Construction Project Planning
Rashid Hussain
Project Time Management
• Project Time Management: It includes the
processes required to ensure timely
completion of the project.
• It includes:
–Activity
–Activity
definition
sequencing
–Activity resource Estimating
–Activity duration Estimating
–Schedule
–Schedule
development
control
Project Time Management II
• Activity Definition: Identifying the specific
schedule activities that need to be performed to
produce the various project deliverables
• Activity Sequencing: Identifying and documenting
dependencies among schedule activities
• Activity Resource Estimating: Estimating the type
and quantities of resources required to perform
each schedule activity
• Activity Duration Estimating: Estimating the
number of work periods that will be needed to
complete individual schedule activities
Project Time Management III
• Schedule Development: Analyzing activity
sequences, durations, resource requirements, and
schedule constraints to create the project schedule
• Schedule Control: Controlling changes to the
project schedule
4
Planning and Scheduling What?
• What is Planning and Scheduling?
– Planning & Scheduling: provides a project
plan/schedule that is essential in project time
management.
• Project Time Management:
– Planning.
– Scheduling.
– Tracking and Control.
5
Planning and Scheduling Why?
• Why do we Plan and Schedule?
• Planning & Scheduling is needed for:
– Scope recognition.
– Task definition & responsibility identification.
– Effective utilization of resources (labor,
material & equipment).
– Tracking and controlling project time and cost.
– Claims analysis, quantification and defense.
6
Planning and Scheduling How?
• How do we Plan and Schedule?
• Planning Determines:
– What must be done?
– How it is to be performed?
– What sequential order it will follow?
• Planning Requires:
– Ability to visualize discrete work elements.
– Establishing interdependencies.
– Intimate knowledge of construction methods.
7
Planning and Scheduling How?
• Planning Steps:
– Generate WBS & Activity List.
– Estimate Activity Duration/Cost.
– Determine job logic (sequential relationships
among activities).
– Draw graphic presentation in a network.
8
Generating WBS and Activities
• Activity: a single work task that consumes time and
has a recognizable start and finish times.
• Activity: A component of work performed during the
course of a project (PMBOK)
• Schedule Activity: A discrete scheduled
component of work performed during the course of a
project. A schedule activity normally has an
estimated duration, an estimated cost, and
estimated resource requirements. Schedule
activities are connected to other schedule activities
with logical relationships, and are decomposed from
work packages.
9
Generating WBS and Activities
• Guidelines for Identifying Activities:
– Area of responsibility (general contractor,
subcontractor).
– Location on site.
– Structural element (substructure,
superstructure, etc.)
– Craft or crew requirements.
– Equipment requirements.
– Material utilized (concrete, timber, steel, etc.)
10
Generating WBS and Activities
• Factors Affecting Level of Detail (Number
of Activities):
– Nature and size of project.
– Required level of detail.
– Which level of management will use the schedule.
• Schedule Hierarchy:
– Master project plan/schedule.
– Master subproject plan/schedule.
– Detailed subproject plan/schedule.
– Detailed work plan/schedule.
11
Generating WBS and Activities
• Work breakdown structure (WBS):
Describes the project scope of work in a
hierarchy of work packages, where each
abstract work package in the higher levels of
the hierarchy is subdivided into more
detailed work packages in lower levels of the
hierarchy.
12
Generating WBS and Activities
• Work breakdown structure: A deliverable-
oriented hierarchical decomposition of the work to
be executed by the project team to accomplish the
project objectives and create the required
deliverables
• It recognizes and defines the total scope of the
project
• Each descending level represents an increasingly
detailed definition of the project work
• The WBS is decomposed into work packages
13
Generating WBS and Activities
• Work Package:
– Is a well-defined scope of work that usually
terminates in a deliverable product.
– Each package may vary in size, but must be a
measurable and controllable unit of work to be
performed.
– It must be identifiable in a numerical accounting
system in order to permit the capture of both
budgeted & actual performance information.
– A work package is a work center. (Neil 1982)
14
Generating WBS and Activities
• Other Names of a Work Package:
– Estimating account.
– Line item.
– Cost account.
15
Generating WBS and Activities
• Uses of WBS:
– Identifying scope of work.
– Preparing preliminary budget.
– Cost estimating.
– Scheduling.
– Identifying cost & schedule at various levels of
details.
– Time & cost control.
– Identifying individual or departmental
responsibilities.
16
Generating WBS and Activities
• Types of Coding Systems:
–Standard code
–Project code
• Standard Code: is a systematic classification
& categorization of all items of work or cost
pertaining to a specific type of construction
(e.g. Building construction, Heavy
construction).
17
Generating WBS and Activities
• Purpose of Standard Code:
– Provides a comprehensive checklist of all items
of work that can be found in a specific type of
construction.
– Provides for uniformity, transfer & comparison of
information among projects.
• Example: Masterformat was developed through a
joint effort of 8 industry & professional associations
including:
– Construction Specifications Institute (CSI)
– Construction Specifications Canada (CSC)
18
Generating WBS and Activities
• Divisions:
1.General Requirements.
2.Site work.
3.Concrete.
4.Masonry.
5.Metals.
6.Woods & Plastics.
7.Thermal & Moisture
Protection.
9. Finishes.
10.Specialties.
11.Equipment
12.Furnishings.
13.Special Construction.
14.Conveying Systems.
15.Mechanical.
16.Electrical.
8.Doors & Windows.
Generating WBS and Activities
• Project Code: is
a systematic
classification &
categorization of
all items of work
or cost pertaining
to a specific
project.
20
Estimating Activity Duration
• Rules for Estimating Activity Duration:
– Evaluate activities one at a time.
– Assume normal level of resources.
– Assume normal working hours (No Overtime).
– Use consistent time units.
– Put project completion date OUT OF MIND.
• Activity Duration is often estimated based on:
– Experience and judgment.
– Quantity of work and crew daily output
Quantity of work
Activity Duration =
Crew daily output
21
Estimating Activity Duration
• Factors Affecting Activity Duration:
–Weather.
–Learning Curve.
–Overtime.
–Space Congestion.
–Design Changes & Rework.
22
Estimating Activity Duration
• Learning Curve:
based on the fact that
skill & productivity in
performing tasks
improve with
experience and
practice.
• Example: The tenth
activity takes less
time than the first.
23
Estimating Activity Duration
24
Determining Job Logic
• Construction Planning Restraints:
– Physical: (formwork must precede pouring
concrete).
– Resource:
• Availability of
• Availability of
• Availability of
• Availability of
material.
equipment.
labor.
money.
– Safety.
– Environment:
• Weather.
• Economical.
• Social.
• Political.
Determ
ining Job Logic
• For each activity answer 3 questions:
– Which activities precede this activity?
– Which activities follow this activity?
– Which activities are concurrent with this
activity?

