SlideShare a Scribd company logo
1 of 6
Download to read offline
D E D Y A R T A N T O
0 8 1 2 8 6 0 9 1 6 8 5
FM-HRM-12/Rev01-10.05.16 Page 1 of 6
CURRICULUM VITAE
PERSONAL DATA
NAME : DEDY ARTANTO
POSITION : CIVIL ENGINEER
PLACE, DATE OF BIRTH : JAKARTA, 07 MAY 1973
MARITAL STATUS : MARRIED
EDUCATION : BACHELOR DEGREE
LANGUAGES SPOKEN : PASSIVE
LANGUAGES WRITTEN : ACTIVE
HOME ADDRESS : BOGOR PERMATA RESIDENCE B5-22
CILEBUT - BOGOR
SUMMARY EXPERIENCE :
Total 14 years experience, 4 years with REKIND and 10 years with other company. As
Civil Field Engineer, I was responsible for the execution of civil engineering activities
at site and engineering coordination with the various taskforce disciplines at site.
D E D Y A R T A N T O
0 8 1 2 8 6 0 9 1 6 8 5
FM-HRM-12/Rev01-10.05.16 Page 2 of 6
WORK EXPERIENCE :
I. Period : 2015 - 2016
Company : PT. REKAYASA INDUSTRI
Location : Sumpal Palembang - South Sumatera, Indonesia.
Client : Conocophillips
Plant Owner : Conocophillips
Postion Held : Field Civil Engineering
Value Project :
My Rensponsibility :
Coordination interdisiplin abaout design for application at site
condition.
Check Revisi design if the design not applicable at site condition
Check Balancing material take off at site with Quantity material from
contract
Make sure the construction work accordance with design
Make sure Preparation the material needed and heavy tools for
construction work.
Check shopdrawing if any design change at site and for construction
work.
Solution of Field Problem.
II. Period : 2014 - 2015
Company : PT. REKAYASA INDUSTRI
Location : LHOKSEUMAWE, ACEH, INDONESIA
Client : PT. PAG (Perta Arun Gas)
Plant Owner : PT. PAG (Perta Arun Gas)
Postion Held : Lead Field Civil Engineering
Value Project :
My Rensponsibility :
Coordination interdisiplin abaout design for application at site
condition.
Check Revisi design if the design not applicable at site condition
Check Balancing material take off at site with Quantity material from
contract
Make sure the construction work accordance with design
Make sure Preparation the material needed and heavy tools for
construction work.
Check shopdrawing if any design change at site and for construction
work.
Solution of Field Problem.
D E D Y A R T A N T O
0 8 1 2 8 6 0 9 1 6 8 5
FM-HRM-12/Rev01-10.05.16 Page 3 of 6
III. Period : 2014
Company : PT. REKAYASA INDUSTRI
Location : Sumpal Palembang - South Sumatera, Indonesia.
Client : Conocophillips
Plant Owner : Conocophillips
Postion Held : Civil Engineer
Value Project :
My Rensponsibility :
Bid Proposal Engineering, Procurement and Construction of Sumpal
Compression Project
IV. Period : 2012 - 2014
Company : PT. REKAYASA INDUSTRI
Location : Grissik Palembang - South Sumatera, Indonesia.
Client : Conocophillips
Plant Owner : Conocophillips
Postion Held : Field Civil Engineer
Value Project :
My Rensponsibility :
Checking design to actual condition.
Revisi design if the design not applicable at site condition
Balancing material take off at site with Quantity material from
contract
Make sure the construction work accordance with design
Preparation the material needed and heavy tools for construction
work.
Make the shopdrawing if any design change at site and for
construction work.
Make the as built drawing.
Solution of Field Problem
V. Period : 2012
Company : PT. Nusantara Global Ind
Location : Pasuruan, INDONESIA
Client : Indonesian Power
Plant Owner : Indonesian Power
Postion Held : Civil Engineer
Value Project :
My Rensponsibility :
As Civil Engineer, prepared Create Design and manage the
implementation of work and Checking document drawings,
specification, data sheet and procedure.
D E D Y A R T A N T O
0 8 1 2 8 6 0 9 1 6 8 5
FM-HRM-12/Rev01-10.05.16 Page 4 of 6
VI. Period : 2011 - 2012
Company : PT. Adiwijaya Prawira
Location : Duriangkang, Indonesia
Client : PT. Drupadi Agung Lestari
Plant Owner : PT. Drupadi Agung Lestari
Postion Held : Lead Estimator
Value Project :
My Rensponsibility :
As Civil Estimator, job description Sketch Drawing, Check Drawing,
Design Specification, Check Report Calculation Sheet
VII. Period : 2011
Company : PT. Fast Track Indonesia
Location : Cilegon Indonesia
Client : PT. TIMAH
Plant Owner : PT. TIMAH
Postion Held : Lead Civil Engineer
Value Project :
My Rensponsibility :
As Lead Civil Engineer, he was responsible for the overall civil
engineering activities.
VIII. Period : 2010 - 2011
Company : PT. HIPTEK Engineering and Contractor
Location : Riau Indonesia
Client : PT. NATIONAL SAGO PRIMA
Plant Owner : PT. NATIONAL SAGO PRIMA
Postion Held : Civil Engineer
Value Project :
My Rensponsibility :
As Civil Engineer, he was responsible for Check Drawing, Design
Specification, Report Bill of Quantity, Solution of Field Problem and
Support Drawing Fabrication.
D E D Y A R T A N T O
0 8 1 2 8 6 0 9 1 6 8 5
FM-HRM-12/Rev01-10.05.16 Page 5 of 6
IX. Period : 2007 - 2010
Company : : PT. Narrator Nusantara
Location : Jakarta Indonesia
Postion Held : Civil Engineer
My Rensponsibility :
As Civil Engineer, he was responsible for the overall civil
engineering activities including civil field engineering activities and
Solution of Field Problem.
Client :
PT. Aero Catering Service
PT. Dapur Selera
X. Period : 2002 - 2007
Company : : CV. Guna Krida
Location : Jakarta Indonesia
Postion Held : Civil Engineer
My Rensponsibility :
As Civil Engineer, he was responsible for the overall civil
engineering activities including civil field engineering activities and
Solution of Field Problem.
Client :
PT. PLN AP Tangerang
PT. PLN Head Office
BNI Syariah
Bank Agro
D E D Y A R T A N T O
0 8 1 2 8 6 0 9 1 6 8 5
FM-HRM-12/Rev01-10.05.16 Page 6 of 6
TRAINING & COURSE :
I. (-)
II. (-)
COMPUTER SKILL :
Autocad
Microsoft Office
3D Max
Yours Faithfully,
(Dedy Artanto)

