INTERNATIONAL ENERGY RESOURCES
             PRESENTS
   THE IER ENERGY SAVER (ES)!




 Protecting, Preserving & Improving the
              Environment
             International Energy
                  Resources
The Need for the IER (ES)

•In the 21st century “Going Green” has
  become a corporate responsibility
•With the rising cost of doing business,
      Energy Efficiency is a must
•Help meet the social requirements of
 “Being Green” and reap the financial
                savings
The Problem
• Electric Motors use more than half of all electricity
• Electricity Costs:
   –   1960’s .019/kwh
   –   1970’s energy crisis .044/kwh
   –   2008 .10+ /kwh
• Most A/C Induction motors operate at 80% efficiency
• NASA research proved that substantial savings could be
  made on the running costs of A/C Induction motors
The Power Supply Dilemma
• The adequacy of North America’s Electricity system will
  decline unless changes are made soon…
…demand for electricity is expected to increase over the
  next ten years by 20% in the U.S., but confirmed power
  capacity will increase by only 10%
-NERC (North American Electric Reliability Council)

“Over $16 billion dollars of electricity is unusable energy,
  but billable in the US.”
                    - U.S. Dept. of Energy
20% increase
in demand
with 10%
increase in
supply
How the Utility Company & the
Environment Benefit
• Enhancement of the capacity of the
  existing electrical systems
• Power supplied to more customers without
  the generation or acquisition of additional
  power plants.
• Less fossil fuel being used to generate
  power
• Less dependency on foreign oil
The Unique Energy Savings with the
                IER (ES)
• The Patented diagnostic device & methodology
    determines to an exact science how much capacitance is
    required to bring each inductive load to unity
•   Optimizing is precisely accomplished on each inductive
    load in minutes
•   The pre-engineered customized systems are assembled
    from modular components based on sizing results
•   Installation is fast and simple
•   Power savings are immediate and can be up to 25%
•   Realize a rapid return on investment (often 24 months or
    less)
IER (ES)
•   Innovative, unique & Patented *
•   U.S. Manufactured
•   NASA Tested and used
•   U.S. Government certified
•   UL Listed CSA Approved
•   Cleaner & Greener / RoHS Certified
•   Reduces the amount of non-productive current in your
    existing electrical system, resulting in a significant
    reduction in power consumption costs
•   Thousands of installations worldwide
•   5 year warranty / 12 year on Residential
          *Methodology & Apparatus
How does the IER Energy Saver
         (ES) work?
• The IER (ES) stores the reactive power to create the electromagnetic field
   (EMF) around the inductive windings of a motor

• As motors operate, reactive power is “pushed” and “pulled” to and from the
   (ES) by the motor at 60 cycles per second

• The IER (ES) stores & releases to motors what they need to function more
   efficiently

• Electricity reclaimed and recycled by the (ES) would normally be pushed
   back through the power distribution lines

• The IER (ES) reclaims, stores, recycles and supplies Reactive power to
   inductive loads
Other Benefits
• The IER (ES) improves the efficiency of the electrical
    system & the kW capacity is increased
•   Maintains quality voltage levels to your system with less
    voltage drops especially long runs of cable
•   Reduces the harmful effects from the EMF’s
•   Less power system losses in your distribution system
•   Reduces the heat on wires and motors
•   Decreases premature failure of motors and other
    inductive equipment
•   Motors run cooler and are more efficient
•   Increases the life of the motors
•   Reduces maintenance costs
Causes of Low Power Factor

• Inductive loads are usually the major portion of
    the power consumed in commercial buildings &
    industrial complexes – 80% or more
•   Types of Inductive loads (reactive Power)
    –   Transformers
    –   Motors
    –   Compressors
    –   Fluorescent lighting with T-12 ballasts
    –   Older style high intensity discharge lighting (HID)
    –   Lightly loaded motors are wasteful and result in lower
        power factor
Power Factor Correction
•   A 20th Century Technology
•   Installed on the line side near the main service
•   Main purpose is for the utility company to “clean up”
    their “dirty Power” and saves the electric company
    money

Power factor Optimization
•   A 21st Century Technology
•   Installed on the demand side, close to the equipment
•   Reduces amperage kWH (slows the meter)
•   Saves the customer money
•   Reduce or eliminate Power Factor Correction penalties
Why you should optimize
           Power Factor?
• Reducing Amperage & kW usage, directly
  reflects dollar savings
• Reduce the monthly “demand charge”
• Eliminate the primary power factor
  surcharge penalty
  – Utilities usually charge customers an
    additional fee (up to 25% more) when their
    power factor is less than 0.85 (PFC
    equipment)
Installing the IER (ES) Units

