surrounding it. This allows the people that stay nearby the ability to excess it easily. Other than that, this site has great facilities. As examples, there are religious buildings there like some churches and a surau nearby. Educational areas such as SK Perdana Jaya are also available there. There are also a music centers, a golf center and more. The site has a lack of proper waste management as seen by garbage being seen around the site. There are also no office and commercial blocks built around the area. This causes the need to drive out of the area for work. Lastly, the air quality is also not very good on site due to the amount of traffic on the road. Disadvantages of the site The site is easily reachable from many directions. It can be reached using Jalan SS16/1 and then turn onto Jalan Kemajuan Subang Highway. The site has a low pollution rating becasue of the residential areas surrounding it. This allows the people that stay nearby the ability to excess it easily. Other than that, this site has great facilities. As examples, there are religious buildings there like some churches and a surau nearby. Educational areas such as SK Perdana Jaya are also avalible there. There are also a music centers, a golf center and more. The site has a lack of proper waste management as seen by garbage being seen around the site. There are also no office and commercial blocks built around the area. This causes the need to drive out of the area for work. Lastly, the air quality is also not very good on site due to the amount of traffic on the road. 14