International Container Terminal Services, Inc. (ICTSI) is in the business of acquiring, developing,
managing, and operating container ports and terminals worldwide. As ICTSI’s flagship division, the
Manila International Container Terminal (MICT) is the largest container port terminal in the Philippines.
A significant adverse incident at MICT can have far reaching consequences for ICTSI and its reputation
for managing ports around the world. More importantly, it can have a significant impact on the econ-
omy of the Philippines, as MICT is a major supply chain hub for the whole nation. It was therefore
imperative to implement or improve contingency plans and business continuity capabilities at MICT
to address such adverse incidents. ICTSI commissioned EMC®
Consulting to assist in this initiative.
At the outset, EMC consultants set the boundaries right in terms of the overlapping and often-times
confusing disciplines such as business continuity and disaster recovery. Many professionals confuse
these terms and use them interchangeably even though they are different, albeit related, concepts.
Business continuity management is about studying business processes and how to enhance their
resilience in a crisis. It comprises a holistic plan for rapidly resuming mission-critical activities in
the event of a crisis or disruption. Disaster recovery planning, on the other hand, is about increasing
the resilience of information technology (IT). Each has a different emphasis—something that is often
not clearly understood in the industry.
Auditing and establishing a business continuity baseline
Once the scope and boundaries of business continuance and disaster recovery were clearly estab-
lished, EMC Consulting was commissioned to conduct an audit of ICTSI’s current business continuity
capabilities. A parallel disaster recovery technology implementation initiative was already underway,
and ICTSI was already writing their disaster recovery plan and procedure to support the technology.
They wanted to go beyond IT and study the resilience of their business processes.
The business continuity audit had the following objectives:
•	To inform ICTSI’s management of their current business continuity readiness
•	To establish a baseline from which further enhancements could be benchmarked against
•	To document a gap analysis report identifying weakness in business continuity capabilities
•	To provide a roadmap of prioritized recommendations on how to move toward a world-class
business continuity capability
As an auditing and rating tool, EMC consultants used the Business Continuity Maturity Model®
or
BCMM®
by Virtual Corporation, New Jersey. This model provided an objective, quantifiable, and
repeatable rating model for ICTSI’s BCM program.
The BCMM is a six-level model that assists organizations in evaluating their resilience by asking a
comprehensive set of questions. The answers to the questions contribute to scores in eight character-
istics of a successful business continuity management program. The assessment scores can be used
to obtain executive support, increase business continuity awareness, and quantify improvements
in the business continuity program.
Using the BCMM, EMC’s consultants conducted detailed interviews and surveys of several key
business leaders in ICTSI on various aspects of business resilience. Inconsistencies in data were
closely studied and re-visited. The audit was completed on time in four weeks. A scorecard was
generated from the exercise rating the various competencies and attributes of a successful BCM
program and how ICTSI scored in each of these areas. EMC consultants wrote a report interpreting
the scores with a list of prioritized recommendations on how to improve business resilience.
“The scorecard and report gave our senior management a bird’s eye view of where we stood,”
said Ms. Catherine Orellano, Information Technology Systems and Services (ITSS) Manager at MICT.
“We actually scored very well in certain areas like security and emergency response. In some other
areas, we needed improvement. The scorecard provided the baseline and springboard to plan these
improvements. From a list of areas to work on, our management chose development of Departmental
Recovery Plans as our top priority.”
An initial in-house, do-it-yourself effort whereby all departments drafted their own departmental
recovery plans met with limited success. The output from each department was not standardized
and varied significantly in scope and functionality. EMC business continuity consultants were called
in again to assist.
