Total 14 years experience, 4 years with REKIND and 10 years with other company. As
Civil Field Engineer, I was responsible for the execution of civil engineering activities
at site and engineering coordination with the various taskforce disciplines at site.
2. D E D Y A R T A N T O
0 8 1 2 8 6 0 9 1 6 8 5
FM-HRM-12/Rev01-10.05.16 Page 2 of 6
WORK EXPERIENCE :
I. Period : 2015 - 2016
Company : PT. REKAYASA INDUSTRI
Location : Sumpal Palembang - South Sumatera, Indonesia.
Client : Conocophillips
Plant Owner : Conocophillips
Postion Held : Field Civil Engineering
Value Project :
My Rensponsibility :
Coordination interdisiplin abaout design for application at site
condition.
Check Revisi design if the design not applicable at site condition
Check Balancing material take off at site with Quantity material from
contract
Make sure the construction work accordance with design
Make sure Preparation the material needed and heavy tools for
construction work.
Check shopdrawing if any design change at site and for construction
work.
Solution of Field Problem.
II. Period : 2014 - 2015
Company : PT. REKAYASA INDUSTRI
Location : LHOKSEUMAWE, ACEH, INDONESIA
Client : PT. PAG (Perta Arun Gas)
Plant Owner : PT. PAG (Perta Arun Gas)
Postion Held : Lead Field Civil Engineering
Value Project :
My Rensponsibility :
Coordination interdisiplin abaout design for application at site
condition.
Check Revisi design if the design not applicable at site condition
Check Balancing material take off at site with Quantity material from
contract
Make sure the construction work accordance with design
Make sure Preparation the material needed and heavy tools for
construction work.
Check shopdrawing if any design change at site and for construction
work.
Solution of Field Problem.
3. D E D Y A R T A N T O
0 8 1 2 8 6 0 9 1 6 8 5
FM-HRM-12/Rev01-10.05.16 Page 3 of 6
III. Period : 2014
Company : PT. REKAYASA INDUSTRI
Location : Sumpal Palembang - South Sumatera, Indonesia.
Client : Conocophillips
Plant Owner : Conocophillips
Postion Held : Civil Engineer
Value Project :
My Rensponsibility :
Bid Proposal Engineering, Procurement and Construction of Sumpal
Compression Project
IV. Period : 2012 - 2014
Company : PT. REKAYASA INDUSTRI
Location : Grissik Palembang - South Sumatera, Indonesia.
Client : Conocophillips
Plant Owner : Conocophillips
Postion Held : Field Civil Engineer
Value Project :
My Rensponsibility :
Checking design to actual condition.
Revisi design if the design not applicable at site condition
Balancing material take off at site with Quantity material from
contract
Make sure the construction work accordance with design
Preparation the material needed and heavy tools for construction
work.
Make the shopdrawing if any design change at site and for
construction work.
Make the as built drawing.
Solution of Field Problem
V. Period : 2012
Company : PT. Nusantara Global Ind
Location : Pasuruan, INDONESIA
Client : Indonesian Power
Plant Owner : Indonesian Power
Postion Held : Civil Engineer
Value Project :
My Rensponsibility :
As Civil Engineer, prepared Create Design and manage the
implementation of work and Checking document drawings,
specification, data sheet and procedure.
4. D E D Y A R T A N T O
0 8 1 2 8 6 0 9 1 6 8 5
FM-HRM-12/Rev01-10.05.16 Page 4 of 6
VI. Period : 2011 - 2012
Company : PT. Adiwijaya Prawira
Location : Duriangkang, Indonesia
Client : PT. Drupadi Agung Lestari
Plant Owner : PT. Drupadi Agung Lestari
Postion Held : Lead Estimator
Value Project :
My Rensponsibility :
As Civil Estimator, job description Sketch Drawing, Check Drawing,
Design Specification, Check Report Calculation Sheet
VII. Period : 2011
Company : PT. Fast Track Indonesia
Location : Cilegon Indonesia
Client : PT. TIMAH
Plant Owner : PT. TIMAH
Postion Held : Lead Civil Engineer
Value Project :
My Rensponsibility :
As Lead Civil Engineer, he was responsible for the overall civil
engineering activities.
VIII. Period : 2010 - 2011
Company : PT. HIPTEK Engineering and Contractor
Location : Riau Indonesia
Client : PT. NATIONAL SAGO PRIMA
Plant Owner : PT. NATIONAL SAGO PRIMA
Postion Held : Civil Engineer
Value Project :
My Rensponsibility :
As Civil Engineer, he was responsible for Check Drawing, Design
Specification, Report Bill of Quantity, Solution of Field Problem and
Support Drawing Fabrication.
5. D E D Y A R T A N T O
0 8 1 2 8 6 0 9 1 6 8 5
FM-HRM-12/Rev01-10.05.16 Page 5 of 6
IX. Period : 2007 - 2010
Company : : PT. Narrator Nusantara
Location : Jakarta Indonesia
Postion Held : Civil Engineer
My Rensponsibility :
As Civil Engineer, he was responsible for the overall civil
engineering activities including civil field engineering activities and
Solution of Field Problem.
Client :
PT. Aero Catering Service
PT. Dapur Selera
X. Period : 2002 - 2007
Company : : CV. Guna Krida
Location : Jakarta Indonesia
Postion Held : Civil Engineer
My Rensponsibility :
As Civil Engineer, he was responsible for the overall civil
engineering activities including civil field engineering activities and
Solution of Field Problem.
Client :
PT. PLN AP Tangerang
PT. PLN Head Office
BNI Syariah
Bank Agro
6. D E D Y A R T A N T O
0 8 1 2 8 6 0 9 1 6 8 5
FM-HRM-12/Rev01-10.05.16 Page 6 of 6
TRAINING & COURSE :
I. (-)
II. (-)
COMPUTER SKILL :
Autocad
Microsoft Office
3D Max
Yours Faithfully,
(Dedy Artanto)