• 2 Types of installations with the IER (ES)
    Panel Mount – accumulation of smaller
    inductive loads
    • Single Phase panel mount
    • Three Phase panel mount

     Equipment Mount – Larger individual
       inductive loads
Return on Investment

Depends On:
• Age of Equipment
• Percentage of PF optimization
• kW per hour charged
• Run time of inductive loads
• Panel mount or equipment mount
• Amount of equipment and labor needed
  for optimization
School District, DE




            8 out of 10 Schools
            Total = 38% Savings
Measuring Power
    Factor



 Select Power
 Factor
 Clamp Load Wire
 Leads on Positive
 and Ground
 Read and record
 initial power
 factor and Amps
Initial Amps
     33.85
Optimized Amps 27.30


6.55 Amp Difference
19.35% Reduction
How the process works!

• Initial meeting to discuss technology and
  application for your facility.
  – This is primarily a discussion that lets you find out
    who we are and what we provide.
  – During this meeting we will gather information about
    your facility. This is called a pre assessment review
    (PAR)
  – This information is used to deliver to you an estimate
    for us to complete an energy analysis of the facility.
Energy Analysis
• An Energy analysis is preformed by a specially trained and licensed
   electrician/s
    – Our team will conduct checks of all relevant electrical panels and
      individual electric motors
    – Information that we are gathering is related to Voltage, Current, Power,
      and Power Factor
    – After the initial readings are taken our patented equipment is hooked
      up to optimize each load.
    – Often times the electrician is confronted with situations in your facility
      that need immediate attention, this information might not have been
      discovered until to late, had we not been there. We will immediately
      notify you if this occurs.
    – The analysis process is not typically disruptive to the work force and all
      of our personnel conduct themselves in a professional manner.
Energy Analysis

• Upon completion of the analysis all data is
    forwarded to the I.E.R. corporate office for
    review.
•   The review process consist of data obtained,
    special notes from the electrician and
    parameters of actually installing the equipment.
•   The data will now be compiled into a proposal
    for customer review.
WHY NOW?

• Conditioned power can increase the life
  of all electric motors in the facility
  leading to reduced maintenance costs.
• Up to 25% SAVINGS realized
  immediately upon installation.
• Environmentally responsible
  organizations are leading the charge in
  Protecting, Preserving & Improving our
  environment.

More Related Content

What's hot

iPLON presentation at Intersolar Mumbai 15 Dec 2011
iPLON presentation at Intersolar Mumbai 15 Dec 2011iPLON presentation at Intersolar Mumbai 15 Dec 2011
iPLON presentation at Intersolar Mumbai 15 Dec 2011iplon
 
Practical Power Distribution
Practical Power DistributionPractical Power Distribution
Practical Power DistributionLiving Online
 
How to reduce energy consumption of pumping systems in mining by up to 30%
How to reduce energy consumption of pumping systems in mining by up to 30%How to reduce energy consumption of pumping systems in mining by up to 30%
How to reduce energy consumption of pumping systems in mining by up to 30%Schneider Electric
 
Session 19 project performance evaluation Operation & Maintenance planning
Session 19   project performance evaluation Operation & Maintenance planningSession 19   project performance evaluation Operation & Maintenance planning
Session 19 project performance evaluation Operation & Maintenance planningChirag Jain
 
Switchgear and Distribution Systems
Switchgear and Distribution SystemsSwitchgear and Distribution Systems
Switchgear and Distribution SystemsLiving Online
 
Session 05 grid connected inverter
Session 05   grid connected inverterSession 05   grid connected inverter
Session 05 grid connected inverterChirag Jain
 
Maintenance and Troubleshooting of Uninterruptible Power Supply (UPS) Systems...
Maintenance and Troubleshooting of Uninterruptible Power Supply (UPS) Systems...Maintenance and Troubleshooting of Uninterruptible Power Supply (UPS) Systems...
Maintenance and Troubleshooting of Uninterruptible Power Supply (UPS) Systems...Living Online
 
Session 08 design & safety overview
Session 08   design & safety overviewSession 08   design & safety overview
Session 08 design & safety overviewChirag Jain
 