The pilot project involved EMC Consulting working on two pilot departments and, in the process,
training ICTSI staff to roll out the program to the other departments. The project activities involved
conducting a Business Impact Analysis (BIA), business continuity strategy plan, and finally, building
the recovery plan and procedures for each department.
Conducting a Business Impact Analysis and formulating a business
continuity strategy
During the BIA stage, recovery time objective (RTO) values were analyzed and calculated for each
business function within the two departments studied. These RTO values showed how quickly a
particular function had to be recovered after a stoppage in order to minimize major losses to the
business. The BIA also identified business functions that were not critical and could be suspended
during a period of crisis, thereby relieving pressure and focusing resources on mission-critical
activities (MCA). The business RTO values derived also permitted a cross-check on the existing
technology RTO values to ensure technology RTOs supported business RTOs.
Once the RTOs were worked out, EMC wrote a business continuity strategy paper that discussed
how continuity could be enhanced at various levels of the organization—at the level of the holding
company (ICTSI), at MICT, and at grass-root departmental levels.
Developing a gold standard for departmental plans
Once the strategy was accepted, it was time to write the detailed departmental plans, which included
step-by-step procedures and supporting information. To maintain consistency, EMC proposed a draft
departmental plan document to be used as a “gold standard” for departmental plans for the whole
company. By following this “gold standard,” all departments would have a standardized way of
writing plans. For example, section 3.2 of the departmental plan for department A would contain
the “roles and responsibilities” of the recovery teams in that department, while the same section
in department B’s plans would cover the same topic. Such standardization meant ease of use of the
plan from a developer, auditor, and management point of view.
“Feedback from business continuity managers involved in actual
disasters revealed that increasing complexity in plans made
them less useful in a crisis. EMC Consulting embarked on a
mission to create a plan that was neither too complex to be
pragmatic, nor too simplistic to be useless. We believe they
achieved this delicate balance.”
Vice President and MICT General Manager
ICTSI’s Vice President and MICT General Manager said, “Feedback from business continuity managers
involved in actual disasters revealed that increasing complexity in plans made them less useful in
a crisis. EMC Consulting embarked on a mission to create a plan that was neither too complex to
be pragmatic, nor too simplistic to be useless. We believe they achieved this delicate balance.
Just one look at the table of contents of the departmental plan told the whole story. There were
sufficient details and these were all laid out in a logical, unambiguous manner to support ease
of use in a crisis.”
Achieving effective knowledge transfer
From the start, an internal BCM team was selected as ICTSI’s “internal consultants.” Part of their job
was to learn from the EMC consultants in the pilot project and then subsequently roll out the expertise
to other departments. Throughout the project, the internal consultants participated and assisted EMC
in data gathering, analysis, reporting, and documentation. In the process, they learned hands-on in
addition to classroom learning from workshops conducted by EMC. By the end of the pilot project,
the internal team felt sufficiently confident to be able to roll out the project company wide.
“The pilot-project approach, combined with a knowledge transfer focus, significantly reduced our
consulting costs and raised the in-house knowledge of our team and empowered them to continue
the project beyond the pilot. This worked out to be a cost-effective way of rolling out BCM without
throwing us too much into the deep end. We are now well on our way to achieving company-wide,
full BCM adoption,” Ms. Orellano further stressed.
EMC Corporation
Hopkinton
Massachusetts
01748-9103
1-508-435-1000
In North America 1-866-464-7381
www.EMC.com
EMC2
, EMC, and where information lives are registered trademarks or trademarks of EMC Corporation in the United States and other countries. All other trademarks used herein are the property of their respective owners.
© Copyright 2009 EMC Corporation. All rights reserved. Published in the USA. 06/09 Customer Profile H6358

