Description Unit
Earthwork, Stone/Brick Work, Wood Work/Sunshadem3
Surface/Shallow Excavation m2
Pointing, Soling, DPC, Plastering m2
Steel/Iron Work kg/Quintel
Dressing of stone/Half Brick wall/partition wall m2
Painting Work/Distemper/Colour Washing/Jali Workm2
Degree ofAccuracy:WoodWork: 2mm,Weight โ€“ 1 kg, length
โ€“ 1 cm,Area โ€“ 0.01 m2
, Volume โ€“ 0.01 m3
๏‚ท Purpose of Valuation
(a) Taxationโ€“ (10โ€“14%)
(b) Rent fixation โ€“ (6 โ€“10% of total value)
Outgoing: (a) Repairness โ€“ (10 โ€“ 15)% of total Income
(b) Management and collection Charge โ€“ (5 โ€“ 10)% of total
Income.
Scrap Value: It is about 10% of total value. It is the value of
Dismental Material.
Salvage Value: It is value at the end of Utility period without
being this dismental.
Sinking Fund:Annual Installment (I) = C
n
S.i.
I .S
(1 i) 1
๏€ฝ
๏€ซ ๏€ญ
(a) Straight line Method: Assume depreciation by same
amount D=
C S
n
๏€ญ
(b) Constant percentage Method: Also called Balancing
Decline Method. It assume depreciation by same
percentage. D =
1/ n
S
1
C
๏ƒฆ ๏ƒถ
๏€ญ๏ƒง ๏ƒท
๏ƒจ ๏ƒธ
General Overhead Cost Job Overhead Cost
Telephone Bill Salary Delay
Travelling charges Establishment of a New Office
Printing, Post office Compensation
Description Quantity
Work in foundation with Mud Mortar 1.5 m3
Work in foundation with Lime/Cement Mortar 1.25 m2
Work in Superstructure with Lime/Cement Mortar1 m3
Work in Superstructure mud Mortar 1.25 m3
Distemper (1 coat) 35 m2
White Washing/Colour Washing (3 Coat) 70 m2
White Washing/Colour Washing (1 Coat) 200 m2
RCC Work 3m3
Half Brick wall/Partition Wall 5 m2
Lime concrete in Roof 6 m3
Lime Concrete in foundation/Floring 8.5 m3
12 mm Plastering with cement/Lime Mortar 8 m2
Degree of Accuracy (descreasing order)
Detailed > Cube rate > Plinth area > Rough estimate
Area
Plinth area Floor area
Circulation area Carpet area
Vertical circulation area
Horizontal circulation area
(Staircase, Lift) (Varandaha, Passes)
4-5% of P.A. 10-15% of P.A.
๏‚ท F.A. = Plinth area โ€“ area occupiedby walls/Intermediate sup-
ports
๏‚ท Courtyard, play ground, unclosed Balcony, cantilever porch
is not included in plinth area.
๏‚ท CarpetArea:Useable area/Living area
๏‚ท C.A. =Totalfloorarea โ€“ (circulation area + Non-useablearea)
๏‚ท C.A. in residential area (50 โ€“ 65)% and in commercial area
(60 โ€“ 75)%.
Work % of Estimate
Departmental charges (centage charge) (10 โ€“ 15)
Contractor charge 10
Labour Charge 25
Electrification 8
Electric fan 4
Saniatory and Water Supply Charge 8
Contigences Charges (3 โ€“ 5)
Work Charge Establishment (1.5 โ€“ 2)
Tools and Plants (1 โ€“ 1.5)
Security money is about 10% of total contract including Earnest
Money.
Security money and Earnest Money are refundable after some
time Without Any Interest.
๏‚ท Types of Contract: Lumsum, unit price, cost plus contract.
๏‚ท TypesofTrap:P,Q, S(Shape), Intercepting,Gully,Floor(Pur-
pose)
๏‚ท Chief Engineer is theAdministrative Head of Department &
Directly responsible to the govt.
๏‚ท Plastering Work:
(a) Volume is increased by 30% (if thickness 12 mm ) &
20% (if thickness 20 mm) due to uneven surface.
(b) Above calculated vol. is increased by 25% for dry vol.
calculation.
๏‚ท Flooring Work:
(a) Volume is increased by 10% due to uneven surface.
(b) Above calculated vol. is increased by 50% for dry vol.
calculation.
๏‚ท Cement Concrete Work: In C.C. mixture, we divide 1.52 by
sum of ratio of material and multiply it with respective
quantity ratio which will give yourespective quantity.
๏‚ท Brick Work:
(a) Volume is increased by 15% due to frog filling, bonding/
jointing, wastage etc.
(b) Above calculated vol. is increased by 25% for dry vol.
calculation.
Event: It is an instant of time at which some specific milestone
has been achieved. It denotes the start or completion of an activity,
& it is represented by nodes of different shapes like rectangular,
circular, square or oval. An event does not consumes any time or
resource.
CIVIL ENGINEERING
ROCKET CHART
FOR QUICK REVISION
BY
S.SOROUT: 9255624029
Dummy Activity: It is an artificial activity represented by
dashed arrows which neither consumes any time nor resources.
Activity G is dummy activity. Dummies maintain the logic of
network diagram & keeps the numbering system of the network
unique.
