Q1 Figure 1.76 shows how bad an implementation can become.
Action needs to be taken to prevent this kind of situation. What
would you recommend should be done?
Q2 You are the project manager for a new management
accounting system that will provide monthly profit and loss
accounts to a chain of 30 computer dealerships, each of which is
franchised to its local owner/manager. They have all done their
own accounting before. What change issues would you expect to
encounter? Does the fact that they are PC dealerships make any
difference? Why might they have joined together in the chain?
Q3 Consider the organisation that employs you or where you
study. What is its culture? Why does it have that particular
culture? What organisational culture would give you most
satisfaction as an employee? Where might you find such an
employer? Given your preferred organisational culture, what
would it mean for you as an employee in terms of your
responsibilities and obligations?
Q4 You have to design a ‘hearts and minds’ programme
connected with the implementation of a new system for the
recording and management of stock in a book-publishing
company and for the supply of books to booksellers. What
would be the main stages of such a programme?
Chapter 2 Business strategy and information systems
Q1 Why is it important for project managers to understand the
strategy of the organisation that uses their services?
Q2 If you knew about an organisation’s strategy, could you
suggest IS applications that would support it? For example, how
could a large supermarket chain use information systems for
cost reduction, or for a strategy based on differentiation?
Q3 If you had to develop a strategy for a small software house
employing 50 or so professional computer people, how would
you go about it? What criteria would you use to test whether or
not the strategy was sound?
Chapter 3 The business case
Q1 At what point in the project lifecycle should the business
case be prepared?
Q2 What should be the role of the project manager in relation
to the business case?
Q3 Explain the term ‘cost/benefit analysis’
Q4 What do you understand by the terms ‘tangible’ and
‘intangible’ when applied to costs and benefits?
Q5 What is meant by the term ‘benefits realisation’ and why is
it important?
Chapter 4 The organisational framework
Q1 1 How many different types of customer may there be
for a systems development project? Who are they? What kind of
relationship and reporting arrangements should the project
manager have with the sponsor?
Q2 Describe the roles of (a) the sponsor and (b) the project
manager
Q3 What are the principal problems of managing projects
within a completely functional organisation structure?
Q4 What are the pros and cons of a ‘pure’ project organisation
compared with a project operating within a matrix structure
Q5 In a PRINCE2® project structure there are formal
committees, a project board and specific roles. What is your
opinion about the value of this kind of arrangement? How do
you see it working in large and small projects? Could it be
useful for projects outside IT?
Chapter 5 The programme and project support office
Q1 Explain why the concept of PPSO arose in the first place.
Q2 What are the advantages to an organisation of having a
PPSO?
Q3 What conflicts are likely to arise between project managers
and PPSO staff?
Q4 What skills are useful when working in PPSO?
Chapter 6 Development lifecycles and approaches
Q1 You have been asked to take charge of a system
development where the customer requires about 50 per cent of
the functionality very urgently to meet a business opportunity
but where the remaining functions can be delivered over the
next few years. Which of the various development lifecycles do
you think would be most suitable for this project and why?
Q2 What would you say are the principal advantages and
disadvantages of the sequential approach to system development
offered by the waterfall and ‘V’ lifecycle models?
Q3 Some critics have said that the use of structured methods,
such as SSADM, increases both delivery time and bureaucracy.
Do you think these criticisms are justified and what are the
claimed advantages in the use of structured methods?
4Q4 Increasing interest is being taken in the use of rapid
application development. Why is this, and are there any dangers
associated with the RAD approach?
Q5 Consider how you would organise your project team for a
RAD-type project. What leadership practices would it require
from the project leader and what would the team members have
to do? How, and at which points, would you involve the users?
Q6 What have RAD and extreme programming got in common?
What are the claimed advantages of these approaches?
Q7 Why are approaches such as the Soft Systems Methodology,
the Socio-Technical Approach and Business Process
Reengineering relevant to IS project managers?
Chapter 7 The profile of a project
Q1 What work goes on prior to project start-up?
Q2 Describe the products that typically result from the
following project stages: Project Start-up; Analysis of
Requirements; Design Integration and Testing.
Q3 Explain the incremental approach to testing represented by
the sequence: unit (module) test; integration test; system test;
acceptance test.
Q4 From what product should the acceptance criteria for a
project be derived and why?
Q5 Why is it important that the project team and the users
develop and agree a process model for a project?
Chapter 8 Project planning: understanding the work
Q1 Give three reasons why it is essential to plan an IS project
in detail before starting work on it.
Q2 Ideally, the requirement for an IS project would be
specified in some detail before planning begins. If the
requirement is not detailed enough, what steps can the project
manager take to improve the likelihood of the project’s success?
Q3 In essence there are two basic ways of breaking down a
project into plannable chunks: the use of a work breakdown
structure or a product breakdown structure. Contrast the
advantages and disadvantages of these approaches.
Q4 4 What do you understand by the term dependency?
How can project dependencies be represented for planning
purposes?
Q5 Define the terms “product” and “work package” and explain
how these are related to each other.
Q6 Network diagrams and bar charts have different parts to
play in planning a project. Where is each of these tools used and
what does it show?
Chapter 9 Project planning: estimating
Q1 Explain three reasons why estimating for IS projects has a
poor reputation and a bad track record. What can be done about
these problems?
Q2 The analogy method of estimating is often used to produce
broad-brush estimates at the start of a project. Why is this
method particularly suited to this application?
Q3 The analysis effort and programming methods both rest on
the principle of extrapolating the total development effort from
detailed estimates of one phase of the project. Describe the
approach taken in each of these methods and show in what
circumstances each might best be employed.
Q4 The Delphi technique aims to achieve a consensus estimate
from the efforts of a number of estimators. How is this achieved
and what is the advantage of the Delphi technique over, for
example, a round-table discussion?
Q5 Describe how you would go about estimating for the
following supporting project activities and why you would take
your chosen approach to each.
a) Project management
b) Team leading/supervision
c) Quality control
d) Familiarisation.
Q6 State three factors that could influence the estimates for an
IS project and how you would attempt to adjust the estimates
for these factors.
Chapter 10 Scheduling and resourcing
Q1 Explain the difference between effort and elapsed time.
What is the significance of this difference for project planning
purposes?
Q2 Scheduling a project involves understanding the degree to
which project tasks can be partitioned. What is meant by this
term and what effect does partitioning have on the scheduling
process?
Q3 In long-term project planning, it is wise to assume that staff
will be available for project work for less than 100 per cent of
the total available time. What factors will reduce staff
availability and what adjustments should be made for them?
Q4 What do you understand by the term project milestone?
How would you decide how many milestones to show on your
project plan?
Q5 The PRINCE2® project management method envisages a
hierarchy of plans. Describe this hierarchy.
Chapter 11 Monitoring progress
Q1 How is effort monitored on a project? It is important that
the effort to be spent on activities is reassessed on a regular
basis – why is this so vital?
Q2 Staff time is usually the principal cost component of an IS
project. Describe five other areas where project costs could
arise.
Q3 Describe three methods than could be used to exercise
quality control and explain the advantages and disadvantages of
each.
Q4 In what circumstances might you consider increasing the
volume and/or frequency of quality control checks? When might
you decrease their volume or frequency?
Q5 What does the term ‘earned value analysis’ mean? What
additional insights into the dynamics of a project is afforded by
the use of EVA.
Q6 Explain these terms: actual cost of work performed
(ACWP); budgeted cost of work performed (BCWP); budgeted
cost of work scheduled (BCWS).
Chapter 12 Exercising control
Q1 What is meant by the term the triple constraint? What are
the three elements of the triple constraint and why is an
understanding of their relative weight important in exercising
control over a project?
Q2 Your project is behind schedule and you are considering
adding extra staff to the team. What would be the potential
advantages and disadvantages of this approach?
Q3 In what circumstances might you (a) increase or (b)
decrease the amount of supervision given to a team member?
Q4 Changes often bedevil IS projects. What steps are required
to ensure that proper change control is exercised on a project?
Q5 Explain the difference between change control and
configuration management and the relationship between them.
Chapter 13 Reporting progress
Q1 What factors would you consider when deciding on the
frequency with which you would report progress to (a) senior IS
management, and (b) customer management?
Q2 What is meant by the term exception reporting? What are
the benefits and the disadvantages of this type of reporting?
Q3 What are the benefits to the project manager in providing
regular progress reports to the project team members?
Q4 Explain the fillowingfollowing terms used in the
PRINCE2® project management method:
a) Project initiation
b) End stage assessment
c) Highlight report
d) Checkpoint.
Chapter 14 Quality
Q1 How could the quality culture behaviours described in
section 1214.3 be applied in a hospital?
Q2 Why do you suppose there are an increasing number of
organisations concerned with the development of quality
practices for IS development?
Q3 What is the purpose of a Quality Plan? Who should create
it?
Q4 Do you agree with what Dick Brandon said about sex in
