1. Track Users Meeting Presentation PRESENTATION TITLE:FUTURA MEDIUM 24PT emboldenedUp to Three Lines All Capital or Title Case Subheading /introduction textFutura Medium 16pt It is important that you read the User Guide for this version of PowerPoint. Jay Kinberger Maintenance Excellence Manager Shell Norco Use this area for cover image(height 6.5cm, width 8cm) Author’s Name Futura Medium12pt Role in Organization Futura Medium12pt 1
11. 4 Common Pay Rules Scheduled Start – Early/Late in Time Time will not be automatically counted before Schedule unless by Supervisor Approval. Unless, the Contractor has clocked in 2 hours before schedule will Track assume that the contractor was called out to begin work early for the day. Contractors must be onsite 5 minutes before Schedule. If they clock in the 5 minute window before schedule, they will be docked fifteen minutes. If they clock in after the scheduled start, they will be docked 30 minutes. Examples: 0700-1530 Schedule 0656 clock in will result in dock of 15 minutes. 0701 clock in will result in dock of 30 minutes. Scheduled End – Early/Late Time Time will not be counted after end of schedule unless by Supervisor Approval. Grace Periods There will be no grace Periods entered into Track.
12. 5 Common Pay Rules Lunch 30 minutes Lunch Deduction will occur after 75% of the scheduled work day. 8hr schedule – after 360 minutes, 10hr –after 450 minutes. Any offsite time during the lunch period over and above the 30 minute period will be counted towards the total lunch deduction. Rounding Rounding will be counted in 15 minutes increments. Rounding will round down to the nearest 15th minutes increment.
13. 6 Cost control The Objective -predict daily spend on routine mtc by operating area. Exposure to double billing for resources to multiple companies Lack of controls to identify resources sliding between Projects/Nonroutinemtc to Routine mtc Lack of a common daily time approval work process The Solution All contractors and company craft’s time entered into TRACK on a daily basis The time is entered at the work order level, with work order type (routine mtc, projects, etc) and functional location (operating area or project coordinator ) details Approvers are broken down by work order type and functional location
19. 12 Future - Personnel Accountability There is a desire to decrease the amount of time that it currently takes to identify personnel that may be in the area of field incident Looking into the options of putting additional card readers in safe zones.