More Related Content

What's hot

Improving IT Skills the Right Way
Improving IT Skills the Right WayImproving IT Skills the Right Way
Improving IT Skills the Right WayBMC Software
 
Abhijit chaudhuri
Abhijit chaudhuriAbhijit chaudhuri
Abhijit chaudhuriPMI2011
 
Global Platform Replacement: Practice, Issues and Recommendations an IBM Whit...
Global Platform Replacement: Practice, Issues and Recommendations an IBM Whit...Global Platform Replacement: Practice, Issues and Recommendations an IBM Whit...
Global Platform Replacement: Practice, Issues and Recommendations an IBM Whit...Noreen Buckley
 
01企業對於資訊系統管理之實務要求
01企業對於資訊系統管理之實務要求01企業對於資訊系統管理之實務要求
01企業對於資訊系統管理之實務要求Ray James X
 
Managing Technical Debt
Managing Technical DebtManaging Technical Debt
Managing Technical DebtAndre Perkins
 
Case Study: Upgrading the University of South Australia's IBM Cognos BI
Case Study: Upgrading the University of South Australia's IBM Cognos BICase Study: Upgrading the University of South Australia's IBM Cognos BI
Case Study: Upgrading the University of South Australia's IBM Cognos BIDilan J. Gunawardana
 
Aiim State Of Ecm 2007 Keynote Presentation
Aiim   State Of Ecm 2007   Keynote PresentationAiim   State Of Ecm 2007   Keynote Presentation
Aiim State Of Ecm 2007 Keynote PresentationMarc Chin
 
Scalable light weight processes
Scalable light weight processesScalable light weight processes
Scalable light weight processesGlen Alleman
 
The Compass of Local Competitiveness v0.9
The Compass of Local Competitiveness v0.9The Compass of Local Competitiveness v0.9
The Compass of Local Competitiveness v0.9led4lgus
 
Bcm Project Or Profession V4
Bcm Project Or Profession V4Bcm Project Or Profession V4
Bcm Project Or Profession V4Brigitte Theuma
 
IT Outsourcing and Core IS Capabilities: Challenges and Lessons at Dupont
IT Outsourcing and Core IS Capabilities: Challenges and Lessons at DupontIT Outsourcing and Core IS Capabilities: Challenges and Lessons at Dupont
IT Outsourcing and Core IS Capabilities: Challenges and Lessons at DupontMonzer Osama Alchikh WARAK
 
Resume edmund fredrick_young_iii
Resume edmund fredrick_young_iiiResume edmund fredrick_young_iii
Resume edmund fredrick_young_iiiEdmund F. Young III
 
Business Continuity Awareness Week 2009
Business Continuity Awareness Week 2009Business Continuity Awareness Week 2009
Business Continuity Awareness Week 2009Brigitte Theuma
 
Get Smart About Technical Debt
Get Smart About Technical DebtGet Smart About Technical Debt
Get Smart About Technical DebtCAST
 
Design Patterns in Electronic Data Management
Design Patterns in Electronic Data ManagementDesign Patterns in Electronic Data Management
Design Patterns in Electronic Data ManagementGlen Alleman
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET Journal
 
Information Technology Project Management - part 05
Information Technology Project Management - part 05Information Technology Project Management - part 05
Information Technology Project Management - part 05Rizwan Khurram
 

What's hot (20)

Improving IT Skills the Right Way
Improving IT Skills the Right WayImproving IT Skills the Right Way
Improving IT Skills the Right Way
 
Abhijit chaudhuri
Abhijit chaudhuriAbhijit chaudhuri
Abhijit chaudhuri
 
Global Platform Replacement: Practice, Issues and Recommendations an IBM Whit...
Global Platform Replacement: Practice, Issues and Recommendations an IBM Whit...Global Platform Replacement: Practice, Issues and Recommendations an IBM Whit...
Global Platform Replacement: Practice, Issues and Recommendations an IBM Whit...
 
01企業對於資訊系統管理之實務要求
01企業對於資訊系統管理之實務要求01企業對於資訊系統管理之實務要求
01企業對於資訊系統管理之實務要求
 
Managing Technical Debt
Managing Technical DebtManaging Technical Debt
Managing Technical Debt
 
Case Study: Upgrading the University of South Australia's IBM Cognos BI
Case Study: Upgrading the University of South Australia's IBM Cognos BICase Study: Upgrading the University of South Australia's IBM Cognos BI
Case Study: Upgrading the University of South Australia's IBM Cognos BI
 
Aiim State Of Ecm 2007 Keynote Presentation
Aiim   State Of Ecm 2007   Keynote PresentationAiim   State Of Ecm 2007   Keynote Presentation
Aiim State Of Ecm 2007 Keynote Presentation
 
IT CMF Patterns
IT CMF Patterns  IT CMF Patterns
IT CMF Patterns
 
EA Benefits
EA BenefitsEA Benefits
EA Benefits
 
Scalable light weight processes
Scalable light weight processesScalable light weight processes
Scalable light weight processes
 