section 1214.10? Do not take this question too seriously!
Chapter 15 Risk management
Q1 Why is the use of risk management techniques becoming
increasingly important in IS projects?
Q2 Describe a five-stage process for project risk management.
Q3 Three factors that need to be assessed when considering
risks are likelihood, impact and urgency. Explain what is meant
by each of these terms and show how each might be assessed.
Q4 Risk actions are of two types: avoidance actions and
mitigation actions. Describe the relationship between these
types of risk action and where each might be employed.
Q5 Describe the characteristics needed in a risk owner.
Chapter 16 Value engineering and value management
Q1 Explain the difference between value management and
value engineering.
Q2 What is meant by the term value tree?
Q3 How can value management be used to compare different
possible design solutions?
Q4 Once a project is under way, how can value management be
used to evaluate proposed changes?
Chapter 17 Selling the project
Q1 How would you assess the importance of sales skills to a
project manager? Are they, in your view, increasing or
decreasing in importance? Why do you think there is this
change? Is it more important to understand selling or buying?
Q2 Persuading someone to buy is a complex process. Why is
this? Is the process inherently complex, or is it because so many
people are involved?
Q3 If selling is an ‘asking process’, how could you use it to
help you sell some extra functionality to a system under
development?
Chapter 18 Managing stakeholders
Q1 Stakeholders have different interests or ‘stakes’ in a project.
How can you determine where to put your management effort?
Q2 What is meant by the term managing expectations? Why is
expectation management an important part of the project
manager’s job? What influences a customer’s expectations?
Q3 Why is it important for the project manager to establish a
network of contacts within the IS organisation and also within
the user organisation? In what circumstances can these networks
be useful?
Chapter 19 Managing suppliers
Q1 Describe three situations in which an IS project may need
or wish to use subcontractors.
Q2 It is important that the contracts between the main
contractor and the customer and between the main contractor
and subcontractors are back-to-back; what is meant by this
term?
Q3 Subcontracts often include penalty clauses to give the main
contractor protection in the case of the supplier’s poor
performance. Why are penalty clauses not the complete answer
to safeguarding the main contractor’s position?
Q4 Describe four methods that can be used to monitor supplier
performance.
Q5 Explain how quality control can be applied to a
subcontractor’s work.
Chapter 20 Leadership
Q1 Refer back to the introduction and consider again the
leadership challenge at the end of the section. What kind of
project management would you need to deliver to have people
volunteer to work on your projects?
Q2 How can Maslow and Hertzberg’sHerzberg theories of
motivation help you to organise your project team and the way
work is allocated?
Q4 Think of a situation at home, at work, at university or in a
club to which you belong. It is a situation that involves you.
You want to change the present circumstances and set a new
basis for the future. Using the behavioural commitments at the
end of section 18.4, what could you do to change things?
Chapter 21 Performance management
Q1 You are dissatisfied with the general level of performance
of one of your team. The quality of work is below your
expectations. How will you deal with this?
Q2 A member of your team exhibits disruptive behaviour. Her
work is good but she is not a team player. The consequences are
that she does not contribute to team effort and her colleagues
find her difficult to work with; the project team secretary has
refused to work with her at all. How could this serious problem
have arisen? What can be done now?
Q3 Describe the process of setting objectives. What might be
three objectives for a newly appointed junior programmer?
Chapter 22 Project teams
Q1 Prepare an interview plan for the post of Business Analyst in
your team.
Q2 When you first assemble your project team, what can you
do to build team spirit? What behaviours are the different
individuals likely to exhibit during this team-building process?
How do you demonstrate your leadership?
Chapter 23 Managing the project climate
Q1 Consider a project manager with a team of 15 to 20 people:
a mixture of analysts, designers, programmers and support staff.
The project also uses some specialist staff on a part-time basis.
How could the project manager influence the working
environment of such a team so as to get the best out of them?
What are the behaviours that they could exhibit that would have
an effect on the working style of the project team?
Q2 Conflict and stress arise naturally in IS project teams. Some
people argue that a little of both is useful, but everyone agrees
that too much is destructive. How could you organise your
project team to minimise the destructive effect of conflict and
stress?
Chapter 24 The project manager
Q1 How does the ‘vision of the project manager’ in this chapter
relate to the way you see the job? Are there aspects of the job
that do not appear in the vision? Why might that be?
Q2 Consider the skills and qualities of project managers
described in the ‘developmental approach’. Can you add to
these? How far do you see yourself being proficient in these
skills? How could you develop further?
Chapter 1 Managing change
Q1 Figure 1.76 shows how bad an implementation can become.
Action needs to be taken to prevent this kind of situation. What
would you recommend should be done?
Q2 You are the project manager for a new management
accounting system that will provide monthly profit and loss
accounts to a chain of 30 computer dealerships, each of which is
franchised to its local owner/manager. They have all done their
own accounting before. What change issues would you expect to
encounter? Does the fact that they are PC dealerships make any
difference? Why might they have joined together in the chain?
Q3 Consider the organisation that employs you or where you
study. What is its culture? Why does it have that particular
culture? What organisational culture would give you most
satisfaction as an employee? Where might you find such an
employer? Given your preferred organisational culture, what
would it mean for you as an employee in terms of your
responsibilities and obligations?
Q4 You have to design a ‘hearts and minds’ programme
connected with the implementation of a new system for the
recording and management of stock in a book-publishing
company and for the supply of books to booksellers. What
would be the main stages of such a programme?
Chapter 2 Business strategy and information systems
Q1 Why is it important for project managers to understand the
strategy of the organisation that uses their services?
Q2 If you knew about an organisation’s strategy, could you
suggest IS applications that would support it? For example, how
could a large supermarket chain use information systems for
cost reduction, or for a strategy based on differentiation?
Q3 If you had to develop a strategy for a small software house
employing 50 or so professional computer people, how would
you go about it? What criteria would you use to test whether or
not the strategy was sound?
Chapter 3 The business case
Q1 At what point in the project lifecycle should the business
case be prepared?
Q2 What should be the role of the project manager in relation
to the business case?
Q3 Explain the term ‘cost/benefit analysis’
Q4 What do you understand by the terms ‘tangible’ and
‘intangible’ when applied to costs and benefits?
Q5 What is meant by the term ‘benefits realisation’ and why is
it important?
Chapter 4 The organisational framework
Q1 1 How many different types of customer may there be
for a systems development project? Who are they? What kind of
relationship and reporting arrangements should the project
manager have with the sponsor?
Q2 Describe the roles of (a) the sponsor and (b) the project
manager
Q3 What are the principal problems of managing projects
within a completely functional organisation structure?
Q4 What are the pros and cons of a ‘pure’ project organisation
compared with a project operating within a matrix structure
Q5 In a PRINCE2® project structure there are formal
committees, a project board and specific roles. What is your
opinion about the value of this kind of arrangement? How do
you see it working in large and small projects? Could it be
useful for projects outside IT?
Chapter 5 The programme and project support office
Q1 Explain why the concept of PPSO arose in the first place.
Q2 What are the advantages to an organisation of having a
PPSO?
Q3 What conflicts are likely to arise between project managers
and PPSO staff?
Q4 What skills are useful when working in PPSO?
Chapter 6 Development lifecycles and approaches
Q1 You have been asked to take charge of a system
development where the customer requires about 50 per cent of
the functionality very urgently to meet a business opportunity
but where the remaining functions can be delivered over the
next few years. Which of the various development lifecycles do
you think would be most suitable for this project and why?
Q2 What would you say are the principal advantages and
disadvantages of the sequential approach to system development
offered by the waterfall and ‘V’ lifecycle models?
Q3 Some critics have said that the use of structured methods,
such as SSADM, increases both delivery time and bureaucracy.
Do you think these criticisms are justified and what are the
claimed advantages in the use of structured methods?
4Q4 Increasing interest is being taken in the use of rapid
application development. Why is this, and are there any dangers
associated with the RAD approach?
Q5 Consider how you would organise your project team for a
RAD-type project. What leadership practices would it require
from the project leader and what would the team members have
to do? How, and at which points, would you involve the users?
Q6 What have RAD and extreme programming got in common?
What are the claimed advantages of these approaches?
Q7 Why are approaches such as the Soft Systems Methodology,
the Socio-Technical Approach and Business Process
Reengineering relevant to IS project managers?
Chapter 7 The profile of a project
Q1 What work goes on prior to project start-up?
Q2 Describe the products that typically result from the
following project stages: Project Start-up; Analysis of
Requirements; Design Integration and Testing.
Q3 Explain the incremental approach to testing represented by
the sequence: unit (module) test; integration test; system test;
acceptance test.
Q4 From what product should the acceptance criteria for a
project be derived and why?
Q5 Why is it important that the project team and the users
develop and agree a process model for a project?
Chapter 8 Project planning: understanding the work
Q1 Give three reasons why it is essential to plan an IS project
