Engineering Economics
Work Breakdown
Structure
Introduction
 For project budgetary planning and control
purposes, dividing complex projects to simpler
and manageable tasks is the process identified
as Work Breakdown Structure (WBS).
 Usually, the project managers use this method for
simplifying the project execution.
 In WBS, much larger tasks are broken-down to
manageable chunks of work.
 These chunks can be easily supervised and
estimated.
A Work Breakdown Structure
 A work breakdown structure element may be a
product, data, a service, or any combination.
 A WBS also provides the necessary framework
for detailed cost estimating and control along with
providing guidance for schedule development and
control.
Why WBS in a Project?
 Accurate and readable project organization.
 Accurate assignment of responsibilities to the
project team.
 Indicates the project milestones and control
points.
 Helps to estimate the cost, time and risk.
 Illustrate the project scope, so the stakeholders
can have a better understanding of the same.
Purpose of WBS
1. First reason is that it helps more accurately and
specifically to define and organize the scope of
total project.
2. The second reason for using a WBS in your
projects is to help with assigning
responsibilities, resource allocation, monitoring
the project, and controlling the project
3. Finally, it allows you double check all the
deliverables' specifics with the stakeholders and
make sure there is nothing missing or
overlapping.
Work Breakdown Structure
*
Task
*
Work
Activity
Work Breakdown Structure
Work Breakdown Structure: The aggregation of all the work
to be performed in a project. Often called WBS
Activities, Tasks and Functions
 Activity: A major unit of work with precise dates
that consists of smaller activities or tasks. It
culminates in a project milestone.
 Task: Smallest unit of work subject to
management. Small enough for adequate
planning and tracking. Large enough to avoid
micro management
 Project Function: An activity or set of activities
that span the duration of the project
Some Important Definitions
 Project:
 A Project has a duration and consists of functions,
activities and tasks
 Work Package:
 A description of the work to be accomplished in an
activity or task
 Work Product:
 Any tangible item that results from a project function,
activity or task.
 Project Baseline:
 A work product that has been formally reviewed and
agreed upon.
 A project baselines can only be changed through a
formal change procedure
 Project Deliverable:
 A work product to be delivered to the customer
How do you develop a good
WBS?
 Top down approach:
 Start at the highest, top level activities and
systematically develop increasing levels of detail for all
activities.
 Bottom up approach (“Brainstorming”):
 Generate all activities you can think of that will have to
be done and then group them into categories.
 Which one you use depends on
 how familiar you and your team are with the project,
 whether similar projects have successfully been
performed in the past, and
 how many new methods and technologies will be used.
The Top Down WBS
Development
 Specify all activities required for the entire project
to be finished
 Determine all tasks required to complete each
activity
 If necessary, specify sub-activities required to
complete each task
 Continue in this way until you have adequately
detailed your project.
 Top Down WBS Approach is good if
 You are familiar with the problem (or your team)
 You have successfully managed a similar project in
the past
 You are not introducing new methodologies,
methods or tools
The Brainstorming WBS
Development
 On a single list, write any activities you think will have to
be performed for your project.
 Brainstorming means you
 Don’t worry about overlap or level of detail
 Don’t discuss activity wordings or other details
 Don’t make any judgements
 Write everything down
 Then study the list and group activities into a few major
categories with common characteristics
 If appropriate, group identified activities into higher level
activities
 Consider each category you have created and use the
top-down WBS development to determine any additional
activities you may have overlooked.
Displaying Work Breakdown
Structures
Three different formats are usually used:
 Organization-chart format
 Effectively portrays an overview of your project and
the hierarchical relationships of different activities
and tasks.
 Outline format
 Sub-activities and tasks are indented
 Bubble format
 The bubble in the center represents your project
 Lines from the center bubble lead to activities
 Lines from activities lead to tasks
Prepare Report
1.0 Prepare draft report
2.0 Review draft report
3.0 Prepare final report
3.1 Write final report
3.2 Print final report
Review
Draft Report Prepare
Report
Review
Draft Report
Review
Final Report
Print
Final Report
Write
Final Report
Prepare Report
Prepare
Draft Report
Review
Draft Report
Prepare
Final Report
Write
Final Report
Print
Final Report
Org-Chart Format
Outline Format
Bubble Format
WBS Hierarchies
Engineering Economics|Work Breakdown Structure
Engineering Economics|Work Breakdown Structure

More Related Content

What's hot (20)

Project milestone
Project milestoneProject milestone
Project milestone
 
Creating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft projectCreating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft project
 
Work Breakdown Structures (WBS)
Work Breakdown Structures (WBS)Work Breakdown Structures (WBS)
Work Breakdown Structures (WBS)
 
