2. History of Indian Power generation
First hydro power plant in India:
130 KW -1898-Darjeeling.
First Thermal PP in India:
1000KWโ1899- Calcutta (Kolkata).
First Hydro plant in Karnataka:
17200 KW -1902- Shimsha Hydro
Electric Project
(Kunigal Taluk of Tumkur district).
Three years later Bangalore city got
electrified.
Email:er.vs.ekbote@gmail.com 2
3. 3
a) First 200 MW TPS was Obra TPS of Russian
(LMZ) design commissioned on 1977.
b) First 500 MW TPS was Trombay TPS
commissioned on 1984.
c) KWU units started in India from 1983
onwards with higher steam parameters and
improved heat rate.
d) First super thermal power station: 2000MW
capacity is -Singrauli Super Thermal Power
Plant (UP) โ 1987.
e) First UMPP project - 4000 MW (UMPP)-
Coastal Gujarat Power Limited (CGPL),
Mundra Port, GEumjaail:rera.vst. ek-b2ot0e@1g2mail.com
4. History of Power scenario
Power plant Installed capacity in India until 1900 was less
than 2000 KW ( 2 MW)
Installed capacity in the year 1947: 1362 MW
Installed capacity in the year 1950: less than 2000MW
Installed capacity in the year 2000: reached One Lakh MW
Installed capacity in the year 2012: reached Two Lakh MW
Energy projection in the year 2020-21 is 3, 50,000 MW
Energy projection in the year 2031-32 is 7, 80,000 MW
1947
1362 MW
Jan 2014
2,28,000 MW
India
generated
855 BU
electricity
during
2011-12
fiscal.
Email:er.vs.ekbote@gmail.com 4
6. Global Energy scenario
๏ฎ Global Average energy
consumption is 1.68TOE
๏ฎUSA Average energy
consumption is 8.55TOE
๏ฎ Indian Average energy
consumption is 0.32 TOE
Email:er.vs.ekbote@gmail.com 6
7. ๏ฎ Indiaโs Fuel reserve against world
๏ฎ Oil -----20 / 42 Years
๏ฎ Gas ---36 / 60 Years
๏ฎ Coal ---114 / 122 Years
5
4
3
2
1
0
Indian dependency on oil
1997 2010 2020
M
bd
Net impor t s Domest ic
product ion
57% Oil
Impor t
85%
92%
Impor t Of Crude Oi l
Email:er.vs.ekbote@gmail.com 7
8. Sl.N
o
Unit Capacity Nos. in % % of
power
Generatio
n
1 110 MW and
smaller Units
33.4 % 21 %
2 210 MW 48.5 % 54 %
3 500 MW units 8.5 % 25 %
Email:er.vs.ekbote@gmail.com 8
9. Global challenge to TPP
3E-Concept
(Sustainable Development )
Ecological
Balance
Employment (Social Progress )
Economic Growth
Email:er.vs.ekbote@gmail.com 9
18. 18
Sustainable Balance
Environment Development
Sustainable development means living
on Earthโs income rather than eroding its capitalโ
& keeping the consumption of renewable natural
Resources within the limits Email:er.vs.ekbo otef@ tghmeaiil.rc ormeplenishmentโ
19. 1) Engineer the โEnergy for futureโ (Green Energy)
2) Engineer to Reduce , Reuse, Rejuvenate And
Recycle in all directions.
3) Engineer to Start waste to wealth
4) Green revolution is the Best engineering Industry on
earth
5) The problem is window of engineering - opportunity
6) Simplicity is the best engineering design.
7) Establish right โEngineering Practice โ
8) Engineer the โSustainable livingโ
Email:er.vs.ekbote@gmail.com 19
20. 20
?
pls. SMS or Mail your valuable opinion to this,