in detail before starting work on it.
Q2 Ideally, the requirement for an IS project would be
specified in some detail before planning begins. If the
requirement is not detailed enough, what steps can the project
manager take to improve the likelihood of the project’s success?
Q3 In essence there are two basic ways of breaking down a
project into plannable chunks: the use of a work breakdown
structure or a product breakdown structure. Contrast the
advantages and disadvantages of these approaches.
Q4 4 What do you understand by the term dependency?
How can project dependencies be represented for planning
purposes?
Q5 Define the terms “product” and “work package” and explain
how these are related to each other.
Q6 Network diagrams and bar charts have different parts to
play in planning a project. Where is each of these tools used and
what does it show?
Chapter 9 Project planning: estimating
Q1 Explain three reasons why estimating for IS projects has a
poor reputation and a bad track record. What can be done about
these problems?
Q2 The analogy method of estimating is often used to produce
broad-brush estimates at the start of a project. Why is this
method particularly suited to this application?
Q3 The analysis effort and programming methods both rest on
the principle of extrapolating the total development effort from
detailed estimates of one phase of the project. Describe the
approach taken in each of these methods and show in what
circumstances each might best be employed.
Q4 The Delphi technique aims to achieve a consensus estimate
from the efforts of a number of estimators. How is this achieved
and what is the advantage of the Delphi technique over, for
example, a round-table discussion?
Q5 Describe how you would go about estimating for the
following supporting project activities and why you would take
your chosen approach to each.
a) Project management
b) Team leading/supervision
c) Quality control
d) Familiarisation.
Q6 State three factors that could influence the estimates for an
IS project and how you would attempt to adjust the estimates
for these factors.
Chapter 10 Scheduling and resourcing
Q1 Explain the difference between effort and elapsed time.
What is the significance of this difference for project planning
purposes?
Q2 Scheduling a project involves understanding the degree to
which project tasks can be partitioned. What is meant by this
term and what effect does partitioning have on the scheduling
process?
Q3 In long-term project planning, it is wise to assume that staff
will be available for project work for less than 100 per cent of
the total available time. What factors will reduce staff
availability and what adjustments should be made for them?
Q4 What do you understand by the term project milestone?
How would you decide how many milestones to show on your
project plan?
Q5 The PRINCE2® project management method envisages a
hierarchy of plans. Describe this hierarchy.
Chapter 11 Monitoring progress
Q1 How is effort monitored on a project? It is important that
the effort to be spent on activities is reassessed on a regular
basis – why is this so vital?
Q2 Staff time is usually the principal cost component of an IS
project. Describe five other areas where project costs could
arise.
Q3 Describe three methods than could be used to exercise
quality control and explain the advantages and disadvantages of
each.
Q4 In what circumstances might you consider increasing the
volume and/or frequency of quality control checks? When might
you decrease their volume or frequency?
Q5 What does the term ‘earned value analysis’ mean? What
additional insights into the dynamics of a project is afforded by
the use of EVA.
Q6 Explain these terms: actual cost of work performed
(ACWP); budgeted cost of work performed (BCWP); budgeted
cost of work scheduled (BCWS).
Chapter 12 Exercising control
Q1 What is meant by the term the triple constraint? What are
the three elements of the triple constraint and why is an
understanding of their relative weight important in exercising
control over a project?
Q2 Your project is behind schedule and you are considering
adding extra staff to the team. What would be the potential
advantages and disadvantages of this approach?
Q3 In what circumstances might you (a) increase or (b)
decrease the amount of supervision given to a team member?
Q4 Changes often bedevil IS projects. What steps are required
to ensure that proper change control is exercised on a project?
Q5 Explain the difference between change control and
configuration management and the relationship between them.
Chapter 13 Reporting progress
Q1 What factors would you consider when deciding on the
frequency with which you would report progress to (a) senior IS
management, and (b) customer management?
Q2 What is meant by the term exception reporting? What are
the benefits and the disadvantages of this type of reporting?
Q3 What are the benefits to the project manager in providing
regular progress reports to the project team members?
Q4 Explain the fillowingfollowing terms used in the
PRINCE2® project management method:
a) Project initiation
b) End stage assessment
c) Highlight report
d) Checkpoint.
Chapter 14 Quality
Q1 How could the quality culture behaviours described in
section 1214.3 be applied in a hospital?
Q2 Why do you suppose there are an increasing number of
organisations concerned with the development of quality
practices for IS development?
Q3 What is the purpose of a Quality Plan? Who should create
it?
Q4 Do you agree with what Dick Brandon said about sex in
section 1214.10? Do not take this question too seriously!
Chapter 15 Risk management
Q1 Why is the use of risk management techniques becoming
increasingly important in IS projects?
Q2 Describe a five-stage process for project risk management.
Q3 Three factors that need to be assessed when considering
risks are likelihood, impact and urgency. Explain what is meant
by each of these terms and show how each might be assessed.
Q4 Risk actions are of two types: avoidance actions and
mitigation actions. Describe the relationship between these
types of risk action and where each might be employed.
Q5 Describe the characteristics needed in a risk owner.
Chapter 16 Value engineering and value management
Q1 Explain the difference between value management and
value engineering.
Q2 What is meant by the term value tree?
Q3 How can value management be used to compare different
possible design solutions?
Q4 Once a project is under way, how can value management be
used to evaluate proposed changes?
Chapter 17 Selling the project
Q1 How would you assess the importance of sales skills to a
project manager? Are they, in your view, increasing or
decreasing in importance? Why do you think there is this
change? Is it more important to understand selling or buying?
Q2 Persuading someone to buy is a complex process. Why is
this? Is the process inherently complex, or is it because so many
people are involved?
Q3 If selling is an ‘asking process’, how could you use it to
help you sell some extra functionality to a system under
development?
Chapter 18 Managing stakeholders
Q1 Stakeholders have different interests or ‘stakes’ in a project.
How can you determine where to put your management effort?
Q2 What is meant by the term managing expectations? Why is
expectation management an important part of the project
manager’s job? What influences a customer’s expectations?
Q3 Why is it important for the project manager to establish a
network of contacts within the IS organisation and also within
the user organisation? In what circumstances can these networks
be useful?
Chapter 19 Managing suppliers
Q1 Describe three situations in which an IS project may need
or wish to use subcontractors.
Q2 It is important that the contracts between the main
contractor and the customer and between the main contractor
and subcontractors are back-to-back; what is meant by this
term?
Q3 Subcontracts often include penalty clauses to give the main
contractor protection in the case of the supplier’s poor
performance. Why are penalty clauses not the complete answer
to safeguarding the main contractor’s position?
Q4 Describe four methods that can be used to monitor supplier
performance.
Q5 Explain how quality control can be applied to a
subcontractor’s work.
Chapter 20 Leadership
Q1 Refer back to the introduction and consider again the
leadership challenge at the end of the section. What kind of
project management would you need to deliver to have people
volunteer to work on your projects?
Q2 How can Maslow and Hertzberg’sHerzberg theories of
motivation help you to organise your project team and the way
work is allocated?
Q4 Think of a situation at home, at work, at university or in a
club to which you belong. It is a situation that involves you.
You want to change the present circumstances and set a new
basis for the future. Using the behavioural commitments at the
end of section 18.4, what could you do to change things?
Chapter 21 Performance management
Q1 You are dissatisfied with the general level of performance
of one of your team. The quality of work is below your
expectations. How will you deal with this?
Q2 A member of your team exhibits disruptive behaviour. Her
work is good but she is not a team player. The consequences are
that she does not contribute to team effort and her colleagues
find her difficult to work with; the project team secretary has
refused to work with her at all. How could this serious problem
have arisen? What can be done now?
Q3 Describe the process of setting objectives. What might be
three objectives for a newly appointed junior programmer?
Chapter 22 Project teams
Q1 Prepare an interview plan for the post of Business Analyst in
your team.
Q2 When you first assemble your project team, what can you
do to build team spirit? What behaviours are the different
individuals likely to exhibit during this team-building process?
How do you demonstrate your leadership?
Chapter 23 Managing the project climate
Q1 Consider a project manager with a team of 15 to 20 people:
a mixture of analysts, designers, programmers and support staff.
The project also uses some specialist staff on a part-time basis.
How could the project manager influence the working
environment of such a team so as to get the best out of them?
What are the behaviours that they could exhibit that would have
an effect on the working style of the project team?
Q2 Conflict and stress arise naturally in IS project teams. Some
people argue that a little of both is useful, but everyone agrees
that too much is destructive. How could you organise your
project team to minimise the destructive effect of conflict and
stress?
Chapter 24 The project manager
Q1 How does the ‘vision of the project manager’ in this chapter
relate to the way you see the job? Are there aspects of the job
that do not appear in the vision? Why might that be?
Q2 Consider the skills and qualities of project managers
described in the ‘developmental approach’. Can you add to
these? How far do you see yourself being proficient in these
skills? How could you develop further?

