Production cost: N340,000.00
Installation & Logistic Cost : N30,000.00
Settlement of Touts (Area Boys): N30,000.00
Status: Wall sign production &
Installed
MUSHIN BRANCH
Before: Pylon and wall refurbished
OGBA BRANCH
Status: Wall sign production
& Installed
Production cost: N340,000.00
Installation & Logistic Cost (industrial Scaffold): N50,000.00
Ogudu Branch
Status: Wall sign production
& Installed
Production cost: N340,000.00
Installation & logistic Cost : N30,000.00
After: Pylon and wall refurbishedOKE AFA BRANCH
Production cost: N340,000.00
Installation & Logistic Cost: N30,000.00
Status: Wall sign production
& Installed
Before: Pylon and wall
OKE AFA BRANCH
Status: Wall sign production
& Installed
Production cost: N340,000.00
Installation & Logistic Cost: N30,000.00
OKE-ARIN BRANCH
Production cost: N340,000.00
Installation & Logistic Cost: (Ind. Scaffold) N50,000.00
Settlement of touts (area boys):N50,000.00
Status: Wall sign production
& Installed
OKOTA BRANCH
Production cost: N340,000.00
Installation & Logistic Cost (Ind. Scaffold): N50,000.00
Status: Wall sign production
& Installed
ONIPANU BRANCH
Status: Wall sign production
& Installed
Production cost: N340,000.00
Installation & Logistic Cost (Ind. Scaffold): N50,000.00
OREGUN BRANCH
After: Pylon and wall refurbished
Status: Wall sign production
& Installed
Production cost: N340,000.00
Installation & Logistic Cost: N30,000.00
ORILE COKER BRANCH
Status: Wall sign production
& Installed
Production cost: N340,000.00
Installation & Logistic Cost: N30,000.00
OROYINYIN BRANCH
Status: Wall sign production
& Installed
Production cost: N340,000.00
Installation & Logistic Cost: N30,000.00
Settlement of Touts (Area Boys): N50,000.00
OSOLO WAY BRANCH
Production cost: N340,000.00
Installation & Logistic Cost (Ind. Scaffold): N50,000.00
Status: Wall sign production
& Installed
RANDLE ROAD BRANCH
Before: Pylon and wall refurbished
Production cost: N340,000.00
Installation & Logistic Cost: N50,000.00
Status: Wall sign production
& Installed
SHOMOLU BRANCH
Production cost: N340,000.00
Installation Cost: N50,000.00
Status: Wall sign production
& Installed
Production cost: N340,000.00
Installation & Logistic Cost: N50,000.00
TRADE FAIR BRANCH
Status: Wall sign production
& Installed
Total Value of Project:
• Production 15 FCMB Branches of Wall Signs- N5, 100,000.00
• Installation & Logistic (Industrial scaffold used at Ogba, Osolo, Shomolu,
Onipanu, Randle, Oke-Arin, Trade Fair each at N50,000)- N610,000.00
• Settle of Touts (area boys) – N130,000.00
• VAT 5% - 292,000.00
• Total- N6,132,000.00

More Related Content

What's hot

What's hot (20)

Resume
ResumeResume
Resume
 
Argenta case study
Argenta case studyArgenta case study
Argenta case study
 
My Job
My JobMy Job
My Job
 
Dextor Moren
Dextor MorenDextor Moren
Dextor Moren
 
SSC Electrical & Building Materials
SSC Electrical & Building MaterialsSSC Electrical & Building Materials
SSC Electrical & Building Materials
 
092 sectional sofa
092 sectional sofa092 sectional sofa
092 sectional sofa
 
Fouad Z CV
Fouad Z CVFouad Z CV
Fouad Z CV
 
Amrapali Adarsh Awas Yojna, Greater Noida (W)
Amrapali Adarsh Awas Yojna, Greater Noida (W)Amrapali Adarsh Awas Yojna, Greater Noida (W)
Amrapali Adarsh Awas Yojna, Greater Noida (W)
 
Bespoke Exhibition Stands
Bespoke Exhibition StandsBespoke Exhibition Stands
Bespoke Exhibition Stands
 
PHILIPPE POLO RESUME
PHILIPPE POLO RESUMEPHILIPPE POLO RESUME
PHILIPPE POLO RESUME
 
Mike resume 2015
Mike resume 2015Mike resume 2015
Mike resume 2015
 
SAMIR UDDIN KHAN CV
SAMIR UDDIN KHAN CVSAMIR UDDIN KHAN CV
SAMIR UDDIN KHAN CV
 
master cv january 2016 pdf 2
master cv january 2016 pdf 2master cv january 2016 pdf 2
master cv january 2016 pdf 2
 