WBS PROJECT
WBS PROJECTWBS PROJECT
WBS PROJECT
 
Project controls
Project controlsProject controls
Project controls
 
Work Breakdown Structure
Work Breakdown StructureWork Breakdown Structure
Work Breakdown Structure
 
Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structure
 
Project closure
Project closureProject closure
Project closure
 
Project management tools and techniques
Project management tools and techniquesProject management tools and techniques
Project management tools and techniques
 
Project Management Tools and Techniques
Project Management Tools and TechniquesProject Management Tools and Techniques
Project Management Tools and Techniques
 
Project Closing Process
Project Closing ProcessProject Closing Process
Project Closing Process
 
Managing multiple projects
Managing multiple projectsManaging multiple projects
Managing multiple projects
 
Effective project management skills
Effective project management skillsEffective project management skills
Effective project management skills
 
Pre Bid Risk Assessment
Pre Bid Risk AssessmentPre Bid Risk Assessment
Pre Bid Risk Assessment
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
 
Project initiation
Project initiationProject initiation
Project initiation
 
Project Charter Guide
Project Charter GuideProject Charter Guide
Project Charter Guide
 
Project Management Steps
Project Management StepsProject Management Steps
Project Management Steps
 
Different project management methodologies
Different project management methodologiesDifferent project management methodologies
Different project management methodologies
 
Project Management Fundamentals
Project Management FundamentalsProject Management Fundamentals
Project Management Fundamentals
 

Similar to Engineering Economics|Work Breakdown Structure

workbreakdownstructureppt-130410021152-phpapp02 (1).pdf
workbreakdownstructureppt-130410021152-phpapp02 (1).pdfworkbreakdownstructureppt-130410021152-phpapp02 (1).pdf
workbreakdownstructureppt-130410021152-phpapp02 (1).pdfDipakBorse6
 
Workbreakdownstructureppt 130410021152-phpapp02
Workbreakdownstructureppt 130410021152-phpapp02Workbreakdownstructureppt 130410021152-phpapp02
Workbreakdownstructureppt 130410021152-phpapp02sayyed sabir
 
Chapter 2 Work Break down Structure1.ppt
Chapter 2 Work Break down Structure1.pptChapter 2 Work Break down Structure1.ppt
Chapter 2 Work Break down Structure1.pptssuser4f8f65
 
Chapter 2 Work Break down Structure (1).ppt
Chapter 2 Work Break down Structure (1).pptChapter 2 Work Break down Structure (1).ppt
Chapter 2 Work Break down Structure (1).pptssuser8cd298
 
Understanding the Work Breakdown Structure.pdf
Understanding the Work Breakdown Structure.pdfUnderstanding the Work Breakdown Structure.pdf
Understanding the Work Breakdown Structure.pdfTEWMAGAZINE
 
6 Work Breakdown Structure and SchedulingCavan ImagesSto.docx
6 Work Breakdown Structure  and SchedulingCavan ImagesSto.docx6 Work Breakdown Structure  and SchedulingCavan ImagesSto.docx
6 Work Breakdown Structure and SchedulingCavan ImagesSto.docxevonnehoggarth79783
 
Team Final_Scope Management
Team Final_Scope ManagementTeam Final_Scope Management
Team Final_Scope ManagementRKDickey
 
Work breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran jWork breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran jIIT delhi
 
Project scope management
 Project scope management Project scope management
Project scope managementSidraSaleem17
 
Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time ManagementSabrinaScott22
 
Work breakdown structure (WBS) PRESENTATION.pptx
Work breakdown structure (WBS) PRESENTATION.pptxWork breakdown structure (WBS) PRESENTATION.pptx
Work breakdown structure (WBS) PRESENTATION.pptxErzaScarlet64
 
By now you certainly appreciate how very challenging defining
By now you certainly appreciate how very challenging defining By now you certainly appreciate how very challenging defining
By now you certainly appreciate how very challenging defining TawnaDelatorrejs
 
CSCI 714 Software Project Planning and EstimationLec.docx
CSCI 714 Software Project Planning and EstimationLec.docxCSCI 714 Software Project Planning and EstimationLec.docx
CSCI 714 Software Project Planning and EstimationLec.docxmydrynan
 
PositioningPositioning of Product or ServiceParis based weig.docx
PositioningPositioning of Product or ServiceParis based weig.docxPositioningPositioning of Product or ServiceParis based weig.docx
PositioningPositioning of Product or ServiceParis based weig.docxChantellPantoja184
 