Naps Solar Systems: Libya pipeline electrification
Naps Solar Systems: Libya pipeline electrificationNaps Solar Systems: Libya pipeline electrification
Naps Solar Systems: Libya pipeline electrificationNapsSolar
 
Photovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant MaintenancePhotovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant MaintenanceLeonardo ENERGY
 
Session 03 solar pv rooftop technology overview
Session 03   solar pv rooftop technology overviewSession 03   solar pv rooftop technology overview
Session 03 solar pv rooftop technology overviewChirag Jain
 
Naps telecom references
Naps telecom referencesNaps telecom references
Naps telecom referencesNapsSolar
 
PV solar Design and Installtion
PV solar Design and InstalltionPV solar Design and Installtion
PV solar Design and InstalltionEli Israeli
 

What's hot (20)

iPLON presentation at Intersolar Mumbai 15 Dec 2011
iPLON presentation at Intersolar Mumbai 15 Dec 2011iPLON presentation at Intersolar Mumbai 15 Dec 2011
iPLON presentation at Intersolar Mumbai 15 Dec 2011
 
Practical Power Distribution
Practical Power DistributionPractical Power Distribution
Practical Power Distribution
 
How to reduce energy consumption of pumping systems in mining by up to 30%
How to reduce energy consumption of pumping systems in mining by up to 30%How to reduce energy consumption of pumping systems in mining by up to 30%
How to reduce energy consumption of pumping systems in mining by up to 30%
 
Session 19 project performance evaluation Operation & Maintenance planning
Session 19   project performance evaluation Operation & Maintenance planningSession 19   project performance evaluation Operation & Maintenance planning
Session 19 project performance evaluation Operation & Maintenance planning
 
Switchgear and Distribution Systems
Switchgear and Distribution SystemsSwitchgear and Distribution Systems
Switchgear and Distribution Systems
 
Inspecting Photovoltaic (PV) Systems for Code Compliance
Inspecting Photovoltaic (PV) Systems for Code ComplianceInspecting Photovoltaic (PV) Systems for Code Compliance
Inspecting Photovoltaic (PV) Systems for Code Compliance
 
Session 05 grid connected inverter
Session 05   grid connected inverterSession 05   grid connected inverter
Session 05 grid connected inverter
 
Maintenance and Troubleshooting of Uninterruptible Power Supply (UPS) Systems...
Maintenance and Troubleshooting of Uninterruptible Power Supply (UPS) Systems...Maintenance and Troubleshooting of Uninterruptible Power Supply (UPS) Systems...
Maintenance and Troubleshooting of Uninterruptible Power Supply (UPS) Systems...
 
Utilities
UtilitiesUtilities
Utilities
 
Session 08 design & safety overview
Session 08   design & safety overviewSession 08   design & safety overview
Session 08 design & safety overview
 
Naps Solar Systems: Libya pipeline electrification
Naps Solar Systems: Libya pipeline electrificationNaps Solar Systems: Libya pipeline electrification
Naps Solar Systems: Libya pipeline electrification
 
AccuSine pfv+
AccuSine pfv+ AccuSine pfv+
AccuSine pfv+
 
Analysis of PVSyst Loss Diagram
Analysis of PVSyst Loss DiagramAnalysis of PVSyst Loss Diagram
Analysis of PVSyst Loss Diagram
 
Photovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant MaintenancePhotovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant Maintenance
 
Rooftop Solar Benefits: Net Metering
Rooftop Solar Benefits: Net MeteringRooftop Solar Benefits: Net Metering
Rooftop Solar Benefits: Net Metering
 
CUF vs PR
CUF vs PRCUF vs PR
CUF vs PR
 
2014 PV Reliability, Operations & Maintenance Workshop: Commissioning PV Syst...
2014 PV Reliability, Operations & Maintenance Workshop: Commissioning PV Syst...2014 PV Reliability, Operations & Maintenance Workshop: Commissioning PV Syst...
2014 PV Reliability, Operations & Maintenance Workshop: Commissioning PV Syst...
 