Gelo my fab yard working for you
Gelo   my fab yard working for youGelo   my fab yard working for you
Gelo my fab yard working for you
 
Aaron-Clayton
Aaron-ClaytonAaron-Clayton
Aaron-Clayton
 
Resume
ResumeResume
Resume
 
CV
CVCV
CV
 
Dwaine's Resume1
Dwaine's Resume1Dwaine's Resume1
Dwaine's Resume1
 
Mr Michael Toye CV 1 (2)
Mr Michael Toye CV 1 (2)Mr Michael Toye CV 1 (2)
Mr Michael Toye CV 1 (2)
 
Doufre one pager
Doufre one pagerDoufre one pager
Doufre one pager
 

More from Theophilus Akhimie

Integrated Howdy Konzult Brand portfolio profile
Integrated Howdy Konzult Brand portfolio profileIntegrated Howdy Konzult Brand portfolio profile
Integrated Howdy Konzult Brand portfolio profileTheophilus Akhimie
 
Gtb north west & north east Brand Refresh Exercise Report
Gtb north west & north east Brand Refresh Exercise ReportGtb north west & north east Brand Refresh Exercise Report
Gtb north west & north east Brand Refresh Exercise ReportTheophilus Akhimie
 
Fbn pylon refurbishment for report
Fbn pylon refurbishment for reportFbn pylon refurbishment for report
Fbn pylon refurbishment for reportTheophilus Akhimie
 
Integrated Howdy Konzult profile
Integrated Howdy Konzult profileIntegrated Howdy Konzult profile
Integrated Howdy Konzult profileTheophilus Akhimie
 
GTB Lagos maintenance report march 2015
 GTB Lagos maintenance report march 2015 GTB Lagos maintenance report march 2015
GTB Lagos maintenance report march 2015Theophilus Akhimie
 
Ascon Signage Maintenance Review Report
Ascon Signage Maintenance Review ReportAscon Signage Maintenance Review Report
Ascon Signage Maintenance Review ReportTheophilus Akhimie
 

More from Theophilus Akhimie (10)

Integrated Howdy Konzult Brand portfolio profile
Integrated Howdy Konzult Brand portfolio profileIntegrated Howdy Konzult Brand portfolio profile
Integrated Howdy Konzult Brand portfolio profile
 
Gtb north west & north east Brand Refresh Exercise Report
Gtb north west & north east Brand Refresh Exercise ReportGtb north west & north east Brand Refresh Exercise Report
Gtb north west & north east Brand Refresh Exercise Report
 
Fbn pylon refurbishment for report
Fbn pylon refurbishment for reportFbn pylon refurbishment for report
Fbn pylon refurbishment for report
 
Integrated Howdy Konzult profile
Integrated Howdy Konzult profileIntegrated Howdy Konzult profile
Integrated Howdy Konzult profile
 
Fbn pylon maintenance visuals
Fbn pylon maintenance visualsFbn pylon maintenance visuals
Fbn pylon maintenance visuals
 
Shark sam
Shark samShark sam
Shark sam
 
GTB Lagos maintenance report march 2015
 GTB Lagos maintenance report march 2015 GTB Lagos maintenance report march 2015
GTB Lagos maintenance report march 2015
 
Portfolio- signage/signs
Portfolio-      signage/signsPortfolio-      signage/signs
Portfolio- signage/signs
 
Ascon Signage Maintenance Review Report
Ascon Signage Maintenance Review ReportAscon Signage Maintenance Review Report
Ascon Signage Maintenance Review Report
 
Portfolio Accounts
Portfolio AccountsPortfolio Accounts
Portfolio Accounts
 

Recently uploaded

VIP 7001035870 Find & Meet Hyderabad Call Girls Film Nagar high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Film Nagar high-profile Call ...VIP 7001035870 Find & Meet Hyderabad Call Girls Film Nagar high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Film Nagar high-profile Call ...aditipandeya
 
ASO Process: What is App Store Optimization
ASO Process: What is App Store OptimizationASO Process: What is App Store Optimization
ASO Process: What is App Store OptimizationAli Raza
 
marketing strategy of tanishq word PPROJECT.pdf
marketing strategy of tanishq word PPROJECT.pdfmarketing strategy of tanishq word PPROJECT.pdf
marketing strategy of tanishq word PPROJECT.pdfarsathsahil
 
pptx.marketing strategy of tanishq. pptx
pptx.marketing strategy of tanishq. pptxpptx.marketing strategy of tanishq. pptx
pptx.marketing strategy of tanishq. pptxarsathsahil
 
