(1) The document is a question paper from April 2014 for the subject BPR (Business Process Reengineering). It contains 7 questions to be answered in 3 hours for a total of 100 marks. (2) Question 1 is compulsory and contains 4 sub-questions related to defining and explaining BPR, GAP analysis, the breakthrough reengineering model, and the steps to implement BPR in an organization. (3) The other questions cover topics like project planning templates, the role of consultants in BPR, HR modules in ERP, quality management, defining project scope, quality plans, business cases, materials requirement planning, BPR methodologies, and difficulties/risks of BPR.
1. B P R
Q u e s t i o n P a p e r ( A p r i l – 2 0 1 4 ) [ O l d S y l l a b u s ]
1 | Page
M u m b a i B . S c . I T S t u d y
F a c e b o o k | T w i t t e r | I n s t a g r a m | G o o g l e + | Y o u T u b e
– Kamal T.
Time: 3 Hours Total Marks: 100
N.B.: (1) Question No. 1 is Compulsory.
(2) Attempt any four questions from Q.2 – Q.7.
(3) Make suitable assumption whenever necessary and state the assumption made.
(4) Answers to the same questions must be written together.
(5) Numbers to the right indicate marks.
(6) Draw a neat labelled diagram and give example whenever necessary.
Q.1 Attempt The Following Question: (20 Marks)
(A) Define and explain Business Process Re-Engineering. (5)
(B) Write a short note on GAP Analysis. (5)
(C) Explain the Breakthrough Reengineering Model. (5)
(D) Explain the steps involved in implementation of BPR in organization. (5)
Q.2 Attempt The Following Question: (20 Marks)
(A) Design and explain a template for Project Planning. (10)
(B) Discuss in detail the role of consultants in BPR. (10)
Q.3 Attempt The Following Question: (20 Marks)
(A) Discuss the general activates of HR Module of ERP. (10)
(B) Discuss the role of consultants in BPR. (10)
Q.4 Attempt The Following Question: (20 Marks)
(A) Explain the problem solving sequence for Total Quality Management process
Management.
(10)
(B) How is the budget for a Software Project decided? Explain in detail. (10)
Q.5 Attempt The Following Question: (20 Marks)
(A) Why is it necessary to define project scope? How is it defined? Explain in detail. (10)
(B) Explain the purpose of Project Quality Plan? Explain the quality elements that must
be included in project plan.
(10)
2. B P R
Q u e s t i o n P a p e r ( A p r i l – 2 0 1 4 ) [ O l d S y l l a b u s ]
2 | Page
M u m b a i B . S c . I T S t u d y
F a c e b o o k | T w i t t e r | I n s t a g r a m | G o o g l e + | Y o u T u b e
– Kamal T.
Q.6 Attempt The Following Question: (20 Marks)
(A) Why should business case be written? Who should write the Business Case? When
should it be written? What are the benefits of writing Business Case?
(10)
(B) What is Materials Requirement Planning? Explain in detail. (10)
Q.7 Attempt The Following Question: (20 Marks)
(A) Explain the different methodologies used in BPR. Compare these methodologies. (10)