Session 03 solar pv rooftop technology overview
Session 03   solar pv rooftop technology overviewSession 03   solar pv rooftop technology overview
Session 03 solar pv rooftop technology overview
 
Naps telecom references
Naps telecom referencesNaps telecom references
Naps telecom references
 
PV solar Design and Installtion
PV solar Design and InstalltionPV solar Design and Installtion
PV solar Design and Installtion
 

Similar to Power Presentation West Palm

Power Presentation West Palm2
Power Presentation West Palm2Power Presentation West Palm2
Power Presentation West Palm2ECRESINC
 
Kvar Presentation Ppt 8.8.08[1]
Kvar Presentation Ppt 8.8.08[1]Kvar Presentation Ppt 8.8.08[1]
Kvar Presentation Ppt 8.8.08[1]Keystone Clean Air
 
Retail P P T Kvar Presentation 2
Retail  P P T  Kvar  Presentation 2Retail  P P T  Kvar  Presentation 2
Retail P P T Kvar Presentation 2Robert B. Luquette
 
M A MALLICK ppt. for FDP SEPT. 2019
M A MALLICK ppt. for  FDP SEPT. 2019M A MALLICK ppt. for  FDP SEPT. 2019
M A MALLICK ppt. for FDP SEPT. 2019Mohammad Mallick
 
Reducing Your Electric bills & your Carbon Footprint
Reducing Your Electric bills & your Carbon FootprintReducing Your Electric bills & your Carbon Footprint
Reducing Your Electric bills & your Carbon FootprintScottStephens
 
Power factor
Power factorPower factor
Power factorwkugubre
 
Standby power systems for hospitals
Standby power systems for hospitalsStandby power systems for hospitals
Standby power systems for hospitalsmichaeljmack
 
Next105 Ases Power Point Presentation Internal Final
Next105 Ases Power Point Presentation Internal FinalNext105 Ases Power Point Presentation Internal Final
Next105 Ases Power Point Presentation Internal FinalNextronex Inc
 
(B) pepco energy solutions overview document email
(B) pepco energy solutions overview document email(B) pepco energy solutions overview document email
(B) pepco energy solutions overview document emailsgraham007
 
Slideshare presentation
Slideshare presentationSlideshare presentation
Slideshare presentationNextronex Inc
 
Consumer Basics for Renewable Energy
Consumer Basics for Renewable EnergyConsumer Basics for Renewable Energy
Consumer Basics for Renewable EnergyRockyViewCounty
 
Energy Efficient Appliances
Energy Efficient AppliancesEnergy Efficient Appliances
Energy Efficient AppliancesVijay Sharma
 
Solar electricity india-2011
Solar electricity india-2011Solar electricity india-2011
Solar electricity india-2011H Janardan Prabhu
 
Harmonics Limited Quick Intro Roi And Benefits 2010
Harmonics Limited Quick Intro Roi And Benefits 2010Harmonics Limited Quick Intro Roi And Benefits 2010
Harmonics Limited Quick Intro Roi And Benefits 2010NextGen_Energy
 
FINAL PROJECT ppt.pptx
FINAL PROJECT ppt.pptxFINAL PROJECT ppt.pptx
FINAL PROJECT ppt.pptxmmpnair0
 
Tsl Kvar Power Point
Tsl Kvar Power PointTsl Kvar Power Point
Tsl Kvar Power Pointguest496e10
 
final ppt major.pdf
final ppt major.pdffinal ppt major.pdf
final ppt major.pdfmanojboura
 

Similar to Power Presentation West Palm (20)

Power Presentation West Palm2
Power Presentation West Palm2Power Presentation West Palm2
Power Presentation West Palm2
 
Kvar Presentation Ppt 8.8.08[1]
Kvar Presentation Ppt 8.8.08[1]Kvar Presentation Ppt 8.8.08[1]
Kvar Presentation Ppt 8.8.08[1]
 
Retail P P T Kvar Presentation 2
Retail  P P T  Kvar  Presentation 2Retail  P P T  Kvar  Presentation 2
Retail P P T Kvar Presentation 2
 
M A MALLICK ppt. for FDP SEPT. 2019
M A MALLICK ppt. for  FDP SEPT. 2019M A MALLICK ppt. for  FDP SEPT. 2019
M A MALLICK ppt. for FDP SEPT. 2019
 
Reducing Your Electric bills & your Carbon Footprint
Reducing Your Electric bills & your Carbon FootprintReducing Your Electric bills & your Carbon Footprint
Reducing Your Electric bills & your Carbon Footprint
 
EE494_SENIOR_DESIGN_PRESENTATION_2015_V3
EE494_SENIOR_DESIGN_PRESENTATION_2015_V3EE494_SENIOR_DESIGN_PRESENTATION_2015_V3
EE494_SENIOR_DESIGN_PRESENTATION_2015_V3
 
