© 2014 HALLIBURTON. ALL RIGHTS RESERVED. 1
Halliburton Cyprus
▌ Company Registered May 2013
▌ Nicosia Office December 2013...
© 2014 HALLIBURTON. ALL RIGHTS RESERVED. 2
Lloyds recommendations and citizen concerns
▌ Visual Impact
 Halliburton chang...
© 2014 HALLIBURTON. ALL RIGHTS RESERVED. 3
Radioactive Mud
▌ The mud was measured by and found to be non radioactive
© 2014 HALLIBURTON. ALL RIGHTS RESERVED. 4
BARASWIFTTM & Bulk Powder Facility
▌ BARASWIFTTM Liquid Mud
Plant
 Total stora...
© 2014 HALLIBURTON. ALL RIGHTS RESERVED. 5
BARASWIFTTM - Larnaca Set-Up
© 2014 HALLIBURTON. ALL RIGHTS RESERVED. 6
Liquid & Bulk powder facility – Larnaka- 49 x 35 mt
Upcoming SlideShare
Loading in …5
×

Halliburton Liquid mud plant at Larnaka port

852 views

Published on

Halliburton Liquid mud plant at Larnaka port

Published in: Data & Analytics
  • Be the first to comment

  • Be the first to like this

Halliburton Liquid mud plant at Larnaka port

  1. 1. © 2014 HALLIBURTON. ALL RIGHTS RESERVED. 1 Halliburton Cyprus ▌ Company Registered May 2013 ▌ Nicosia Office December 2013 ▌ Larnaca Base Jan 2015 ▌ Main business – Completion Tools, Cementing, Drilling Fluids, Waste Management, Continuous Circulation, Coring and Drill Bits ▌ Relocation to Fanoremeni office April 2015 ▌ Total of 8 Employees in country with 88% national workforce ▌ Peak workforce 58
  2. 2. © 2014 HALLIBURTON. ALL RIGHTS RESERVED. 2 Lloyds recommendations and citizen concerns ▌ Visual Impact  Halliburton changed vertical tanks to horizontal to minimise visual impact ▌ Noise Impact  Halliburton brought in low noise generators to minimise audible impact ▌ Dust  Included the latest in dust collection technology to bring dust to lowest practical level ▌ Water Pollution  Weekly measurement of water quality in drainage culvert to the port. No discharge to environment.
  3. 3. © 2014 HALLIBURTON. ALL RIGHTS RESERVED. 3 Radioactive Mud ▌ The mud was measured by and found to be non radioactive
  4. 4. © 2014 HALLIBURTON. ALL RIGHTS RESERVED. 4 BARASWIFTTM & Bulk Powder Facility ▌ BARASWIFTTM Liquid Mud Plant  Total storage capacity= 1536 m3  24 tanks of 54 m3 each capacity  2 x 40 m3 independent mixing tanks ▌ Bulk Facility  Total storage capacity= min. 360 ton  3 x 62.3 m3 (2200 cuft ) silos with loading cells  1 x 5.7 m3 (200 cuft) cutting bottle  2 x Air compressors with driers  Dust collector
  5. 5. © 2014 HALLIBURTON. ALL RIGHTS RESERVED. 5 BARASWIFTTM - Larnaca Set-Up
  6. 6. © 2014 HALLIBURTON. ALL RIGHTS RESERVED. 6 Liquid & Bulk powder facility – Larnaka- 49 x 35 mt

×