More Related Content

What's hot (20)

CV_QS_Rohit Kumar
CV_QS_Rohit KumarCV_QS_Rohit Kumar
CV_QS_Rohit Kumar
 
Sathish-CV.-2Nov16
Sathish-CV.-2Nov16Sathish-CV.-2Nov16
Sathish-CV.-2Nov16
 
Abdoul_original (1).doc- upated May'16
Abdoul_original (1).doc- upated May'16Abdoul_original (1).doc- upated May'16
Abdoul_original (1).doc- upated May'16
 
DRS
DRSDRS
DRS
 
Cv goutam sen (1)
Cv goutam sen (1)Cv goutam sen (1)
Cv goutam sen (1)
 
Updated Resume (1)
Updated Resume (1)Updated Resume (1)
Updated Resume (1)
 
thampi CV
thampi CVthampi CV
thampi CV
 
prakash Civil Engineer
prakash Civil Engineerprakash Civil Engineer
prakash Civil Engineer
 
CYNIL CV-
CYNIL CV-CYNIL CV-
CYNIL CV-
 
cv Syukur Anton Nugroho
cv  Syukur Anton Nugrohocv  Syukur Anton Nugroho
cv Syukur Anton Nugroho
 
Shabd saran sahu
Shabd saran sahuShabd saran sahu
Shabd saran sahu
 
Updated CV for 11.11.16
Updated CV for 11.11.16 Updated CV for 11.11.16
Updated CV for 11.11.16
 
Elavarasu_CV
Elavarasu_CVElavarasu_CV
Elavarasu_CV
 
cv andriyansysh
cv andriyansyshcv andriyansysh
cv andriyansysh
 
CV_S.Athan_2017_01
CV_S.Athan_2017_01CV_S.Athan_2017_01
CV_S.Athan_2017_01
 
CV_SATYA PRAKASH
CV_SATYA PRAKASHCV_SATYA PRAKASH
CV_SATYA PRAKASH
 
AS_CV
AS_CVAS_CV
AS_CV
 
narasimha gupta updated cv
narasimha gupta updated cvnarasimha gupta updated cv
narasimha gupta updated cv
 
susanta
susanta  susanta
susanta
 
Resume
ResumeResume
Resume
 

Viewers also liked

Thomas J Silva Resume 1
Thomas J Silva Resume 1Thomas J Silva Resume 1
Thomas J Silva Resume 1
Thomas Silva
 
