Submit Search
Upload
التكهف.pptx
•
Download as PPTX, PDF
•
0 likes
•
130 views
T
Thinkers المفكرون
Follow
شرح ظاهرة التكهف واين يحدث واضراره وطرق تجنبه
Read less
Read more
Engineering
Report
Share
Report
Share
1 of 7
Download now
Recommended
Failure Prevention
Failure Prevention
Ray Mignogna
Phased Array Ultrasonic Testing Presentation
Phased Array Ultrasonic Testing Presentation
Connor Marshman
Main_book_CSWIP_3_1_Welding_Inspector_WI.pdf
Main_book_CSWIP_3_1_Welding_Inspector_WI.pdf
University of Sarajevo, Manufacturing Technology:
Acoustic Emission testing
Acoustic Emission testing
Hareesha N Gowda, Dayananda Sagar College of Engg, Bangalore
Rstreng
Rstreng
Ricardo Rivas Remón
Halliburton Liquid mud plant at Larnaka port
Halliburton Liquid mud plant at Larnaka port
Andy Varoshiotis
L23 thermography test
L23 thermography test
karthi keyan
Failure Analysis For Integrated Circuit
Failure Analysis For Integrated Circuit
CH §Shen
Recommended
Failure Prevention
Failure Prevention
Ray Mignogna
Phased Array Ultrasonic Testing Presentation
Phased Array Ultrasonic Testing Presentation
Connor Marshman
Main_book_CSWIP_3_1_Welding_Inspector_WI.pdf
Main_book_CSWIP_3_1_Welding_Inspector_WI.pdf
University of Sarajevo, Manufacturing Technology:
Acoustic Emission testing
Acoustic Emission testing
Hareesha N Gowda, Dayananda Sagar College of Engg, Bangalore
Rstreng
Rstreng
Ricardo Rivas Remón
Halliburton Liquid mud plant at Larnaka port
Halliburton Liquid mud plant at Larnaka port
Andy Varoshiotis
L23 thermography test
L23 thermography test
karthi keyan
Failure Analysis For Integrated Circuit
Failure Analysis For Integrated Circuit
CH §Shen
Root Cause Failure Analysis Methods for Pump Failures
Root Cause Failure Analysis Methods for Pump Failures
Abdulrahman Alkhowaiter
Paut full notes
Paut full notes
indukuri sraju
Quality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipeline
IEI GSC
Stress corrosion cracking of pipeline steels
Stress corrosion cracking of pipeline steels
Sum K
Qc piping guide
Qc piping guide
MOHAMMAD ATIF ALI
NDT TESTING
NDT TESTING
Arjun Pachauri
Condition monitoring through non destructive testings of machine ppt
Condition monitoring through non destructive testings of machine ppt
muchulucky
PAUT PRESENTATION.pptx
PAUT PRESENTATION.pptx
EndLab
Reliability and Maintenance Conference - 7-9 April 2014, Al Khobar, Kingdom o...
Reliability and Maintenance Conference - 7-9 April 2014, Al Khobar, Kingdom o...
Ricky Smith CMRP, CMRT
Piping inspector questions 1
Piping inspector questions 1
MOHAMMAD ATIF ALI
Reliability Centered Maintenance Case Study
Reliability Centered Maintenance Case Study
Mohammed Hamed Ahmed Soliman
Phased Array Scan Planning and Modeling for Weld inspection
Phased Array Scan Planning and Modeling for Weld inspection
Olympus IMS
Weld Defects
Weld Defects
adminn2
The Basics Of Failures
The Basics Of Failures
Ricky Smith CMRP, CMRT
NDT
NDT
DENNY OTTARACKAL
Planejamento Avançado da Qualidade do Produto Item 7.3 e
Planejamento Avançado da Qualidade do Produto Item 7.3 e
Rogério Souza
Welding Inspection
Welding Inspection
Randall Stremmel
Saes w-011-welding on plot ( process ) piping
Saes w-011-welding on plot ( process ) piping
abhi10apr
Presentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptx
hesham ismail
Welding map shell plate (condesete loading tank)
Welding map shell plate (condesete loading tank)
ZULKAR NAIN
المحاضرة الأولى في دورة التحكم الصناعي ل
المحاضرة الأولى في دورة التحكم الصناعي ل
sofyan20058
المحاضرة الأولى لدورة التحكم الصناعي العملية
المحاضرة الأولى لدورة التحكم الصناعي العملية
sofyan20058
More Related Content
What's hot
Root Cause Failure Analysis Methods for Pump Failures
Root Cause Failure Analysis Methods for Pump Failures
Abdulrahman Alkhowaiter
Paut full notes
Paut full notes
indukuri sraju
Quality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipeline
IEI GSC
Stress corrosion cracking of pipeline steels
Stress corrosion cracking of pipeline steels
Sum K
Qc piping guide
Qc piping guide
MOHAMMAD ATIF ALI
NDT TESTING
NDT TESTING
Arjun Pachauri
Condition monitoring through non destructive testings of machine ppt
Condition monitoring through non destructive testings of machine ppt
muchulucky
PAUT PRESENTATION.pptx
PAUT PRESENTATION.pptx
EndLab
Reliability and Maintenance Conference - 7-9 April 2014, Al Khobar, Kingdom o...