Power factor
Power factorPower factor
Power factor
 
Standby power systems for hospitals
Standby power systems for hospitalsStandby power systems for hospitals
Standby power systems for hospitals
 
Next105 Ases Power Point Presentation Internal Final
Next105 Ases Power Point Presentation Internal FinalNext105 Ases Power Point Presentation Internal Final
Next105 Ases Power Point Presentation Internal Final
 
(B) pepco energy solutions overview document email
(B) pepco energy solutions overview document email(B) pepco energy solutions overview document email
(B) pepco energy solutions overview document email
 
Slideshare presentation
Slideshare presentationSlideshare presentation
Slideshare presentation
 
Consumer Basics for Renewable Energy
Consumer Basics for Renewable EnergyConsumer Basics for Renewable Energy
Consumer Basics for Renewable Energy
 
Energy Efficient Appliances
Energy Efficient AppliancesEnergy Efficient Appliances
Energy Efficient Appliances
 
Solar electricity india-2011
Solar electricity india-2011Solar electricity india-2011
Solar electricity india-2011
 
Harmonics Limited Quick Intro Roi And Benefits 2010
Harmonics Limited Quick Intro Roi And Benefits 2010Harmonics Limited Quick Intro Roi And Benefits 2010
Harmonics Limited Quick Intro Roi And Benefits 2010
 
FINAL PROJECT ppt.pptx
FINAL PROJECT ppt.pptxFINAL PROJECT ppt.pptx
FINAL PROJECT ppt.pptx
 
Understanding power quality and its importantce
Understanding power quality and its importantceUnderstanding power quality and its importantce
Understanding power quality and its importantce
 
Tsl Kvar Power Point
Tsl Kvar Power PointTsl Kvar Power Point
Tsl Kvar Power Point
 
Tsl Kvar Power Point
Tsl Kvar Power PointTsl Kvar Power Point
Tsl Kvar Power Point
 