The Compass of Local Competitiveness v0.9
The Compass of Local Competitiveness v0.9The Compass of Local Competitiveness v0.9
The Compass of Local Competitiveness v0.9
 
Bcm Project Or Profession V4
Bcm Project Or Profession V4Bcm Project Or Profession V4
Bcm Project Or Profession V4
 
IT Outsourcing and Core IS Capabilities: Challenges and Lessons at Dupont
IT Outsourcing and Core IS Capabilities: Challenges and Lessons at DupontIT Outsourcing and Core IS Capabilities: Challenges and Lessons at Dupont
IT Outsourcing and Core IS Capabilities: Challenges and Lessons at Dupont
 
Resume edmund fredrick_young_iii
Resume edmund fredrick_young_iiiResume edmund fredrick_young_iii
Resume edmund fredrick_young_iii
 
Business Continuity Awareness Week 2009
Business Continuity Awareness Week 2009Business Continuity Awareness Week 2009
Business Continuity Awareness Week 2009
 
ITMAM Profile-English v1.19
ITMAM Profile-English v1.19ITMAM Profile-English v1.19
ITMAM Profile-English v1.19
 
Get Smart About Technical Debt
Get Smart About Technical DebtGet Smart About Technical Debt
Get Smart About Technical Debt
 
Design Patterns in Electronic Data Management
Design Patterns in Electronic Data ManagementDesign Patterns in Electronic Data Management
Design Patterns in Electronic Data Management
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
 
Information Technology Project Management - part 05
Information Technology Project Management - part 05Information Technology Project Management - part 05
Information Technology Project Management - part 05
 

Similar to ICTSI enhances resilience through BCP

Interview with Banca Intesa: Unbiased Metrics For Objective Portfolio Rationa...
Interview with Banca Intesa: Unbiased Metrics For Objective Portfolio Rationa...Interview with Banca Intesa: Unbiased Metrics For Objective Portfolio Rationa...
Interview with Banca Intesa: Unbiased Metrics For Objective Portfolio Rationa...CAST
 
An Integrated Proactive Knowledge Management Model For Enhancing Engineering ...
An Integrated Proactive Knowledge Management Model For Enhancing Engineering ...An Integrated Proactive Knowledge Management Model For Enhancing Engineering ...
An Integrated Proactive Knowledge Management Model For Enhancing Engineering ...Darian Pruitt
 
Подборка о рисках ИТ-проектов
Подборка о рисках ИТ-проектовПодборка о рисках ИТ-проектов
Подборка о рисках ИТ-проектовAlexey Ivasyuk
 
Noemi, a collaborative management for ict process improvement in sme experien...
Noemi, a collaborative management for ict process improvement in sme experien...Noemi, a collaborative management for ict process improvement in sme experien...
Noemi, a collaborative management for ict process improvement in sme experien...christophefeltus
 
Practical ITSMS Transformation Techniques Competency Building
Practical ITSMS Transformation Techniques Competency BuildingPractical ITSMS Transformation Techniques Competency Building
Practical ITSMS Transformation Techniques Competency BuildingSukumar Daniel
 
Business Continuity, Disaster Recovery Planning & Leadership, 16 - 19 Februar...
Business Continuity, Disaster Recovery Planning & Leadership, 16 - 19 Februar...Business Continuity, Disaster Recovery Planning & Leadership, 16 - 19 Februar...
Business Continuity, Disaster Recovery Planning & Leadership, 16 - 19 Februar...360 BSI
 
Doug Mader Us Eng Overview Public
Doug Mader Us Eng Overview  PublicDoug Mader Us Eng Overview  Public
Doug Mader Us Eng Overview Publicdmader
 
Implementation of a Decision System for a Suitable IT Governance Framework
Implementation of a Decision System for a Suitable IT Governance FrameworkImplementation of a Decision System for a Suitable IT Governance Framework
Implementation of a Decision System for a Suitable IT Governance FrameworkIJCSIS Research Publications
 