Slack: It is associated with an event. It is the difference between
the latest allowable occurrence time & earliest expected
occurrence time of the event. It is the excess time by which
occurence of an event can be delayed without affecting the project
completion time.
Types of Slack -
(a) Positive slack ( S >0 ) - Ts
> TE
(b) Zero slack ( S = 0 ) - Ts
= TE
(c) Negative slack ( S < 0 ) - Ts
< TE
( (
(
(
๏‚ท ij
Activity Name (EST, EFT)
(i) (j)
t x days (LST, LFT)
๏€ฝ
๏‚ท Float is associated with An activity.
1. Total Float: It is the difference between maximum time
available & actual time required for the completion of the
activity.
2. Free Float: It is the amount of time by which an activity
can be delayed without affecting the EST of the succeeding
activity
3. Independent Float: It is the excess of minimum available
time over the required activity duration.
4. Interfering Float: It is the difference of total float & free
float of an activity. It is also equal to the slack of head event of
an activity.
Types of float -
(a) Negative total float (FT
< 0 ) - If maximum available time for an
activity is less than the activity time, then total float will be a
negative value. Such activities are called super-critical
activities.They need extra deployment of resources.
(b) Total float zero (FT
= 0 ) - If maximum available time for an
activity is equal to the activity time, then total float will be
zero. Such activities are called critical activities.In them, no
freedom of delay is allowed.
(c) Positive total float (FT
> 0 ) - If maximum available time for an
activity is more than the activity time, then total float will be
a positive value. Such activities are called sub-critical
activities.They demand normal attention but allowing them
some freedom of action.
PERT absorbs uncertainties into the time estimates for activity
& project duration. Following are 3 time estimate -
(a) Optimistic Time Estimate (to
) - It is the minimum time
required for an activity if everything occurs perfectly right without
any problems or adverse conditions developed during completetion
of the activity.
(b) Pessimistic Time Estimate (tp
) - It is the maximum time
required for an activity if everything goes wrong & abnormal
conditions prevail. It does not include possible effects of major
catastrophes like as earthquakes, flood, fire etc.
(c) Most Likely Time Estimate (tm
) - It lie in between pessimistic
& optimistic time estimate. It is time required to complete the
activity if normal conditions prevail.
๏‚ท Mean time ๏€จ ๏€ฉ
x :
1 2 3 n
x x x ...... x
x
n
๏€ซ ๏€ซ
๏€ฝ =
x
n
๏“
๏‚ท Deviation (๏ค): x x
๏ค ๏€ฝ ๏€ญ
๏‚ท Variance :
๏€จ ๏€ฉ2
2
2 x x
n n
๏“ ๏€ญ
๏“๏ค
๏ณ ๏€ฝ ๏€ฝ
PERT CPM
1.Probabilistic approach 1. Deterministic approach
2.Three time estimate 2. Single time estimate
3.Event oriented 3. Activity oriented.
4.Cost is proportional to time 4. Cost model is developed
5.๏ข-distribution 5. Normal distribution
6.Concept of slack 6. Concept of float
7.Critical path by joining 7. Critical path by joining
critical events critical activities.
Crashing: The process of reduction of the total project duration
along the longest path (time wise) of the network (along the critical
path to obtain the optimum project cost & optimum duration.)
Updating : It is the process of reviewing the progress of project,
execution & redrafting the network according to latest
requirements
Cost slope =
c n
n c
C C
t t
๏€ญ
๏€ญ
Cost
Crash
time
Optimum
time
Normal
time
Overheads
Outage cost
Indirect cost
Direct cost
Total cost
Resource Smoothing: ยทIn this, the total project duration is not
changed but the activities having float are rescheduled in such a
way that a uniform demand for the resources is achieved. In it, the
resources are considered to be limited & the critical path of the
project remains unchanged.
Resource Levelling: In it, the activities are so rescheduled in such
a way that maximum or peak demand of the resource does not
exceed the availability of resources. In it, the resource are
unlimited & the critical path may get changed (so project
duration may also get changed). Uniform demand of resources
is achieved.
CIVIL BOOSTER - Dnt trust us, Just Check itโ€™s content &
ThenGoforit-(LEAVETHEREST,GETTHEBEST). Available
on amazon flipkart. Zero Error bookwithBEST Content