The Pitfalls of Keyword Stuffing in SEO Copywriting
The Pitfalls of Keyword Stuffing in SEO CopywritingThe Pitfalls of Keyword Stuffing in SEO Copywriting
The Pitfalls of Keyword Stuffing in SEO CopywritingJuan Pineda
 
How To Quickly Create Your Affiliate Site with Artificial Intelligence!.pdf
How To Quickly Create Your Affiliate Site with Artificial Intelligence!.pdfHow To Quickly Create Your Affiliate Site with Artificial Intelligence!.pdf
How To Quickly Create Your Affiliate Site with Artificial Intelligence!.pdfSOFTTECHHUB
 
Cost-effective tactics for navigating CPC surges
Cost-effective tactics for navigating CPC surgesCost-effective tactics for navigating CPC surges
Cost-effective tactics for navigating CPC surgesPushON Ltd
 
BLOOM_April2024. Balmer Lawrie Online Monthly Bulletin
BLOOM_April2024. Balmer Lawrie Online Monthly BulletinBLOOM_April2024. Balmer Lawrie Online Monthly Bulletin
BLOOM_April2024. Balmer Lawrie Online Monthly BulletinBalmerLawrie
 
Forecast of Content Marketing through AI
Forecast of Content Marketing through AIForecast of Content Marketing through AI
Forecast of Content Marketing through AIRinky
 
Brighton SEO April 2024 - The Good, the Bad & the Ugly of SEO Success
Brighton SEO April 2024 - The Good, the Bad & the Ugly of SEO SuccessBrighton SEO April 2024 - The Good, the Bad & the Ugly of SEO Success
Brighton SEO April 2024 - The Good, the Bad & the Ugly of SEO SuccessVarn
 
DIGITAL MARKETING STRATEGY_INFOGRAPHIC IMAGE.pdf
DIGITAL MARKETING STRATEGY_INFOGRAPHIC IMAGE.pdfDIGITAL MARKETING STRATEGY_INFOGRAPHIC IMAGE.pdf
DIGITAL MARKETING STRATEGY_INFOGRAPHIC IMAGE.pdfmayanksharma0441
 
Social Samosa Guidebook for SAMMIES 2024.pdf
Social Samosa Guidebook for SAMMIES 2024.pdfSocial Samosa Guidebook for SAMMIES 2024.pdf
Social Samosa Guidebook for SAMMIES 2024.pdfSocial Samosa
 
Branding strategies of new company .pptx
Branding strategies of new company .pptxBranding strategies of new company .pptx
Branding strategies of new company .pptxVikasTiwari846641
 
Avoid the 2025 web accessibility rush: do not fear WCAG compliance
Avoid the 2025 web accessibility rush: do not fear WCAG complianceAvoid the 2025 web accessibility rush: do not fear WCAG compliance
Avoid the 2025 web accessibility rush: do not fear WCAG complianceDamien ROBERT
 
Jai Institute for Parenting Program Guide
Jai Institute for Parenting Program GuideJai Institute for Parenting Program Guide
Jai Institute for Parenting Program Guidekiva6
 
How To Utilize Calculated Properties in your HubSpot Setup
How To Utilize Calculated Properties in your HubSpot SetupHow To Utilize Calculated Properties in your HubSpot Setup
How To Utilize Calculated Properties in your HubSpot Setupssuser4571da
 
Inbound Marekting 2.0 - The Paradigm Shift in Marketing | Axon Garside
Inbound Marekting 2.0 - The Paradigm Shift in Marketing | Axon GarsideInbound Marekting 2.0 - The Paradigm Shift in Marketing | Axon Garside
Inbound Marekting 2.0 - The Paradigm Shift in Marketing | Axon Garsiderobwhite630290
 
Influencer Marketing Power point presentation
Influencer Marketing  Power point presentationInfluencer Marketing  Power point presentation
Influencer Marketing Power point presentationdgtivemarketingagenc
 
The Skin Games 2024 25 - Sponsorship Deck
The Skin Games 2024 25 - Sponsorship DeckThe Skin Games 2024 25 - Sponsorship Deck
The Skin Games 2024 25 - Sponsorship DeckToluwanimi Balogun
 