More Related Content

Similar to Chapter 1 Managing changeQ1 Figure 1.76 shows how bad an imple.docx

Project Management MethodologiesPPMP20009Week 10 LectureDr.docx
Project Management MethodologiesPPMP20009Week 10 LectureDr.docxProject Management MethodologiesPPMP20009Week 10 LectureDr.docx
Project Management MethodologiesPPMP20009Week 10 LectureDr.docxbriancrawford30935
 
Cmgt410
Cmgt410Cmgt410
Cmgt410joituy
 
Cmgt410 Entire Course
Cmgt410 Entire CourseCmgt410 Entire Course
Cmgt410 Entire CourseCMGT410
 
Cmgt 410 Entire Course
Cmgt 410 Entire CourseCmgt 410 Entire Course
Cmgt 410 Entire CourseCMGT410
 
19701759 project-report-on-railway-reservation-system-by-amit-mittal
19701759 project-report-on-railway-reservation-system-by-amit-mittal19701759 project-report-on-railway-reservation-system-by-amit-mittal
19701759 project-report-on-railway-reservation-system-by-amit-mittalsatyaragha786
 
Cmgt410
Cmgt410Cmgt410
Cmgt410sci207
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410sci207
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410joituy
 
Speed Creation REEW
Speed Creation REEWSpeed Creation REEW
Speed Creation REEWSven Krause
 
GAS MANAGEMENT SYSTEM.pdf
GAS MANAGEMENT SYSTEM.pdfGAS MANAGEMENT SYSTEM.pdf
GAS MANAGEMENT SYSTEM.pdfRmsDagi
 
Five pitfalls of Agile Transformations in Healthcare
Five pitfalls of Agile Transformations in HealthcareFive pitfalls of Agile Transformations in Healthcare
Five pitfalls of Agile Transformations in HealthcareCorina Mihaela Paraschiv
 
Estimation of agile functionality in software development
Estimation of agile functionality in software developmentEstimation of agile functionality in software development
Estimation of agile functionality in software developmentBashir Nasr Azadani
 
Agile projects are for delivering packaged software too
Agile projects are for delivering packaged software tooAgile projects are for delivering packaged software too
Agile projects are for delivering packaged software tooDavid Harmer
 

Similar to Chapter 1 Managing changeQ1 Figure 1.76 shows how bad an imple.docx (20)

Project Management MethodologiesPPMP20009Week 10 LectureDr.docx
Project Management MethodologiesPPMP20009Week 10 LectureDr.docxProject Management MethodologiesPPMP20009Week 10 LectureDr.docx
Project Management MethodologiesPPMP20009Week 10 LectureDr.docx
 
Cmgt410
Cmgt410Cmgt410
Cmgt410
 
Dev ops
Dev opsDev ops
Dev ops
 
Cmgt410
Cmgt410Cmgt410
Cmgt410
 
Cmgt410 Entire Course
Cmgt410 Entire CourseCmgt410 Entire Course
Cmgt410 Entire Course
 
Cmgt 410 Entire Course
Cmgt 410 Entire CourseCmgt 410 Entire Course
Cmgt 410 Entire Course
 
19701759 project-report-on-railway-reservation-system-by-amit-mittal
19701759 project-report-on-railway-reservation-system-by-amit-mittal19701759 project-report-on-railway-reservation-system-by-amit-mittal
19701759 project-report-on-railway-reservation-system-by-amit-mittal
 
Smu mba semester 2
Smu mba semester 2Smu mba semester 2
Smu mba semester 2
 
Cmgt410
Cmgt410Cmgt410
Cmgt410
 
Cmgt410
Cmgt410Cmgt410
Cmgt410
 
Cmgt410
Cmgt410Cmgt410
Cmgt410
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410
 
Speed Creation REEW
Speed Creation REEWSpeed Creation REEW
Speed Creation REEW
 
GAS MANAGEMENT SYSTEM.pdf
GAS MANAGEMENT SYSTEM.pdfGAS MANAGEMENT SYSTEM.pdf
GAS MANAGEMENT SYSTEM.pdf
 
Five pitfalls of Agile Transformations in Healthcare
Five pitfalls of Agile Transformations in HealthcareFive pitfalls of Agile Transformations in Healthcare
Five pitfalls of Agile Transformations in Healthcare
 
Estimation of agile functionality in software development
Estimation of agile functionality in software developmentEstimation of agile functionality in software development
Estimation of agile functionality in software development
 
Agile projects are for delivering packaged software too
Agile projects are for delivering packaged software tooAgile projects are for delivering packaged software too
Agile projects are for delivering packaged software too
 

More from tidwellveronique

EDUC 742EDUC 742Reading Summary and Reflective Comments .docx
EDUC 742EDUC 742Reading Summary and Reflective Comments .docxEDUC 742EDUC 742Reading Summary and Reflective Comments .docx
EDUC 742EDUC 742Reading Summary and Reflective Comments .docxtidwellveronique
 
EDUC 380 Blog Post Samples Module 1 The Brain Below .docx
EDUC 380 Blog Post Samples Module 1 The Brain  Below .docxEDUC 380 Blog Post Samples Module 1 The Brain  Below .docx
EDUC 380 Blog Post Samples Module 1 The Brain Below .docxtidwellveronique
 
EDUC 741Course Project Part 1 Grading RubricCriteriaLevels .docx
EDUC 741Course Project Part 1 Grading RubricCriteriaLevels .docxEDUC 741Course Project Part 1 Grading RubricCriteriaLevels .docx
EDUC 741Course Project Part 1 Grading RubricCriteriaLevels .docxtidwellveronique
 
EDUC 740Prayer Reflection Report Grading RubricCriteriaLev.docx
EDUC 740Prayer Reflection Report Grading RubricCriteriaLev.docxEDUC 740Prayer Reflection Report Grading RubricCriteriaLev.docx
EDUC 740Prayer Reflection Report Grading RubricCriteriaLev.docxtidwellveronique
 
EDUC 6733 Action Research for EducatorsReading LiteracyDraft.docx
EDUC 6733 Action Research for EducatorsReading LiteracyDraft.docxEDUC 6733 Action Research for EducatorsReading LiteracyDraft.docx
EDUC 6733 Action Research for EducatorsReading LiteracyDraft.docxtidwellveronique
 
EDUC 637Technology Portfolio InstructionsGeneral OverviewF.docx
EDUC 637Technology Portfolio InstructionsGeneral OverviewF.docxEDUC 637Technology Portfolio InstructionsGeneral OverviewF.docx
EDUC 637Technology Portfolio InstructionsGeneral OverviewF.docxtidwellveronique
 
EDUC 364 The Role of Cultural Diversity in Schooling A dialecti.docx
EDUC 364 The Role of Cultural Diversity in Schooling A dialecti.docxEDUC 364 The Role of Cultural Diversity in Schooling A dialecti.docx
EDUC 364 The Role of Cultural Diversity in Schooling A dialecti.docxtidwellveronique
 
EDUC 144 Writing Tips The writing assignments in this cla.docx
EDUC 144 Writing Tips  The writing assignments in this cla.docxEDUC 144 Writing Tips  The writing assignments in this cla.docx
EDUC 144 Writing Tips The writing assignments in this cla.docxtidwellveronique
 
EDUC 1300- LEARNING FRAMEWORK Portfolio Page Prompts .docx
EDUC 1300- LEARNING FRAMEWORK Portfolio Page Prompts .docxEDUC 1300- LEARNING FRAMEWORK Portfolio Page Prompts .docx
EDUC 1300- LEARNING FRAMEWORK Portfolio Page Prompts .docxtidwellveronique
 
EDU734 Teaching and Learning Environment Week 5.docx
EDU734 Teaching and  Learning Environment Week 5.docxEDU734 Teaching and  Learning Environment Week 5.docx
EDU734 Teaching and Learning Environment Week 5.docxtidwellveronique
 
EDU 505 – Contemporary Issues in EducationCOURSE DESCRIPTION.docx
EDU 505 – Contemporary Issues in EducationCOURSE DESCRIPTION.docxEDU 505 – Contemporary Issues in EducationCOURSE DESCRIPTION.docx
EDU 505 – Contemporary Issues in EducationCOURSE DESCRIPTION.docxtidwellveronique
 