More Related Content

Similar to ESTIMATE COSTING.pdf

Critical Path Method
Critical Path MethodCritical Path Method
Critical Path MethodMr. Ramesh Nayaka
ย 
Project management
Project managementProject management
Project managementKwesi Kissiedu
ย 
Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )Akaresh Jose Kaviyil JY
ย 
Chapter 12(cpm pert)
Chapter 12(cpm pert)Chapter 12(cpm pert)
Chapter 12(cpm pert)Debanjan15
ย 
Pert,cpm, resource allocation and gert
Pert,cpm, resource allocation and gertPert,cpm, resource allocation and gert
Pert,cpm, resource allocation and gertRaj J Das
ย 
Pert, cpm & gert
Pert, cpm & gertPert, cpm & gert
Pert, cpm & gertPranav Krishna
ย 
Chapter-2 Solved examples.ppt
Chapter-2 Solved examples.pptChapter-2 Solved examples.ppt
Chapter-2 Solved examples.pptBetshaTizazu2
ย 
Operation research's CPM techniques
Operation research's CPM techniques Operation research's CPM techniques
Operation research's CPM techniques Mohammad Younus
ย 
construction resource optimization 1.pptx
construction resource optimization 1.pptxconstruction resource optimization 1.pptx
construction resource optimization 1.pptxkimkov119
ย 
Critical path method
Critical path methodCritical path method
Critical path methodDushyant Nasit
ย 
criticalpathmethod-151022164503-lva1-app6892.pdf
criticalpathmethod-151022164503-lva1-app6892.pdfcriticalpathmethod-151022164503-lva1-app6892.pdf
criticalpathmethod-151022164503-lva1-app6892.pdfSalahudin Babar
ย 
Program Evaluation and Review Technique
Program Evaluation and Review TechniqueProgram Evaluation and Review Technique
Program Evaluation and Review TechniqueRaymund Sanchez
ย 
Pert Analysis
Pert AnalysisPert Analysis
Pert AnalysisKaizer Dave
ย 
P E R T
P E R TP E R T
P E R TVikas Verma
ย 
Construction Management
Construction ManagementConstruction Management
Construction ManagementBENTHOMASOOMMEN
ย 

Similar to ESTIMATE COSTING.pdf (20)

