This is presentation of basic for anaesthesia technician, about how to check anaesthesia machine before start the procedure. What is the mandatory steps to perform.
2. Checking each component of anaesthesia
machine for appropriate functioning prior to
use is essential to ensure patient safety.
Machine check is mandatory for daily and after
every case.
Everyday Morning we must do full test.
After every procedure we must do circuit leak
test.
3.
4. Ensure the Power supply is connected.
Check Main Gas supply is properly connected.
Perform Tug Test
5. On Machine Power switch.
Ensure electric indicator is green.
6. After on the machine go to checkout.
Click to Start Full Test, this method is perform in latest machines.
7. This is first step of full test vent and gas.
8. In this steps we check the ventilator
functionality.
Set bag/vent switch to vent, open the circuit.
Set ACGO to circle and select start.
Test will be start automatically.
9. In this step we check the circuit leak.
Select bag/vent switch to bag.
Set APL Valve between 30 to 70.
Occlude the Circuit wye Piece.
11. After Full Test completed. We need some
manual check and mandatory steps perform.
Check alternate O2 control is functional.
Press the button On Open nob check bobin is
working
12. Checking of integrated suction.
Very important part of the anaesthesia.
On suction nob max and checking suction
pressure is good.
13. Open the cylinder and check the pressure of oxygen
minimum is 70 and full cylinder pressure is 137 bar.
Nitrous Cylinder minimum pressure is 50 bar.
If Cylinder Pressure is less than minimum pressure
change the cylinder