final ppt major.pdf
final ppt major.pdffinal ppt major.pdf
final ppt major.pdf
 

Power Presentation West Palm

  • 1. INTERNATIONAL ENERGY RESOURCES PRESENTS THE IER ENERGY SAVER (ES)! Protecting, Preserving & Improving the Environment International Energy Resources
  • 2. The Need for the IER (ES) •In the 21st century “Going Green” has become a corporate responsibility •With the rising cost of doing business, Energy Efficiency is a must •Help meet the social requirements of “Being Green” and reap the financial savings
  • 3. The Problem • Electric Motors use more than half of all electricity • Electricity Costs: – 1960’s .019/kwh – 1970’s energy crisis .044/kwh – 2008 .10+ /kwh • Most A/C Induction motors operate at 80% efficiency • NASA research proved that substantial savings could be made on the running costs of A/C Induction motors
  • 4.
  • 5. The Power Supply Dilemma • The adequacy of North America’s Electricity system will decline unless changes are made soon… …demand for electricity is expected to increase over the next ten years by 20% in the U.S., but confirmed power capacity will increase by only 10% -NERC (North American Electric Reliability Council) “Over $16 billion dollars of electricity is unusable energy, but billable in the US.” - U.S. Dept. of Energy
  • 6. 20% increase in demand with 10% increase in supply
  • 7. How the Utility Company & the Environment Benefit • Enhancement of the capacity of the existing electrical systems • Power supplied to more customers without the generation or acquisition of additional power plants. • Less fossil fuel being used to generate power • Less dependency on foreign oil
  • 8.
  • 9.
  • 10. The Unique Energy Savings with the IER (ES) • The Patented diagnostic device & methodology determines to an exact science how much capacitance is required to bring each inductive load to unity • Optimizing is precisely accomplished on each inductive load in minutes • The pre-engineered customized systems are assembled from modular components based on sizing results • Installation is fast and simple • Power savings are immediate and can be up to 25% • Realize a rapid return on investment (often 24 months or less)
  • 11. IER (ES) • Innovative, unique & Patented * • U.S. Manufactured • NASA Tested and used • U.S. Government certified • UL Listed CSA Approved • Cleaner & Greener / RoHS Certified • Reduces the amount of non-productive current in your existing electrical system, resulting in a significant reduction in power consumption costs • Thousands of installations worldwide • 5 year warranty / 12 year on Residential *Methodology & Apparatus
  • 12.
  • 13. How does the IER Energy Saver (ES) work? • The IER (ES) stores the reactive power to create the electromagnetic field (EMF) around the inductive windings of a motor • As motors operate, reactive power is “pushed” and “pulled” to and from the (ES) by the motor at 60 cycles per second • The IER (ES) stores & releases to motors what they need to function more efficiently • Electricity reclaimed and recycled by the (ES) would normally be pushed back through the power distribution lines • The IER (ES) reclaims, stores, recycles and supplies Reactive power to inductive loads
  • 14. Other Benefits • The IER (ES) improves the efficiency of the electrical system & the kW capacity is increased • Maintains quality voltage levels to your system with less voltage drops especially long runs of cable • Reduces the harmful effects from the EMF’s • Less power system losses in your distribution system • Reduces the heat on wires and motors • Decreases premature failure of motors and other inductive equipment • Motors run cooler and are more efficient • Increases the life of the motors • Reduces maintenance costs
  • 15. Causes of Low Power Factor • Inductive loads are usually the major portion of the power consumed in commercial buildings & industrial complexes – 80% or more • Types of Inductive loads (reactive Power) – Transformers – Motors – Compressors – Fluorescent lighting with T-12 ballasts – Older style high intensity discharge lighting (HID) – Lightly loaded motors are wasteful and result in lower power factor
  • 16. Power Factor Correction • A 20th Century Technology • Installed on the line side near the main service • Main purpose is for the utility company to “clean up” their “dirty Power” and saves the electric company money Power factor Optimization • A 21st Century Technology • Installed on the demand side, close to the equipment • Reduces amperage kWH (slows the meter) • Saves the customer money • Reduce or eliminate Power Factor Correction penalties
  • 17. Why you should optimize Power Factor? • Reducing Amperage & kW usage, directly reflects dollar savings • Reduce the monthly “demand charge” • Eliminate the primary power factor surcharge penalty – Utilities usually charge customers an additional fee (up to 25% more) when their power factor is less than 0.85 (PFC equipment)
  • 18. Installing the IER (ES) Units • 2 Types of installations with the IER (ES) Panel Mount – accumulation of smaller inductive loads • Single Phase panel mount • Three Phase panel mount Equipment Mount – Larger individual inductive loads
  • 19. Return on Investment Depends On: • Age of Equipment • Percentage of PF optimization • kW per hour charged • Run time of inductive loads • Panel mount or equipment mount • Amount of equipment and labor needed for optimization
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26. School District, DE 8 out of 10 Schools Total = 38% Savings
  • 27.
  • 28.
  • 29. Measuring Power Factor Select Power Factor Clamp Load Wire Leads on Positive and Ground Read and record initial power factor and Amps
  • 30. Initial Amps 33.85
  • 31. Optimized Amps 27.30 6.55 Amp Difference 19.35% Reduction
  • 32.
  • 33.
  • 34.
  • 35.
  • 36. How the process works! • Initial meeting to discuss technology and application for your facility. – This is primarily a discussion that lets you find out who we are and what we provide. – During this meeting we will gather information about your facility. This is called a pre assessment review (PAR) – This information is used to deliver to you an estimate for us to complete an energy analysis of the facility.
  • 37.
  • 38. Energy Analysis • An Energy analysis is preformed by a specially trained and licensed electrician/s – Our team will conduct checks of all relevant electrical panels and individual electric motors – Information that we are gathering is related to Voltage, Current, Power, and Power Factor – After the initial readings are taken our patented equipment is hooked up to optimize each load. – Often times the electrician is confronted with situations in your facility that need immediate attention, this information might not have been discovered until to late, had we not been there. We will immediately notify you if this occurs. – The analysis process is not typically disruptive to the work force and all of our personnel conduct themselves in a professional manner.
  • 39. Energy Analysis • Upon completion of the analysis all data is forwarded to the I.E.R. corporate office for review. • The review process consist of data obtained, special notes from the electrician and parameters of actually installing the equipment. • The data will now be compiled into a proposal for customer review.
  • 40.
  • 41.
  • 42.
  • 43.
  • 44.
  • 45. WHY NOW? • Conditioned power can increase the life of all electric motors in the facility leading to reduced maintenance costs. • Up to 25% SAVINGS realized immediately upon installation. • Environmentally responsible organizations are leading the charge in Protecting, Preserving & Improving our environment.