EDU 3338 Lesson Plan TemplateCandidate NameCooperatin.docx
EDU 3338 Lesson Plan TemplateCandidate NameCooperatin.docxEDU 3338 Lesson Plan TemplateCandidate NameCooperatin.docx
EDU 3338 Lesson Plan TemplateCandidate NameCooperatin.docxtidwellveronique
 
EDU 3215 Lesson Plan Template & Elements Name Andres Rod.docx
EDU 3215 Lesson Plan Template & Elements  Name Andres Rod.docxEDU 3215 Lesson Plan Template & Elements  Name Andres Rod.docx
EDU 3215 Lesson Plan Template & Elements Name Andres Rod.docxtidwellveronique
 
EDST 1100R SITUATED LEARNING EDST 1100 N Situated Learning .docx
EDST 1100R SITUATED LEARNING  EDST 1100 N Situated Learning .docxEDST 1100R SITUATED LEARNING  EDST 1100 N Situated Learning .docx
EDST 1100R SITUATED LEARNING EDST 1100 N Situated Learning .docxtidwellveronique
 
EDU 151 Thematic Unit Required ComponentsThematic Unit Requireme.docx
EDU 151 Thematic Unit Required ComponentsThematic Unit Requireme.docxEDU 151 Thematic Unit Required ComponentsThematic Unit Requireme.docx
EDU 151 Thematic Unit Required ComponentsThematic Unit Requireme.docxtidwellveronique
 
EDSP 429Differentiated Instruction PowerPoint InstructionsThe .docx
EDSP 429Differentiated Instruction PowerPoint InstructionsThe .docxEDSP 429Differentiated Instruction PowerPoint InstructionsThe .docx
EDSP 429Differentiated Instruction PowerPoint InstructionsThe .docxtidwellveronique
 
EDSP 429Fact Sheet on Disability Categories InstructionsThe pu.docx
EDSP 429Fact Sheet on Disability Categories InstructionsThe pu.docxEDSP 429Fact Sheet on Disability Categories InstructionsThe pu.docx
EDSP 429Fact Sheet on Disability Categories InstructionsThe pu.docxtidwellveronique
 
EDSP 370Individualized Education Plan (IEP) InstructionsThe .docx
EDSP 370Individualized Education Plan (IEP) InstructionsThe .docxEDSP 370Individualized Education Plan (IEP) InstructionsThe .docx
EDSP 370Individualized Education Plan (IEP) InstructionsThe .docxtidwellveronique
 
EDSP 377Scenario InstructionsScenario 2 Teaching communicatio.docx
EDSP 377Scenario InstructionsScenario 2 Teaching communicatio.docxEDSP 377Scenario InstructionsScenario 2 Teaching communicatio.docx
EDSP 377Scenario InstructionsScenario 2 Teaching communicatio.docxtidwellveronique
 
EDSP 377Autism Interventions1. Applied Behavior Analysis (ABA).docx
EDSP 377Autism Interventions1. Applied Behavior Analysis (ABA).docxEDSP 377Autism Interventions1. Applied Behavior Analysis (ABA).docx
EDSP 377Autism Interventions1. Applied Behavior Analysis (ABA).docxtidwellveronique
 

More from tidwellveronique (20)

EDUC 742EDUC 742Reading Summary and Reflective Comments .docx
EDUC 742EDUC 742Reading Summary and Reflective Comments .docxEDUC 742EDUC 742Reading Summary and Reflective Comments .docx
EDUC 742EDUC 742Reading Summary and Reflective Comments .docx
 
EDUC 380 Blog Post Samples Module 1 The Brain Below .docx
EDUC 380 Blog Post Samples Module 1 The Brain  Below .docxEDUC 380 Blog Post Samples Module 1 The Brain  Below .docx
EDUC 380 Blog Post Samples Module 1 The Brain Below .docx
 
EDUC 741Course Project Part 1 Grading RubricCriteriaLevels .docx
EDUC 741Course Project Part 1 Grading RubricCriteriaLevels .docxEDUC 741Course Project Part 1 Grading RubricCriteriaLevels .docx
EDUC 741Course Project Part 1 Grading RubricCriteriaLevels .docx
 
EDUC 740Prayer Reflection Report Grading RubricCriteriaLev.docx
EDUC 740Prayer Reflection Report Grading RubricCriteriaLev.docxEDUC 740Prayer Reflection Report Grading RubricCriteriaLev.docx
EDUC 740Prayer Reflection Report Grading RubricCriteriaLev.docx
 
EDUC 6733 Action Research for EducatorsReading LiteracyDraft.docx
EDUC 6733 Action Research for EducatorsReading LiteracyDraft.docxEDUC 6733 Action Research for EducatorsReading LiteracyDraft.docx
EDUC 6733 Action Research for EducatorsReading LiteracyDraft.docx
 
EDUC 637Technology Portfolio InstructionsGeneral OverviewF.docx
EDUC 637Technology Portfolio InstructionsGeneral OverviewF.docxEDUC 637Technology Portfolio InstructionsGeneral OverviewF.docx
EDUC 637Technology Portfolio InstructionsGeneral OverviewF.docx
 
EDUC 364 The Role of Cultural Diversity in Schooling A dialecti.docx
EDUC 364 The Role of Cultural Diversity in Schooling A dialecti.docxEDUC 364 The Role of Cultural Diversity in Schooling A dialecti.docx
EDUC 364 The Role of Cultural Diversity in Schooling A dialecti.docx
 
EDUC 144 Writing Tips The writing assignments in this cla.docx
EDUC 144 Writing Tips  The writing assignments in this cla.docxEDUC 144 Writing Tips  The writing assignments in this cla.docx
EDUC 144 Writing Tips The writing assignments in this cla.docx
 
EDUC 1300- LEARNING FRAMEWORK Portfolio Page Prompts .docx
EDUC 1300- LEARNING FRAMEWORK Portfolio Page Prompts .docxEDUC 1300- LEARNING FRAMEWORK Portfolio Page Prompts .docx
EDUC 1300- LEARNING FRAMEWORK Portfolio Page Prompts .docx
 
EDU734 Teaching and Learning Environment Week 5.docx
EDU734 Teaching and  Learning Environment Week 5.docxEDU734 Teaching and  Learning Environment Week 5.docx
EDU734 Teaching and Learning Environment Week 5.docx
 
EDU 505 – Contemporary Issues in EducationCOURSE DESCRIPTION.docx
EDU 505 – Contemporary Issues in EducationCOURSE DESCRIPTION.docxEDU 505 – Contemporary Issues in EducationCOURSE DESCRIPTION.docx
EDU 505 – Contemporary Issues in EducationCOURSE DESCRIPTION.docx
 
EDU 3338 Lesson Plan TemplateCandidate NameCooperatin.docx
EDU 3338 Lesson Plan TemplateCandidate NameCooperatin.docxEDU 3338 Lesson Plan TemplateCandidate NameCooperatin.docx
EDU 3338 Lesson Plan TemplateCandidate NameCooperatin.docx
 
EDU 3215 Lesson Plan Template & Elements Name Andres Rod.docx
EDU 3215 Lesson Plan Template & Elements  Name Andres Rod.docxEDU 3215 Lesson Plan Template & Elements  Name Andres Rod.docx
EDU 3215 Lesson Plan Template & Elements Name Andres Rod.docx
 
EDST 1100R SITUATED LEARNING EDST 1100 N Situated Learning .docx
EDST 1100R SITUATED LEARNING  EDST 1100 N Situated Learning .docxEDST 1100R SITUATED LEARNING  EDST 1100 N Situated Learning .docx
EDST 1100R SITUATED LEARNING EDST 1100 N Situated Learning .docx
 
EDU 151 Thematic Unit Required ComponentsThematic Unit Requireme.docx
EDU 151 Thematic Unit Required ComponentsThematic Unit Requireme.docxEDU 151 Thematic Unit Required ComponentsThematic Unit Requireme.docx
EDU 151 Thematic Unit Required ComponentsThematic Unit Requireme.docx
 
EDSP 429Differentiated Instruction PowerPoint InstructionsThe .docx
EDSP 429Differentiated Instruction PowerPoint InstructionsThe .docxEDSP 429Differentiated Instruction PowerPoint InstructionsThe .docx
EDSP 429Differentiated Instruction PowerPoint InstructionsThe .docx
 
EDSP 429Fact Sheet on Disability Categories InstructionsThe pu.docx
EDSP 429Fact Sheet on Disability Categories InstructionsThe pu.docxEDSP 429Fact Sheet on Disability Categories InstructionsThe pu.docx
EDSP 429Fact Sheet on Disability Categories InstructionsThe pu.docx
 
EDSP 370Individualized Education Plan (IEP) InstructionsThe .docx
EDSP 370Individualized Education Plan (IEP) InstructionsThe .docxEDSP 370Individualized Education Plan (IEP) InstructionsThe .docx
EDSP 370Individualized Education Plan (IEP) InstructionsThe .docx
 