Critical Path Method
Critical Path MethodCritical Path Method
Critical Path Method
ย 
Project management
Project managementProject management
Project management
ย 
Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )
ย 
Chapter 12(cpm pert)
Chapter 12(cpm pert)Chapter 12(cpm pert)
Chapter 12(cpm pert)
ย 
Pert,cpm, resource allocation and gert
Pert,cpm, resource allocation and gertPert,cpm, resource allocation and gert
Pert,cpm, resource allocation and gert
ย 
Pert, cpm & gert
Pert, cpm & gertPert, cpm & gert
Pert, cpm & gert
ย 
Ch 06 - CPM PERT (1).pptx
Ch 06 - CPM  PERT (1).pptxCh 06 - CPM  PERT (1).pptx
Ch 06 - CPM PERT (1).pptx
ย 
Cpmprt
CpmprtCpmprt
Cpmprt
ย 
PERT-CPM PPT.pptx
PERT-CPM PPT.pptxPERT-CPM PPT.pptx
PERT-CPM PPT.pptx
ย 
Chapter-2 Solved examples.ppt
Chapter-2 Solved examples.pptChapter-2 Solved examples.ppt
Chapter-2 Solved examples.ppt
ย 
PERT.pptx
PERT.pptxPERT.pptx
PERT.pptx
ย 
Operation research's CPM techniques
Operation research's CPM techniques Operation research's CPM techniques
Operation research's CPM techniques
ย 
construction resource optimization 1.pptx
construction resource optimization 1.pptxconstruction resource optimization 1.pptx
construction resource optimization 1.pptx
ย 
Critical path method
Critical path methodCritical path method
Critical path method
ย 
criticalpathmethod-151022164503-lva1-app6892.pdf
criticalpathmethod-151022164503-lva1-app6892.pdfcriticalpathmethod-151022164503-lva1-app6892.pdf
criticalpathmethod-151022164503-lva1-app6892.pdf
ย 
Program Evaluation and Review Technique
Program Evaluation and Review TechniqueProgram Evaluation and Review Technique
Program Evaluation and Review Technique
ย 
Pert Analysis
Pert AnalysisPert Analysis
Pert Analysis
ย 
P E R T
P E R TP E R T
P E R T
ย 
Construction Management
Construction ManagementConstruction Management
Construction Management
ย 
CPM AND PERT
CPM AND PERTCPM AND PERT
CPM AND PERT
ย 

Recently uploaded

Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
ย 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
ย 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
ย 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
ย 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
ย 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
ย 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
ย 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
ย 
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night StandCall Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Standamitlee9823
ย 
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...9953056974 Low Rate Call Girls In Saket, Delhi NCR
ย 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
ย 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
ย 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
ย 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
ย 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
ย 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
ย 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
ย 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
ย 

Recently uploaded (20)

Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
ย 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
ย 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
ย 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ย 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
ย 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
ย 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
ย 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
ย 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
ย 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
ย 
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night StandCall Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
ย 
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
ย 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
ย 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
ย 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
ย 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
ย 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
ย 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
ย 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
ย 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
ย 