StanleyMauriceFloyd2016
StanleyMauriceFloyd2016StanleyMauriceFloyd2016
StanleyMauriceFloyd2016
Stanley Floyd
 
CV Henk Kos 2016 pdf
CV Henk Kos 2016 pdfCV Henk Kos 2016 pdf
CV Henk Kos 2016 pdf
Henk Kos
 
mohammed ahmed awaad final
mohammed ahmed awaad finalmohammed ahmed awaad final
mohammed ahmed awaad final
mohamed awaad
 
Yarra Swim Co purposes edited by Gemma
Yarra Swim Co purposes edited by GemmaYarra Swim Co purposes edited by Gemma
Yarra Swim Co purposes edited by Gemma
Gemma Luscombe
 
Virginio's Bernardo CV 04052016
Virginio's Bernardo CV 04052016Virginio's Bernardo CV 04052016
Virginio's Bernardo CV 04052016
Virginio Bernardo
 
Resumen English Felix Marquez #2
Resumen English Felix Marquez #2Resumen English Felix Marquez #2
Resumen English Felix Marquez #2
Felix Marquez
 
Rodrick Hughes New Resume 2-2
Rodrick Hughes New Resume 2-2Rodrick Hughes New Resume 2-2
Rodrick Hughes New Resume 2-2
rodrick hughes
 
Completed covering letter
Completed covering letterCompleted covering letter
Completed covering letter
Kenn Bertram
 

Viewers also liked (20)

Thomas J Silva Resume 1
Thomas J Silva Resume 1Thomas J Silva Resume 1
Thomas J Silva Resume 1
 
Akbar Smart Card
Akbar Smart CardAkbar Smart Card
Akbar Smart Card
 
StanleyMauriceFloyd2016
StanleyMauriceFloyd2016StanleyMauriceFloyd2016
StanleyMauriceFloyd2016
 
Bernhard hoff cv english l
Bernhard hoff cv english lBernhard hoff cv english l
Bernhard hoff cv english l
 
asif
asifasif
asif
 
Jayaprakash k updated v1-kk
Jayaprakash k  updated v1-kkJayaprakash k  updated v1-kk
Jayaprakash k updated v1-kk
 
CV Henk Kos 2016 pdf
CV Henk Kos 2016 pdfCV Henk Kos 2016 pdf
CV Henk Kos 2016 pdf
 
mohammed ahmed awaad final
mohammed ahmed awaad finalmohammed ahmed awaad final
mohammed ahmed awaad final
 
2015 Cv
2015 Cv2015 Cv
2015 Cv
 
Yarra Swim Co purposes edited by Gemma
Yarra Swim Co purposes edited by GemmaYarra Swim Co purposes edited by Gemma
Yarra Swim Co purposes edited by Gemma
 
Virginio's Bernardo CV 04052016
Virginio's Bernardo CV 04052016Virginio's Bernardo CV 04052016
Virginio's Bernardo CV 04052016
 
SEUN UPDATED CV NEW
SEUN UPDATED CV NEWSEUN UPDATED CV NEW
SEUN UPDATED CV NEW
 
BJ Engineering news executive summary spring 2008
BJ Engineering news executive summary spring 2008BJ Engineering news executive summary spring 2008
BJ Engineering news executive summary spring 2008
 
CV_TAEHOON LIM
CV_TAEHOON LIMCV_TAEHOON LIM
CV_TAEHOON LIM
 
Tastinisha Resume3
Tastinisha Resume3Tastinisha Resume3
Tastinisha Resume3
 
Matthew McCallum CV
Matthew McCallum CVMatthew McCallum CV
Matthew McCallum CV
 
Resumen English Felix Marquez #2
Resumen English Felix Marquez #2Resumen English Felix Marquez #2
Resumen English Felix Marquez #2
 
RONNEL-RESUME
RONNEL-RESUMERONNEL-RESUME
RONNEL-RESUME
 
Rodrick Hughes New Resume 2-2
Rodrick Hughes New Resume 2-2Rodrick Hughes New Resume 2-2
Rodrick Hughes New Resume 2-2
 
Completed covering letter
Completed covering letterCompleted covering letter
Completed covering letter
 

Similar to CV 2016 (20)

Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)
 