Reliability and Maintenance Conference - 7-9 April 2014, Al Khobar, Kingdom o...
Ricky Smith CMRP, CMRT
Piping inspector questions 1
Piping inspector questions 1
MOHAMMAD ATIF ALI
Reliability Centered Maintenance Case Study
Reliability Centered Maintenance Case Study
Mohammed Hamed Ahmed Soliman
Phased Array Scan Planning and Modeling for Weld inspection
Phased Array Scan Planning and Modeling for Weld inspection
Olympus IMS
Weld Defects
Weld Defects
adminn2
The Basics Of Failures
The Basics Of Failures
Ricky Smith CMRP, CMRT
NDT
NDT
DENNY OTTARACKAL
Planejamento Avançado da Qualidade do Produto Item 7.3 e
Planejamento Avançado da Qualidade do Produto Item 7.3 e
Rogério Souza
Welding Inspection
Welding Inspection
Randall Stremmel
Saes w-011-welding on plot ( process ) piping
Saes w-011-welding on plot ( process ) piping
abhi10apr
Presentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptx
hesham ismail
Welding map shell plate (condesete loading tank)
Welding map shell plate (condesete loading tank)
ZULKAR NAIN
What's hot
(20)
Root Cause Failure Analysis Methods for Pump Failures
Root Cause Failure Analysis Methods for Pump Failures
Paut full notes
Paut full notes
Quality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipeline
Stress corrosion cracking of pipeline steels
Stress corrosion cracking of pipeline steels
Qc piping guide
Qc piping guide
NDT TESTING
NDT TESTING
Condition monitoring through non destructive testings of machine ppt
Condition monitoring through non destructive testings of machine ppt
PAUT PRESENTATION.pptx
PAUT PRESENTATION.pptx
Reliability and Maintenance Conference - 7-9 April 2014, Al Khobar, Kingdom o...
Reliability and Maintenance Conference - 7-9 April 2014, Al Khobar, Kingdom o...
Piping inspector questions 1
Piping inspector questions 1
Reliability Centered Maintenance Case Study
Reliability Centered Maintenance Case Study
Phased Array Scan Planning and Modeling for Weld inspection
Phased Array Scan Planning and Modeling for Weld inspection
Weld Defects
Weld Defects
The Basics Of Failures
The Basics Of Failures
NDT
NDT
Planejamento Avançado da Qualidade do Produto Item 7.3 e
Planejamento Avançado da Qualidade do Produto Item 7.3 e
Welding Inspection
Welding Inspection
Saes w-011-welding on plot ( process ) piping
Saes w-011-welding on plot ( process ) piping
Presentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptx
Welding map shell plate (condesete loading tank)
Welding map shell plate (condesete loading tank)
Recently uploaded
المحاضرة الأولى في دورة التحكم الصناعي ل
المحاضرة الأولى في دورة التحكم الصناعي ل
sofyan20058
المحاضرة الأولى لدورة التحكم الصناعي العملية
المحاضرة الأولى لدورة التحكم الصناعي العملية
sofyan20058
م. زكريا بزي - الأمن الغذائي من منظور التخطيط الإقليمي انطلاقاً من جودة تصميم...
م. زكريا بزي - الأمن الغذائي من منظور التخطيط الإقليمي انطلاقاً من جودة تصميم...
ZakariaBEZZI1
امتحانات البلاغة وإجاباتها.pdfbvvvvvvvvvvvv
امتحانات البلاغة وإجاباتها.pdfbvvvvvvvvvvvv
mhosn627
نظم التحكم البيئي pdf...................
نظم التحكم البيئي pdf...................
cartoon1232
Emergency Fire Action.pdfماذا تفعل في حالة الحريق
Emergency Fire Action.pdfماذا تفعل في حالة الحريق
Dr/Mohamed Abdelkawi
e-Implementation ver ffffffffffffffffffffffffff2.0.pptx
e-Implementation ver ffffffffffffffffffffffffff2.0.pptx
RedhaElhuni
الإيجاز و الإطناب.pdf bbggggggggggggggggggggggggg
الإيجاز و الإطناب.pdf bbggggggggggggggggggggggggg
mhosn627
Recently uploaded
(8)
المحاضرة الأولى في دورة التحكم الصناعي ل
المحاضرة الأولى في دورة التحكم الصناعي ل
المحاضرة الأولى لدورة التحكم الصناعي العملية
المحاضرة الأولى لدورة التحكم الصناعي العملية
م. زكريا بزي - الأمن الغذائي من منظور التخطيط الإقليمي انطلاقاً من جودة تصميم...