EDSP 377Scenario InstructionsScenario 2 Teaching communicatio.docx
EDSP 377Scenario InstructionsScenario 2 Teaching communicatio.docxEDSP 377Scenario InstructionsScenario 2 Teaching communicatio.docx
EDSP 377Scenario InstructionsScenario 2 Teaching communicatio.docx
 
EDSP 377Autism Interventions1. Applied Behavior Analysis (ABA).docx
EDSP 377Autism Interventions1. Applied Behavior Analysis (ABA).docxEDSP 377Autism Interventions1. Applied Behavior Analysis (ABA).docx
EDSP 377Autism Interventions1. Applied Behavior Analysis (ABA).docx
 

Recently uploaded

Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...anjaliyadav012327
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 

Recently uploaded (20)

Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 

Chapter 1 Managing changeQ1 Figure 1.76 shows how bad an imple.docx

  • 1. Chapter 1 Managing change Q1 Figure 1.76 shows how bad an implementation can become. Action needs to be taken to prevent this kind of situation. What would you recommend should be done? Q2 You are the project manager for a new management accounting system that will provide monthly profit and loss accounts to a chain of 30 computer dealerships, each of which is franchised to its local owner/manager. They have all done their own accounting before. What change issues would you expect to encounter? Does the fact that they are PC dealerships make any difference? Why might they have joined together in the chain? Q3 Consider the organisation that employs you or where you study. What is its culture? Why does it have that particular culture? What organisational culture would give you most satisfaction as an employee? Where might you find such an employer? Given your preferred organisational culture, what would it mean for you as an employee in terms of your responsibilities and obligations? Q4 You have to design a ‘hearts and minds’ programme connected with the implementation of a new system for the recording and management of stock in a book-publishing company and for the supply of books to booksellers. What would be the main stages of such a programme? Chapter 2 Business strategy and information systems Q1 Why is it important for project managers to understand the strategy of the organisation that uses their services? Q2 If you knew about an organisation’s strategy, could you suggest IS applications that would support it? For example, how could a large supermarket chain use information systems for cost reduction, or for a strategy based on differentiation? Q3 If you had to develop a strategy for a small software house employing 50 or so professional computer people, how would
  • 2. you go about it? What criteria would you use to test whether or not the strategy was sound? Chapter 3 The business case Q1 At what point in the project lifecycle should the business case be prepared? Q2 What should be the role of the project manager in relation to the business case? Q3 Explain the term ‘cost/benefit analysis’ Q4 What do you understand by the terms ‘tangible’ and ‘intangible’ when applied to costs and benefits? Q5 What is meant by the term ‘benefits realisation’ and why is it important? Chapter 4 The organisational framework Q1 1 How many different types of customer may there be for a systems development project? Who are they? What kind of relationship and reporting arrangements should the project manager have with the sponsor? Q2 Describe the roles of (a) the sponsor and (b) the project manager Q3 What are the principal problems of managing projects within a completely functional organisation structure? Q4 What are the pros and cons of a ‘pure’ project organisation compared with a project operating within a matrix structure Q5 In a PRINCE2® project structure there are formal committees, a project board and specific roles. What is your opinion about the value of this kind of arrangement? How do you see it working in large and small projects? Could it be useful for projects outside IT? Chapter 5 The programme and project support office Q1 Explain why the concept of PPSO arose in the first place. Q2 What are the advantages to an organisation of having a PPSO? Q3 What conflicts are likely to arise between project managers and PPSO staff?
  • 3. Q4 What skills are useful when working in PPSO? Chapter 6 Development lifecycles and approaches Q1 You have been asked to take charge of a system development where the customer requires about 50 per cent of the functionality very urgently to meet a business opportunity but where the remaining functions can be delivered over the next few years. Which of the various development lifecycles do you think would be most suitable for this project and why? Q2 What would you say are the principal advantages and disadvantages of the sequential approach to system development offered by the waterfall and ‘V’ lifecycle models? Q3 Some critics have said that the use of structured methods, such as SSADM, increases both delivery time and bureaucracy. Do you think these criticisms are justified and what are the claimed advantages in the use of structured methods? 4Q4 Increasing interest is being taken in the use of rapid application development. Why is this, and are there any dangers associated with the RAD approach? Q5 Consider how you would organise your project team for a RAD-type project. What leadership practices would it require from the project leader and what would the team members have to do? How, and at which points, would you involve the users? Q6 What have RAD and extreme programming got in common? What are the claimed advantages of these approaches? Q7 Why are approaches such as the Soft Systems Methodology, the Socio-Technical Approach and Business Process Reengineering relevant to IS project managers? Chapter 7 The profile of a project Q1 What work goes on prior to project start-up? Q2 Describe the products that typically result from the following project stages: Project Start-up; Analysis of Requirements; Design Integration and Testing. Q3 Explain the incremental approach to testing represented by
  • 4. the sequence: unit (module) test; integration test; system test; acceptance test. Q4 From what product should the acceptance criteria for a project be derived and why? Q5 Why is it important that the project team and the users develop and agree a process model for a project? Chapter 8 Project planning: understanding the work Q1 Give three reasons why it is essential to plan an IS project in detail before starting work on it. Q2 Ideally, the requirement for an IS project would be specified in some detail before planning begins. If the requirement is not detailed enough, what steps can the project manager take to improve the likelihood of the project’s success? Q3 In essence there are two basic ways of breaking down a project into plannable chunks: the use of a work breakdown structure or a product breakdown structure. Contrast the advantages and disadvantages of these approaches. Q4 4 What do you understand by the term dependency? How can project dependencies be represented for planning purposes? Q5 Define the terms “product” and “work package” and explain how these are related to each other. Q6 Network diagrams and bar charts have different parts to play in planning a project. Where is each of these tools used and what does it show? Chapter 9 Project planning: estimating Q1 Explain three reasons why estimating for IS projects has a poor reputation and a bad track record. What can be done about these problems? Q2 The analogy method of estimating is often used to produce broad-brush estimates at the start of a project. Why is this method particularly suited to this application? Q3 The analysis effort and programming methods both rest on the principle of extrapolating the total development effort from detailed estimates of one phase of the project. Describe the approach taken in each of these methods and show in what
  • 5. circumstances each might best be employed. Q4 The Delphi technique aims to achieve a consensus estimate from the efforts of a number of estimators. How is this achieved and what is the advantage of the Delphi technique over, for example, a round-table discussion? Q5 Describe how you would go about estimating for the following supporting project activities and why you would take your chosen approach to each. a) Project management b) Team leading/supervision c) Quality control d) Familiarisation. Q6 State three factors that could influence the estimates for an IS project and how you would attempt to adjust the estimates for these factors. Chapter 10 Scheduling and resourcing Q1 Explain the difference between effort and elapsed time. What is the significance of this difference for project planning purposes? Q2 Scheduling a project involves understanding the degree to which project tasks can be partitioned. What is meant by this term and what effect does partitioning have on the scheduling process? Q3 In long-term project planning, it is wise to assume that staff will be available for project work for less than 100 per cent of the total available time. What factors will reduce staff availability and what adjustments should be made for them? Q4 What do you understand by the term project milestone? How would you decide how many milestones to show on your project plan? Q5 The PRINCE2® project management method envisages a hierarchy of plans. Describe this hierarchy. Chapter 11 Monitoring progress Q1 How is effort monitored on a project? It is important that the effort to be spent on activities is reassessed on a regular basis – why is this so vital?
  • 6. Q2 Staff time is usually the principal cost component of an IS project. Describe five other areas where project costs could arise. Q3 Describe three methods than could be used to exercise quality control and explain the advantages and disadvantages of each. Q4 In what circumstances might you consider increasing the volume and/or frequency of quality control checks? When might you decrease their volume or frequency? Q5 What does the term ‘earned value analysis’ mean? What additional insights into the dynamics of a project is afforded by the use of EVA. Q6 Explain these terms: actual cost of work performed (ACWP); budgeted cost of work performed (BCWP); budgeted cost of work scheduled (BCWS). Chapter 12 Exercising control Q1 What is meant by the term the triple constraint? What are the three elements of the triple constraint and why is an understanding of their relative weight important in exercising control over a project? Q2 Your project is behind schedule and you are considering adding extra staff to the team. What would be the potential advantages and disadvantages of this approach? Q3 In what circumstances might you (a) increase or (b) decrease the amount of supervision given to a team member? Q4 Changes often bedevil IS projects. What steps are required to ensure that proper change control is exercised on a project? Q5 Explain the difference between change control and configuration management and the relationship between them. Chapter 13 Reporting progress Q1 What factors would you consider when deciding on the frequency with which you would report progress to (a) senior IS management, and (b) customer management? Q2 What is meant by the term exception reporting? What are the benefits and the disadvantages of this type of reporting? Q3 What are the benefits to the project manager in providing