CV_Arijanto EP_2016
CV_Arijanto EP_2016CV_Arijanto EP_2016
CV_Arijanto EP_2016
 
Ariel Almes -CV_update
Ariel Almes -CV_updateAriel Almes -CV_update
Ariel Almes -CV_update
 
Vali
ValiVali
Vali
 
My saifullizan cv 2015 latest march 15 (1)
My saifullizan cv 2015 latest march 15 (1)My saifullizan cv 2015 latest march 15 (1)
My saifullizan cv 2015 latest march 15 (1)
 
SULU TOLANI cv
SULU TOLANI cvSULU TOLANI cv
SULU TOLANI cv
 
My saifullizan cv 2015 latest march 15 (1)
My saifullizan cv 2015 latest march 15 (1)My saifullizan cv 2015 latest march 15 (1)
My saifullizan cv 2015 latest march 15 (1)
 
GIRIRAJAN
GIRIRAJANGIRIRAJAN
GIRIRAJAN
 
MRITYUNJOY_MAJUMDAR-_CV
MRITYUNJOY_MAJUMDAR-_CVMRITYUNJOY_MAJUMDAR-_CV
MRITYUNJOY_MAJUMDAR-_CV
 
CV A SAMUEL N
CV A SAMUEL NCV A SAMUEL N
CV A SAMUEL N
 
New CV Donny Baru
New CV Donny BaruNew CV Donny Baru
New CV Donny Baru
 
Resume_Tathagata Sen
Resume_Tathagata SenResume_Tathagata Sen
Resume_Tathagata Sen
 
Rezume ongky
Rezume ongkyRezume ongky
Rezume ongky
 
Sahrum Idrus, ST
Sahrum Idrus, STSahrum Idrus, ST
Sahrum Idrus, ST
 
Ritesh_s_CV.doc.PDF
Ritesh_s_CV.doc.PDFRitesh_s_CV.doc.PDF
Ritesh_s_CV.doc.PDF
 
ROHITRESUME
ROHITRESUMEROHITRESUME
ROHITRESUME
 
Solai_Resume _As on 29th Aug 15
Solai_Resume _As on 29th Aug 15Solai_Resume _As on 29th Aug 15
Solai_Resume _As on 29th Aug 15
 
CV
CVCV
CV
 
Srinivas Naidu Rakula new (1)
Srinivas Naidu Rakula new (1)Srinivas Naidu Rakula new (1)
Srinivas Naidu Rakula new (1)
 