More Related Content

Similar to A PPT ON CONSTRUction PROJECT PLANNING - RASHID HUSSAIN.pdf

Managing the information system project
Managing the information system projectManaging the information system project
Managing the information system projectalpha1unity
 
DISE - Introduction to Project Management
DISE - Introduction to Project ManagementDISE - Introduction to Project Management
DISE - Introduction to Project ManagementRasan Samarasinghe
 
Project Management.pptx
 Project  Management.pptx Project  Management.pptx
Project Management.pptxHafixFarhan
 
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Shrikant Kate
 
MIS485 Capstone Project in MIS 2MGT 400 - Project M
MIS485 Capstone Project in MIS 2MGT 400 - Project MMIS485 Capstone Project in MIS 2MGT 400 - Project M
MIS485 Capstone Project in MIS 2MGT 400 - Project MIlonaThornburg83
 
L6.2 planing&scheduling
L6.2 planing&schedulingL6.2 planing&scheduling
L6.2 planing&schedulingmanusug
 
OpenERP Construction Module Version 7
OpenERP Construction Module Version 7OpenERP Construction Module Version 7
OpenERP Construction Module Version 7Pragmatic Techsoft
 
Odoo OpenERP 7 construction management
Odoo OpenERP 7 construction managementOdoo OpenERP 7 construction management
Odoo OpenERP 7 construction managementpragmatic123
 
Chapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapterChapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapterpreetidamakale
 
2. PAE AcFn621 Ch-2 Principle ppt.pptx
2. PAE AcFn621 Ch-2 Principle ppt.pptx2. PAE AcFn621 Ch-2 Principle ppt.pptx
2. PAE AcFn621 Ch-2 Principle ppt.pptxProfDrAnbalaganChinn
 
Time management pressent
Time management pressentTime management pressent
Time management pressentiklil fairuz
 
Unit 3 WorkBreakdownStructure.ppt related to project management
Unit 3 WorkBreakdownStructure.ppt related to project managementUnit 3 WorkBreakdownStructure.ppt related to project management
Unit 3 WorkBreakdownStructure.ppt related to project managementtanishkagupta907
 
7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..pptPedadaSaikumar
 

Similar to A PPT ON CONSTRUction PROJECT PLANNING - RASHID HUSSAIN.pdf (20)

system analysis and design Class 3
system analysis and design Class 3system analysis and design Class 3
system analysis and design Class 3
 
EpM
EpMEpM
EpM
 
Intro to PM.ppt
Intro to PM.pptIntro to PM.ppt
Intro to PM.ppt
 
Managing the information system project
Managing the information system projectManaging the information system project
Managing the information system project
 
6 sept project fiche
6 sept project fiche6 sept project fiche
6 sept project fiche
 