Case study ING
Case study INGCase study ING
Case study INGITpreneurs
 
Project Planning, Execution And Closure Essay
Project Planning, Execution And Closure EssayProject Planning, Execution And Closure Essay
Project Planning, Execution And Closure EssayJennifer Letterman
 
Resume _571966_Hrushikesh Deshpande
Resume _571966_Hrushikesh DeshpandeResume _571966_Hrushikesh Deshpande
Resume _571966_Hrushikesh Deshpandehrushikesh deshpande
 
Integrated knowledge management model for global application management business
Integrated knowledge management model for global application management businessIntegrated knowledge management model for global application management business
Integrated knowledge management model for global application management businessApplication Management
 
The Road to IT Governance Excellence
The Road to IT Governance ExcellenceThe Road to IT Governance Excellence
The Road to IT Governance ExcellenceAPEX Global
 
Brown Susan - Resume2
Brown Susan - Resume2Brown Susan - Resume2
Brown Susan - Resume2Susan Brown
 
Digital Strategy and Transformation
Digital Strategy and TransformationDigital Strategy and Transformation
Digital Strategy and TransformationGustavoVelandia3
 
What Is Oracle Primavera Unifier
What Is Oracle Primavera UnifierWhat Is Oracle Primavera Unifier
What Is Oracle Primavera UnifierJessica Tanner
 

Similar to ICTSI enhances resilience through BCP (20)

ISO_6
ISO_6ISO_6
ISO_6
 
Interview with Banca Intesa: Unbiased Metrics For Objective Portfolio Rationa...
Interview with Banca Intesa: Unbiased Metrics For Objective Portfolio Rationa...Interview with Banca Intesa: Unbiased Metrics For Objective Portfolio Rationa...
Interview with Banca Intesa: Unbiased Metrics For Objective Portfolio Rationa...
 
An Integrated Proactive Knowledge Management Model For Enhancing Engineering ...
An Integrated Proactive Knowledge Management Model For Enhancing Engineering ...An Integrated Proactive Knowledge Management Model For Enhancing Engineering ...
An Integrated Proactive Knowledge Management Model For Enhancing Engineering ...
 
Подборка о рисках ИТ-проектов
Подборка о рисках ИТ-проектовПодборка о рисках ИТ-проектов
Подборка о рисках ИТ-проектов
 
Noemi, a collaborative management for ict process improvement in sme experien...
Noemi, a collaborative management for ict process improvement in sme experien...Noemi, a collaborative management for ict process improvement in sme experien...
Noemi, a collaborative management for ict process improvement in sme experien...
 
Noemi, a collaborative management for ict process improvement in sme experien...
Noemi, a collaborative management for ict process improvement in sme experien...Noemi, a collaborative management for ict process improvement in sme experien...
Noemi, a collaborative management for ict process improvement in sme experien...
 
Practical ITSMS Transformation Techniques Competency Building
Practical ITSMS Transformation Techniques Competency BuildingPractical ITSMS Transformation Techniques Competency Building
Practical ITSMS Transformation Techniques Competency Building
 
Paritosh Kalra Resume
Paritosh Kalra ResumeParitosh Kalra Resume
Paritosh Kalra Resume
 
Business Continuity, Disaster Recovery Planning & Leadership, 16 - 19 Februar...
Business Continuity, Disaster Recovery Planning & Leadership, 16 - 19 Februar...Business Continuity, Disaster Recovery Planning & Leadership, 16 - 19 Februar...
Business Continuity, Disaster Recovery Planning & Leadership, 16 - 19 Februar...
 
Doug Mader Us Eng Overview Public
Doug Mader Us Eng Overview  PublicDoug Mader Us Eng Overview  Public
Doug Mader Us Eng Overview Public
 
Implementation of a Decision System for a Suitable IT Governance Framework
Implementation of a Decision System for a Suitable IT Governance FrameworkImplementation of a Decision System for a Suitable IT Governance Framework
Implementation of a Decision System for a Suitable IT Governance Framework
 
Case study ING
Case study INGCase study ING
Case study ING
 
Project Planning, Execution And Closure Essay
Project Planning, Execution And Closure EssayProject Planning, Execution And Closure Essay
Project Planning, Execution And Closure Essay
 