  • 7. regular progress reports to the project team members? Q4 Explain the fillowingfollowing terms used in the PRINCE2® project management method: a) Project initiation b) End stage assessment c) Highlight report d) Checkpoint. Chapter 14 Quality Q1 How could the quality culture behaviours described in section 1214.3 be applied in a hospital? Q2 Why do you suppose there are an increasing number of organisations concerned with the development of quality practices for IS development? Q3 What is the purpose of a Quality Plan? Who should create it? Q4 Do you agree with what Dick Brandon said about sex in section 1214.10? Do not take this question too seriously! Chapter 15 Risk management Q1 Why is the use of risk management techniques becoming increasingly important in IS projects? Q2 Describe a five-stage process for project risk management. Q3 Three factors that need to be assessed when considering risks are likelihood, impact and urgency. Explain what is meant by each of these terms and show how each might be assessed. Q4 Risk actions are of two types: avoidance actions and mitigation actions. Describe the relationship between these types of risk action and where each might be employed. Q5 Describe the characteristics needed in a risk owner. Chapter 16 Value engineering and value management Q1 Explain the difference between value management and value engineering. Q2 What is meant by the term value tree? Q3 How can value management be used to compare different possible design solutions? Q4 Once a project is under way, how can value management be used to evaluate proposed changes?
  • 8. Chapter 17 Selling the project Q1 How would you assess the importance of sales skills to a project manager? Are they, in your view, increasing or decreasing in importance? Why do you think there is this change? Is it more important to understand selling or buying? Q2 Persuading someone to buy is a complex process. Why is this? Is the process inherently complex, or is it because so many people are involved? Q3 If selling is an ‘asking process’, how could you use it to help you sell some extra functionality to a system under development? Chapter 18 Managing stakeholders Q1 Stakeholders have different interests or ‘stakes’ in a project. How can you determine where to put your management effort? Q2 What is meant by the term managing expectations? Why is expectation management an important part of the project manager’s job? What influences a customer’s expectations? Q3 Why is it important for the project manager to establish a network of contacts within the IS organisation and also within the user organisation? In what circumstances can these networks be useful? Chapter 19 Managing suppliers Q1 Describe three situations in which an IS project may need or wish to use subcontractors. Q2 It is important that the contracts between the main contractor and the customer and between the main contractor and subcontractors are back-to-back; what is meant by this term? Q3 Subcontracts often include penalty clauses to give the main contractor protection in the case of the supplier’s poor performance. Why are penalty clauses not the complete answer to safeguarding the main contractor’s position? Q4 Describe four methods that can be used to monitor supplier performance. Q5 Explain how quality control can be applied to a
  • 9. subcontractor’s work. Chapter 20 Leadership Q1 Refer back to the introduction and consider again the leadership challenge at the end of the section. What kind of project management would you need to deliver to have people volunteer to work on your projects? Q2 How can Maslow and Hertzberg’sHerzberg theories of motivation help you to organise your project team and the way work is allocated? Q4 Think of a situation at home, at work, at university or in a club to which you belong. It is a situation that involves you. You want to change the present circumstances and set a new basis for the future. Using the behavioural commitments at the end of section 18.4, what could you do to change things? Chapter 21 Performance management Q1 You are dissatisfied with the general level of performance of one of your team. The quality of work is below your expectations. How will you deal with this? Q2 A member of your team exhibits disruptive behaviour. Her work is good but she is not a team player. The consequences are that she does not contribute to team effort and her colleagues find her difficult to work with; the project team secretary has refused to work with her at all. How could this serious problem have arisen? What can be done now? Q3 Describe the process of setting objectives. What might be three objectives for a newly appointed junior programmer? Chapter 22 Project teams Q1 Prepare an interview plan for the post of Business Analyst in your team. Q2 When you first assemble your project team, what can you do to build team spirit? What behaviours are the different individuals likely to exhibit during this team-building process? How do you demonstrate your leadership?
  • 10. Chapter 23 Managing the project climate Q1 Consider a project manager with a team of 15 to 20 people: a mixture of analysts, designers, programmers and support staff. The project also uses some specialist staff on a part-time basis. How could the project manager influence the working environment of such a team so as to get the best out of them? What are the behaviours that they could exhibit that would have an effect on the working style of the project team? Q2 Conflict and stress arise naturally in IS project teams. Some people argue that a little of both is useful, but everyone agrees that too much is destructive. How could you organise your project team to minimise the destructive effect of conflict and stress? Chapter 24 The project manager Q1 How does the ‘vision of the project manager’ in this chapter relate to the way you see the job? Are there aspects of the job that do not appear in the vision? Why might that be? Q2 Consider the skills and qualities of project managers described in the ‘developmental approach’. Can you add to these? How far do you see yourself being proficient in these skills? How could you develop further? Chapter 1 Managing change Q1 Figure 1.76 shows how bad an implementation can become. Action needs to be taken to prevent this kind of situation. What would you recommend should be done? Q2 You are the project manager for a new management accounting system that will provide monthly profit and loss accounts to a chain of 30 computer dealerships, each of which is franchised to its local owner/manager. They have all done their own accounting before. What change issues would you expect to encounter? Does the fact that they are PC dealerships make any difference? Why might they have joined together in the chain? Q3 Consider the organisation that employs you or where you study. What is its culture? Why does it have that particular
  • 11. culture? What organisational culture would give you most satisfaction as an employee? Where might you find such an employer? Given your preferred organisational culture, what would it mean for you as an employee in terms of your responsibilities and obligations? Q4 You have to design a ‘hearts and minds’ programme connected with the implementation of a new system for the recording and management of stock in a book-publishing company and for the supply of books to booksellers. What would be the main stages of such a programme? Chapter 2 Business strategy and information systems Q1 Why is it important for project managers to understand the strategy of the organisation that uses their services? Q2 If you knew about an organisation’s strategy, could you suggest IS applications that would support it? For example, how could a large supermarket chain use information systems for cost reduction, or for a strategy based on differentiation? Q3 If you had to develop a strategy for a small software house employing 50 or so professional computer people, how would you go about it? What criteria would you use to test whether or not the strategy was sound? Chapter 3 The business case Q1 At what point in the project lifecycle should the business case be prepared? Q2 What should be the role of the project manager in relation to the business case? Q3 Explain the term ‘cost/benefit analysis’ Q4 What do you understand by the terms ‘tangible’ and ‘intangible’ when applied to costs and benefits? Q5 What is meant by the term ‘benefits realisation’ and why is it important? Chapter 4 The organisational framework Q1 1 How many different types of customer may there be for a systems development project? Who are they? What kind of
  • 12. relationship and reporting arrangements should the project manager have with the sponsor? Q2 Describe the roles of (a) the sponsor and (b) the project manager Q3 What are the principal problems of managing projects within a completely functional organisation structure? Q4 What are the pros and cons of a ‘pure’ project organisation compared with a project operating within a matrix structure Q5 In a PRINCE2® project structure there are formal committees, a project board and specific roles. What is your opinion about the value of this kind of arrangement? How do you see it working in large and small projects? Could it be useful for projects outside IT? Chapter 5 The programme and project support office Q1 Explain why the concept of PPSO arose in the first place. Q2 What are the advantages to an organisation of having a PPSO? Q3 What conflicts are likely to arise between project managers and PPSO staff? Q4 What skills are useful when working in PPSO? Chapter 6 Development lifecycles and approaches Q1 You have been asked to take charge of a system development where the customer requires about 50 per cent of the functionality very urgently to meet a business opportunity but where the remaining functions can be delivered over the next few years. Which of the various development lifecycles do you think would be most suitable for this project and why? Q2 What would you say are the principal advantages and disadvantages of the sequential approach to system development offered by the waterfall and ‘V’ lifecycle models? Q3 Some critics have said that the use of structured methods,
  • 13. such as SSADM, increases both delivery time and bureaucracy. Do you think these criticisms are justified and what are the claimed advantages in the use of structured methods? 4Q4 Increasing interest is being taken in the use of rapid application development. Why is this, and are there any dangers associated with the RAD approach? Q5 Consider how you would organise your project team for a RAD-type project. What leadership practices would it require from the project leader and what would the team members have to do? How, and at which points, would you involve the users? Q6 What have RAD and extreme programming got in common? What are the claimed advantages of these approaches? Q7 Why are approaches such as the Soft Systems Methodology, the Socio-Technical Approach and Business Process Reengineering relevant to IS project managers? Chapter 7 The profile of a project Q1 What work goes on prior to project start-up? Q2 Describe the products that typically result from the following project stages: Project Start-up; Analysis of Requirements; Design Integration and Testing. Q3 Explain the incremental approach to testing represented by the sequence: unit (module) test; integration test; system test; acceptance test. Q4 From what product should the acceptance criteria for a project be derived and why? Q5 Why is it important that the project team and the users develop and agree a process model for a project? Chapter 8 Project planning: understanding the work Q1 Give three reasons why it is essential to plan an IS project in detail before starting work on it. Q2 Ideally, the requirement for an IS project would be specified in some detail before planning begins. If the requirement is not detailed enough, what steps can the project manager take to improve the likelihood of the project’s success? Q3 In essence there are two basic ways of breaking down a project into plannable chunks: the use of a work breakdown