SPM_UNIT-2.pptx
SPM_UNIT-2.pptxSPM_UNIT-2.pptx
SPM_UNIT-2.pptx
 
DISE - Introduction to Project Management
DISE - Introduction to Project ManagementDISE - Introduction to Project Management
DISE - Introduction to Project Management
 
Project Management.pptx
 Project  Management.pptx Project  Management.pptx
Project Management.pptx
 
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
 
MIS485 Capstone Project in MIS 2MGT 400 - Project M
MIS485 Capstone Project in MIS 2MGT 400 - Project MMIS485 Capstone Project in MIS 2MGT 400 - Project M
MIS485 Capstone Project in MIS 2MGT 400 - Project M
 
L6.2 planing&scheduling
L6.2 planing&schedulingL6.2 planing&scheduling
L6.2 planing&scheduling
 
OpenERP Construction Module Version 7
OpenERP Construction Module Version 7OpenERP Construction Module Version 7
OpenERP Construction Module Version 7
 
Odoo OpenERP 7 construction management
Odoo OpenERP 7 construction managementOdoo OpenERP 7 construction management
Odoo OpenERP 7 construction management
 
Chapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapterChapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapter
 
2. PAE AcFn621 Ch-2 Principle ppt.pptx
2. PAE AcFn621 Ch-2 Principle ppt.pptx2. PAE AcFn621 Ch-2 Principle ppt.pptx
2. PAE AcFn621 Ch-2 Principle ppt.pptx
 
Construction module version 7
Construction module version 7Construction module version 7
Construction module version 7
 
Time management pressent
Time management pressentTime management pressent
Time management pressent
 
Unit 3 WorkBreakdownStructure.ppt related to project management
Unit 3 WorkBreakdownStructure.ppt related to project managementUnit 3 WorkBreakdownStructure.ppt related to project management
Unit 3 WorkBreakdownStructure.ppt related to project management
 
7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt
 
Time management
Time managementTime management
Time management
 

More from ssuserfc98db

More from ssuserfc98db (8)

CI.pptx
CI.pptxCI.pptx
CI.pptx
 
Presentation13.pptx
Presentation13.pptxPresentation13.pptx
Presentation13.pptx
 
Budget3207.pptx
Budget3207.pptxBudget3207.pptx
Budget3207.pptx
 
Equipment Sizing.pdf
Equipment Sizing.pdfEquipment Sizing.pdf
Equipment Sizing.pdf
 
Pid.pdf
Pid.pdfPid.pdf
Pid.pdf
 
Pipeline Construct.pptx
Pipeline Construct.pptxPipeline Construct.pptx
Pipeline Construct.pptx
 
Mangemnt3207.pptx
Mangemnt3207.pptxMangemnt3207.pptx
Mangemnt3207.pptx
 
SP and R.pptx
SP and R.pptxSP and R.pptx
SP and R.pptx
 

Recently uploaded

HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 

Recently uploaded (20)

HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 

A PPT ON CONSTRUction PROJECT PLANNING - RASHID HUSSAIN.pdf

  • 2. Project Time Management • Project Time Management: It includes the processes required to ensure timely completion of the project. • It includes: –Activity –Activity definition sequencing –Activity resource Estimating –Activity duration Estimating –Schedule –Schedule development control
  • 3. Project Time Management II • Activity Definition: Identifying the specific schedule activities that need to be performed to produce the various project deliverables • Activity Sequencing: Identifying and documenting dependencies among schedule activities • Activity Resource Estimating: Estimating the type and quantities of resources required to perform each schedule activity • Activity Duration Estimating: Estimating the number of work periods that will be needed to complete individual schedule activities
  • 4. Project Time Management III • Schedule Development: Analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule • Schedule Control: Controlling changes to the project schedule 4
  • 5. Planning and Scheduling What? • What is Planning and Scheduling? – Planning & Scheduling: provides a project plan/schedule that is essential in project time management. • Project Time Management: – Planning. – Scheduling. – Tracking and Control. 5
  • 6. Planning and Scheduling Why? • Why do we Plan and Schedule? • Planning & Scheduling is needed for: – Scope recognition. – Task definition & responsibility identification. – Effective utilization of resources (labor, material & equipment). – Tracking and controlling project time and cost. – Claims analysis, quantification and defense. 6
  • 7. Planning and Scheduling How? • How do we Plan and Schedule? • Planning Determines: – What must be done? – How it is to be performed? – What sequential order it will follow? • Planning Requires: – Ability to visualize discrete work elements. – Establishing interdependencies. – Intimate knowledge of construction methods. 7
  • 8. Planning and Scheduling How? • Planning Steps: – Generate WBS & Activity List. – Estimate Activity Duration/Cost. – Determine job logic (sequential relationships among activities). – Draw graphic presentation in a network. 8
  • 9. Generating WBS and Activities • Activity: a single work task that consumes time and has a recognizable start and finish times. • Activity: A component of work performed during the course of a project (PMBOK) • Schedule Activity: A discrete scheduled component of work performed during the course of a project. A schedule activity normally has an estimated duration, an estimated cost, and estimated resource requirements. Schedule activities are connected to other schedule activities with logical relationships, and are decomposed from work packages. 9
  • 10. Generating WBS and Activities • Guidelines for Identifying Activities: – Area of responsibility (general contractor, subcontractor). – Location on site. – Structural element (substructure, superstructure, etc.) – Craft or crew requirements. – Equipment requirements. – Material utilized (concrete, timber, steel, etc.) 10
  • 11. Generating WBS and Activities • Factors Affecting Level of Detail (Number of Activities): – Nature and size of project. – Required level of detail. – Which level of management will use the schedule. • Schedule Hierarchy: – Master project plan/schedule. – Master subproject plan/schedule. – Detailed subproject plan/schedule. – Detailed work plan/schedule. 11
  • 12. Generating WBS and Activities • Work breakdown structure (WBS): Describes the project scope of work in a hierarchy of work packages, where each abstract work package in the higher levels of the hierarchy is subdivided into more detailed work packages in lower levels of the hierarchy. 12
  • 13. Generating WBS and Activities • Work breakdown structure: A deliverable- oriented hierarchical decomposition of the work to be executed by the project team to accomplish the project objectives and create the required deliverables • It recognizes and defines the total scope of the project • Each descending level represents an increasingly detailed definition of the project work • The WBS is decomposed into work packages 13
  • 14. Generating WBS and Activities • Work Package: – Is a well-defined scope of work that usually terminates in a deliverable product. – Each package may vary in size, but must be a measurable and controllable unit of work to be performed. – It must be identifiable in a numerical accounting system in order to permit the capture of both budgeted & actual performance information. – A work package is a work center. (Neil 1982) 14
  • 15. Generating WBS and Activities • Other Names of a Work Package: – Estimating account. – Line item. – Cost account. 15
  • 16. Generating WBS and Activities • Uses of WBS: – Identifying scope of work. – Preparing preliminary budget. – Cost estimating. – Scheduling. – Identifying cost & schedule at various levels of details. – Time & cost control. – Identifying individual or departmental responsibilities. 16
  • 17. Generating WBS and Activities • Types of Coding Systems: –Standard code –Project code • Standard Code: is a systematic classification & categorization of all items of work or cost pertaining to a specific type of construction (e.g. Building construction, Heavy construction). 17
  • 18. Generating WBS and Activities • Purpose of Standard Code: – Provides a comprehensive checklist of all items of work that can be found in a specific type of construction. – Provides for uniformity, transfer & comparison of information among projects. • Example: Masterformat was developed through a joint effort of 8 industry & professional associations including: – Construction Specifications Institute (CSI) – Construction Specifications Canada (CSC) 18
  • 19. Generating WBS and Activities • Divisions: 1.General Requirements. 2.Site work. 3.Concrete. 4.Masonry. 5.Metals. 6.Woods & Plastics. 7.Thermal & Moisture Protection. 9. Finishes. 10.Specialties. 11.Equipment 12.Furnishings. 13.Special Construction. 14.Conveying Systems. 15.Mechanical. 16.Electrical. 8.Doors & Windows.
  • 20. Generating WBS and Activities • Project Code: is a systematic classification & categorization of all items of work or cost pertaining to a specific project. 20
  • 21. Estimating Activity Duration • Rules for Estimating Activity Duration: – Evaluate activities one at a time. – Assume normal level of resources. – Assume normal working hours (No Overtime). – Use consistent time units. – Put project completion date OUT OF MIND. • Activity Duration is often estimated based on: – Experience and judgment. – Quantity of work and crew daily output Quantity of work Activity Duration = Crew daily output 21
  • 22. Estimating Activity Duration • Factors Affecting Activity Duration: –Weather. –Learning Curve. –Overtime. –Space Congestion. –Design Changes & Rework. 22
  • 23. Estimating Activity Duration • Learning Curve: based on the fact that skill & productivity in performing tasks improve with experience and practice. • Example: The tenth activity takes less time than the first. 23
  • 25. Determining Job Logic • Construction Planning Restraints: – Physical: (formwork must precede pouring concrete). – Resource: • Availability of • Availability of • Availability of • Availability of material. equipment. labor. money.
  • 26. – Safety. – Environment: • Weather. • Economical. • Social. • Political. Determ ining Job Logic • For each activity answer 3 questions: – Which activities precede this activity?
  • 27. – Which activities follow this activity? – Which activities are concurrent with this activity?