Netflix Ads The Game Changer in Video Ads – Who Needs YouTube.pptx (Chester Y...
Netflix Ads The Game Changer in Video Ads – Who Needs YouTube.pptx (Chester Y...Netflix Ads The Game Changer in Video Ads – Who Needs YouTube.pptx (Chester Y...
Netflix Ads The Game Changer in Video Ads – Who Needs YouTube.pptx (Chester Y...ChesterYang6
 

Recently uploaded (20)

VIP 7001035870 Find & Meet Hyderabad Call Girls Film Nagar high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Film Nagar high-profile Call ...VIP 7001035870 Find & Meet Hyderabad Call Girls Film Nagar high-profile Call ...
VIP 7001035870 Find & Meet Hyderabad Call Girls Film Nagar high-profile Call ...
 
ASO Process: What is App Store Optimization
ASO Process: What is App Store OptimizationASO Process: What is App Store Optimization
ASO Process: What is App Store Optimization
 
marketing strategy of tanishq word PPROJECT.pdf
marketing strategy of tanishq word PPROJECT.pdfmarketing strategy of tanishq word PPROJECT.pdf
marketing strategy of tanishq word PPROJECT.pdf
 
pptx.marketing strategy of tanishq. pptx
pptx.marketing strategy of tanishq. pptxpptx.marketing strategy of tanishq. pptx
pptx.marketing strategy of tanishq. pptx
 
The Pitfalls of Keyword Stuffing in SEO Copywriting
The Pitfalls of Keyword Stuffing in SEO CopywritingThe Pitfalls of Keyword Stuffing in SEO Copywriting
The Pitfalls of Keyword Stuffing in SEO Copywriting
 
How To Quickly Create Your Affiliate Site with Artificial Intelligence!.pdf
How To Quickly Create Your Affiliate Site with Artificial Intelligence!.pdfHow To Quickly Create Your Affiliate Site with Artificial Intelligence!.pdf
How To Quickly Create Your Affiliate Site with Artificial Intelligence!.pdf
 
Cost-effective tactics for navigating CPC surges
Cost-effective tactics for navigating CPC surgesCost-effective tactics for navigating CPC surges
Cost-effective tactics for navigating CPC surges
 
BLOOM_April2024. Balmer Lawrie Online Monthly Bulletin
BLOOM_April2024. Balmer Lawrie Online Monthly BulletinBLOOM_April2024. Balmer Lawrie Online Monthly Bulletin
BLOOM_April2024. Balmer Lawrie Online Monthly Bulletin
 
Forecast of Content Marketing through AI
Forecast of Content Marketing through AIForecast of Content Marketing through AI
Forecast of Content Marketing through AI
 
Brighton SEO April 2024 - The Good, the Bad & the Ugly of SEO Success
Brighton SEO April 2024 - The Good, the Bad & the Ugly of SEO SuccessBrighton SEO April 2024 - The Good, the Bad & the Ugly of SEO Success
Brighton SEO April 2024 - The Good, the Bad & the Ugly of SEO Success
 
DIGITAL MARKETING STRATEGY_INFOGRAPHIC IMAGE.pdf
DIGITAL MARKETING STRATEGY_INFOGRAPHIC IMAGE.pdfDIGITAL MARKETING STRATEGY_INFOGRAPHIC IMAGE.pdf
DIGITAL MARKETING STRATEGY_INFOGRAPHIC IMAGE.pdf
 
Social Samosa Guidebook for SAMMIES 2024.pdf
Social Samosa Guidebook for SAMMIES 2024.pdfSocial Samosa Guidebook for SAMMIES 2024.pdf
Social Samosa Guidebook for SAMMIES 2024.pdf
 
Branding strategies of new company .pptx
Branding strategies of new company .pptxBranding strategies of new company .pptx
Branding strategies of new company .pptx
 
Avoid the 2025 web accessibility rush: do not fear WCAG compliance
Avoid the 2025 web accessibility rush: do not fear WCAG complianceAvoid the 2025 web accessibility rush: do not fear WCAG compliance
Avoid the 2025 web accessibility rush: do not fear WCAG compliance
 
Jai Institute for Parenting Program Guide
Jai Institute for Parenting Program GuideJai Institute for Parenting Program Guide
Jai Institute for Parenting Program Guide
 
How To Utilize Calculated Properties in your HubSpot Setup
How To Utilize Calculated Properties in your HubSpot SetupHow To Utilize Calculated Properties in your HubSpot Setup
How To Utilize Calculated Properties in your HubSpot Setup
 