Similar to Engineering Economics|Work Breakdown Structure (20)

workbreakdownstructureppt-130410021152-phpapp02 (1).pdf
workbreakdownstructureppt-130410021152-phpapp02 (1).pdfworkbreakdownstructureppt-130410021152-phpapp02 (1).pdf
workbreakdownstructureppt-130410021152-phpapp02 (1).pdf
 
Workbreakdownstructureppt 130410021152-phpapp02
Workbreakdownstructureppt 130410021152-phpapp02Workbreakdownstructureppt 130410021152-phpapp02
Workbreakdownstructureppt 130410021152-phpapp02
 
Lect2
Lect2Lect2
Lect2
 
Chapter 2 Work Break down Structure1.ppt
Chapter 2 Work Break down Structure1.pptChapter 2 Work Break down Structure1.ppt
Chapter 2 Work Break down Structure1.ppt
 
Chapter 2 Work Break down Structure (1).ppt
Chapter 2 Work Break down Structure (1).pptChapter 2 Work Break down Structure (1).ppt
Chapter 2 Work Break down Structure (1).ppt
 
Understanding the Work Breakdown Structure.pdf
Understanding the Work Breakdown Structure.pdfUnderstanding the Work Breakdown Structure.pdf
Understanding the Work Breakdown Structure.pdf
 
6 Work Breakdown Structure and SchedulingCavan ImagesSto.docx
6 Work Breakdown Structure  and SchedulingCavan ImagesSto.docx6 Work Breakdown Structure  and SchedulingCavan ImagesSto.docx
6 Work Breakdown Structure and SchedulingCavan ImagesSto.docx
 
Team Final_Scope Management
Team Final_Scope ManagementTeam Final_Scope Management
Team Final_Scope Management
 
Work breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran jWork breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran j
 
Babu 143
Babu 143Babu 143
Babu 143
 
Lab exercise 6
Lab exercise 6Lab exercise 6
Lab exercise 6
 
Project scope management
 Project scope management Project scope management
Project scope management
 
SEN-22413 - UNIT - V.pptx
SEN-22413 -  UNIT - V.pptxSEN-22413 -  UNIT - V.pptx
SEN-22413 - UNIT - V.pptx
 
Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time Management
 
Work breakdown structure (WBS) PRESENTATION.pptx
Work breakdown structure (WBS) PRESENTATION.pptxWork breakdown structure (WBS) PRESENTATION.pptx
Work breakdown structure (WBS) PRESENTATION.pptx
 
By now you certainly appreciate how very challenging defining
By now you certainly appreciate how very challenging defining By now you certainly appreciate how very challenging defining
By now you certainly appreciate how very challenging defining
 
Wbs, gant charts
Wbs, gant chartsWbs, gant charts
Wbs, gant charts
 
Managing Small Projects Introduction
Managing Small Projects   IntroductionManaging Small Projects   Introduction
Managing Small Projects Introduction
 
CSCI 714 Software Project Planning and EstimationLec.docx
CSCI 714 Software Project Planning and EstimationLec.docxCSCI 714 Software Project Planning and EstimationLec.docx
CSCI 714 Software Project Planning and EstimationLec.docx
 
PositioningPositioning of Product or ServiceParis based weig.docx
PositioningPositioning of Product or ServiceParis based weig.docxPositioningPositioning of Product or ServiceParis based weig.docx
PositioningPositioning of Product or ServiceParis based weig.docx
 

More from umair khan

SEE Sensitivity Analysis
SEE Sensitivity AnalysisSEE Sensitivity Analysis
SEE Sensitivity Analysisumair khan
 
Basic Software Effort Estimation
Basic Software Effort EstimationBasic Software Effort Estimation
Basic Software Effort Estimationumair khan
 
Isomorphic graph
Isomorphic graphIsomorphic graph
Isomorphic graphumair khan
 
game development
game  developmentgame  development
game developmentumair khan
 
Game devolopment
Game devolopmentGame devolopment
Game devolopmentumair khan
 
Digital modulation
Digital modulationDigital modulation
Digital modulationumair khan
 

More from umair khan (10)

Spinal cord
Spinal cordSpinal cord
Spinal cord
 
SEE Sensitivity Analysis
SEE Sensitivity AnalysisSEE Sensitivity Analysis
SEE Sensitivity Analysis
 
Basic Software Effort Estimation
Basic Software Effort EstimationBasic Software Effort Estimation
Basic Software Effort Estimation
 
queue
queuequeue
queue
 
Isomorphic graph
Isomorphic graphIsomorphic graph
Isomorphic graph
 
Hashing data
Hashing dataHashing data
Hashing data
 
Counters
CountersCounters
Counters
 
game development
game  developmentgame  development
game development
 
Game devolopment
Game devolopmentGame devolopment
Game devolopment
 
Digital modulation
Digital modulationDigital modulation
Digital modulation
 

Recently uploaded

Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spaintimesproduction05
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 