  • 14. structure or a product breakdown structure. Contrast the advantages and disadvantages of these approaches. Q4 4 What do you understand by the term dependency? How can project dependencies be represented for planning purposes? Q5 Define the terms “product” and “work package” and explain how these are related to each other. Q6 Network diagrams and bar charts have different parts to play in planning a project. Where is each of these tools used and what does it show? Chapter 9 Project planning: estimating Q1 Explain three reasons why estimating for IS projects has a poor reputation and a bad track record. What can be done about these problems? Q2 The analogy method of estimating is often used to produce broad-brush estimates at the start of a project. Why is this method particularly suited to this application? Q3 The analysis effort and programming methods both rest on the principle of extrapolating the total development effort from detailed estimates of one phase of the project. Describe the approach taken in each of these methods and show in what circumstances each might best be employed. Q4 The Delphi technique aims to achieve a consensus estimate from the efforts of a number of estimators. How is this achieved and what is the advantage of the Delphi technique over, for example, a round-table discussion? Q5 Describe how you would go about estimating for the following supporting project activities and why you would take your chosen approach to each. a) Project management b) Team leading/supervision c) Quality control d) Familiarisation. Q6 State three factors that could influence the estimates for an IS project and how you would attempt to adjust the estimates for these factors.
  • 15. Chapter 10 Scheduling and resourcing Q1 Explain the difference between effort and elapsed time. What is the significance of this difference for project planning purposes? Q2 Scheduling a project involves understanding the degree to which project tasks can be partitioned. What is meant by this term and what effect does partitioning have on the scheduling process? Q3 In long-term project planning, it is wise to assume that staff will be available for project work for less than 100 per cent of the total available time. What factors will reduce staff availability and what adjustments should be made for them? Q4 What do you understand by the term project milestone? How would you decide how many milestones to show on your project plan? Q5 The PRINCE2® project management method envisages a hierarchy of plans. Describe this hierarchy. Chapter 11 Monitoring progress Q1 How is effort monitored on a project? It is important that the effort to be spent on activities is reassessed on a regular basis – why is this so vital? Q2 Staff time is usually the principal cost component of an IS project. Describe five other areas where project costs could arise. Q3 Describe three methods than could be used to exercise quality control and explain the advantages and disadvantages of each. Q4 In what circumstances might you consider increasing the volume and/or frequency of quality control checks? When might you decrease their volume or frequency? Q5 What does the term ‘earned value analysis’ mean? What additional insights into the dynamics of a project is afforded by the use of EVA. Q6 Explain these terms: actual cost of work performed (ACWP); budgeted cost of work performed (BCWP); budgeted cost of work scheduled (BCWS).
  • 16. Chapter 12 Exercising control Q1 What is meant by the term the triple constraint? What are the three elements of the triple constraint and why is an understanding of their relative weight important in exercising control over a project? Q2 Your project is behind schedule and you are considering adding extra staff to the team. What would be the potential advantages and disadvantages of this approach? Q3 In what circumstances might you (a) increase or (b) decrease the amount of supervision given to a team member? Q4 Changes often bedevil IS projects. What steps are required to ensure that proper change control is exercised on a project? Q5 Explain the difference between change control and configuration management and the relationship between them. Chapter 13 Reporting progress Q1 What factors would you consider when deciding on the frequency with which you would report progress to (a) senior IS management, and (b) customer management? Q2 What is meant by the term exception reporting? What are the benefits and the disadvantages of this type of reporting? Q3 What are the benefits to the project manager in providing regular progress reports to the project team members? Q4 Explain the fillowingfollowing terms used in the PRINCE2® project management method: a) Project initiation b) End stage assessment c) Highlight report d) Checkpoint. Chapter 14 Quality Q1 How could the quality culture behaviours described in section 1214.3 be applied in a hospital? Q2 Why do you suppose there are an increasing number of organisations concerned with the development of quality practices for IS development? Q3 What is the purpose of a Quality Plan? Who should create it?
  • 17. Q4 Do you agree with what Dick Brandon said about sex in section 1214.10? Do not take this question too seriously! Chapter 15 Risk management Q1 Why is the use of risk management techniques becoming increasingly important in IS projects? Q2 Describe a five-stage process for project risk management. Q3 Three factors that need to be assessed when considering risks are likelihood, impact and urgency. Explain what is meant by each of these terms and show how each might be assessed. Q4 Risk actions are of two types: avoidance actions and mitigation actions. Describe the relationship between these types of risk action and where each might be employed. Q5 Describe the characteristics needed in a risk owner. Chapter 16 Value engineering and value management Q1 Explain the difference between value management and value engineering. Q2 What is meant by the term value tree? Q3 How can value management be used to compare different possible design solutions? Q4 Once a project is under way, how can value management be used to evaluate proposed changes? Chapter 17 Selling the project Q1 How would you assess the importance of sales skills to a project manager? Are they, in your view, increasing or decreasing in importance? Why do you think there is this change? Is it more important to understand selling or buying? Q2 Persuading someone to buy is a complex process. Why is this? Is the process inherently complex, or is it because so many people are involved? Q3 If selling is an ‘asking process’, how could you use it to help you sell some extra functionality to a system under development? Chapter 18 Managing stakeholders Q1 Stakeholders have different interests or ‘stakes’ in a project. How can you determine where to put your management effort?
  • 18. Q2 What is meant by the term managing expectations? Why is expectation management an important part of the project manager’s job? What influences a customer’s expectations? Q3 Why is it important for the project manager to establish a network of contacts within the IS organisation and also within the user organisation? In what circumstances can these networks be useful? Chapter 19 Managing suppliers Q1 Describe three situations in which an IS project may need or wish to use subcontractors. Q2 It is important that the contracts between the main contractor and the customer and between the main contractor and subcontractors are back-to-back; what is meant by this term? Q3 Subcontracts often include penalty clauses to give the main contractor protection in the case of the supplier’s poor performance. Why are penalty clauses not the complete answer to safeguarding the main contractor’s position? Q4 Describe four methods that can be used to monitor supplier performance. Q5 Explain how quality control can be applied to a subcontractor’s work. Chapter 20 Leadership Q1 Refer back to the introduction and consider again the leadership challenge at the end of the section. What kind of project management would you need to deliver to have people volunteer to work on your projects? Q2 How can Maslow and Hertzberg’sHerzberg theories of motivation help you to organise your project team and the way work is allocated? Q4 Think of a situation at home, at work, at university or in a club to which you belong. It is a situation that involves you. You want to change the present circumstances and set a new basis for the future. Using the behavioural commitments at the end of section 18.4, what could you do to change things?
  • 19. Chapter 21 Performance management Q1 You are dissatisfied with the general level of performance of one of your team. The quality of work is below your expectations. How will you deal with this? Q2 A member of your team exhibits disruptive behaviour. Her work is good but she is not a team player. The consequences are that she does not contribute to team effort and her colleagues find her difficult to work with; the project team secretary has refused to work with her at all. How could this serious problem have arisen? What can be done now? Q3 Describe the process of setting objectives. What might be three objectives for a newly appointed junior programmer? Chapter 22 Project teams Q1 Prepare an interview plan for the post of Business Analyst in your team. Q2 When you first assemble your project team, what can you do to build team spirit? What behaviours are the different individuals likely to exhibit during this team-building process? How do you demonstrate your leadership? Chapter 23 Managing the project climate Q1 Consider a project manager with a team of 15 to 20 people: a mixture of analysts, designers, programmers and support staff. The project also uses some specialist staff on a part-time basis. How could the project manager influence the working environment of such a team so as to get the best out of them? What are the behaviours that they could exhibit that would have an effect on the working style of the project team? Q2 Conflict and stress arise naturally in IS project teams. Some people argue that a little of both is useful, but everyone agrees that too much is destructive. How could you organise your project team to minimise the destructive effect of conflict and stress? Chapter 24 The project manager
  • 20. Q1 How does the ‘vision of the project manager’ in this chapter relate to the way you see the job? Are there aspects of the job that do not appear in the vision? Why might that be? Q2 Consider the skills and qualities of project managers described in the ‘developmental approach’. Can you add to these? How far do you see yourself being proficient in these skills? How could you develop further?