Resume _571966_Hrushikesh Deshpande
Resume _571966_Hrushikesh DeshpandeResume _571966_Hrushikesh Deshpande
Resume _571966_Hrushikesh Deshpande
 
Integrated knowledge management model for global application management business
Integrated knowledge management model for global application management businessIntegrated knowledge management model for global application management business
Integrated knowledge management model for global application management business
 
The Road to IT Governance Excellence
The Road to IT Governance ExcellenceThe Road to IT Governance Excellence
The Road to IT Governance Excellence
 
Ecm
EcmEcm
Ecm
 
Brown Susan - Resume2
Brown Susan - Resume2Brown Susan - Resume2
Brown Susan - Resume2
 
Digital Strategy and Transformation
Digital Strategy and TransformationDigital Strategy and Transformation
Digital Strategy and Transformation
 
What Is Oracle Primavera Unifier
What Is Oracle Primavera UnifierWhat Is Oracle Primavera Unifier
What Is Oracle Primavera Unifier
 

ICTSI enhances resilience through BCP

  • 1. customer profile International Container Terminal Services, Inc. Leading container terminal operator enhances its business resilience through sound business continuity planning International Container Terminal Services, Inc. (ICTSI) is in the business of acquiring, developing, managing, and operating container ports and terminals worldwide. As ICTSI’s flagship division, the Manila International Container Terminal (MICT) is the largest container port terminal in the Philippines. A significant adverse incident at MICT can have far reaching consequences for ICTSI and its reputation for managing ports around the world. More importantly, it can have a significant impact on the econ- omy of the Philippines, as MICT is a major supply chain hub for the whole nation. It was therefore imperative to implement or improve contingency plans and business continuity capabilities at MICT to address such adverse incidents. ICTSI commissioned EMC® Consulting to assist in this initiative. At the outset, EMC consultants set the boundaries right in terms of the overlapping and often-times confusing disciplines such as business continuity and disaster recovery. Many professionals confuse these terms and use them interchangeably even though they are different, albeit related, concepts. Business continuity management is about studying business processes and how to enhance their resilience in a crisis. It comprises a holistic plan for rapidly resuming mission-critical activities in the event of a crisis or disruption. Disaster recovery planning, on the other hand, is about increasing the resilience of information technology (IT). Each has a different emphasis—something that is often not clearly understood in the industry. Auditing and establishing a business continuity baseline Once the scope and boundaries of business continuance and disaster recovery were clearly estab- lished, EMC Consulting was commissioned to conduct an audit of ICTSI’s current business continuity capabilities. A parallel disaster recovery technology implementation initiative was already underway, and ICTSI was already writing their disaster recovery plan and procedure to support the technology. They wanted to go beyond IT and study the resilience of their business processes. The business continuity audit had the following objectives: • To inform ICTSI’s management of their current business continuity readiness • To establish a baseline from which further enhancements could be benchmarked against • To document a gap analysis report identifying weakness in business continuity capabilities • To provide a roadmap of prioritized recommendations on how to move toward a world-class business continuity capability As an auditing and rating tool, EMC consultants used the Business Continuity Maturity Model® or BCMM® by Virtual Corporation, New Jersey. This model provided an objective, quantifiable, and repeatable rating model for ICTSI’s BCM program. The BCMM is a six-level model that assists organizations in evaluating their resilience by asking a comprehensive set of questions. The answers to the questions contribute to scores in eight character- istics of a successful business continuity management program. The assessment scores can be used to obtain executive support, increase business continuity awareness, and quantify improvements in the business continuity program.
  • 2. Using the BCMM, EMC’s consultants conducted detailed interviews and surveys of several key business leaders in ICTSI on various aspects of business resilience. Inconsistencies in data were closely studied and re-visited. The audit was completed on time in four weeks. A scorecard was generated from the exercise rating the various competencies and attributes of a successful BCM program and how ICTSI scored in each of these areas. EMC consultants wrote a report interpreting the scores with a list of prioritized recommendations on how to improve business resilience. “The scorecard and report gave our senior management a bird’s eye view of where we stood,” said Ms. Catherine Orellano, Information Technology Systems and Services (ITSS) Manager at MICT. “We actually scored very well in certain areas