م. زكريا بزي - الأمن الغذائي من منظور التخطيط الإقليمي انطلاقاً من جودة تصميم...
امتحانات البلاغة وإجاباتها.pdfbvvvvvvvvvvvv
امتحانات البلاغة وإجاباتها.pdfbvvvvvvvvvvvv
نظم التحكم البيئي pdf...................
نظم التحكم البيئي pdf...................
Emergency Fire Action.pdfماذا تفعل في حالة الحريق
Emergency Fire Action.pdfماذا تفعل في حالة الحريق
e-Implementation ver ffffffffffffffffffffffffff2.0.pptx
e-Implementation ver ffffffffffffffffffffffffff2.0.pptx
الإيجاز و الإطناب.pdf bbggggggggggggggggggggggggg
الإيجاز و الإطناب.pdf bbggggggggggggggggggggggggg
التكهف.pptx
1.
التكهف cavitation • التكهف تعريف • حدوثه أماكن • التكهف
اضرار • طرق تجنب حدوثه
2.
التكهف هو ما • إلى
يؤدي البخارمما ضغط إلى المائع ضغط انخفاض ظاهرة هى انفجا لها يحدث والتى المائع داخل البخار من فقاعات تكون ر تسب مما أعلى ضغط لمنطقة انتقالها او بسطح تالمسها عند ب بالسطح اهتزاز وحدوث السطح هذا بتشوه
3.
التكهف؟ يحدث اين • الطلمب
فى غالبا التكهف يحدث ات الخاص السحب خط فى وذلك الض انخفاض نتيجة بالطلمبة غط المتكونة الضغط وفقاعات به بمروحة اصطدام عند تنفجر الطلمبة impeller فى هتسيب سطحه تشوه
4.
الطلمبات على التكهف
اضرار • عمرالمضخة تقليل • الطلمبة بريشة تاكل التكهف يحدث impeller على انفجارها عند البخار فقاعات تسبب حيث ال وجسم الريشة سطح volute حدوث فى pitting وتشوه المدن سطح فى نحر او نقر او حدوث يسبب كما vibration عالى اهتزاز الت كراسى تلف إلى يؤدي قد والذى بالطلمبة حميل bearings سيل الميكانيكل فى كسر حدوث او mechanical seal
5.
طرق تجنب التكهف حدوث • او استاتيكى
ضغط وجود head • ال تقليل friction السحب خط فى suction line • ال تنظيف strainer المضخة المائع دخول قبل الموجود • ال نوعية material ب الخاصة impeller ال أن حيث impeller الزهر حديد من المصنع ال من المصنوع من للتكهف عرضة اكثر stainless steel • التاكل حدوث منع corrosion السحب اختناق الى ويؤدى السحب مواسير داخل يحدث الذى وا نخفاض مواد باضافة وذلك السحب ضغط anti corrosion مواسير استخدام او للمائع ذات material االستانلس مواسير مثل للصدا مقاومة او مجلفنة • البخار ضغط لتقليل وذلك منخفضة السحب حرارة درجة على الحفاظ • يكون الزم السحب ماسورة قطر اكبر من قطر ماسورة الطرد
6.
هامة مالحظات • بالطلمبة الخاص
الطرد خط على الموجودة الرجوع عدم بلوف صيانه من التأكد يجب وجود الن بهم خاص هيدر فى وتطرد التوازى على متركبة طلمبات وجود عند خاصة الطل إلى األخرى الطلمبات من الخارج المياه ضغط رجوع فى تسبب سوف به مشكلة مبة وعن االتجاه عكس الطلمبة عمود دوران فى تسبب سوف وبالتالي الخدمة من إلخارجة د ع عزم يحدث سوف فجأه الطلمبة تشغيل ك تهر أن كما العمود كسر إلى يؤدي قد سى يب فى الموجودة الطلمبات من الخارج الضغط يهدر سوف الرجوع عدم محبس من الضغط الخدمة • الن وذلك تدريجيا وفتحه الطرد محبس غلق يجب الطلمبة تشغيل بدايه فى start current أضعاف ثالثة بيوصل التشغيل بدايه فى جدا عالى بيكون الطلمبة بتاع وعند تيار اقل وبالتالي قدرة اقل بيكون التشغيل بدايه فى الطرد محبس غلق
7.
سؤال ؟؟ • ماذا يحدث عند تشغيل طلمبة الطرد المركزى centrifugal pump باستخدام مائع ذو لزوجة عالية مثل الزيوت ؟
Download now