Recently uploaded (20)

Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 

Engineering Economics|Work Breakdown Structure

  • 3. Introduction  For project budgetary planning and control purposes, dividing complex projects to simpler and manageable tasks is the process identified as Work Breakdown Structure (WBS).  Usually, the project managers use this method for simplifying the project execution.  In WBS, much larger tasks are broken-down to manageable chunks of work.  These chunks can be easily supervised and estimated.
  • 4. A Work Breakdown Structure  A work breakdown structure element may be a product, data, a service, or any combination.  A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.
  • 5. Why WBS in a Project?  Accurate and readable project organization.  Accurate assignment of responsibilities to the project team.  Indicates the project milestones and control points.  Helps to estimate the cost, time and risk.  Illustrate the project scope, so the stakeholders can have a better understanding of the same.
  • 6. Purpose of WBS 1. First reason is that it helps more accurately and specifically to define and organize the scope of total project. 2. The second reason for using a WBS in your projects is to help with assigning responsibilities, resource allocation, monitoring the project, and controlling the project 3. Finally, it allows you double check all the deliverables' specifics with the stakeholders and make sure there is nothing missing or overlapping.
  • 7. Work Breakdown Structure * Task * Work Activity Work Breakdown Structure Work Breakdown Structure: The aggregation of all the work to be performed in a project. Often called WBS
  • 8. Activities, Tasks and Functions  Activity: A major unit of work with precise dates that consists of smaller activities or tasks. It culminates in a project milestone.  Task: Smallest unit of work subject to management. Small enough for adequate planning and tracking. Large enough to avoid micro management  Project Function: An activity or set of activities that span the duration of the project
  • 9. Some Important Definitions  Project:  A Project has a duration and consists of functions, activities and tasks  Work Package:  A description of the work to be accomplished in an activity or task  Work Product:  Any tangible item that results from a project function, activity or task.  Project Baseline:  A work product that has been formally reviewed and agreed upon.  A project baselines can only be changed through a formal change procedure  Project Deliverable:  A work product to be delivered to the customer
  • 10. How do you develop a good WBS?  Top down approach:  Start at the highest, top level activities and systematically develop increasing levels of detail for all activities.  Bottom up approach (“Brainstorming”):  Generate all activities you can think of that will have to be done and then group them into categories.  Which one you use depends on  how familiar you and your team are with the project,  whether similar projects have successfully been performed in the past, and  how many new methods and technologies will be used.
  • 11. The Top Down WBS Development  Specify all activities required for the entire project to be finished  Determine all tasks required to complete each activity  If necessary, specify sub-activities required to complete each task  Continue in this way until you have adequately detailed your project.  Top Down WBS Approach is good if  You are familiar with the problem (or your team)  You have successfully managed a similar project in the past  You are not introducing new methodologies, methods or tools
  • 12. The Brainstorming WBS Development  On a single list, write any activities you think will have to be performed for your project.  Brainstorming means you  Don’t worry about overlap or level of detail  Don’t discuss activity wordings or other details  Don’t make any judgements  Write everything down  Then study the list and group activities into a few major categories with common characteristics  If appropriate, group identified activities into higher level activities  Consider each category you have created and use the top-down WBS development to determine any additional activities you may have overlooked.
  • 13. Displaying Work Breakdown Structures Three different formats are usually used:  Organization-chart format  Effectively portrays an overview of your project and the hierarchical relationships of different activities and tasks.  Outline format  Sub-activities and tasks are indented  Bubble format  The bubble in the center represents your project  Lines from the center bubble lead to activities  Lines from activities lead to tasks
  • 14. Prepare Report 1.0 Prepare draft report 2.0 Review draft report 3.0 Prepare final report 3.1 Write final report 3.2 Print final report Review Draft Report Prepare Report Review Draft Report Review Final Report Print Final Report Write Final Report Prepare Report Prepare Draft Report Review Draft Report Prepare Final Report Write Final Report Print Final Report Org-Chart Format Outline Format Bubble Format

Editor's Notes

  1. “formally reviewed and agreed upon” does not mean a baseline is frozen! Avoid this term by any means!
  2. Break Example for previous slide: You are at the beach, you are building a sandcastl e, somebody else too, soon you are noticing that the wall, your wall!, is used by the oterh kid. War! Sandwar! This type of war is typical, if you mix approaches, for example if you mix the functional WBS with the product component approach.