subhash__cv
subhash__cvsubhash__cv
subhash__cv
 

CV 2016

  • 1. D E D Y A R T A N T O 0 8 1 2 8 6 0 9 1 6 8 5 FM-HRM-12/Rev01-10.05.16 Page 1 of 6 CURRICULUM VITAE PERSONAL DATA NAME : DEDY ARTANTO POSITION : CIVIL ENGINEER PLACE, DATE OF BIRTH : JAKARTA, 07 MAY 1973 MARITAL STATUS : MARRIED EDUCATION : BACHELOR DEGREE LANGUAGES SPOKEN : PASSIVE LANGUAGES WRITTEN : ACTIVE HOME ADDRESS : BOGOR PERMATA RESIDENCE B5-22 CILEBUT - BOGOR SUMMARY EXPERIENCE : Total 14 years experience, 4 years with REKIND and 10 years with other company. As Civil Field Engineer, I was responsible for the execution of civil engineering activities at site and engineering coordination with the various taskforce disciplines at site.
  • 2. D E D Y A R T A N T O 0 8 1 2 8 6 0 9 1 6 8 5 FM-HRM-12/Rev01-10.05.16 Page 2 of 6 WORK EXPERIENCE : I. Period : 2015 - 2016 Company : PT. REKAYASA INDUSTRI Location : Sumpal Palembang - South Sumatera, Indonesia. Client : Conocophillips Plant Owner : Conocophillips Postion Held : Field Civil Engineering Value Project : My Rensponsibility : Coordination interdisiplin abaout design for application at site condition. Check Revisi design if the design not applicable at site condition Check Balancing material take off at site with Quantity material from contract Make sure the construction work accordance with design Make sure Preparation the material needed and heavy tools for construction work. Check shopdrawing if any design change at site and for construction work. Solution of Field Problem. II. Period : 2014 - 2015 Company : PT. REKAYASA INDUSTRI Location : LHOKSEUMAWE, ACEH, INDONESIA Client : PT. PAG (Perta Arun Gas) Plant Owner : PT. PAG (Perta Arun Gas) Postion Held : Lead Field Civil Engineering Value Project : My Rensponsibility : Coordination interdisiplin abaout design for application at site condition. Check Revisi design if the design not applicable at site condition Check Balancing material take off at site with Quantity material from contract Make sure the construction work accordance with design Make sure Preparation the material needed and heavy tools for construction work. Check shopdrawing if any design change at site and for construction work. Solution of Field Problem.
  • 3. D E D Y A R T A N T O 0 8 1 2 8 6 0 9 1 6 8 5 FM-HRM-12/Rev01-10.05.16 Page 3 of 6 III. Period : 2014 Company : PT. REKAYASA INDUSTRI Location : Sumpal Palembang - South Sumatera, Indonesia. Client : Conocophillips Plant Owner : Conocophillips Postion Held : Civil Engineer Value Project : My Rensponsibility : Bid Proposal Engineering, Procurement and Construction of Sumpal Compression Project IV. Period : 2012 - 2014 Company : PT. REKAYASA INDUSTRI Location : Grissik Palembang - South Sumatera, Indonesia. Client : Conocophillips Plant Owner : Conocophillips Postion Held : Field Civil Engineer Value Project : My Rensponsibility : Checking design to actual condition. Revisi design if the design not applicable at site condition Balancing material take off at site with Quantity material from contract Make sure the construction work accordance with design Preparation the material needed and heavy tools for construction work. Make the shopdrawing if any design change at site and for construction work. Make the as built drawing. Solution of Field Problem V. Period : 2012 Company : PT. Nusantara Global Ind Location : Pasuruan, INDONESIA Client : Indonesian Power Plant Owner : Indonesian Power Postion Held : Civil Engineer Value Project : My Rensponsibility : As Civil Engineer, prepared Create Design and manage the implementation of work and Checking document drawings, specification, data sheet and procedure.
  • 4. D E D Y A R T A N T O 0 8 1 2 8 6 0 9 1 6 8 5 FM-HRM-12/Rev01-10.05.16 Page 4 of 6 VI. Period : 2011 - 2012 Company : PT. Adiwijaya Prawira Location : Duriangkang, Indonesia Client : PT. Drupadi Agung Lestari Plant Owner : PT. Drupadi Agung Lestari Postion Held : Lead Estimator Value Project : My Rensponsibility : As Civil Estimator, job description Sketch Drawing, Check Drawing, Design Specification, Check Report Calculation Sheet VII. Period : 2011 Company : PT. Fast Track Indonesia Location : Cilegon Indonesia Client : PT. TIMAH Plant Owner : PT. TIMAH Postion Held : Lead Civil Engineer Value Project : My Rensponsibility : As Lead Civil Engineer, he was responsible for the overall civil engineering activities. VIII. Period : 2010 - 2011 Company : PT. HIPTEK Engineering and Contractor Location : Riau Indonesia Client : PT. NATIONAL SAGO PRIMA Plant Owner : PT. NATIONAL SAGO PRIMA Postion Held : Civil Engineer Value Project : My Rensponsibility : As Civil Engineer, he was responsible for Check Drawing, Design Specification, Report Bill of Quantity, Solution of Field Problem and Support Drawing Fabrication.
  • 5. D E D Y A R T A N T O 0 8 1 2 8 6 0 9 1 6 8 5 FM-HRM-12/Rev01-10.05.16 Page 5 of 6 IX. Period : 2007 - 2010 Company : : PT. Narrator Nusantara Location : Jakarta Indonesia Postion Held : Civil Engineer My Rensponsibility : As Civil Engineer, he was responsible for the overall civil engineering activities including civil field engineering activities and Solution of Field Problem. Client : PT. Aero Catering Service PT. Dapur Selera X. Period : 2002 - 2007 Company : : CV. Guna Krida Location : Jakarta Indonesia Postion Held : Civil Engineer My Rensponsibility : As Civil Engineer, he was responsible for the overall civil engineering activities including civil field engineering activities and Solution of Field Problem. Client : PT. PLN AP Tangerang PT. PLN Head Office BNI Syariah Bank Agro
  • 6. D E D Y A R T A N T O 0 8 1 2 8 6 0 9 1 6 8 5 FM-HRM-12/Rev01-10.05.16 Page 6 of 6 TRAINING & COURSE : I. (-) II. (-) COMPUTER SKILL : Autocad Microsoft Office 3D Max Yours Faithfully, (Dedy Artanto)