like security and emergency response. In some other areas, we needed improvement. The scorecard provided the baseline and springboard to plan these improvements. From a list of areas to work on, our management chose development of Departmental Recovery Plans as our top priority.” An initial in-house, do-it-yourself effort whereby all departments drafted their own departmental recovery plans met with limited success. The output from each department was not standardized and varied significantly in scope and functionality. EMC business continuity consultants were called in again to assist. The pilot project involved EMC Consulting working on two pilot departments and, in the process, training ICTSI staff to roll out the program to the other departments. The project activities involved conducting a Business Impact Analysis (BIA), business continuity strategy plan, and finally, building the recovery plan and procedures for each department. Conducting a Business Impact Analysis and formulating a business continuity strategy During the BIA stage, recovery time objective (RTO) values were analyzed and calculated for each business function within the two departments studied. These RTO values showed how quickly a particular function had to be recovered after a stoppage in order to minimize major losses to the business. The BIA also identified business functions that were not critical and could be suspended during a period of crisis, thereby relieving pressure and focusing resources on mission-critical activities (MCA). The business RTO values derived also permitted a cross-check on the existing technology RTO values to ensure technology RTOs supported business RTOs. Once the RTOs were worked out, EMC wrote a business continuity strategy paper that discussed how continuity could be enhanced at various levels of the organization—at the level of the holding company (ICTSI), at MICT, and at grass-root departmental levels. Developing a gold standard for departmental plans Once the strategy was accepted, it was time to write the detailed departmental plans, which included step-by-step procedures and supporting information. To maintain consistency, EMC proposed a draft departmental plan document to be used as a “gold standard” for departmental plans for the whole company. By following this “gold standard,” all departments would have a standardized way of writing plans. For example, section 3.2 of the departmental plan for department A would contain the “roles and responsibilities” of the recovery teams in that department, while the same section in department B’s plans would cover the same topic. Such standardization meant ease of use of the plan from a developer, auditor, and management point of view. “Feedback from business continuity managers involved in actual disasters revealed that increasing complexity in plans made them less useful in a crisis. EMC Consulting embarked on a mission to create a plan that was neither too complex to be pragmatic, nor too simplistic to be useless. We believe they achieved this delicate balance.” Vice President and MICT General Manager
  • 3. ICTSI’s Vice President and MICT General Manager said, “Feedback from business continuity managers involved in actual disasters revealed that increasing complexity in plans made them less useful in a crisis. EMC Consulting embarked on a mission to create a plan that was neither too complex to be pragmatic, nor too simplistic to be useless. We believe they achieved this delicate balance. Just one look at the table of contents of the departmental plan told the whole story. There were sufficient details and these were all laid out in a logical, unambiguous manner to support ease of use in a crisis.” Achieving effective knowledge transfer From the start, an internal BCM team was selected as ICTSI’s “internal consultants.” Part of their job was to learn from the EMC consultants in the pilot project and then subsequently roll out the expertise to other departments. Throughout the project, the internal consultants participated and assisted EMC in data gathering, analysis, reporting, and documentation. In the process, they learned hands-on in addition to classroom learning from workshops conducted by EMC. By the end of the pilot project, the internal team felt sufficiently confident to be able to roll out the project company wide. “The pilot-project approach, combined with a knowledge transfer focus, significantly reduced our consulting costs and raised the in-house knowledge of our team and empowered them to continue the project beyond the pilot. This worked out to be a cost-effective way of rolling out BCM without throwing us too much into the deep end. We are now well on our way to achieving company-wide, full BCM adoption,” Ms. Orellano further stressed. EMC Corporation Hopkinton Massachusetts 01748-9103 1-508-435-1000 In North America 1-866-464-7381 www.EMC.com EMC2 , EMC, and where information lives are registered trademarks or trademarks of EMC Corporation in the United States and other countries. All other trademarks used herein are the property of their respective owners. © Copyright 2009 EMC Corporation. All rights reserved. Published in the USA. 06/09 Customer Profile H6358