ESTIMATE COSTING.pdf

  • 1. Description Unit Earthwork, Stone/Brick Work, Wood Work/Sunshadem3 Surface/Shallow Excavation m2 Pointing, Soling, DPC, Plastering m2 Steel/Iron Work kg/Quintel Dressing of stone/Half Brick wall/partition wall m2 Painting Work/Distemper/Colour Washing/Jali Workm2 Degree ofAccuracy:WoodWork: 2mm,Weight โ€“ 1 kg, length โ€“ 1 cm,Area โ€“ 0.01 m2 , Volume โ€“ 0.01 m3 ๏‚ท Purpose of Valuation (a) Taxationโ€“ (10โ€“14%) (b) Rent fixation โ€“ (6 โ€“10% of total value) Outgoing: (a) Repairness โ€“ (10 โ€“ 15)% of total Income (b) Management and collection Charge โ€“ (5 โ€“ 10)% of total Income. Scrap Value: It is about 10% of total value. It is the value of Dismental Material. Salvage Value: It is value at the end of Utility period without being this dismental. Sinking Fund:Annual Installment (I) = C n S.i. I .S (1 i) 1 ๏€ฝ ๏€ซ ๏€ญ (a) Straight line Method: Assume depreciation by same amount D= C S n ๏€ญ (b) Constant percentage Method: Also called Balancing Decline Method. It assume depreciation by same percentage. D = 1/ n S 1 C ๏ƒฆ ๏ƒถ ๏€ญ๏ƒง ๏ƒท ๏ƒจ ๏ƒธ General Overhead Cost Job Overhead Cost Telephone Bill Salary Delay Travelling charges Establishment of a New Office Printing, Post office Compensation Description Quantity Work in foundation with Mud Mortar 1.5 m3 Work in foundation with Lime/Cement Mortar 1.25 m2 Work in Superstructure with Lime/Cement Mortar1 m3 Work in Superstructure mud Mortar 1.25 m3 Distemper (1 coat) 35 m2 White Washing/Colour Washing (3 Coat) 70 m2 White Washing/Colour Washing (1 Coat) 200 m2 RCC Work 3m3 Half Brick wall/Partition Wall 5 m2 Lime concrete in Roof 6 m3 Lime Concrete in foundation/Floring 8.5 m3 12 mm Plastering with cement/Lime Mortar 8 m2 Degree of Accuracy (descreasing order) Detailed > Cube rate > Plinth area > Rough estimate Area Plinth area Floor area Circulation area Carpet area Vertical circulation area Horizontal circulation area (Staircase, Lift) (Varandaha, Passes) 4-5% of P.A. 10-15% of P.A. ๏‚ท F.A. = Plinth area โ€“ area occupiedby walls/Intermediate sup- ports ๏‚ท Courtyard, play ground, unclosed Balcony, cantilever porch is not included in plinth area. ๏‚ท CarpetArea:Useable area/Living area ๏‚ท C.A. =Totalfloorarea โ€“ (circulation area + Non-useablearea) ๏‚ท C.A. in residential area (50 โ€“ 65)% and in commercial area (60 โ€“ 75)%. Work % of Estimate Departmental charges (centage charge) (10 โ€“ 15) Contractor charge 10 Labour Charge 25 Electrification 8 Electric fan 4 Saniatory and Water Supply Charge 8 Contigences Charges (3 โ€“ 5) Work Charge Establishment (1.5 โ€“ 2) Tools and Plants (1 โ€“ 1.5) Security money is about 10% of total contract including Earnest Money. Security money and Earnest Money are refundable after some time Without Any Interest. ๏‚ท Types of Contract: Lumsum, unit price, cost plus contract. ๏‚ท TypesofTrap:P,Q, S(Shape), Intercepting,Gully,Floor(Pur- pose) ๏‚ท Chief Engineer is theAdministrative Head of Department & Directly responsible to the govt. ๏‚ท Plastering Work: (a) Volume is increased by 30% (if thickness 12 mm ) & 20% (if thickness 20 mm) due to uneven surface. (b) Above calculated vol. is increased by 25% for dry vol. calculation. ๏‚ท Flooring Work: (a) Volume is increased by 10% due to uneven surface. (b) Above calculated vol. is increased by 50% for dry vol. calculation. ๏‚ท Cement Concrete Work: In C.C. mixture, we divide 1.52 by sum of ratio of material and multiply it with respective quantity ratio which will give yourespective quantity. ๏‚ท Brick Work: (a) Volume is increased by 15% due to frog filling, bonding/ jointing, wastage etc. (b) Above calculated vol. is increased by 25% for dry vol. calculation. Event: It is an instant of time at which some specific milestone has been achieved. It denotes the start or completion of an activity, & it is represented by nodes of different shapes like rectangular, circular, square or oval. An event does not consumes any time or resource. CIVIL ENGINEERING ROCKET CHART FOR QUICK REVISION BY S.SOROUT: 9255624029 Dummy Activity: It is an artificial activity represented by dashed arrows which neither consumes any time nor resources. Activity G is dummy activity. Dummies maintain the logic of network diagram & keeps the numbering system of the network unique. Slack: It is associated with an event. It is the difference between the latest allowable occurrence time & earliest expected occurrence time of the event. It is the excess time by which occurence of an event can be delayed without affecting the project completion time. Types of Slack - (a) Positive slack ( S >0 ) - Ts > TE (b) Zero slack ( S = 0 ) - Ts = TE (c) Negative slack ( S < 0 ) - Ts < TE ( ( ( ( ๏‚ท ij Activity Name (EST, EFT) (i) (j) t x days (LST, LFT) ๏€ฝ ๏‚ท Float is associated with An activity. 