Inbound Marekting 2.0 - The Paradigm Shift in Marketing | Axon Garside
Inbound Marekting 2.0 - The Paradigm Shift in Marketing | Axon GarsideInbound Marekting 2.0 - The Paradigm Shift in Marketing | Axon Garside
Inbound Marekting 2.0 - The Paradigm Shift in Marketing | Axon Garside
 
Influencer Marketing Power point presentation
Influencer Marketing  Power point presentationInfluencer Marketing  Power point presentation
Influencer Marketing Power point presentation
 
The Skin Games 2024 25 - Sponsorship Deck
The Skin Games 2024 25 - Sponsorship DeckThe Skin Games 2024 25 - Sponsorship Deck
The Skin Games 2024 25 - Sponsorship Deck
 
Netflix Ads The Game Changer in Video Ads – Who Needs YouTube.pptx (Chester Y...
Netflix Ads The Game Changer in Video Ads – Who Needs YouTube.pptx (Chester Y...Netflix Ads The Game Changer in Video Ads – Who Needs YouTube.pptx (Chester Y...
Netflix Ads The Game Changer in Video Ads – Who Needs YouTube.pptx (Chester Y...
 

Rosaab internatonal report on fcmb wall signage rebranding lagos branch report

  • 1. FCMB WALL SINGAGE LAGOS BRANCHES REBRANDING REPORT by rosaab INTERNATIONAL
  • 2. Production cost: N340,000.00 Installation & Logistic Cost : N30,000.00 Settlement of Touts (Area Boys): N30,000.00 Status: Wall sign production & Installed MUSHIN BRANCH
  • 3. Before: Pylon and wall refurbished OGBA BRANCH Status: Wall sign production & Installed Production cost: N340,000.00 Installation & Logistic Cost (industrial Scaffold): N50,000.00
  • 4. Ogudu Branch Status: Wall sign production & Installed Production cost: N340,000.00 Installation & logistic Cost : N30,000.00
  • 5. After: Pylon and wall refurbishedOKE AFA BRANCH Production cost: N340,000.00 Installation & Logistic Cost: N30,000.00 Status: Wall sign production & Installed
  • 6. Before: Pylon and wall OKE AFA BRANCH Status: Wall sign production & Installed Production cost: N340,000.00 Installation & Logistic Cost: N30,000.00
  • 7. OKE-ARIN BRANCH Production cost: N340,000.00 Installation & Logistic Cost: (Ind. Scaffold) N50,000.00 Settlement of touts (area boys):N50,000.00 Status: Wall sign production & Installed
  • 8. OKOTA BRANCH Production cost: N340,000.00 Installation & Logistic Cost (Ind. Scaffold): N50,000.00 Status: Wall sign production & Installed
  • 9. ONIPANU BRANCH Status: Wall sign production & Installed Production cost: N340,000.00 Installation & Logistic Cost (Ind. Scaffold): N50,000.00
  • 10. OREGUN BRANCH After: Pylon and wall refurbished Status: Wall sign production & Installed Production cost: N340,000.00 Installation & Logistic Cost: N30,000.00
  • 11. ORILE COKER BRANCH Status: Wall sign production & Installed Production cost: N340,000.00 Installation & Logistic Cost: N30,000.00
  • 12. OROYINYIN BRANCH Status: Wall sign production & Installed Production cost: N340,000.00 Installation & Logistic Cost: N30,000.00 Settlement of Touts (Area Boys): N50,000.00
  • 13. OSOLO WAY BRANCH Production cost: N340,000.00 Installation & Logistic Cost (Ind. Scaffold): N50,000.00 Status: Wall sign production & Installed
  • 14. RANDLE ROAD BRANCH Before: Pylon and wall refurbished Production cost: N340,000.00 Installation & Logistic Cost: N50,000.00 Status: Wall sign production & Installed
  • 15. SHOMOLU BRANCH Production cost: N340,000.00 Installation Cost: N50,000.00 Status: Wall sign production & Installed
  • 16. Production cost: N340,000.00 Installation & Logistic Cost: N50,000.00 TRADE FAIR BRANCH Status: Wall sign production & Installed
  • 17. Total Value of Project: • Production 15 FCMB Branches of Wall Signs- N5, 100,000.00 • Installation & Logistic (Industrial scaffold used at Ogba, Osolo, Shomolu, Onipanu, Randle, Oke-Arin, Trade Fair each at N50,000)- N610,000.00 • Settle of Touts (area boys) – N130,000.00 • VAT 5% - 292,000.00 • Total- N6,132,000.00