1. Total Float: It is the difference between maximum time available & actual time required for the completion of the activity. 2. Free Float: It is the amount of time by which an activity can be delayed without affecting the EST of the succeeding activity 3. Independent Float: It is the excess of minimum available time over the required activity duration. 4. Interfering Float: It is the difference of total float & free float of an activity. It is also equal to the slack of head event of an activity. Types of float - (a) Negative total float (FT < 0 ) - If maximum available time for an activity is less than the activity time, then total float will be a negative value. Such activities are called super-critical activities.They need extra deployment of resources. (b) Total float zero (FT = 0 ) - If maximum available time for an activity is equal to the activity time, then total float will be zero. Such activities are called critical activities.In them, no freedom of delay is allowed. (c) Positive total float (FT > 0 ) - If maximum available time for an activity is more than the activity time, then total float will be a positive value. Such activities are called sub-critical activities.They demand normal attention but allowing them some freedom of action. PERT absorbs uncertainties into the time estimates for activity & project duration. Following are 3 time estimate - (a) Optimistic Time Estimate (to ) - It is the minimum time required for an activity if everything occurs perfectly right without any problems or adverse conditions developed during completetion of the activity. (b) Pessimistic Time Estimate (tp ) - It is the maximum time required for an activity if everything goes wrong & abnormal conditions prevail. It does not include possible effects of major catastrophes like as earthquakes, flood, fire etc. (c) Most Likely Time Estimate (tm ) - It lie in between pessimistic & optimistic time estimate. It is time required to complete the activity if normal conditions prevail. ๏‚ท Mean time ๏€จ ๏€ฉ x : 1 2 3 n x x x ...... x x n ๏€ซ ๏€ซ ๏€ฝ = x n ๏“ ๏‚ท Deviation (๏ค): x x ๏ค ๏€ฝ ๏€ญ ๏‚ท Variance : ๏€จ ๏€ฉ2 2 2 x x n n ๏“ ๏€ญ ๏“๏ค ๏ณ ๏€ฝ ๏€ฝ PERT CPM 1.Probabilistic approach 1. Deterministic approach 2.Three time estimate 2. Single time estimate 3.Event oriented 3. Activity oriented. 4.Cost is proportional to time 4. Cost model is developed 5.๏ข-distribution 5. Normal distribution 6.Concept of slack 6. Concept of float 7.Critical path by joining 7. Critical path by joining critical events critical activities. Crashing: The process of reduction of the total project duration along the longest path (time wise) of the network (along the critical path to obtain the optimum project cost & optimum duration.) Updating : It is the process of reviewing the progress of project, execution & redrafting the network according to latest requirements Cost slope = c n n c C C t t ๏€ญ ๏€ญ Cost Crash time Optimum time Normal time Overheads Outage cost Indirect cost Direct cost Total cost Resource Smoothing: ยทIn this, the total project duration is not changed but the activities having float are rescheduled in such a way that a uniform demand for the resources is achieved. In it, the resources are considered to be limited & the critical path of the project remains unchanged. Resource Levelling: In it, the activities are so rescheduled in such a way that maximum or peak demand of the resource does not exceed the availability of resources. In it, the resource are unlimited & the critical path may get changed (so project duration may also get changed). Uniform demand of resources is achieved. CIVIL BOOSTER - Dnt trust us, Just Check itโ€™s content & ThenGoforit-(LEAVETHEREST,GETTHEBEST). Available on amazon flipkart. Zero Error bookwithBEST Content